CURO NORTH SQUARE

139
AS PER CHECK LIST of SEIAA, PUNJAB FOR BUILDING, CONSTRUCTION, TOWNSHIP AND AREA DEVELOPMENT PROJECTS “CURO NORTH SQUARE” AT VILLAGE MULLANPUR GARIBDASS, DISTT. SAS NAGAR (MOHALI), PUNJAB BY M/S. CURO INDIA PVT. LTD. Sr. No. Description Reply 1. Properly filled Form 1 & 1A Form I & IA are enclosed with the application. 2. (a) In case(s) where land has already been purchased/acquired: Proof of ownership of land (b) In case where land is yet to be purchased/acquired: Proof of ownership of land (existing owner) such as copy of latest Jamabandi (not more than one month old) and credible document showing status of land acquisition w.r.t. project site as prescribed in OM dated 07.10.2014 issued by MoEF) Change of land use is enclosed as Annexure-1. Land Documents are enclosed as Annexure-2. 3. Copy of Master Plan of the area showing land use pattern of the proposed site/certificate from Competent Authority intimating land use pattern of the project site as per proposals of Master Plan of the area. Project is cover under Mullanpur Planning area; copy showing project site is enclosed as Drawing-1. 4. Layout plan duly approved by the Competent Authority / Conceptual plan of the project. Approved Layout Plan of the project is enclosed as Drawing-4. 5. Topographical map of the area showing Contour Plan. In case of Area Development Projects, the Contour Plan should reflect the true existing physical features of the site and may be prepared by the project proponent w.r.t. some permanent reference marks. Toposheet showing project site is enclosed with the application. Contour Plan is enclosed as Drawing-8. 6. Status of construction, if any, along with photographs from all the four sides. No construction has been done at site; site photographs are enclosed as Annexure-3. 7. 500 meter radius map of the area from periphery of project site clearly indicating the various industries (specifically red category industries) and structures lying in the area. Location map along with Google image showing project site & surroundings within 500 m are enclosed as Drawing-2 & Drawing-3 respectively. 8. Location plan showing the exact location of the project site w.r.t. some permanent / important features of the area and site plan of the project showing the following: i) Location of STP ii) Solid waste storage area iii) Green belt iv) Parking space v) RWH and water recharge pits vi) Fire fighting equipment layout vii) First aid room viii) Location of Tubewells Location plan showing the features such as: Location of Solid waste segregation area, Green belt, surface Parking, RWH and water recharge pits, First aid room, Tubewells, ESS (i.e. DG Sets and Transformer) is enclosed as Drawing-5. Fire hydrants are marked in Combined Services Plan which is enclosed as Drawing-6.

Transcript of CURO NORTH SQUARE

Page 1: CURO NORTH SQUARE

AS PER CHECK LIST of SEIAA, PUNJAB FOR BUILDING, CONSTRUCTION,TOWNSHIP AND AREA DEVELOPMENT PROJECTS

“CURO NORTH SQUARE” AT VILLAGE MULLANPUR GARIBDASS, DISTT. SAS

NAGAR (MOHALI), PUNJAB BY M/S. CURO INDIA PVT. LTD.

Sr.No.

Description Reply

1. Properly filled Form 1 & 1A Form I & IA are enclosed with theapplication.

2. (a) In case(s) where land has already beenpurchased/acquired:

Proof of ownership of land(b) In case where land is yet to bepurchased/acquired:Proof of ownership of land (existing owner)such as copy of latest Jamabandi (not morethan one month old) and credible documentshowing status of land acquisition w.r.t.project site as prescribed in OM dated07.10.2014 issued by MoEF)

Change of land use is enclosed asAnnexure-1.

Land Documents are enclosed asAnnexure-2.

3. Copy of Master Plan of the area showing landuse pattern of the proposed site/certificatefrom Competent Authority intimating land usepattern of the project site as per proposals ofMaster Plan of the area.

Project is cover under Mullanpur Planningarea; copy showing project site is enclosedas Drawing-1.

4. Layout plan duly approved by the CompetentAuthority / Conceptual plan of the project.

Approved Layout Plan of the project isenclosed as Drawing-4.

5. Topographical map of the area showingContour Plan. In case of Area DevelopmentProjects, the Contour Plan should reflect thetrue existing physical features of the site andmay be prepared by the project proponentw.r.t. some permanent reference marks.

Toposheet showing project site is enclosedwith the application. Contour Plan isenclosed as Drawing-8.

6. Status of construction, if any, along withphotographs from all the four sides.

No construction has been done at site; sitephotographs are enclosed as Annexure-3.

7. 500 meter radius map of the area fromperiphery of project site clearly indicating thevarious industries (specifically red categoryindustries) and structures lying in the area.

Location map along with Google imageshowing project site & surroundings within500 m are enclosed as Drawing-2 &Drawing-3 respectively.

8. Location plan showing the exact location ofthe project site w.r.t. some permanent /important features of the area and site plan ofthe project showing the following:i) Location of STPii) Solid waste storage areaiii) Green beltiv) Parking spacev) RWH and water recharge pitsvi) Fire fighting equipment layoutvii) First aid roomviii) Location of Tubewells

Location plan showing the features such as:Location of Solid waste segregation area,Green belt, surface Parking, RWH andwater recharge pits, First aid room,Tubewells, ESS (i.e. DG Sets andTransformer) is enclosed as Drawing-5.Fire hydrants are marked in CombinedServices Plan which is enclosed asDrawing-6.

Page 2: CURO NORTH SQUARE

ix) DG Sets and Transformersx) Any other utilities

9. Permission of Competent Authority for;a) Water and Sewerage connectionA letter from concerned Local Body /Authority giving details about existing statusof sewer connectivity and availability ofwater supply in the area and acceptance ofLocal Body for taking the quantity of sewageto be generated by the proposed project andproviding the water supply. Existing positionof public sewer and water supply line dulymarked on the layout map / plan.b) Collection of Solid waste

NOC from CGWA regarding water supplyis enclosed as Annexure-8A.

NOC from GMADA regarding watersupply, sewerage & solid waste disposal isenclosed as Annexure-8B.

10. Water balance chart for summer, rainy andwinter seasons indicating critical requirements

Water Balance Diagrams for differentseasons i.e. Summer, Winter & Monsoonseason are shown in Conceptual Plan PageNos. 5 to 7 as Figure No. 1 to 3respectively.

11. Availability of adequate land for use oftreated sewage and plantation.

Wastewater generated from the project willbe treated in STP. Treated water will bereused for flushing, horticulture and HVACcooling and remaining will be discharged toGMADA sewer.

12. Analysis reports of ambient air, ground waterand noise levels from NABL/MoEFAccredited laboratories as per detail below:

(i) The field data sheets as prescribed bySEIAA, Punjab which are available on theofficial website of SEIAA, Punjab along withexact location of sampling / monitoring pointmarked on the layout map should be filled atthe time of sample collection/monitoring bythe Lab and should be attached with the water,air, noise & soil monitoring reports.

(ii) Water, air, noise & soil monitoring reportsmore than 6 months old or prior to date ofsigning of consent letters/agreement with theland owner shall not be accepted w.e.f. June,1st 2015 onwards.

(iii) Atleast one groundwater sample fromthe shallow / first aquifer and in casegroundwater is to be abstracted for drinkingpurposes then atleast one groundwater samplefrom the said aquifer should be monitored andreports be attached accordingly.

Test reports along with the field data sheetsare enclosed as Annexure-10A & 10Brespectively.

Layout map showing the location ofsampling is enclosed as Drawing-9.

Email stating the intimation for monitoringis enclosed as Annexure-10C.

13. Quantification of energy saved and renewableenergy devices used.

Quantification of energy saved is enclosedas Annexure-11.

14. Drawing showing plumbing systems for useof fresh, treated and hot water

Plumbing plan showing fresh water line,sewer line & treated line is shown inCombined Services Plan which is enclosedas Drawing-6.

Page 3: CURO NORTH SQUARE

15. Construction schedule (PERT/CPM Chart) PERT Chart is enclosed as Annexure 7.

16. Undertaking(s) for;a) Constitution of Environment MonitoringCell.b) Use of ready mix concrete or use of fly ashduring construction.c) To provide Fire Fighting System.d) To provide wind breaking curtains andwater sprinkling system to minimize dustemissions during construction phase.e) To provide adequate safety measures forthe construction workers during theconstruction phase.

Affidavit for the same is enclosed asAnnexure 12.

17. Environmental Management Planindicating the following:a) All mitigation measures for each item-wise activity to be undertaken during theconstruction, operation and the entire lifecycle to minimize adverse environmentalimpacts as a result of the activities of theproject.b) Compliance of various environmentalregulations.c) Steps to be taken in case of emergencysuch as accidents at the site including fire.d) For how long period the project proponentwill be responsible for implementation ofEMP and the name of the person(s)responsible for implementation of EMP.e) Capital & recurring cost for the EMP peryear and the details of funds for the same.f) Name of the individual persons /organization, who will be responsible forimplementation of EMP after the lapse of theperiod for which the project proponent isresponsible.

