Conference highlights include:
•FirsthandfeedbackfrominternationalcompanieswithexperienceofmeetingtheASEAN region’s coal demands
•Detailedanalysisofinfrastructure challengesandthesolutionsthatarecurrentlybeingproposed
•Complimentary field triptothesiteofEVN’sDuyenHai3coalfiredpowerplant
5-6 November 2014 SofitelSaigonPlaza,HoChiMinhCity,Vietnam
SILVER SPONSOR BRONZE SPONSORS
coaltrans.com/emergingasia @CoaltransEvents | #CoaltransEmerging
Inassociationwith
HIGHLIGHTING KEY COAL GROWTH MARKETS: MALAYSIA, MYANMAR, PHILIPPINES, THAILAND AND VIETNAM
VietnamisforecasttohavethegreatestgrowthininstalledenergygenerationcapacityoutsideofIndonesiabetween2013and2020.Timelineshavebeensetandplansareinplacetomovetheprojectsforward.Bymovingthe3rd Coaltrans Emerging Asia Coal MarketstoHoChiMinhCity,theconferencewillfocusontheopportunitiesthiswillcreatefortheinternationalcoalproducersasthecountrybecomesincreasinglydependentoncoalimports.
LikeusonFacebookfacebook.com/coaltrans
GET INVOLVED
JoinourLinkedIngroupCoaltransConferencesCommunity
FollowusonTwitter@CoaltransEvents
CRITICAL FIGURES FOR SOUTH EAST ASIA:
TOP THREE REASONS TO ATTEND
20132020
176GW-44GW
coal
263GW-83GW
coal
TOTALENERGYGENERATION IMPORTEDCOALDEMAND
2013 2020
56Mt 131Mt
TOTALCOALDEMAND
2013 2020
360Mt214Mt
COALIMPORTSINCREASEBYCOUNTRY(2013-2020)
THAILAND7Mt
MYANMAR10Mt
VIETNAM10Mt
PHILIPPINES
17Mt
MALAYSIA
27Mt
Source: PT Adaro
It’sanexclusiveopportunitytomeet,learnfromandnetworkwiththose conducting business in the ASEAN region
Youwillhear the latest updatesonregulatorypolicy,financialopportunitiesandlogisticalchallengesfacingemergingcoalmarkets
Thiseventwilldevelopyourknowledgetostrategicallyandsuccessfullydevelop coal mining projects across the region
1
2
3
2
NAME: MaoKheOWNER: VinacominCOAL: LocalOPERATION: 2014LATEST: Operation2014
NAME: VinhTan1OWNER: ChinaSouthernCOAL: ImportedOPERATION: 2014LATEST: Contractsigned2014
NAME: ThaiBinh1OWNER: EVNCOAL: LocalOPERATION: 2015LATEST: Contractsigned2014
NAME: MongDuong1OWNER: EVNCOAL: LocalOPERATION: 2015LATEST: Underconstruction
NAME: UongBi2/2OWNER: EVNCOAL: LocalOPERATION: 2012LATEST: Operation2013
NAME: VinhTan2OWNER: EVNCOAL: LocalOPERATION: 2014LATEST: Undercommissioning
NAME: ThaiBinh2OWNER: PVPowerCOAL: LocalOPERATION: 2015LATEST: Contractsigned2014
NAME: MongDuong2OWNER: AES+Chinese/KoreancompaniesCOAL: LocalOPERATION: 2015LATEST: Undercommissioning
NAME: VinhTan3OWNER: 1Energy–EVNCOAL: LocalOPERATION: 2015LATEST: Contractsigned2013
ABOUTTHEORGANISERS
CoaltransConferencesorganiseslarge-scaleinternationalcoalconferences,whichattractdelegatesfromallovertheworld.Italsorunsfocusedregionalevents,exhibitions,fieldtripsandtrainingcourses.Ithasareputationforemployingthehighestorganisationalstandards.In2014CoaltransisrunningeventsinAustralia,Canada,China,Colombia,Denmark,India,Indonesia,Poland,Russia,Singapore,SouthAfrica,SouthKorea,UK,USAandVietnam.Formoreinformationvisitwww.coaltrans.com.
TheBritishBusinessGroupVietnam(BBGV),whichstartedasaluncheonclubin1995,wasthefirstforeignBusinessGrouptoobtainformalrecognitioninVietnam.Weareanunincorporated,independent,non-profitmakingorganisation.Asamembershipgroup,wehaveover450members.TheprincipleobjectistopromoteBritishbusinessandculturalinterestsinVietnam.Wealsoraisefundsthroughcharityevents.ThesefundsaredonatedtomanyworthwhilecharityprojectsinVietnam.
