CUPLOK® SCAFFOLD SYSTEM
Harsco Infrastructure is the world’s largest access,formwork and industrial maintenance service provider.Operating in 43 countries, we provide innovative,engineered solutions to the global construction, energyand processing industries.
Clients come to us for our proven expertise in:� safe solutions for construction and maintenance� high productivity, cost-effective applications� simple, user-friendly site establishment packages
With over 10,000 employees worldwide, our knowledge,insight and experience are at the heart of our customerservice.This is backed up by an industry-leading range ofproducts and the resources to ensure that even the mostcomplex project requirements are sourced and deliveredon time.
Harsco Infrastructure is a division of the HarscoCorporation, one of the world’s leading industrialservices companies, providing technological solutionsand support services to the global metals, rail, industrialand construction sectors.With operations at over 400locations in 50 countries, Harsco has annual revenuesapproaching $4 billion and employs over 20,000 peopleworldwide.
1
More adaptable:
CUPLOK® can be used to create a huge range of structures -for construction, refurbishment or maintenance.
� Façade scaffolds� Loading bays� Birdcage structures� Curved structures� Shoring structures� Staircases� Mobile towers
Hop-up brackets allow the easy installation of work platformsat 0.5m increments above or below the main deck givingbrickwork and other finishing trades the flexible access theyneed without disruptive adaptations to the main scaffold.Platforms can be created using boards, battens ormodular decks.
For over 30 years, CUPLOK® has been the world’smost popular system scaffold. A fully galvanised,multi-purpose system, it has been chosen bycontractors on many of the world’s largest andmost complex construction and maintenanceprojects.
Faster
CUPLOK® has been proven to be significantly faster to erectthan traditional scaffolding in most applications. Thousands ofcontractors around the world have converted to CUPLOK®
because they found it faster and simpler to erect, savingthem time and money. When we asked our customers howmuch faster they thought CUPLOK® was compared to tubeand fittings they told us between 30% and 50%.
Why CUPLOK®?
2
CUPLOK®
CUPLOK® scaffold system
Simpler
CUPLOK® uses minimal loose fittingsor wedge connectors and standardhorizontals are used as ledgers,transoms and guardrails. Once thebase lift is set out and levelled, theremaining structure is automaticallyaligned.
Specially designed components allowthe easy creation of cantilevers, insideplatforms and staircases, whilstguardrails are automatically aligned atthe correct height.
Lighter to store and transport
CUPLOK® tube is 20% lighter thannormal tube and is palletised for easymechanical handling and efficientstorage both in the yard and on site.CUPLOK® is so robust that delays dueto damaged components are almostunheard of. It is also less likely to getlost or stolen from site.
Safer to erect
CUPLOK® has safety built-in, as it iserected to a recognised configuration ina carefully developed sequence which
facilitates adherence to the Work atHeight Regulations 2005 at everystage.
The security of the CUPLOK® nodepoint fixing is not dependent on brutestrength.
Safer to use
CUPLOK® scaffolds provide clear,uninterrupted working platformswithout obstructions from diagonalbracing across the deck in themajority of cases. Accessories suchas staircases and ladder safety gatesensure safety when movingbetween levels.
Genuine CUPLOK®
CUPLOK®’s success has caused theproduct to be widely imitated with copyproducts claiming CUPLOK®
compatibility. Only CUPLOK® comeswith our exhaustive quality assurance.It has comprehensive technical support,product liability assurance andaccreditation under the NASC Code ofPractice. Don’t take the risk, insist ongenuine CUPLOK®.
Product development
Harsco Infrastructure’s productdevelopment team ensures that ouraccess systems are always at theleading edge of their markets. We alsowork constantly to develop new,innovative solutions for safe, cost-effective access. Our design engineersare available to provide specialist adviceand to work with customers whenconditions demand a tailored designsolution.
Safety
Harsco Infrastructure’s dedicated safetymanagement and regional safety teamsare involved in every aspect of HarscoInfrastructure’s work - from productdevelopment to site installation. Ourcommitment to safety overrides allother aspects of our business.
Important: As with all scaffolding,CUPLOK® should only be erected bytrained personnel.