Environment Management Plan mentioningthe Mitigation measures along withcompliance of various regulations isenclosed with the application.

Mr. Abhay Garg of M/s. Curo India Pvt.Ltd. will be responsible for implementationof EMP for 5 years and after that thewelfare society of "Curo North Square" willbe responsible for the same.

Capital & recurring cost for the EMP peryear is given in Table 1 Page No. 5 ofEMP.

18. Corporate Social Responsibility indicatingvarious activities to be undertaken,provisions of funds for the same, the periodfor which the same is to be implemented andthe person(s) responsible for theimplementation of the same.

Corporate Social Responsibility mentioningvarious activities are mentioned in Page No.5 & 6 of EMP.

19. Traffic Circulation System and connectivitywith a view to ensure adequate parking,conflict free movements, Energy efficientPublic Transport.

Site Plan showing surface parking andbasement plan showing parking is enclosedas Drawing 5 & 7 respectively.

20. Disaster/Risk Assessment and ManagementPlan

Risk Assessment is enclosed with theapplication.

21. Copy of Memorandum of Article &Association / partnership deed / undertakingof sole proprietorship / list of Directors andnames of other persons responsible formanaging the day-to-day affairs of the

Copy of Memorandum of Article &Association is enclosed as Annexure 13.

Page 4: CURO NORTH SQUARE

project.22. In case of expansion projects, compliance

report of earlier granted environmentalclearance conditions verified by NorthernRegional Office of Ministry of Environment,Forests & Climate Change, Chandigarh.

This point is not applicable as this is thefresh application for the EnvironmentalClearance.

23. Copy of presentation to be made before theSEAC at the time of appraisal in PDF formathaving size less than 25 MB.

Agreed

24. Soft copy of all documents in compliance toMinistry of Environment & Forests, NewDelhi Office Memorandum No. J-11-013/19/2012-IA-II(I) dated 31st May, 2012having size less than 25 MB.

Agreed.

25 For expansion projects:i. All the columns in the application formmay be got filled in three parallel columnsi.e. Existing, Proposed and Total.ii. In case of increase in no. of storeys,Structural Safety/ Stability Certificate may berequired from the Approved Engineer.iii. The existing building plan may be gotsuper imposed with the proposed buildingplan and be marked in different colors.iv. Specify the adequacy of internal watersupply system, sewer line and STP for theproposed expansion/revision.

This point is not applicable as this is thefresh application for the EnvironmentalClearance.

Page 5: CURO NORTH SQUARE
a
Typewritten text
ANNEXURE-1
Page 6: CURO NORTH SQUARE
Page 7: CURO NORTH SQUARE
Page 8: CURO NORTH SQUARE
a
Typewritten text
ANNEXURE-2
Page 9: CURO NORTH SQUARE
Page 10: CURO NORTH SQUARE
Page 11: CURO NORTH SQUARE
Page 12: CURO NORTH SQUARE
Page 13: CURO NORTH SQUARE
Page 14: CURO NORTH SQUARE
Page 15: CURO NORTH SQUARE
Page 16: CURO NORTH SQUARE
Page 17: CURO NORTH SQUARE
Page 18: CURO NORTH SQUARE
Page 19: CURO NORTH SQUARE
Page 20: CURO NORTH SQUARE
Page 21: CURO NORTH SQUARE
Page 22: CURO NORTH SQUARE
Page 23: CURO NORTH SQUARE
Page 24: CURO NORTH SQUARE
Page 25: CURO NORTH SQUARE
Page 26: CURO NORTH SQUARE

SITE PHOTOGRAPHS

a
Typewritten text
ANNEXURE-3
Page 27: CURO NORTH SQUARE
a
Typewritten text
ANNEXURE-4
Page 28: CURO NORTH SQUARE

MAIL ACKNOWLEDGEMENT

From: [email protected] [mailto:[email protected]]Sent: 23 April 2016 12:58To: [email protected]: [email protected]: Email Alert From System Administrator of Online Submission and Monitoring of WildlifeClearances Proposal(OSMWCP) portal

This is to acknowledge that a proposal seeking prior approval of Central Government under theForest (Conservation) Act 1980 as per the details given below has been successfully uploadedon the portal of the Ministry of Environment, Forests and Climate Change Government ofIndia.

1. Proposal No. : FP/PB/Others/682/2016

2. Proposal Name : Curo North Square

3. Category of the Proposal : Others

4. Date of Submission : 22/04/2016

5. Name of the Applicant with Contact Details

Name : A K

Mobile No. : 9876210555

State : Chandigarh

District : Chandigarh

Pincode : 160009

6. Protected Area (ha.) : 0

The proposal will be examined by Wild Life Warden, Forest (Conservation) Act, 1980 toassess its completeness.

(System Administrator)

*** This is a system generated email, please do not reply. ***

a
Typewritten text
ANNEXURE-5A
Page 29: CURO NORTH SQUARE

SCREENSHOT

Page 30: CURO NORTH SQUARE

4/23/2016 Wild Life Report

http://forestsclearance.nic.in/Admin/UserAgency_Report_W.aspx?pid=FP/PB/Others/682/2016 1/6

General DetailsA.

Project DetailsA­1.

 

(i). Forest Clearance Required?: No

 

(ii). Proposal No. : FP/PB/Others/682/2016

 

(iii). Name of Project: Curo North Square

 

(iv). Short narrative of the Project : “Curo North Square” at Village Mullanpur Garibdass, Distt. SASNagar (Mohali), Punjab by M/s. Curo India Pvt. Ltd.

 

(v). State : Punjab

 

(vi). Category of the Project : Others

 

(vii). Shape of project land : Linear

 

(viii). Distance of the project from the boundary of the Protected Area (in km.): 5.4

 

(ix). Estimated cost of the Project(Rupees in lacs) : 0

 

(x). Total period for which clearance is required (in year): 7

 

(xi). Total Project Area(in ha.): 4.1197

 

(xii). Project Area under Protected Area (in ha.): 0

 

(xiii). Project Area under Non­Protected Area (in ha.): 4.12

Details of User AgencyA­2.

Wild Life Report

Form for seeking recommendation of Standing Committee of NBWL/SBWL.

PART ­ I(To be filled up by User Agency)

Page 31: CURO NORTH SQUARE

4/23/2016 Wild Life Report

http://forestsclearance.nic.in/Admin/UserAgency_Report_W.aspx?pid=FP/PB/Others/682/2016 2/6

 

(i). Name : CURO INDIA PVT LTD

 

(ii). Address1 : SCO No. 50­51, Ist Floor, Madhya Marg, Sector­9D, Chandigarh

 

(iii). Address2 : NIL

 

(iv). State : Chandigarh

 

(v). District : Chandigarh

 

(vi). Pin : 160009

 

(vii). Landmark : NIL

 

(viii). Email address : [email protected]

 

(ix). Landline Telephone No. : 5060800

 

(x). Fax No. : NIL

 

(xi). Mobile No. : 9876210555

 

(xii). Website (if any) : NIL

 

(xiii). Legal status of User Agency : Private

Details of Person Making ApplicationA­3.

 

(i). First Name: A K

 

(ii). Middle Name: NIL

 

(iii). Last Name: Sharma

 

(iv). Gender: Male

 

(v). Designation: Authorized Signatory

Page 32: CURO NORTH SQUARE

4/23/2016 Wild Life Report

http://forestsclearance.nic.in/Admin/UserAgency_Report_W.aspx?pid=FP/PB/Others/682/2016 3/6

 

(vi). Address 1: SCO No. 50­51, Ist Floor, Madhya Marg, Sector­9D, Chandigarh

 

(vii). Address 2: NIL

 

(viii). State: Chandigarh

 

(ix). District: Chandigarh

 

(x). Pin: 160009

 

(xi). Landmark: NIL

 

(xii). Email Address: [email protected]

 

(xiii). Landline Telephone No.: 5060800

 

(xiv). Fax No.: NIL

 

(xv). Mobile No.: 9876210555

 

(xvi). Upload a copy of documents in support of the competence/authority of the person making thisapplication to make application on behalf of the User Agency: Annexure copy of documents insupport of the competence

Details of Land required for the ProjectB.

Details of Protected AreaB­1.

No. of Divisions involved in Protected AreaB­1.1

Division wise details of land

S.no Division Name Protected AreaName

Project Areaunder Protected

Area

1. SAS Nagar Sukhna WildlifeSanctuary,Chandigarh

0

Details of Districts involvedB­1.2

District wise breakup

Page 33: CURO NORTH SQUARE

4/23/2016 Wild Life Report

http://forestsclearance.nic.in/Admin/UserAgency_Report_W.aspx?pid=FP/PB/Others/682/2016 4/6

S.no DistrictName

Project Area underProtected Area(ha.)

Project Area under Non­Protected Area(ha.)

Component wise breakupB­1.3

Component wise breakup

S.no Component Project Area underProtected Area(ha.)

Project Area under Non­Protected Area(ha.)

NIL

Maps of protected areaC.

