CTCN TECHNICAL
ASSISTANCE
TECHNOLOGY DESIGN & PRIVATE SECTOR FINANCING
FOR CLIMATE RESILIENT CROP PRODUCTIVITY IN MALI
![Page 2: CTCN TECHNICAL ASSISTANCE€¦ · •Coaching and Promoter Preparation •Information Feedback and Incorporation (Stakeholders) •Project Introduction. RESULTS •Project Documents](https://reader034.fdocuments.net/reader034/viewer/2022050402/5f7fadfe3cecab5e4a756552/html5/thumbnails/2.jpg)
GAMA IN PICTURES
![Page 3: CTCN TECHNICAL ASSISTANCE€¦ · •Coaching and Promoter Preparation •Information Feedback and Incorporation (Stakeholders) •Project Introduction. RESULTS •Project Documents](https://reader034.fdocuments.net/reader034/viewer/2022050402/5f7fadfe3cecab5e4a756552/html5/thumbnails/3.jpg)
CONTENTS
• About PFAN
• Project Background
• Technical Assistance
• Approach
• Results
• Challenges
• Lessons Learnt
• Recommendations
![Page 4: CTCN TECHNICAL ASSISTANCE€¦ · •Coaching and Promoter Preparation •Information Feedback and Incorporation (Stakeholders) •Project Introduction. RESULTS •Project Documents](https://reader034.fdocuments.net/reader034/viewer/2022050402/5f7fadfe3cecab5e4a756552/html5/thumbnails/4.jpg)
About PFAN
• PFAN is a network member of CTCN and an affiliate of UNIDO. PFAN matches private financing with innovative low carbon, climate resilient projects in developing countries and emerging economies.
PFAN serves three functions:
• Capacitate entrepreneurs and businesses to develop bankable projects
• Mitigate investor risk
• Facilitate project funding to increase and mainstream investments in low carbon, climate resilient projects for sustainable development
![Page 5: CTCN TECHNICAL ASSISTANCE€¦ · •Coaching and Promoter Preparation •Information Feedback and Incorporation (Stakeholders) •Project Introduction. RESULTS •Project Documents](https://reader034.fdocuments.net/reader034/viewer/2022050402/5f7fadfe3cecab5e4a756552/html5/thumbnails/5.jpg)
PFAN cont’d
• Over 10 years operational experience in origination, preparation,
development and finance facilitation.
• PFAN has raised over USD 850 million of private sector investment for
clean energy and climate change projects
• The investments equate to 590 MW of clean generation capacity and an
annual mitigation potential of 2,6 million tons of CO2 equivalent
• A little over 300 projects in pipeline with a total investment volume of $6,9B
![Page 6: CTCN TECHNICAL ASSISTANCE€¦ · •Coaching and Promoter Preparation •Information Feedback and Incorporation (Stakeholders) •Project Introduction. RESULTS •Project Documents](https://reader034.fdocuments.net/reader034/viewer/2022050402/5f7fadfe3cecab5e4a756552/html5/thumbnails/6.jpg)
BACKGROUND
PROJECT
• Construction of a semi industrial storage and processing facility drawing its entire power needs from the installation of an 80KW capacity Solar PV plant
• Targets 3 fruit crops namely mango, okra and potatoes
• Stalled Development
• - partly due to money (owner resources)
• No Financing
• - business readiness
![Page 7: CTCN TECHNICAL ASSISTANCE€¦ · •Coaching and Promoter Preparation •Information Feedback and Incorporation (Stakeholders) •Project Introduction. RESULTS •Project Documents](https://reader034.fdocuments.net/reader034/viewer/2022050402/5f7fadfe3cecab5e4a756552/html5/thumbnails/7.jpg)
TECHNICAL ASSISTANCE
• Review and update the business plan and supporting documentation accordingly;
• Develop a cash flow model and investment needs to reflect the project business;
• Conduct and produce an independent feasibility audit of the business plan to
support investment decisions;
• Facilitate financing;
• Formulate recommendations and best practices.
![Page 8: CTCN TECHNICAL ASSISTANCE€¦ · •Coaching and Promoter Preparation •Information Feedback and Incorporation (Stakeholders) •Project Introduction. RESULTS •Project Documents](https://reader034.fdocuments.net/reader034/viewer/2022050402/5f7fadfe3cecab5e4a756552/html5/thumbnails/8.jpg)
APPROACH
• Information Interviews and Desktop Review
• Coaching and Promoter Preparation
• Information Feedback and Incorporation (Stakeholders)
• Project Introduction
![Page 9: CTCN TECHNICAL ASSISTANCE€¦ · •Coaching and Promoter Preparation •Information Feedback and Incorporation (Stakeholders) •Project Introduction. RESULTS •Project Documents](https://reader034.fdocuments.net/reader034/viewer/2022050402/5f7fadfe3cecab5e4a756552/html5/thumbnails/9.jpg)
RESULTS
• Project Documents Readiness
- exist in the form acceptable to investing community
- reflect current information
• Promoter’s Capacity Enhanced
- Promoter is able to pitch project with confidence
• Project Introduced to Investor(s)
- ISM-E
- Injaro
- Others
![Page 10: CTCN TECHNICAL ASSISTANCE€¦ · •Coaching and Promoter Preparation •Information Feedback and Incorporation (Stakeholders) •Project Introduction. RESULTS •Project Documents](https://reader034.fdocuments.net/reader034/viewer/2022050402/5f7fadfe3cecab5e4a756552/html5/thumbnails/10.jpg)
CHALLENGES
• Data Validation
• Source and credibility
• Finance Facilitation
• Investor identification/Aligned Interest
• Location concerns
• Technology Options
• Design and Cost Information
![Page 11: CTCN TECHNICAL ASSISTANCE€¦ · •Coaching and Promoter Preparation •Information Feedback and Incorporation (Stakeholders) •Project Introduction. RESULTS •Project Documents](https://reader034.fdocuments.net/reader034/viewer/2022050402/5f7fadfe3cecab5e4a756552/html5/thumbnails/11.jpg)
LESSONS LEARNT
• Importance of Physical Presence
- Faster progress achieved with in country visits
• Promoter Commitment & Signaling
- Promoter investment was an attraction to potential investment
• Stakeholder Engagement (NDEs)
- Facilitates access to information
![Page 12: CTCN TECHNICAL ASSISTANCE€¦ · •Coaching and Promoter Preparation •Information Feedback and Incorporation (Stakeholders) •Project Introduction. RESULTS •Project Documents](https://reader034.fdocuments.net/reader034/viewer/2022050402/5f7fadfe3cecab5e4a756552/html5/thumbnails/12.jpg)
RECOMMENDATIONS
• Technology Design Assistance
- Should precede business development and finance facilitation
• Monitoring & Tracking
- Can be part of the TA and monitoring period should be longer than TA
• Co-Financing
- Consider having proponents contribute to TA esp. those in a position to do so
• Follow on Assistance
- Implementation phase or residual activities
![Page 13: CTCN TECHNICAL ASSISTANCE€¦ · •Coaching and Promoter Preparation •Information Feedback and Incorporation (Stakeholders) •Project Introduction. RESULTS •Project Documents](https://reader034.fdocuments.net/reader034/viewer/2022050402/5f7fadfe3cecab5e4a756552/html5/thumbnails/13.jpg)
THANK YOU
• Contact Information
Albert Boateng
albertboatengppl (skype)