3
� CUPLOK® complies withBS EN 12811 and BS EN 12810
� DIN Accreditation� Safe Working Loads on platforms will
vary between 0.75kN and 3kN persquare metre depending on theconfiguration of the scaffold
Maximum heights and tying-in
The maximum height to which aCUPLOK® structure can be erected isdependent upon a range of factors.Examples of the most important are:
� The vertical distance between tiedpoints on the verticals
� Whether foot ties are used� The lift height� Wind loading� Whether it is sheeted or netted
The CUPLOK® locking procedure
The CUPLOK® locking device is formedby fixed lower cups, welded to thestandards at 0.5m intervals, and slidingupper cups which drop over the bladeends of the ledgers and rotate to lockthem firmly into place.
This revolutionary node point makesCUPLOK® extremely fast and simple toerect. Once a CUPLOK® structure is‘based out’ and levelled, subsequentlifts are automatically erected squareand horizontal.
� Whether cantilever platforms/hop-upsare used
� Leg loading� The position of the top tie relative
to the top of the scaffold
Details for typical layouts are shownin the CUPLOK® datasheets, user’smanual and user guides which areavailable by [email protected]
� To ensure safe erection, alterationand dismantling of scaffolding it isimportant that a safe method of workis followed
� European regulations require thatwork at height is properly planned,organised and carried out bycompetent persons
For scaffolding work this wouldinclude those who design, procure,supply and erect the scaffolding
CUPLOK® safety and technical information
4
ApplicationsCUPLOK® scaffold system
CUPLOK®'s versatility and wide rangeof accessories make it an ideal systemfor almost any situation - from simpledomestic building projects, to the mostcomplex access and support structures.Its ability to follow curves and complexprofiles make it equally suitable formany industrial maintenance situations.
Curved structures
CUPLOK®'s ability to allow ledgers tolock into the standards from any anglemeans that the system is ideally suitedto curved structures. With simplevariations to the normal arrangement ofledgers and transoms, both internal andexternal curves can be created by usinga combination of rectangular andtrapezium shaped bays. See page 20.
Staircase towers
CUPLOK® staircase towers incorporatespecial staircase components within aconventional CUPLOK® tower to createa safe, user-friendly access solution andare quick and simple to erect. Staircasetowers are rapidly becoming the mostpopular option for access on site.See page 12.
Access towers
Square or rectangular access towerscan be erected with standard CUPLOK®
components using either jacks andbase plates or bespoke CUPLOK®
castor wheels to give full mobility. Theworking platform can be formed usingeither scaffold boards or battens. Safeaccess is created by the use of aseparate ladder bay with a safety gategiving access to the work platform.
Loading bays
The basic loading tower uses aconventional 2.5m square CUPLOK®
tower with additional specialcomponents to strengthen the platformenabling it to support heavy, palletisedmaterials which can be forklifted orcraned directly to the working platformlevel. See page 18.
Support structures
CUPLOK® is widely used to createfalsework support structures. Its highleg load capacity and range ofcomponents give the system thecapability to tackle virtually any supportapplication. For formwork support, awide range of grid variations can becreated to suit the loadingrequirements and the decking system.See page 21.
Horizontals
5
Verticals (standards)
All CUPLOK® standards incorporatelower fixed cups at 0.5m intervals withcaptive rotating top cups which secureup to four components. Accessstandards incorporate a 150mm spigotat the top to allow the verticalconnection of further standards.Provision for a locking pin or bolt is alsoprovided.
Base/head plate
Used in conjunction with the universaljack. The spigot is drilled to allow for theinsertion of a securing bolt if required.
Horizontals (ledgers and transoms)
All ledgers and transoms incorporatesymmetrical forged blade ends makingassembly quick and simple, and allowscomponents to be completelyinterchangeable. Horizontals locate inthe bottom cups of the standards andare secured by locking the top cup.
� 2.5m horizontals provide the basicbay length in a CUPLOK® accessstructure. This is a suitable bay sizefor all common access loadingconditions
� 1.8m horizontals provide a make-upbay size for added flexibility
� 1.3m transoms support a five boardwide platform. This transom can alsobe used as a ledger for extra flexibilityand to create corner returns withoutoverlapped boards
� Normal horizontals also act asguardrails
Universal jack
Universal jacks have an adjustmentof up to 0.5m and are used toaccommodate variations in groundlevels and to level the structure.They are used in conjunction withbase/head plates and forkheads.