Division 1. : SAS Nagar

 

(i). Project Area under Protected Area (in ha.) : NIL

 

(ii). Nature of the Project : Linear

 

(iii). No. of Segments : One

Patch/Segment wise details

Segments Protected Area ofsegment(in ha.)

KML file of protectedarea of segment

1. 0     View File

 

(iv). copy of Survey of India Toposheet indicating boundary of protected area:Annexure Survey of India Toposheet

 

(v). scanned copy of the Geo­referenced map of the protected area prepared byusing DGPS or Total Station: Annexure scanned copy of the Geo­referenced map

Justification for locating the Project in protected area and details of alternatesexamined :D.

 

(i). copy of note containing justification for locating the Project in protected area: AnnexureJustification

 

(ii). Whether a copy of map indicating location of alternative examined is required to be provided:No

 

(a). Reason for not providing such map There is no alternative examined.

Employment likely to be generatedE.

Page 34: CURO NORTH SQUARE

4/23/2016 Wild Life Report

http://forestsclearance.nic.in/Admin/UserAgency_Report_W.aspx?pid=FP/PB/Others/682/2016 5/6

 

(i). Whether project is likely to generate employment ?: Yes

 

(a). Permanent/Regular Employment(Number of persons): NIL

 

(b). Temporary Employment(Number of person­days): 50

Displacement of People due to the project, if anyF.

 

(i). Whether project involve displacement?: No

Status of Environmental clearanceG.

 

(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes

 

(a). Status of the Environmental Clearance to the Project : EC application yet to be submitted

Whether proposal is for investigation/surveyH. 

(H­1).Whether proposal is for investigation/survey? : Yes

Division wise details of land

S.no Time Required (in Days)

physical disturbanceneeded within the PAlike(tree cutting,earth

work etc.)

1. 60 earth work

Details of the Bio diversity Impact Assessment report in case the proposal involves use ofmore than 50 ha. NP/WLS.

(H­2).

 

(a).Copy of the Bio diversity Impact Assessment report: Annexure Copy of Bio diversity ImpactAssessment report

Information on the projects undertaken by the proponent agency in the past in ProtectedAreas

(H­3).

 

(a).Upload file: Annexure Information on the projects undertaken by the proponent agency in the past inProtected Areas

Details regarding compliance of the conditions on each proposal(H­4).

 

(a).Upload file: Annexure Details regarding compliance of the conditions on each proposal  

Page 35: CURO NORTH SQUARE

4/23/2016 Wild Life Report

http://forestsclearance.nic.in/Admin/UserAgency_Report_W.aspx?pid=FP/PB/Others/682/2016 6/6

(H­5).Whether any matter related to the project is sub judice in any court of law?: No

Documents

S.No Uploaded Additional Info. Files Remarks

NIL

Print page

Page 36: CURO NORTH SQUARE
Page 37: CURO NORTH SQUARE
Page 38: CURO NORTH SQUARE
Page 39: CURO NORTH SQUARE
a
Typewritten text
ANNEXURE-5B
Page 40: CURO NORTH SQUARE
a
Typewritten text
ANNEXURE-6
a
Rectangle
Page 41: CURO NORTH SQUARE

S. No Description

1 Purchase of Land

(10.17 acres)

2 Approvals

including CLU, layout approval,

Environment Clearence

3 Levelling, dresssing of land

4 Layout of Land

5 Excavation

6 PCC

7 Raft Casting

8 Comlition upto Plinth level

9 Slab Casting G.F. to 22nd Floor

10 Brick Work

11 Electric and Plumbing work

12 Internal Plaster

13 External Plaster

14 Flooring and POP Work

15Wood work, painting, Finishing andHand over

PERT/CPM CHART OF CURO NORTH SQUARESep.2016 to Nov.2016 Dec.2016 to Feb.2017 Mar. to May 2017 June to Aug2017 Sept to Nov. 2017 Dec.2017 to Feb 2018 Mar to May 2018 June to Aug 2018 Sept to Nov. 2018July 2005 to Oct 2014 Mar2016 to May 2016 June 2016 to Aug.2016 Dec.2018 to Feb. 2019 Mar. to May 2019 June to Aug. 2019 Sept to Nov. 2019 Dec. to Feb. 2020

a
Typewritten text
ANNEXURE-7
Page 42: CURO NORTH SQUARE
a
Typewritten text
ANNEXURE-8A
Page 43: CURO NORTH SQUARE
Page 44: CURO NORTH SQUARE
Page 45: CURO NORTH SQUARE
Page 46: CURO NORTH SQUARE
a
Typewritten text
ANNEXURE-8B
Page 47: CURO NORTH SQUARE

DEMOGRAPHIC DETAILS

MOHALI:DISTRICT AT GLANCE

S.A.S. Nagar District has been carved out of areas falling in Ropar and Patiala District as 18th District of

Punjab on 14th April, 2006. Because of its contiguous with the union territory of Chandigarh. The district has

been formed to achieve growth of development as this area is emerging as major I.T.hub of Nothern India.

The district includes Mohali, Kharar and Dera Bassi Teshils. It is located in theNorth Eastpart of Punjab.

And is part of Patiala division The District includes 414 villages. The important township in the district are

Kharar, Kurali, Mohali, Zirakpur & Dera Bassi. Kharar tehsil is the largest administrative unit of the New

district with 154 villages followed by Dera Bassi Tehsil with 44villages.

GEOGRAPHICAL AREA:

The district is spread over geographical area of 1092.64sq. kms. The rural areaconstitutes1021.77

sq.kms. as compared to urban area of 70.87 sq.kms.

POPULATION

As per statistical abstract of the Punjab2011the population of the districtis 9,94,628out of which the rural

population is 450017& population of urban area is544611.The male population of the district is529253

out of which rural male population is240984whereas urban male population is288269. The total female

population of the district is465375out of which the rural female population is209033whereas urban

females are256342. The S.C. population of the district is216231out of which rural S.C. population is

132713& S.C. in urban area is83518.

EDUCATION INTITUTIONS

Mohali District has emerged as a major center of technical education. There are 8 engineering colleges

which offer variety of technical course. The Punjab School Education Board isalso operating in the district.

NIPER: A pioneer institute of pharmaceutical & education research is situated at Mohali.

a
Typewritten text
ANNEXURE-9
Page 48: CURO NORTH SQUARE

Educational Institutions in the District

Nursing College 4Colleges of Engineering and Architect 4Govt. Sr. Sec. Schools 29Govt. High Schools 50Govt. Primary Schools 434

HEALTH SERVICES

There are number ofrenowed hospitals in the district which are equipped with latest technical know how.

The FORTIS Hospital is one of its kinds with multi specialty facilities.

SPORTS

World class CRICKET STADIUM of international fame is situated at Mohali International tournaments are

held from time to time and the people get an opportunity to watch the international cricket in action.

MISCELLANEOUS

District Mohali is emerging as an I.T Hub of North India. Some big companies like QUARCKS DELL & TCS

is already in business and having its establishments whereas others are in the process for opening their

offices.

Community Development Blocks in the District

KHARAR BLOCK

This block consists of 154 villages and 2 towns namely S.A.S. Nagar and Kharar and there 4 un-inhabited

villages. As per2011census the total population of the block is 369798. The rural population of the block is

196044 out of which there are 106688 males and 89356 females. The total S.C. Population in the rural area

is 55544.

The block is having totalarea of 411.32 sq.kms. Out of which the rural area covers 383.26 sq.kms.

Page 49: CURO NORTH SQUARE

Under the service area approach, all the villages havebeen allocated among 17 branches of commercial

banks and 4 branches of RPBs. There are Total 86 branches are functioning in the block which comprises

of 57 commercial banks, 13 private banks. 11 Coop. Banks, 4 Punjab Gramin Banks & 1 Agricultural

Development bank. S.A.S. Nagar has emerged as a Industrial Focal Point and designated as District Head

Quarter. It has become a satellite town of Chandigarh and has registered a fast rate of growth.

MAJRI BLOCK

Majri Block comprises of 116 villages out of which 1 village is un-inhabited. This block forms part of Kharar

sub division. The total population of the block is 111598 as per2011census. The population in rural area is

88551, out of which 47892 aremales and 40659 are female. The S.C. population in rural area is rural area

is 25531. Kurali is the only town in the block and has population of 23047. This block is spread over an

area 274.84 sq.kms. The block comes under dark category. All the villages numbering 116 have been

allocated among 8 branches of commercial banks and one branch of P.G.B.. There are 16 branches

operating in this block which comprises of 9 branches of commercial banks. 1 Pvt. Sector Bank, One

branch of PGB and SAS Nagar central co-operative bank is having 5 branches.

Due to certain incentives being initiated by the- Govt. many large and small scales industrial units have

been established around Kurali.

DERA BASSI BLOCK

This block consists of 144 villages and 2 towns namely Zirakpur and Dera Bassi and there are 6 un-

inhabited villages. As per2011census the total population of the block is 216921. The rural population of

the block is 170192 out of which thereare 93116 males and 77076 females. The total S.C. population lin

the rural area is 48683.

