Selmon West Extension
Selmonextension.com
SELMON
EXTENSION
SELMONEXTENSION
SELMONEXTENSION
By the Numbers
#ConnectingCommunites
South Selmon Safety Project
Tampa-xway.com.com
BEFORE
CURRENT
RENDERING
#ConnectingCommunites
THEA PD&E Studies
Selmonstudies.com
SOUTH SELMON
PD&E
South
Selmon
PD&E
Project
Location
Schedule
Continuous
OutreachContinuous community
outreach is integrated
into every step of the
project to ensure
meaningful participation
in the process.
SOUTH
SELMON PD&E
Upcoming Outreach
September 2020
Alternatives Webinar www.selmonstudies.com
Fall 2020
Information SessionTBD
SOUTH
SELMON PD&E
WHITING STREETPD&E STUDY
Whiting Street PD&E Project Location
1 PD&EStudy
Schedule
WHITING STREETPD&ESTUDY
Selmon East
PD&EStudy
Selmon East PD&E Project Location
1 PD&EStudy
Schedule
Selmon East
PD&E Study
Nebraska AvenuePD&E STUDY
Nebraska Avenue PD&E Project Location
1 PD&EStudy
Nebraska
Avenue Study
limits shown
in yellow
Twiggs Street
Design Build
project limits
shown in
green
#ConnectingCommunites
THEA Community
Enhancement Projects
Tampa-xway.com
UNDERPASS
IMPROVEMENT
Community Projects
MORRISON GATEWAY PROJECT
CURRENT VIEW
SELMON
GREENWAY
ENHANCEMENTS
SELMON GREENWAY UPDATE
Next Phase of Enhancements –Currently in design, Construction programmed for FY22
Jefferson Triangle Lot – to be redeveloped into pocket park as part of Whiting/Ramp project
Remaining Enhancements -Design programmed to begin FY22
Adamo Section Enhancements –to be determined based on area plans and development