Cumulative Impact Assessment for the Wind Energy Sector
Lori Anna ConzoSenior Environmental Specialist, IFC
Prepared for: Wind Farms and the Environment Regional Workshop, Belgrade, Serbia
27 May ‘15
Environmental Impact Assessment (EIA)
Cumulative Impact Assessment (CIA)
Sensitive Receptors, known as “Valued Environmental & Social Component”
Cumulative Impact Assessment (CIA)
Bird Population
Cumulative Impact Assessment (CIA)
BatPopulation
Cumulative Impact Assessment (CIA)
Communities
Red Sea/ Rift Valley Flyway
Dana Nature Reserve / Important Bird Area (IBA)
To be constructed
Will be operational soon
Progress made to date in Jordan
• Scoping Phase• Discussions with focal groups of
stakeholders• Identify spatial boundaries • Identify “VECs” • Identification of existing data
Progress made to date in Jordan
• Identified consultant consortium – project manager, international experts, local experts
• Designed standardized baseline methods• Identified all potential surveyors in Jordan
and carried out in-field training• Implementing standardized baselines at three
wind farm sites• Multi-stakeholder ‘Advisory Committee’
Progress made to date in Jordan
• Developers hired the local consultants• IFC’s CIA international team overseeing local
consultants
Next Steps
• Identify baseline conditions• Undertake uniform Collision Risk Assessment
for each wind farm• Impact assessment• Identify highest risk situations• Identify potential mitigation measures• Eventually… joint post-construction
monitoring
Lessons learnt so far…
• Start process with developers• Ensuring that developers understand the
benefits:– Joint monitoring approaches is cost effective– Access to financing (IFC / EBRD / other
requirement)– Builds credibility– Potential to improve relationships with
stakeholders
Lessons learnt so far…
• Spend adequate time at beginning of process to collect existing data
• Whatever initial timeframe was planned – double it
Thank you!