OurnewBusinessCentre,openedon10thJune2014,isestablishedbasedonapartnershipagreementbetweentheUKtradeandInvestmentandtheBBGV.ItsobjectiveistomaximisetradeandinvestmentactivitiesbyhelpingBritishandVietnamesecompaniestoexplorebusinessopportunitiestogether.Thecentrewillassistcompaniesthroughawiderangeofbusiness-orientatedservices,includingmarketresearch,business-matchmakingandtradeevents.
Furthermore,itwillserveasacontactpointforBritishSmallandMedium-sizedEnterprises(SMEs)toconnectwithbusinessesinVietnambyprovidingadviceonsettingupin-marketoperations,identifyingpotentialbusinesspartnersandtraininginlocalbusinessenvironment.
VI E T N
AM
FollowusonTwitter@CoaltransEvents
Source: Platts and Duane Morris LLC
QUANGNINHTHAINGUYEN
TRAVINH
NAME: HaiPhong2OWNER: HaiPhongPowerCOAL: LocalOPERATION: 2012LATEST: Operation2014
NAME: HaiPhong3OWNER: VinacominCOAL: LocalOPERATION: 2014LATEST: Underdiscussion
HAIPHONG
KIENGIANG
SOCTRANG
THANHHOA
QUANGBINH
THAIBINH
BINHTHUAN
HATINH
NAME: AnKhanh1OWNER: AnKhanhPowerCOAL: LocalOPERATION: 2013LATEST: Underdiscussion
NAME: DuyenHai1OWNER: EVNCOAL: LocalOPERATION: 2014LATEST: Underconstruction
NAME: LongPhu1OWNER: PVPowerCOAL: ImportedOPERATION: 2015LATEST: Contractsigned
NAME: KienLuong1OWNER: TanTaoCOAL: ImportedOPERATION: 2014LATEST: Nofinancing
NAME: VungAng1OWNER: PVPowerCOAL: LocalOPERATION: 2013LATEST: Undercommissioning
NAME: QuangTrach1OWNER: PVPowerCOAL: ImportedLATEST: Underdiscussion
NAME: NghiSon1OWNER: EVNCOAL: LocalOPERATION: 2015LATEST: Undercommissioning
NAME: NghiSon2OWNER: Marubeni/KEPCOCOAL: LocalOPERATION: 2015LATEST: Constructiontobegin–2014
NAME: NghiSonEZOWNER: CongThanhPowerCOAL: LocalOPERATION: 2015LATEST: Underdiscussion
NAME: DuyenHai2OWNER:JanakuasaCOAL: LocalOPERATION: 2015LATEST: Underdiscussion
NAME: LongPhu2OWNER: IdicoCOAL: ImportedOPERATION: 2015LATEST: Underdiscussion
NAME: DuyenHai3OWNER: EVNCOAL: ImportedOPERATION: 2016LATEST: Underdiscussion
1
2
1
2
34
5
5
6
6
7
7
8
8
9
9
10
10
1111
4
3
2 3
DAy ONE WEDNESDAy 5 NOVEMbER 2014
08:00 Registration and coffee
08:55 Welcome and opening remarks Henry Hely Hutchinson, Managing Director,
Coaltrans Conferences Ltd
09:00 – 10:30GOVERNMENT KEyNOTES
Chair’sopeningremarksNick Holder, Chairman, British Business Group Vietnam (BBGV); Chief Financial Officer, Prudential VietnamSupporting Vietnam’s infrastructure developments to ensure growing energy demand can be met•Shorttermsolutionsthatwillenablecoalimportsinincreasedquantitiesfrom2015
•Longertermplansforimprovinginfrastructureassociatedwithcoalimports
•Expandingtheinternaldistributionnetwork–Whataretheoptions?
Nguyen Cong bang, Deputy Director of Transport Department, Ministry of Transport
A place to do business – The competitiveness of Vietnam as an investment opportunity•CommitmenttotheTransPacificPartnership(TPP)–WhatsecuritieswillthisofferinvestorslookingatVietnam?