Code No. Length (m) Weight (kg)
271060 0.6 2.7
271090 0.9 3.8
271127 1.25 4.8
271130 1.3 4.9
271180 1.8 6.9
271250 2.5 9.5
271300 3.0 11.5
Verticals with spigots
Code No. Length Overall length Weight
(m) (m) (kg)
270100 1.0 1.150 5.8
270200 2.0 2.150 11.2
270300 3.0 3.150 16.5
Code No. Adjustment (m) Weight (kg)
279540 0.4 2.2
279550 0.5 4.0
Code No. Height (m) Weight (kg)
279500 0.110 2.3
Code No. Adjustment (m) Weight (kg)
279555 0.5 3.8
Combined jack and base plate
Components
Verticals without spigots
Code No. Length (m) Weight (kg)
270043 0.4 2.4
270083 0.8 4.1
270133 1.3 6.6
270183 1.8 9.1
270233 2.3 11.6
500mm
220mm
500mm
80mm
420mm
500mm
80mm
6
Intermediate transoms
These units are designed to provideintermediate support for standardscaffold boards by spanning betweenthe inner and outer ledgers. The jawsection at each end is turneddownwards to prevent dislocation.One end is provided with an integrallocking device to prevent movementalong the ledgers during use.
The 1.3m intermediate transomssupport a standard five board platform.Two and three board intermediatetransoms are used where scaffoldboards require support between hop-upbrackets. They span between the insideledger of the main scaffold and theledger linking the hop-up brackets.1.8 and 2.5m intermediate transomscan be used in 'birdcage' structures andother specialist applications.
Inside board transoms
Acts as an intermediate transom butextends beyond the inside ledger toprovide intermediate support for one ortwo inside boards. Drops into placeover the ledgers and is secured with alocking device to prevent movement.
Single board support
Locates in the cup joint and providessupport for a single inside board at avertical. It replaces the inside boardtransom at that point.
Return device
A conventional blade end connected toa hook section which locates over theledger on the adjacent return scaffold toprovide a connection. Used in pairs.
Spigot pin
A quick-action locking device whichresists tensile forces between verticalmembers. There are no loose nuts orbolts.
Hop-up brackets
Designed to increase the overall widthof the working platform by supportingtwo or three additional boards beyondthe inner face of the scaffold. Itincorporates a cup joint at the outer endto allow the fitting of an inside ledgerand a socket to support a handrail post.
Steel toeboard
A new steel toeboard system designedspecifically for CUPLOK®. It canincorporate curves, angles and cornersand provides quick, sturdy protection atplatform level.
ComponentsCUPLOK® scaffold system
Code No. Length (m) Weight (kg)
272056 0.565 (2 board) 2.8
272078 0.795 (3 board) 3.7
272130 1.3 5.5
272180 1.8 7.3
272250 2.5 16.5Code No. Length (m) Weight (kg)
274713 1.3 3.1
274718 1.8 4.3
274725 2.5 8.5
Code No. Length (m) Weight (kg)
273101 1.62 (1 board) 9.0
273200 1.895 (2 board) 11.5
Code No. Diameter (mm) Weight (kg)
279340 8.0 0.09
Code No. Description Length Weight
(m) (kg)
274200 2 board 0.565 6.3
274300 3 board 0.795 7.7
Code No. Weight (kg)
279280 1.15
Code No. Length (m) Weight (kg)
279300 0.26 1.5
7
Scaffold boards
A variety of lengths are available forsupport at either 1.2m or 1.5m asrequired.
Please [email protected]
Castor wheel
For use when CUPLOK® is erected as amobile tower. The shank of the castorfits into the base of the CUPLOK®
standard and is secured with ahexagonal head bolt.
Handrail post
For use with hop-up brackets, 4 legstaircase towers and on supportscaffolds when required. Incorporatescup joints to allow the location ofledgers to form guardrails.
Hook decks
Harsco Infrastructure supply a widerange of hook decks in 2.5m, 1.8m and1.3m lengths to suit different marketapplications. For further informationemail [email protected]
Swivel face brace
Provides face bracing on a CUPLOK®
access scaffold. Each brace hasswivelling blade ends to allow for easylocation within the node joint. As onlyone blade end can be located in eachjoint, parallel bracing is employed ratherthan the 'dog-leg' or 'zig-zag' method.