This block is having total area of 406.48 sq.kms. Out of which the rural area covers 371.17 sq.kms.

Page 50: CURO NORTH SQUARE

Dera Bassi block has a good number of small scale units. Chemical paints, Steel tubes, plywood,

handlooms and kntting of daris are some of the industries which have koffered good employment to a

number of persons. The soil of the block is sandy to sandy loam

There are total 25 branches are functioning in the block which comprises of 19 commercial banks, 1 private

banks, 3 coop. banks, 1 Malwa Gramin Bank & 1 agricultural development bank.

(Source:Census of India 2011)

Page 51: CURO NORTH SQUARE
a
Typewritten text
ANNEXURE-10A
Page 52: CURO NORTH SQUARE
Page 53: CURO NORTH SQUARE
Page 54: CURO NORTH SQUARE
Page 55: CURO NORTH SQUARE
Page 56: CURO NORTH SQUARE
Page 57: CURO NORTH SQUARE
Page 58: CURO NORTH SQUARE
Page 59: CURO NORTH SQUARE
a
Typewritten text
ANNEXURE-10B
Page 60: CURO NORTH SQUARE
Page 61: CURO NORTH SQUARE
Page 62: CURO NORTH SQUARE
Page 63: CURO NORTH SQUARE
Page 64: CURO NORTH SQUARE
Page 65: CURO NORTH SQUARE
Page 66: CURO NORTH SQUARE
Page 67: CURO NORTH SQUARE
Page 68: CURO NORTH SQUARE
Page 69: CURO NORTH SQUARE
Page 70: CURO NORTH SQUARE
Page 71: CURO NORTH SQUARE
Page 72: CURO NORTH SQUARE
Page 73: CURO NORTH SQUARE

1

ems

From: simran [[email protected]]Sent: Saturday, December 19, 2015 6:07 PMTo: [email protected]: [email protected]: Intimation for monitoring

To ,

The Member Secretary,SEIAA/SEAC, Punjab,C/o Punjab Pollution Control BoardVatavaran Bhawan, Nabha Road, PatialaE-mail: [email protected]

Subject :- Intimation for Environmental monitoring

Sir,

As per proceedings of 6th combined meeting of SEIAA & SEAC held on 17.10.2014, it is tobring to your kind notice that we will be starting sampling for EIA purpose of Group HousingProject by M/s Curo India Pvt. Ltd. located at Village Mullanpur Garibdas, Distt. SAS Nagar,Punjab on 22nd December, 2015 Tuesday.

This is for your information please.

CC: Environmental EngineerRegional OfficePunjab Pollution Control Board,Plot No. 55, Phase-II, Opposite Bassi Theatre, MohaliE-mail: [email protected]

With Warm Regards

SIMRANJIT KAURManager Quality08872043178

Eco Paryavaran Engineers & Consultants Pvt. Ltd.(An ISO 9001: 2008 certified company)

Eco Laboratories & Consultants Pvt. Ltd.(An ISO 9001:2008, EMS ISO 14001:2004 & OHSAS 18001:2007 certified company)ACCREDITATIONS: MOEF (Ministry of Environment & Forest), PPCB (Punjab Pollution Control Board), NABL(National Accreditation Board for testing & calibration Laboratories)

Administrative Office cum worksE-207, Industrial Area, Phase VIII-B (Sector-74),Mohali (Punjab) - 160071Tel: 0172-4616225, Website: www.ecoparyavaran.org

Please consider the environment before printing this e-mail

a
Typewritten text
ANNEXURE-10C
Page 74: CURO NORTH SQUARE

Curo North Square 1

Type of Fixture Load/ Fixture (W) No. of FixturesTotal Load

(KW)Type of Fixture Load/Fixture (W)

No. ofFixtures

Total Load(KW)

1 2 x 36W FTL (Basement) 80.0W 2300 184.0KW 2 x 20 W LED 40.0W 3000 120.0KW

2 Metal Hallide 50.0W 150 7.5KW LED Down Light 23.0W 150 3.5KW

31 x 36 W Ceiling Light FTL(Tower Common Area)

40.0W 1100 44.0KW LED Down Light 20.0W 1100 22.0KW

41 x 36 W Ceiling Light FTL(Tower Staircase)

40.0W 400 16.0KW LED Down Light 20.0W 400 8.0KW

4Halogen/Sodium Vapour Lightfor External Light/FacadeLighting

125.0W 100 12.5KW LED Street Lighting 90.0W 125 11.3KW

5Halogen/Sodium Vapour Lightfor External Light/FacadeLighting

100.0W 70 7.0KW LED Street Lighting 60.0W 100 6.0KW

6Halogen/Sodium Vapour Lightfor External Light/FacadeLighting

70.0W 125 8.8KW LED Lighting 45.0W 150 6.8KW

Total Load 279.75KW 177.45KWSay 280.00KW 177.00KW

20 % External Lighting Using Solar Lighting 4.80KW

Actual Load 280.00KW 172.20KW

= 280.00KW

= 172.20KW

Net Savings = 107.80KW

Net Savings In %ge = 38.5%

CURO NORTH SQUARE

Total Load Using Non- Conventional System/Energy EfficientFixtures

ENERGY CONSERVATION DETAILS (Common Area & Parking)

COMPARISON/DETAILS OF ENERGY SAVED USING LED FIXTURES VS CONVENTIONAL FIXTURES.

Sl. NoWith Conventional Fixtures With Energy Efficient LED Fixtures

Total Load Using Conventional System/Fixtures

Energy Conservation Details Envirotech Design Pvt Ltd

a
Typewritten text
ANNEXURE-11
Page 75: CURO NORTH SQUARE
a
Typewritten text
ANNEXURE-12
Page 76: CURO NORTH SQUARE
a
Typewritten text
ANNEXURE-13
Page 77: CURO NORTH SQUARE
Page 78: CURO NORTH SQUARE
Page 79: CURO NORTH SQUARE
Page 80: CURO NORTH SQUARE
Page 81: CURO NORTH SQUARE
Page 82: CURO NORTH SQUARE
Page 83: CURO NORTH SQUARE
Page 84: CURO NORTH SQUARE
Page 85: CURO NORTH SQUARE
Page 86: CURO NORTH SQUARE
Page 87: CURO NORTH SQUARE
Page 88: CURO NORTH SQUARE
Page 89: CURO NORTH SQUARE
Page 90: CURO NORTH SQUARE
Page 91: CURO NORTH SQUARE
Page 92: CURO NORTH SQUARE
Page 93: CURO NORTH SQUARE
Page 94: CURO NORTH SQUARE
Page 95: CURO NORTH SQUARE
Page 96: CURO NORTH SQUARE
Page 97: CURO NORTH SQUARE
Page 98: CURO NORTH SQUARE
Page 99: CURO NORTH SQUARE
Page 100: CURO NORTH SQUARE
Page 101: CURO NORTH SQUARE
Page 102: CURO NORTH SQUARE
Page 103: CURO NORTH SQUARE
Page 104: CURO NORTH SQUARE
Page 105: CURO NORTH SQUARE
Page 106: CURO NORTH SQUARE
Page 107: CURO NORTH SQUARE
Page 108: CURO NORTH SQUARE
Page 109: CURO NORTH SQUARE
Page 110: CURO NORTH SQUARE
Page 111: CURO NORTH SQUARE
Page 112: CURO NORTH SQUARE
Page 113: CURO NORTH SQUARE
Page 114: CURO NORTH SQUARE
Page 115: CURO NORTH SQUARE
Page 116: CURO NORTH SQUARE
Page 117: CURO NORTH SQUARE
Page 118: CURO NORTH SQUARE
Page 119: CURO NORTH SQUARE

“CURO NORTHSQUARE”

a
Typewritten text
DRAWING-1
Page 120: CURO NORTH SQUARE
a
Typewritten text
DRAWING-2
Page 121: CURO NORTH SQUARE

PANORAMIC VIEW OF “CURONORTH SQUARE” SHOWING500 Mt. RADIUS

PROJECT SITE

SHANGARI WALI

MILKH

MILAK

MASTGARH

DLF MULLANPUR

a
Typewritten text
DRAWING-3
Page 122: CURO NORTH SQUARE
a
Typewritten text
DRAWING 4
Page 123: CURO NORTH SQUARE

31M

ts.

188.26MTS(617'-6")12

1.64

MT

S(3

99'-0

")

14.48MTS(47'-6")

58M

TS

(190

'-0")

56M

TS

(185

'-3")

31.85MT

S(104'-6")

13MTS(42'-9")

154MTS.(505'-875")

16.38MTS

102.80MT

S(337'-3")

15MTS.(49'-2")

TO CHANDIGARHTO MULLANPUR

60MTS WIDE ROAD

GR

EE

N B

UFF

ER

AR

EA

(5M

WID

E)

PLOT LINE(AS PER REVENUE)

3'-0:HIGH BOUNDRYWALL & 3'-0" HIGHRAILING

6M SETBACK LINE

PRO

POSE

D 2

00' W

IDE

RO

AD

18MTS.(59'-0")

35MTS

.