•Localsourcingrequirements–Understandingtheimplicationsonanyinvestment
•HighlightingareasofopportunitywithintheVietnamesemarketandhowtheGovernmentintendstoattractfurtherinvestmentfromoverseas
Dr Vu Tien Loc, Chairman, Vietnam Chamber of Commerce and Industry (VCCI)
Questions and discussion
Networking refreshment break
11:00 – 12:45INDUSTRy KEyNOTES
Chair’sopeningremarks
Lessons learned from the first coal tenderDuong Quang Thanh, Vice President, Vietnam Electricity (EVN)
Overcoming challenges to become a coal importer in Vietnam•Establishinglongtermcontractswithreliablesuppliers•Evaluatingthepositionofbeingacustomerortakinganequitystake–Whatarethepreferredoptions?
•Resolvingthelogisticsbarriers–Existingoptionsandproposedsolutions
Do Thi Thanh binh, Deputy Director, Commercial Division, Petrovietnam Power Corporation
Malaysia’s increasing use of coal•Malaysia’srisingenergydemand–Howcancoalcontribute?•Newcoal-firedpowerplantscomingonlineinthenearfuture•ForeseenchallengesintheshorttermandmediumtermDato’ Mohd Nazri bin Shahruddin, Vice President – Energy Ventures, Tenaga Nasional Berhard
From exporter of anthracite to importer of thermal coal – Making the transition•Keylessonslearnedofinternationalcoalmarketsthroughthehandlingofcoalexports
•Domesticcoalproduction–Whatarethetargetsfor2015/2016?
•Strategicallymanagingthecostoftaxesplacedondomesticcoalproduction
•Sellingcoalatmarketprice–Howhasthisimpactedmarketdynamics?
•Proposedprocurementstrategyforsourcingthermalcoalsfromtheglobalseabornemarket
Speaker to be confirmed
Networking lunch
14:00 – 15:30INDONESIA: THROUGH THE
LOOKING GLASS
Chair’sopeningremarks
Overview of Indonesian coal-fired power plants coming online in the near future•Mostrecentforecastsforconstructionofnewcoal-firedpowerplantsinIndonesia–Addedpowergenerationcapacityinthecomingfiveyears
•Typesofboilerstobeusedanddemandfordifferentcoalqualities
•Willtheexistingandnewplantsbesufficienttomeetdemand?Inwhatareasisconstructionofnewplantsmosturgent?
Helmi Najamuddin, Head of Coal Division, PT PLN (Persero)
Rising to the opportunity – What can Indonesia offer the Vietnamese market?•Reliabilityinquality–Howcanthisbeachieved?•CreatingatransparentmarketthroughregulardialoguewithVietnamesecoalbuyers
•Thelogisticsadvantage–Maximisingthedevelopmentsinbargetechnology
Rodrigo Echeverri, General Manager, Regional Marketing, PT Adaro
Panel discussion
Questions to be answered include: •QualityofIndonesiancoals–Whatwillbethemostaccessiblecalorificvaluecoalovertheforeseeablefuture?
•Futureofregulation–HowcouldthischangeSouthEastAsia’saccesstoIndonesiancoals?
•WhatarethemostcompetitivemethodsofshippingIndonesiancoalsthroughouttheregion?
•Spotcontractsandlongtermcontracts–WhatarethepreferredmarketingstrategiesandappetiteforenteringsuchcontractswithVietnamesecompanies?
Further panellists to be announced, visit www.coaltrans.com/emergingasia for more details
Networking refreshment break
AVAILAbLE TO
SPONSOR
AVAILAbLE TO
SPONSOR
AVAILAbLE TO
SPONSOR
4
16:00 – 17:30TAKING VIETNAM TO THE NEXT LEVEL –
TAPPING FINANCIAL POCKETS
Financing options available for coal-fired power in Asia•Overcomingreluctancetoinvestincoalfiredpowerplants•StrategiesforaccessingfinancefrominternationalmarketsDuncan Ritchie, Executive Director, Aequero Ltd
Deconstructing the complexities of PPAs in Asia•DeconstructingthecomplexitiesofPPAsinAsia•OverviewofstructureandpurposeofPPAsinmanaginginvestmentrisks
•AnalysisofPPAprovisionsthathaveevolvedwiththedivergenceofAsianpowermarkets
•Key‘hotspots’whennegotiatinganAsianPPAJohn yeap, Partner and Head of Energy, Asia, Pinsent Masons
Accessibility of trade finance for Vietnamese coal buyers•Whodocoalbuyersneedtotalktodevelopadirectlinetothebanks?