L
X
Y
Swivel blade
Deck Adaptor
CUPLOK® deck adaptor
This component allows the laying of alevel, uninterrupted platform across thetop of a CUPLOK® birdcage structure.The deck adaptor fits on the top of anaccess vertical and has a low-profileupper cup which screws down to lieflush with adjacent boards.
Code No. Description Diameter Weight
(mm) (kg)
279080 Rubber 200 6.7
279100 Steel 200 7.0
Code No. Overall length (m) Weight (kg)
279244 1.150 4.9
Code No. Weight (kg)
271909 1.3
Code No. Description Length Weight
x y (m) (kg)
276150 1.8 x 1.5m 2.343 8.7
276180 1.8 x 2.0m 2.691 9.8
276153 2.5 x 1.5m 2.916 10.7
276203 2.5 x 2.0m 3.202 11.5
276207 3.0 x 2.0m 3.606 13.0
8
ComponentsCUPLOK® scaffold system
Ladder safety gates
The CUPLOK® safety gate allows safeladder access to and from the workingplatform. The sprung gate mechanismensures that the access openingremains fully closed when the scaffoldis in use. Two sizes are available.
Plastic plate
Half coupler
Plastic plate
Half coupler
Code No. Size (m) Weight (kg)
279448 0.8 14
279449 1.4 24
9
Swan necked vertical
Locates on the horizontal members toprovide an opening in the guardrails of astandard CUPLOK® bay to allow ladderaccess to the working platform.
Deck
Ladder
Safety gate
Single boardsupport toprevent rotation
Larger spans
To create openings or support spansgreater than the normal bay width, avariety of Harsco Infrastructurealuminium beams may be used tosupport the upper section of thescaffold structure.
Deck
Extra horizontal
Swan necked vertical
Ladder
Half coupler
Safety gate
Code No. Length (m) Weight (kg)
270172 1.72 7.2
10
Omega componentsCUPLOK® scaffold system
Batten platforms
The Omega batten system incorporatesall the main CUPLOK® componentsbut replaces the tubular transom withthe profiled Omega transom intowhich steel or timber battens slot toprovide a secure, flush work platform.No intermediate transoms are required.Battens are either timber or steel units.
Omega transom
The standard 1.3m Omega transomprovides a firm location for a five boardwide Omega batten scaffold. Thespecially designed section provides avery strong supporting platform andprevents the battens from moving.Forged blade ends locate into the cupjoint of the vertical in the normal way.A 0.8m unit is available for use where anarrow width scaffold is required.
2.5 and 1.8m Omega transoms can beused when CUPLOK® is erected toform a birdcage access scaffold usingtimber or steel battens, or on mobileaccess towers in modular sizes.
Return transom
A transom with a hook profile whichlocates over the ledger of the adjacentreturn scaffold, linking the two sectionstogether.
Omega single board support
Locates at the cup joint and providessupport for a single inside batten.
Omega hop-up bracket
Designed to increase the overall widthof the working platform by supportingtwo or three additional battens beyondthe inner face of the scaffold. Itincorporates a cup joint at the far end toallow the fitting of an inside ledger anda socket to support a handrail post.
Code No. Size Overall Weight
(m) length (m) (kg)
275080 0.8 0.752 3.9
275130 1.3 1.252 6.6
275180 1.8 1.752 10.0
275254 2.5 2.452 24.8
(Heavy duty type)
Code No. Length (m) Weight (kg)
275550 1.3 8.6
Code No. Overall length (m) Weight (kg)
275510 0.267 2.3
Code No. Description Overall Weight
length (m) (kg)
275520 2-Board 0.585 6.6
275530 3-Board 0.815 7.6
11
Code No. Weight (kg)
279200 1.0
Timber battens
All CUPLOK® timber battens are 63mmthick and of 225mm nominal width.Weights shown are approximate at27% moisture content.
Steel battens
CUPLOK® galvanised steel battens haveoverall depth of 57mm and are 238mmwide.
They incorporate a perforated surfacefor slip resistance.
Toeboard clips
Timber
For use with timber battens only.Locates around the standards and sitson the 'top-hat' section of the Omegatransom.
Steel
For use with steel battens only. Locatesaround the standards and locks thetoeboard securely into position.