69.5MT

S(228'-0")

47M

ts.

16Mts.

49M

ts.

27M

ts.

RETAIL(G+3)

RETAIL/MULTIPLEX(G+3)

TOWER -06

TOWER-07

54Mts.

87M

ts.

RETAIL(G+3) +

1 service floor+ STUDIO APPT

15 STOREY

4Mts.

7Mts.16Mts.

4Mts.

25M

ts.

30Mts.

3Mts.

4Mts.

47M

ts.14Mts.

40Mts.

18M

ts.

S+23

G+1Community building

TO

WE

R-0

1

4Mts.

3Mts

.22

Mts

.22

Mts

.

9Mts.

11Mts.

9Mts

.19

Mts

.19

Mts

.CENTRAL GREENS

ORGANISEDGREEN SPACE

AREA FORFUTURE EXPANSION

AREA FORFUTURE EXPANSION

31M

ts. 22Mts.

31M

ts.22Mts.

31M

ts.

22Mts.

S+22

S+22

S+22TOWER-05

TOWER-04

TOWER-03

4Mts.4Mts.

6Mts.8Mts.

13M

ts.

2Mts

.13

Mts

.

9Mts. 4Mts.

4Mts

.

9Mts.

4Mts.2Mts.4Mts.

1Mts

.

Green fields

3'-0:HIGH BOUNDRYWALL & 3'-0" HIGHRAILING

Entry/Exit

20Mts.

Entry/Exit

6 M CIRCULATION

6 M

CIR

CU

LA

TIO

N

LOCATION OFUG WATER TANKIN BASEMENT

25M

ts.

39Mts.

S+23TOWER-02

6Mts

.

14Mts. 8Mts. 17Mts.

9Mts

.6M

ts.

9Mts

.4Mts

.

3Mts.

7Mts

.

8Mts.

6 M CIRCULATION

6 M C

IRC

UL

AT

ION

15MTS WIDEORGANISEDGREEN BELT

5MTS W

IDE G

REEN BELT

LAND AREACEDED FOR ROAD

LAND AREA CEEDEDIN VISION TRAINGLE

6M WIDE FIRE TENDER MOMENT

6M W

IDE

FIR

E T

EN

DE

R M

OM

EN

T

6M W

IDE

FIR

E T

EN

DE

R M

OM

EN

T

DROP OFF

GREEN AREA

GREEN AREA

GREEN AREA

GREEN AREA

Entry/ Exit

SECTION -1

PROFILE OFBASEMENT LEVEL 1

6Mts

.

6Mts.

6Mts.

6Mts.

34M

ts.

9Mts.

37M

ts. 60

Mts

.

10Mts.

15M

ts.

41Mts.

24M

ts.

20M

ts.

25Mts.

30M

ts.

6Mts.

PROFILE OFBASEMENT ON SITE2 LEVELBASEMENTS HERE

LOCATION OF ESS IN BASEMENT HERE

3

1

E60Mts.

20M

ts.

19Mts.

28M

ts.

20Mts.

48M

ts.8Mts.

2

B

D

A

C

5

G

H

125Mts.

5Mts.

LOCATION OF STPIN BASEMENT

6M W

IDE

FIR

E T

EN

DE

R M

OM

EN

T

5Mts.

66M

ts.

I

5Mts.

41M

ts.

6

60Mts.

6mtr.

6mtr.

HT.- +74MTR.

HT.- +74MTR.

HT.- +71MTR.

HT.- +71MTR.

HT.- +71MTR.

HT.- +18 MTR.

HT.- +88 MTR.

6 M

CIR

CU

LA

TIO

N

1

22

23

68

69

131

132

173

212

213 241

242

256

172

60MT

S

vision traingle

16Mts.

4

9Mts. 9Mts.

5Mts.

6Mts.

5Mts.

6 M

CIR

CULATION

5Mts

.

41Mts.

J

5Mts.

54M

ts.

2038/1

2239/2/1

22482249 /1

2237/1

2236/1/2

22

35

/2

2250/2

2250/1

2049/1

2237/2

2236/1/2

2246/2

2247/2

40K 27K

84K

71K

13K43K

40K

16K

68K

22K

63K18K

17K

32K

62K18K

32K32K

63K7K6K

7K5.5K

7K17K

10K

41K

40K

34K

20K9K

32K

18K

71K

16K

30K

2239/1

20K

F5Mts.

11M

ts.

In Ramp-4m wideGR to UB(slope 1:10)

15M

ts.

3Mts

. 50Mts.K

32Mts. 7Mts.

16M

ts.

8Mts. 12Mts.

NOTE: TOWER DIMENSIONS FOR TOWER 3,4 AND 5 ARE SAME

21Mts.

5Mts.

10M

ts.

6OMTS

18M

ts.

4Mts

.4Mts

Ou

t Ram

p-4m

wid

eU

B to

GR

(slop

e 1:10)

In Ramp-4m wideGR to UB(slope 1:10)

Out Ramp-4m wideUB to GR(slope 1:10)

In R

amp

-4m w

ide

GR

to U

B(slo

pe 1:10)

Ou

t Ram

p-4m

wid

eU

B to

GR

(slop

e 1:10)

4Mts

.

4Mts

.

Solid wastesegregation area

First aid room

Hazardous wastestorage area

RESIDENTIALZONE

25963.27 SQM.

COMMERCIALZONE

7965.286 SQM.SECTION -1

BASEMENT 2

LANDSCAPE

BASEMENT 1

Zoned Area

Area Already Taken By GMADA For Road Widening

Area Demarcated For Proposed Side Road Widening

Area Under Green Buffer

EEC (Electric Substation)

RP (Rainwater Harvesting Pit)

STP&UG Tank (Sewage Treatment Plant &Underground Watertank

LEGEND

SITE AREA DETAIL

TOTAL SITE AREA = 10.18 ACRES

SITE AREA AS PER CLU OBTAINED = 9.713 ACRES

AREA ALREADY ACQUIRED BY GMADA FOR ROAD WIDENING = 0.467 ACRES(NOCOMPENSATION TAKEN FROM GMADA IN LIEU FAR WILL BE TAKEN)

ARCHITECTS

ARCOP Associates Pvt. LtdA-15, Pamposh Enclave,New Delhi - 110048

PROMOTER

SIGNATURE OF THE ARCHITECT

SIGNATURE OF THE OWNER

DATE

NORTH

04.04.2016

DRAWING TITLE

NAME OF THE PROJECT :CURO NORTH SQUARE

VILLAGE :MULLANPUR GARIBDASS

TEHSIL :KHARAR

DISTT :S.A.S. NAGAR, PUNJAB

DRAWING NO. 01

2. ALL ELECTRICAL INSTALLATIONS SHALL BE AS PERPROVISIONS OF NBC.

3. FIRE-FIGHTING / SAFETY PROVISIONS WILLBE AS PER RELEVANT NBC PROVISIONS

1. ALL LIFTS SHALL HAVE 100% POWER BACK-UP.

4. MAIN ENTRANCE GATE AS PER STANDARD DESIGN.

GENERAL NOTES :-

EXISTING PLOT LINE

SETBACK LINE

ARCHITECTURAL LEGEND & NOTES :-

a
Typewritten text
DRAWING-5
a
Highlight
a
Highlight
a
Highlight
a
Highlight
a
Highlight
a
Highlight
a
Highlight
a
Highlight
a
Rectangle
a
Line
a
Text Box
Tubewell
a
Rectangle
a
Line
a
Text Box
Tubewell
Page 124: CURO NORTH SQUARE

TO CHANDIGARHTO MULLANPUR

60MTS WIDE ROAD

GR

EE

N B

UFF

ER

AR

EA

(5M

WID

E)

PRO

POSE

D 2

00' W

IDE

RO

AD

RETAIL(G+3)

RETAIL/MULTIPLEX(G+3)

TOWER -06

TOWER-07

RETAIL(G+3) +

1 service floor+ STUDIO APPT

15 STOREY

S+23

G+1Community building

TOWER-01

CENTRAL GREENS

ORGANISEDGREEN SPACE

AREA FORFUTURE EXPANSION

AREA FORFUTURE EXPANSION

S+22

S+22

S+22TOWER-05

TOWER-04

TOWER-03

Green fields

Entry/ExitEntry/Exit

6 M CIRCULATION

6 M

CIR

CU

LA

TIO

N

6 M CIRCULATION

6 M C

IRC

UL

AT

ION

15MTS WIDEORGANISEDGREEN BELT

5MTS W

IDE G

REEN BELT

6M WIDE FIRE TENDER MOMENT

6M W

IDE

FIR

E T

EN

DE

R M

OM

EN

T

DROP OFF

GREEN AREAGREEN AREA

GREEN AREA

GREEN AREA

Entry/ Exit

3

1

E

2

B

D

A

C

5

G

H 6M

WID

E F

IRE

TE

ND

ER

MO

ME

NT

I

6

HT.- +74MTR.