•Strategiesforaccessingthecheapestinterestrates•Keyelementstoconsiderwhenapproachingthebanks
Questions and discussion
17:30 End of day one
17:45 Networking drinks reception
DAy TWOTHURSDAy 6 NOVEMbER 2014
08:55 Welcome and opening remarks Louisa Pratt, Conference Manager, Coaltrans Conferences Ltd
09:00 – 10:30WORKING WITH THE GEOGRAPHy
Chair’sopeningremarks
WiththegeographyofVietnamrestrictingthecountry’sabilitytosupportlargervessels,shippingthequantitiesofcoalthatVietnamisforecasttorequirewillbeparticularlychallengingandincreasinglyuncompetitive.Variouseffortsarebeingmadetodevelopaseriesofportsandtranshipmentfacilities.Thispaneldiscussionwillexplorethesolutionsavailableinmoredetail.
Specific topics to be discussed:•Draftlimitationsandhowtheycanbeovercome•TheVietnamcoast’sexposuretoextremeweatherconditionsforalargepercentageoftheyear
•Seriesofindividualportsversusacombinedmegadrybulkcommodityport
•Afixedtranshipmentfacilityversusafloatingtranshipmentfacility
•Bargesversusshipments–Whichtypeoftransporthasthecompetitiveedge?
•Connectingthereceiverport/facilitytotheinternalnetwork
•Appropriatefinancialframeworktoenabledevelopmentofinfrastructureprojects
Mario Terenzio, Managing Director, Logmarin AdvisorsChristopher McLean, Chief Operating Officer, N&M CommoditiesMartijn Lips, Director, Advisory Group, Maritime & Waterways, Royal HaskoningDHV
Networking refreshment break
11:00 – 12:45PRESENCE IN VIETNAM – LESSONS
LEARNED TO DATE
Chair’sopeningremarks
Investing in Vietnam – Understanding the system to make strategic choices•Evaluatingtheregulatoryenvironmentandwheretheopportunitieslie
•Managingthetaxesstructure–‘Witholdingtaxoptions’asoneexample
•CasestudiesofinvestmentsmadeintoVietnameseenergyprojects
Panel discussion:WithanumberofcompaniesstartingtoimportquantitiesofthermalandmetallurgicalcoalintoVietnam,aswellasIPPsnowundertheconstructionphase,thissessionwillallowrepresentativesateachstageofthecoalsupplychaintosharetheirexperiencesofdoingbusinessinVietnamandhowtheyintendtoexpandonthisbusinessinthefuture.
Examples of topics to be touched on include:•Developinganoperationalporttosupportcurrentrequirements•Valueofhavingaframeworktosupportelectricitypricingstructure
•Expandingacompany’spresenceintheVietnamesemarkettoenablebusinesswithlargercoalsuppliers
•BringinginternationalexperienceofcoalprocurementtoVietnam
•Managingcoalqualitiesinanewmarket•Factoringthevolatilityofcoalpricesintothefinancialplansofaproject
Nguyen Quy Dong, Sales Manager, A&A Commodities Michael Indra, Trade Manager, HeidelbergCement TradingDinh Quang Trung, General Manager, Import-Export Division, Vinacomin
Networking lunch
14:00 – 15:30CREATING CONTEXT FOR ASEAN COAL
FIRED POWER DEVELOPMENT
Chair’sopeningremarks
boiler technologies that offer competitive advantages for the ASEAN market•Combinedfluidisedboilertechnologyv.supercriticalboilertechnologyv.ultrasupercriticalboilertechnology
•Whatdothedifferenttechnologiesmeanforthevariousprojectscoaldemand?
•Increasedpresenceofalternativecleancoaltechnologiesandhowtheycorrelatewithboilertechnologies
Tony Segadelli, Managing Director, OWL Energy
AVAILAbLE TO
SPONSOR
AVAILAbLE TO
SPONSOR
AVAILAbLE TO
SPONSOR
4 5
SouthEastAsiaisoneofthefewregionsinwhichthereisactiveinvestmentintocoalfiredpower.Asenergydemandthroughoutthisregioncontinuestogrowandcoalfeaturesasaprimecomponentforensuringasecure,reliablesupplyofelectricity,whatcanthevariouscountriesthroughouttheregionlearnfromoneanother?
Topics to be discussed include: •RelationshipbetweendomesticcoalproductioninMalaysia,Myanmar,PhilippinesandThailandandtherespectivecountriesdemandforpower
•Useoftri-lateralpurchasingarrangements–CanMalaysia’ssetupberolledoutthroughouttheregion?