End toeboard clip
Locates on the Omega transom.For use with timber or steel battens.
Code No. Description Overall Weight
length (m) (kg)
274613 1.3m 12.50 12.5
274617 1.8m 17.50 17.5
274625 2.5m 24.50 24.5
Code No. Description Overall Weight
length (m) (kg)
274512 1.3m 1.25 9.1
274517 1.8m 1.75 13.0
274525 2.5m 2.45 17.5
Code No. Weight (kg)
279180 0.74
Code No. Weight (kg)
275585 1.5
12
Staircase towersCUPLOK® scaffold system
� Broad landing platforms with steel ortimber battens
� Full guard-railing to stairs andlandings with double guardrails
� Stairways are rigid and provide, firmnon-slip treads ensuring maximumsecurity for users
� Removes potentially hazardous deckopenings normally created by ladder
Staircase sizes
CUPLOK® staircase towers are basedon three plan layouts, using four,eight or ten leg tower structures.Staircase flights are available in steelor aluminium.
Each staircase type comes in 1.5mor 2m lifts for maximum flexibility.Different lift sizes may be combinedin the same tower to suit workplatform levels.
A CUPLOK® public access stair is alsoavailable. See CUPLOK® staircasebrochure or CUPLOK® user’s manualfor details.
CUPLOK® staircase towers incorporatepurpose designed stairway units andoffer a safer, quicker, more efficientroute between levels on site. They arequick and easy to erect and generatesignificant time savings for everyoneon site.
There are four basic staircase options inthe CUPLOK® range. All use thestandard CUPLOK® system to providethe main structure - with a smallnumber of additional staircasecomponents, including a choice of steeland aluminium stairway units.
13
4 leg staircase tower
Plan area: 1.8m x 3m
Landing platforms: 0.6m x 1.8m
Stair width: 0.8m
Lift height: 1.5m or 2m
Stair units: steel or aluminium
Max height: 40m*
*Greater heights may be achieved but requirespecific design.
The 4 leg staircase tower is the mostcompact staircase option. It employsthe fewest components and cantherefore be erected faster and in moreconfined spaces, giving a convenientand economical access solution. A newpurpose-designed steel mesh landingplatform provides a superior option tothe staircase transom unit, boardbearers and scaffold boards.
14
Staircase towersCUPLOK® scaffold system
8 leg staircase tower
Plan area: 1.8m x 4.4m
Landing platforms: 1.3m x 1.8m
Stair width: 0.8m
Lift height: 1.5m or 2m
Stair units: steel or aluminium
Max height: 38m*
*Greater heights may be achieved but requirespecific design.
This larger configuration can be built toa height of 38m (subject to ties andloadings).
The plan module is 4.4m long overall,incorporating a centre bay of 1.8m andtwo 1.3m landing modules at eitherend. These allow the use of 1.3mOmega transoms in conjunction withtimber or steel battens to form thelanding platforms.
The wider landing platforms give thisstaircase greater capacity.
15
10 leg staircase tower
Plan area: 1.8m x 4.4m
Landing platforms: 1.3m x 1.8m
Stair width: 0.8m
Lift height: 1.5m or 2m
Stair units: steel or aluminium
Max height: 53m*
*Greater heights may be achieved but requirespecific design.
This staircase is similar in layout to the8 leg tower, but incorporates twoadditional central standards at theinside ends of the staircase flights.This gives the structure greaterstrength and rigidity allowing heavierloading and construction to a maximumheight of 53m.
16
Staircase componentsCUPLOK® scaffold system
Mesh landing unit
A composite steel landing unit withmesh decking for use on the 4 legstaircase. Incorporates hooks to locateover side ledgers and sockets to receivehandrail posts.
Aluminium staircase units
Staircase flights to the samedimensions as the steel stairs, butapproximately half the weight for easeof handling.The 1.5m unit incorporatesan aluminium landing at the base ofthe flight.
Aluminium staircase: 1.8m bay x 1.5m lift
Aluminium staircase: 1.8m bay x 2m lift
Staircase units
Steel staircase units
Available in two sizes, each staircaseincorporates steel stiles for maximumrigidity and steel treads giving a firm,slip-resistant step. The 1.5m unitincorporates a plywood landing at thebase of the flight.