HT.- +74MTR.

HT.- +71MTR.

HT.- +71MTR.

HT.- +71MTR.

HT.- +18 MTR.

HT.- +88 MTR.

6 M

CIR

CU

LA

TIO

N

1

22

68

69

131

132

173

212

241

242

256

172

4

6 M

CIR

CULATION

J

F

In Ramp-4m wideGR to UB(slope 1:10)

K

NOTE: TOWER DIMENSIONS FOR TOWER 3,4 AND 5 ARE SAME

Ou

t Ram

p-4m

wid

eU

B to

GR

(slop

e 1:10)

In Ramp-4m wideGR to UB(slope 1:10)

Out Ramp-4m wideUB to GR(slope 1:10)

In R

amp

-4m w

ide

GR

to U

B(slo

pe 1:10)

Ou

t Ram

p-4m

wid

eU

B to

GR

(slop

e 1:10)

PROFILE OFBASEMENT ON SITE

2 LEVELBASEMENTS HERE

LAND AREA CEEDEDIN VISION TRAINGLE

LAND AREACEDED FOR ROAD

LOCATION OF ESS INBASEMENT HERE

3'-0:HIGH BOUNDRY WALL & 3'-0" HIGH RAILING

PLOT LINE(AS PER REVENUE)

3'-0:HIGH BOUNDRY WALL & 3'-0" HIGHRAILING

6M SETBACK LINE

BELOW

SEWAGE TREATMENT PLANT

LEGEND FOR PLUMBINGSTONEWARES.W

MANHOLE FOR SEWERAGE

METREM

LENGTHL

GROUND LEVELG.L

I.L

C.L

INVERT LEVEL

CONNECTION LEVEL

LEGEND FOR PLUMBINGREINFORCED CEMENT CONCRETER.C.C

MANHOLE FOR DRAINAGE

METREM

LENGTHLGROUND LEVELG.L

I.L INVERT LEVEL

CONNECTION LEVELI.L

LEGEND FOR PLUMBING

E.F.H EXTERNAL FIRE HYDRANT

MILD STEEL EXTERNAL FIRE HYDRANT LINE

LEGEND FOR PLUMBING

SOLAR PANEL FOR HOT WATER

LEGEND FOR PLUMBING

DOMESTIC WATER SUPPLY LINE

FLUSHING WATER SUPPLY LINE

GARDEN HYDRANT

OUTER DIAOD

IRRIGATION LINE

RESIDENTIALZONE

25963.27 SQM.

COMMERCIALZONE

7965.286 SQM.SECTION -1

BASEMENT 2

LANDSCAPE

BASEMENT 1

Zoned Area

Area Already Taken By GMADA For Road Widening

Area Demarcated For Proposed Side Road Widening

Area Under Green Buffer

EEC (Electric Substation)

RP (Rainwater Harvesting Pit)

STP&UG Tank (Sewage Treatment Plant &Underground Watertank

LEGEND

SITE AREA DETAIL

TOTAL SITE AREA = 10.18 ACRES

SITE AREA AS PER CLU OBTAINED = 9.713 ACRES

AREA ALREADY ACQUIRED BY GMADA FOR ROAD WIDENING = 0.467 ACRES(NOCOMPENSATION TAKEN FROM GMADA IN LIEU FAR WILL BE TAKEN)

ARCHITECTS

ARCOP Associates Pvt. LtdA-15, Pamposh Enclave,New Delhi - 110048

PROMOTER

SIGNATURE OF THE ARCHITECT

SIGNATURE OF THE OWNER

DATE

NORTH

31.03.2016

DRAWING TITLE

NAME OF THE PROJECT :CURO NORTH SQUARE

VILLAGE :MULLANPUR GARIBDASS

TEHSIL :KHARAR

DISTT :S.A.S. NAGAR, PUNJAB

DRAWING NO. PL-SP-01

2. ALL ELECTRICAL INSTALLATIONS SHALL BE AS PERPROVISIONS OF NBC.

3. FIRE-FIGHTING / SAFETY PROVISIONS WILLBE AS PER RELEVANT NBC PROVISIONS

1. ALL LIFTS SHALL HAVE 100% POWER BACK-UP.

4. MAIN ENTRANCE GATE AS PER STANDARD DESIGN.

GENERAL NOTES :-

EXISTING PLOT LINE

SETBACK LINE

ARCHITECTURAL LEGEND & NOTES :-

ARK CONSULTANTS1/30 ROSHAN GARDEN-IIKAKROLA ROAD NAJAFGARHNEW DELHI-110043PH:- [email protected]

PLUMBING CONSULTANTS :

a
Typewritten text
DRAWING-6
Page 125: CURO NORTH SQUARE

44Mts.

33Mts.

6M

ts.

37M

ts.

28Mts.

40M

ts.

31Mts.

113M

ts.

94Mts.

72M

ts.

58M

ts.

1

5

M

t

s

.

5

3

M

t

s

.

BASEMENT -1 PLAN

SITE LIN

E PRO

FILE

13M

ts.

8Mts.

33Mts.

9M

ts.

63M

ts.

12M

ts.

5.1MTS

9M

ts.

7Mts.

27M

ts.

14M

ts.

6Mts.

99Mts.

12M

ts.

19M

ts.

40M

ts.

123M

ts.

94Mts.

79 M

ts.

33Mts.

49M

ts.

BASEMENT -2 PLAN

9M

ts.

7Mts.

5M

ts.

31Mts.

44Mts.

33Mts.

6M

ts.

37M

ts.

28Mts.

40M

ts.

31Mts.

113M

ts.

94Mts.

72M

ts.

58M

ts.

1

5

M

t

s

.

5

3

M

t

s

.

2

2

2

3

544

E

D

C

F

G

13M

ts.

8Mts.

35Mts.

9M

ts.

40M

ts.

63M

ts.

12M

ts.

5.1MTS

9M

ts.

7Mts.

27M

ts.

14M

ts.

6Mts.

99Mts.

12M

ts.

8

19M

ts.

9

39M

ts.

3Mts.

128M

ts.

96Mts.

33Mts.

49M

ts.

2

13M

ts.

8Mts.

12M

ts.

7Mts.

79M

ts.

31Mts.

5M

ts.

3

AREA CALCULATIONSBASEMENT -01

AREA CALCULATIONSBASEMENT -02

ARCHITECTS

ARCOP Associates Pvt. LtdA-15, Pamposh Enclave,New Delhi - 110048

PROMOTER

SIGNATURE OF THE ARCHITECT

SIGNATURE OF THE OWNER

DATE

NORTH

31.01.2016

DRAWING TITLE

NAME OF THE PROJECT :

CURO NORTH SQUARE

VILLAGE :

MULLANPUR GARIBDASS

TEHSIL :

KHARAR

DISTT :

S.A.S. NAGAR, PUNJAB

DRAWING NO. 02

a
Typewritten text
DRAWING-7
Page 126: CURO NORTH SQUARE
a
Typewritten text
DRAWING-8
Page 127: CURO NORTH SQUARE
a
Typewritten text
DRAWING-9
Page 128: CURO NORTH SQUARE
a
Typewritten text
Document of Consultant
Page 129: CURO NORTH SQUARE

LIST ‘A’