Steel staircase: 1.8m bay x 1.5m lift
Steel staircase: 1.8m bay x 2m lift
Code No. Length (m) Weight (kg)
279417 1.8 32.0
Code No. Height (m) Weight (kg)
279418 1.5 28.0
279419 2.0 30.0Code No. Height (m) Weight (kg)
279400 1.5 55.0
279420 2.0 73.1
All Harsco Infrastructure CUPLOK® staircasescomply with BS EN 12811.1:2003 Class B.
17
Staircase handrail units
A special double-handrail unit for usewith 1.5m lift staircase units. Suppliedin right hand and left hand versions.
2m lift staircases use standardCUPLOK® 2m x 1.8m diagonal bracesas handrails.
Staircase guardpost/handrail post
Type 1: fitted at the top and bottom ofeach flight to provide support for innerstair guardrails. Incorporates a halfcoupler fitting at the base to secure it tothe ledgers and two cup joints toreceive the swivel blades on thehandrails. Used on 8 leg towers only.
GuardpostType 1
Handrail postType 2
Further details on the construction ofstaircase towers can be found in theCUPLOK® user’s manual or by [email protected]
Code No. Size Weight (kg)
279404 Left hand 1.8 x 1.5m 14.2
279403 Right hand 1.8 x 1.5m 14.2
Code No. Weight (kg) Overall length (m)
279244 Type 1 7.2 1.23
279380 Type 2 4.9 1.15
Type 2: standard CUPLOK® handrailpost: used on the 4 leg staircase whereit locates within the sockets on themesh landing unit.
18
Loading baysCUPLOK® scaffold system
CUPLOK® loading bays incorporate aspecially strengthened platformdesigned to support heavy palletisedmaterials. It features a new up and over,‘flexi arm’ gate which keeps theoperator a safe distance from theplatform edge. As the gate is raised, asafety barrier is automatically loweredin front of the operator maintainingconstant edge protection.
Wider bays can be constructed bysubstituting the mesh panel for scaffoldtubes, a separate toeboard and meshbrickguards to maintain a completelysecure edge barrier.
Flexi arm
Links the panel to the CUPLOK®
structure, allowing it to be swung intothe overhead position whilstautomatically lowering the temporaryprotection barrier.
Mesh panel
Back
Front
2205
1000
Note*Hinging coupler can be
removed to eliminate handing
Code No. Length Height Weight
(mm) (mm) (kg)
019005 1751 1781 19.1
Hinging coupler can be reversed toeliminate left and right-hand versions.
Code No. Length (mm) Weight (kg)
271137 1300 8.5
271254 2500 14.5
HD aluminium ledger
Supports the board bearers at decklevel eliminating the need for kneebracing when supporting light loads.
19
Board bearer
Bearers are installed beneath the deckto provide support to the deck andloaded materials. The number of unitswill be dependent upon the requiredcapacity of the platform.
Guardrails
Conventional scaffold tubes spanbetween the flexi arms to create theinner safety barrier and operating bar.They can also be used to create a frontbarrier as an alternative to the meshpanel allowing loading bays of differentwidths to be created.
Code No. Length (mm) Weight (kg)
279040 2572 17.3
Knee brace
Used in pairs to provide extra supportto the ledger on which the boardbearers rest. Incorporates a half couplerfitting which locates on the ledger 1.5mbelow the platform and a double halfcoupler fitting to bolt onto the ledger atplatform level.
Code No. Length (mm) Weight (kg)
279260 1.860 8.23
20
Curved and circular structuresCUPLOK® scaffold system
Circular structures
CUPLOK®'s ability to allow ledgers tolock into the standards from any anglemeans that the system is ideally suitedto curved and circular structures -without the requirement for specialcomponents.
With simple variations to the normalarrangement of ledgers and transoms,both internal and external curves can becreated by using a combination ofrectangular and trapezium shaped bays.(Trapezium shaped bays incorporateinside and outside ledgers of differentlength).
Further details on the construction ofcircular structures can be found in theCUPLOK® user’s manual or by [email protected]
Layout of ledgers and transoms
As two ledgers or transoms can befitted into the same cup at less than90 degrees to each other on curvedstructures, inside and outside ledgersand transoms cannot all be fitted at thesame level. This requires certainamendments to normal CUPLOK®
layouts:
� On scaffolds forming an outsidecurve, locate the outside ledgersabove the deck level to form thehandrails
� On scaffolds forming an inside curve,move the inner ledgers down by0.5m in alternate bays
� Construct trapezium shaped baysusing the shortest possible ledgersas intermediate transoms cannot beused
� If larger trapezium bays are inevitable,thicker boards should be used
Decking on circular structures
The work platform can be created usingscaffold boards or specially cut battens.To create a continuous working deckusing scaffold boards, someoverlapping is inevitable. To avoidcreating safety hazards, please observethe following procedures:
� All boards should be laid in line withthe run of the scaffold
� If rectangular bays with intermediatetransoms are used the boards overthese bays must form the lower ofthe two layers
� The overlapping boards of the upperlayer should, ideally, be cut to give aneat edge and fillet pieces nailedacross the ends to prevent a triphazard
Further details on the construction ofcircular structures can be found in theCUPLOK® user’s manual.
Trapezium bayRectangular bay
B: Using only trapezium shaped bays:
A: Using a combination of rectangular andtrapezium shaped bays:
Related literature
For further details on safe erection anddismantling procedures please refer tothe relevant Harsco Infrastructure userguide or the CUPLOK® user’s manual.Other relevant publications include:
� CUPLOK® user manual� CUPLOK® scaffold system user guide� CUPLOK® staircase brochure� Scaffold decking user guide� Scaffold tube, fittings, steel and
aluminium beam user guide� Harsco Infrastructure guide to
formwork and shoring� Safety harnesses for use with
CUPLOK®
These brochures and guides canbe obtained by [email protected]
Further advice regarding the designof more complex applications isavailable - please [email protected]
21
Support structures
Associated components
DU-AL™ aluminium beam
Complementing CUPLOK® in thecreation of formwork support structuresis Harsco Infrastructure DU-AL™aluminium beam system. Its highstrength allows larger grids to beachieved and its low weight makes iteasy to handle and quick to erect.The DU-AL™ aluminium beam systemincludes three beam profiles. In eachcase they are supported in forkheadsmounted on the CUPLOK® verticals andfastened in place with a quick-fixingclamp.
EXTRAGUARD™ edge protection
Mesh barrier panels which clamp ontothe DU-AL™ aluminium beam toprovide edge protection to theformwork deck. Galvanised and powdercoated in high visibility yellow, thepanels also incorporate an integraltoeboard.
CUPLOK for support structures
CUPLOK® is an ideal system forfalsework support structures due to itsadaptability, high leg load and widerange of accessories.
The CUPLOK® system includes awide range of specialist supportcomponents for use with HarscoInfrastructure and other formworksystems. For further details contactHarsco Infrastructure by [email protected]
Benefits
The key advantages of CUPLOK® overtraditional scaffolding for supportstructures are:
� High leg load: up to 74kN� Unique node point: four connections
in one action� Quick erection and systemised
bracing� Lighter than traditional scaffolding
All information in this brochure is correct at thetime of going to press. Harsco Infrastructurereserves the right to change products details orwithdraw products at any time. Harsco CorporationTrademarks – Companies within the Harsco Groupare the proprietors of, amongst others, thefollowing trading names and trade marks:Harsco, Harsco Infrastructure, SGB, Huennebeckand Patent.
For further information onHarsco Infrastructure,please contact:[email protected]
Harsco InfrastructureHarsco HouseRegent Park299 Kingston RoadLeatherheadSurrey KT22 7SGTel: +44 (0) 1372 381 300
Harsco InfrastructureRehhecke 8040885 RatingenGermanyTel: +49 (0) 2102 937 0
Harsco Infrastructure650 From RoadSuite 525ParamusNJ, 07652USATel: +1 201 261 5600
Or visit us at:www.harsco-i.com
www.harsco-i.atwww.harsco-i.co.ukwww.harsco-i.czwww.harsco-i.dewww.harsco-i.dkwww.harsco-i.frwww.harsco-i.huwww.harsco-i.itwww.harsco-i.nlwww.harsco-i.nowww.harsco-i.plwww.harsco-i.rowww.harsco-i.ruwww.harsco-i.sewww.harsco-i.sk
©20
10H
arsc
oC
orpo
ratio
n03
10/C
DP
/1.5
K/H
306