1. Accredited Consultants - 92 • Consultants with Accreditation - 26

S. N. Name State/ City

1. Asian Consulting Engineers Pvt. Ltd. Delhi

2. B. S. Envi-Tech Pvt. Ltd. Hyderabad

3. Bhagavathi Ana Lab Hyderabad

4. Cholamandalam MS Risk Services Chennai

5. Consulting Engineering Services (India) Private Limited New Delhi

6. EMTRC Consultants Private Limited Delhi

7. Engineers India Limited Gurgaon

8. Envirotech East Pvt. Ltd. Kolkata

9. En-vision Enviro Engineers Pvt. Ltd. Surat

10. EQMS India Pvt. Ltd. Delhi

11. ERM India Private Limited Gurgaon

12. Ghosh, Bose and Associates Pvt. Ltd. Kolkata

13. Grass Roots Research & Creation India (P) Ltd. New Delhi

14. Hubert Enviro Care Systems (P) Ltd. Chennai

15. JM Environet Pvt. Ltd. Gurgaon

16. Kadam Environmental Consultants Vadodra

17. Kalyani Laboratories Bhubaneshwar

18. Mecon Limited Ranchi

19. Pioneer Enviro Laboratories and Consultants Pvt. Ltd. Hyderabad

20. Ramans Consultancy Services Pvt. Ltd. Ahmedabad

21. Ramky Enviro Engineers Limited Hyderabad

22. RS Envirolink Technologies Pvt. Ltd. Gurgaon

23. S. S. Environics (India) Pvt. Ltd. Bhubaneshwar

24. Senes Consultants India Pvt. Ltd. Noida

25. Team Labs and Consultants Hyderabad

26. Voyants Solutions Pvt. Ltd. Gurgaon

• Consultants with provisional Accreditation - 66

S. N. Name State/ City

1. ABC Environ Solutions Pvt. Ltd. Chennai

2. Anacon Laboratories Pvt. Ltd. Nagpur

3. Anand Consultants Ahmedabad

4. Apex Mintech Consultants Udaipur

5. Bhagwati Enviro Care Pvt. Ltd. Ahmedabad

6. Centre for Envotech and Management Consultancy Private Limited Bhubaneshwar

7. Consulting Engineers Group Ltd. Jaipur

8. Creative Engineers & Consultants Chennai

9. Creative Enviro Services Bhopal

10. Desein Private Limited New Delhi

11. Detox Corporation Pvt. Ltd. Surat

12. Development Consultants Private Limited Kolkata

13. Earthcare Labs Private Limited Nagpur

14. Eco Chem Sales and Service Surat

15. Eco Laboratories and Consultants Mohali

16. Ecomen Laboratories Pvt. Ltd. Lucknow

17. Enkay Group Jaipur

18. ENV Developmental Assistance Systems (I) Pvt. Ltd. Lucknow

a
Highlight
Page 130: CURO NORTH SQUARE

S. N. Name State/ City

19. Enviro Techno Consult Nagpur

20. Envirocare Consultants (I) Pvt. Ltd. Baroda

21. Environ India Kolkata

22. Environment Protection and Training Research Institute Hyderabad

23. Environmental Engineers & Consultants Pvt. Ltd. New Delhi

24. ENVOMIN Consultant (Pvt.) Ltd. Bhubaneshwar

25. Geomin Consultants Pvt. Limited Bhubaneshwar

26. GIS Enabled Environment & Neo-Graphic Centre Ghaziabad

27. Global Enviro Labs Hyderabad

28. Global Experts (A Techno-Enviro Consultant) Bhubaneshwar

29. Green Chem Solutions Pvt. Ltd. Chennai

30. Holtec Consulting Private Limited Gurgaon

31. Idma Laboratories Limited Panchkula, Haryana

32. Intercontinental Consultants and Technocrats Pvt. Ltd. New Delhi

33. Kirloskar Consultants Limited Pune

34. L & T – RAMBOLL Consulting Engineers Limited Andhra Pradesh

35. LEA Associates South Asia Pvt. Ltd. New Delhi

36. M. N. Dastur and Company (Pvt.) Ltd. Kolkata

37. M/s Padmaja Aerobiologicals Pvt. Ltd. Navi Mumbai

38. M/s Visiontek Consultancy Services Pvt. Ltd. Bhubaneshwar

39. Mantec Consultants Pvt. Ltd. Delhi

40. Mineral Engineering Services Karnataka

41. Mineviron Systems Pvt. Ltd., Nagpur

42. MITCON Consultancy Services Ltd. Pune

43. Mott Mac Donald Pvt. Ltd. Ahmedabad

44. National Environmental Engineering Research Institute Nagpur

45. Perfact Enviro Solutions Pvt. Ltd. Delhi

46. Pollution Control Research Institute Haridwar

47. Pragathi Labs & Consultants Pvt. Ltd. Secunderabad

48. Projects & Development India Limited Noida

49. Pure Enviro Engineers Pvt. Ltd. Chennai

50. RITES Limited Gurgaon

51. San Envirotech Pvt. Ltd. Ahmedabad

52. SECON Private limited Bangalore

53. SGS India Pvt. Ltd Gurgaon

54. Singareni Collieries Company Limited

Khammam, Andhra

Pradesh

55. SMEC India Private Limited Gurgaon

56. SV Enviro Labs & Consultants Vishakapatnam

57. TATA Consulting Engineers Limited Mumbai

58. Ultra-Tech Environmental Consultancy and Laboratory Thane

59. UniStar Environment & Research Labs Pvt. Ltd. Vapi, Gujarat

60. Vimta Labs Limited Hyderabad

61. VITYA Consultants Pvt. Ltd. Secunderabad

62. WAPCOS Limited Gurgaon

63. Wolkem Consultancy Services Udaipur

64. Det Norske Veritas AS Hyderabad

65. Enviro Analyst & Engineers Pvt. Ltd. Mumbai

66. Environmental, Mine Plan & Resource Evaluation Solutions Chennai

Page 131: CURO NORTH SQUARE

LIST ‘B’

2. Applications under processing (eligible applications) - 110

• Assessment completed, ready for being put up to AC - 17

S. N. Name State/ City

1. Amba Recycler Private Limited Chennai

2. CTRAN Consulting Private Limited Bhubaneswar

3. E. C. Engineers (Environmental Consultants) Jaipur

4. Envisafe Environmental Consultants Ahmedabad

5. Garden City Environmental Services Bangalore

6. In Situ Enviro Care Bhopal

7. Louis Berger Consulting Pvt. Ltd. Gurgaon

8. Richardson & Cruddas Chennai

9. SAI Consulting Engineers Pvt. Ltd. Ahmedabad

10. Saitech Research & Development Organization Kolhapur

11. SPAN Consultants Pvt. Ltd. Noida

12. Srushti Sewa Nagpur

13. Superintendence Company of India Pvt. Ltd. Kolkata

14. T.R. Associates Ahmedabad

15. Vasantdada Sugar Institute. Pune

16. Water and Waste Water Research Center Sangli

17. Yogiraja Industrial Consultants Pune

• At Stage III (Document Assessment completed,

Office Assessment to be done) - 24

S. N. Name State/ City

1. Ace Engineers & Consultants Patiala

2. Aditya Environmental Services Pvt. Ltd. Mumbai

3. Agricultural finance corporation Ltd. Mumbai

4. Aquatech Enviro Engineers Bangalore

5. Central Road Research Institute(CRRI) New Delhi

6. Deccan Consulting Engineers Private Limited Delhi

7. Eco Services India Private Limited Chennai

8. Egis India Consulting Engineers Pvt. Ltd. Faridabad

9. ENPRO Enviro Tech & Engineers Pvt. Ltd. Surat

10. Enviro Care India (P) Ltd. Madurai

11. Greentech Environmental Engineer and Consultants Guwahati

12. JB Enviro Consultants Pvt. Ltd. Kolkata

13. M/S Indus Technical and Financial Consultants Ltd. Raipur

14. M/s Udaipur Min-Tech Pvt. Ltd. Udaipur

15. Mahabal Enviro Engineers Pvt. Ltd. Thane

16. Min Mec Consultancy Pvt. Ltd. New Delhi

17. Mitra S. K. Private Limited Kolkata

18. Pacific Scientific Consultancy Pvt. Ltd. Kolkata

19. Prakriti Consultants Services Lucknow

20. R. K. Consultants Jodhpur

21. Sawen Consultancy Services Lucknow

22. Siddhi Consultants Ankleshwar

23. Sri Sai Manasa Nature Tech Pvt. Ltd. Hyderabad

24. Sun Consultancy and Services Bhubaneshwar

Page 132: CURO NORTH SQUARE

• Stage II (Document assessment in process) - 57

S. N. Name State/ City

1. Aarvee associates architects engineers & consultants Pvt. Ltd. Hyderabad

2. Action for Ecology, Environment, Energy and Management Rishikesh

3. AECOM India Private Limited Gurgaon

4. Building Environment Pvt. Ltd. Navi Mumbai

5. C. E. Testing company Pvt. Ltd. Kolkata

6. Central Mine Planning & Design Institute Limited Ranchi

7. Centre for Environment Health & Safety, Annamalai

University Tamilnadu

8. Centre for Interdisciplinary Studies Of Mountain & Hill

Environment University Of Delhi(CISMHE) Delhi

9. Centre For Sustainable Development Hooghly

10. Centre of Mining Environment, Department of Environmental

Science and Engineering Dhanbad

11. Century Consulting Engineers Chandigarh

12. Chaitanya Projects Consultancy Pvt. Ltd Ghaziabad

13. Chilworth Technology Pvt. Ltd. New Delhi

14. D.Y. Patil College of Engineering Pune

15. DHI India Water & Environment Pvt. Ltd. New Delhi

16. Eco Care Burdwan,West Bengal

17. Energy Infratech Pvt. Ltd. Gurgaon

18. En-Geo Consultancy & Research Centre(ENGECORC) Guwahati

19. Enviro Care Engineers & Consultant Surat

20. Environment & Power Technologies Private Limited Bangalore

21. Environmental System Consultants & Ambiente Lab Solutions

Pvt. Ltd. Chennai

22. Epsilon Projects Pvt. Ltd. Lucknow

23. Gadark Lab Pvt. Ltd. Mumbai

24. Gherzi Eastern Limited New Delhi

25. K. R. S Enterprises Banglore

26. KKB Envirocare Consultants PVT. LTD. Hyderabad

27. Madhya Pradesh State Forest Research Institute Jabalpur

28. N. K. Buildcon Pvt. Ltd. Jaipur

29. National Institute for Interdisciplinary Science & Technology

(NIIST) Thiruvananthapuram

30. Oasis Environmental Foundation Pune

31. Octagon Consultancy Services Kolkata

32. Pollution & Ecology Control Services Nagpur

33. Prakruti Environmental Engineers Vadodara

34. Precitech Laboratories Vapi

35. Ramji Mine Envirotech Jaipur

36. S G M Corporate Consultants Pvt. Ltd. Pune

37. S. N.Hirpara Surat

38. SA Infrastructure Consultants Pvt. Ltd Ghaziabad

39. School of Water Resources Engineering, Jadavpur University Kolkata

40. Science and Technology Park Pune

41. Shiva Test House Patna

42. Shivalik Solid Waste Management Limited Solan

43. SMS Envocare Ltd. Pune

44. Spectro Analytical Labs Limited New Delhi

45. Team Institute of Science & Technology Pvt. Ltd. Jaipur

46. Technoenviron Consultants Maharashtra

47. Terracon Ecotech Private Limited Mumbai

48. Tetra Tech India Limited New Delhi

49. Thriveni Consultancy Services

Keonjhar,

Odisha

50. Transit Surveys Karnataka

Page 133: CURO NORTH SQUARE

S. N. Name State/ City

51. Trio-Chem Techno- Legal Services Pvt. Ltd. Pune

52. V R Enviro Engineers Chennai

53. Vison Labs Hyderabad

54. Vogue Construction and Consultancy Services Private Limited New Delhi

55. Waste Encare (India) Pvt. Ltd. Thane

56. Weston Solutions (India) Pvt. Ltd. Hyderabad

57. Wilbur Smith Associates Private Limited Bangalore

• Stage I (Completeness of Application - response received

against NABET query, being verified) - 12

S. No. Name State/ City

1. Consafe Science India Hyderabad

2. CPTL Envirotech Designers & Pollution Control Consultants Chandigarh

3. Galaxy Envirotech Pvt. Ltd. New Delhi

4. GLOBAL Environment & Mining Services Hospet, Karnatka

5. Gondwana Geotech Services Pvt. Ltd. Ranchi

6. MSV International Inc. Gurgaon

7. Pollution and Project Consultants Kolkata

8. Rightsource Industrial Solutions Pvt. Ltd. Hyderabad

9. SD Engineering Services Pvt. Ltd. Aurangabad

10. SEE Tech Solutions Pvt. Ltd. Nagpur

11. Sky Lab Analytical Laboratory Thane

12. Sophisticated Industrial Materials analytic Labs Pvt. Ltd. New Delhi

Page 134: CURO NORTH SQUARE

LIST ‘B’

3. Ineligible Applications - 39

S. N. Name State/ City

1. A & N Technologies Bangalore

2. Akshar Consultant Gujarat

3. Aquagreen Engineering Management Pvt. Ltd.

New Delhi

4. ASCENSO Management and Consulting Services Pvt. Ltd. New Delhi

5. Bombay Natural history Society Mumbai

6. Brigade Enterprises Limited Bangalore

7. C.P. Consultants Private Limited New Delhi

8. Central Institute of Mining and Fuel Research Dhanbad

9. Crystal Consultant Ranchi

10. Eco Care Engineering Pvt. Ltd. Chennai

11. Engineering & Technological Services Delhi

12. Enviroaid Consultants Gwalior

13. Environmental Research and Services (India) Pvt. Ltd. Bhubaneswar

14. Excel Enviro Tech Ahmedabad

15. Fine Envirotech Engineers Mumbai

16. Hydro ChemTech Chennai

17. Ind Tech House Consult New Delhi

18. India Glycols Limited Kashipur, Uttarakhand

19. Integrated Techno-Legal Consultants Mumbai

20. IRG Systems South Asia Pvt. Ltd. New Delhi

21. Jain Mining and Technical Consultants Udaipur

22. Krishna Gangaa Enviro System Pvt. Ltd. Nagpur

23. LION Engineering Consultants Bhopal

24. Lotus Environments Pune

25. Mechatronics Systems Pvt. Ltd. Pune

26. Metro Enviro-Chem Associates Ahmedabad

27. MNEC Consultants Pvt. Ltd. Nagpur

28. N H Consulting Pvt. Ltd. New Delhi

29. National Institute of Ocean Technology Chennai

30. National Institute of Oceanography Goa

31. Oil and Natural Gas Corporation New Delhi

32. Paryavaran Labs (India) Limited Hyderabad

33. Remedy Environmental Consultants Bellary

34. Royal Environment Auditing & Consultancy Services Rajkot

35. S Pradhan Bhubaneshwar

36. Sadekar Enviro Engineers Pvt. Ltd. Goa

37. Shri Environmental Technology Institute New Delhi

38. Vasudev Associates Ahmedabad

39. Zomah Engineers Consultants Pvt. Ltd. New Delhi

Page 135: CURO NORTH SQUARE

LIST ‘C’

4. Applications not accepted/ rejected/ withdrawn - 24

S. N. Name State/ City

1. Metamorphosis Bangalore

2. Environmental Health And Safety Consultants Private

Limited

Bangalore

3. M/s Pragathi Labs and Consultants Pvt. Ltd.

(Original application withdrawn, revised application received

assessed and provisionally accredited)

Secunderabad

4.

Indian Council of Forestry Research and Education Dehradun

5. Earth and Environment Bhubaneshwar

6. Green Circle, Inc. Vadodra

7. M/s Aqua-Air Environmental Engineers Pvt. Ltd. Surat

8. Indomer Coastal Hydraulics (P) Ltd. Chennai

9. Mantras Resources (Environmental Division) Nashik

10. EST Consultants (P) Ltd. New Delhi

11. Scott Wilson India Pvt. Ltd. New Delhi

12. International Testing Centre Panchkula

13. ECO-CARE Solutions (Environmental Consultants &

Engineers) Vadodra

14. SEAMAK HITECH PRODUCTS Bangalore

15. Jyoti Om Chemical Research Centre Private Limited Ankleshwar

16. Clean Technologies Bangalore

17. AET Infrastructure Environmental Services New Delhi

18. Betterworld Enviro Consultants Faridabad

19. Centre for Climate change & Environmental Advisory

Services Hyderabad

20. Ecotech Services Inc. Faridabad

21. SOWiL Limited Noida

22. Techno Analytical Kolkata

23. Gujarat Mineral Research & Industrial Consultancy Society

(GMRICS) Ahmedabad

24. Enpro Techno Solutions Chennai

Page 136: CURO NORTH SQUARE

LIST ‘D’

5. Applications received after Sept., 2010 - 48

Application

No. (as recd

in NABET)

Name State/ City

266 Pridhvi Envirotech (P ) Limited Hyderabad

267 Shriram Institute for Industrial Research New Delhi

268 Gem Solutions Bangalore

269 Swasti Enviro Solutions Pvt. Ltd. Chennai

270 Powertec Engineering Pvt. Ltd. New Delhi

271 Enviro Solutions & Services Tamilnadu

272 Clean Enviro Projects Consultancy Pvt. Ltd. Valsad, Gujarat

273 Alfa Enviro Systems Chennai

274 CPTL Engineers & Consultants, INC. Chandigarh

275 Viraj Envirozing India Private Limited Pune

276 Naik Environment reaearch institute limited (NERIL) Pune

277 Guru Enviro Udyog Chennai

278 Center for Environmental Studies Chennai

279 STUP Consultants Pvt. Ltd. Kolkata

280 Institute of Environment and Hazardous Material Management Bangalore

281* Metamorphosis Bangalore

282 Mahindra Consulting Engineers Ltd. Chennai

283 EIA Project, Gauhati University Guwahati

284 Institute for Catchment Studies and Environmental Management- ICSEM Bangalore

285* Green Circle, Inc. Vadodra

286 Nature Care Bhubaneshwar

287 Surya Envirotech Nagpur

288* Environmental Health And Safety Consultants Private Limited Bangalore

289 Gujarat Institute of Desert Ecology Gujarat

290 Horizon Services Pune

291 ENSYS Technologies (I) Pvt. Ltd. Chennai

292 Environmental Technologies Services Organisation Faridabad

293 Institute of Ocean Management, Anna University Chennai

294 Department of Forestry, H. N. B. Garhwal University Srinagar

295 Dust Devils Overseas & Company Burdwan (West

Bengal)

296 Evapo Tech Technical Services & Consultants Patiala

297 University of Kashmir Srinagar

298 Equinox Environments (India) Private Limited Maharashtra

299 VK :e environmental Pune

300 Pavan & Co. Ahmedabad

301 University of Jammu Jammu

302 Creative Research Group Kolkata

303 Sainath Envirotech Tuticorin

304 Halcrow Consulting India Pvt. Ltd. Noida

305 Envirochem Laboratories (P) Ltd. Thrissur, Kerala

306 Palle Consultants Private Limited Hyderabad

307 Global Environmental Systems Bangalore

308 National Council for Cement and Building Materials Ballabgarh

309 Feedback Ventures Pvt. Ltd. (FVPL) Gurgaon

310 Anant Advisory Noida

311* Indian Council of Forestry Research & Education Dehradun

312* Mantras Resources (Engineers and Environmental Consultants) Nashik

313* Clean Technologies Bangalore