•Prospectsfortheexchangeofpower–Whatplansaretheretodeveloptransmission/powerlinesacrosstheregion?
Further panellists to be announced, visit www.coaltrans.com/emergingasia for more details
Closing remarks
15:30 Close of conference
For further information and to receive a detailed sponsorship prospectus, please contact:Oliver Bufton at +44 20 7779 8748 or [email protected]
SUPPORTERS
Friday 7 November 2014
NB – The field trip is subject to a minimum and maximum number of participants. Delegates will be able to join on a first-come, first-served basis. It is the sole responsibility of delegates to ensure that they are properly insured which should include adequate Personal Accident and Travel insurance. As a matter of good order, delegates should also ensure that they have liability insurance cover.
Register your participation on page 8
Note: The first coal firing date of Unit 1 is June 15, 2016.
year 2016 2017 2018 2019 2020 ...
Consumption coal volume (mil. metric tonnes) 1 3.9 3.9 3.9 3.9 3.9
DUYENHAI3(POWERGENERATIONCORPORATION1/THERMALPOWERPROJECTMANAGEMENTBOARD3)
POWERGENERATIONCORPORATION1(EVNGENCO1)belongstoVIETNAMELECTRICITY,acompanyestablishedandoperatingpursuanttotheEnterpriseLawoftheSocialistRepublicofVietnamwhichhasitsregisteredofficeatQuangTrungWard,UongBiCity,QuangNinhProvince,VietNam;representedbyThermalPowerProjectManagementBoard3.DH3EPCContractorisCHINACHENGDAENGINEERINGCO.,LTD.TheyaretheleaderoftheConsortiumconsistingofCHENGDA-DEC-SWEPDI-ZEPC.OnthebasisoftheEPCcontract,theProjecthasanominalpoweroutputof2x622MW=1244MW.
DH3islocatedinMuUHamlet,DanThanhCommuneinDuyenHaiDistrict,TraVinhProvince,Vietnam.TheprojectwillbeputintocommercialoperationinOctober2016forthefirstunitandinFebruary2017forthesecondunit.AccordingtothedecisionoftheVietnamMinistryofIndustryandTrade,thecoalsourceofDH3shouldbeimportedcoalinsteadofdomesticcoal.
Theblendhasbeenestablishedas30/70(30%bituminouswith70%Sub-bituminous).Thisproportionwillbeadjusted
afterthefirstphaseofthecontract,withthecoalexpectedtobeimportedfromIndonesiaandAustralia.Sub-bituminouscoalfromIndonesiaandbituminouscoalfromAustraliasatisfythecoalqualitysuitableforitspowerproduction,withtheofferofcompetitivecoalpricesandshortertransportationdistancesfromtheminestoVietnamcomparativetoothercoalsuppliers.
EVNGENCO1hasstipulatedthatallcoalrequiredtomeetcommittedcapacityforpowergenerationfromDuyenHai3ThermalPowerPlantmustbecontractedunderlong-termcoalsupplyagreements(TheDuyenHai3thermalpowerplant’slifeisdesignedtobe30years)witheachhavingatermofnotlessthan10years.
Duringthefirstyearofoperation,therewillbeaprogressive‘ramp-up’incoalvolumeconsumedaseachunitofthepowerstationisbroughtintoservice.ThetotalamountofimportedcoalrequiredannuallyforDuyenHai3ThermalPowerPlantisexpectedtobebetween3.7and3.9millionmetrictonnes.AnnualConsumptionCoalVolumeofDH3isshowninthebelowtable.
COMPLIMENTARy PRE-CONFERENCE FIELD TRIP
6
NETWORK WITH THE INDUSTRY
DECISION MAKERS, NEW AND
EXISTING CLIENTS.
FEATURE
ALONGSIDELEADING COAL
INDUSTRY PLAYERS
GENERATE NEW SALES AND SEAL
POTENTIAL ONES
STRENGTHENYOUR POSITIONIN THE MARKET
DEMONSTRATERESILIENCE INTOUGH TIMES
HOST YOURCLIENTS WITHHIGH QUALITYHOSPITALITY
For further information and to receive a detailed sponsorship prospectus, please contact:Oliver Bufton at +44 20 7779 8748 or [email protected]
PROMOTION
Promotional corporate literature inserted
into every delegate bag
EXHIBIT
Exhibition space in a prime
networking area of the conference
LOGO
Logo visibility on event
signage, on stage and website
DELEGATES
Pre-event delegate list sent to you
2 weeks before the conference
HANDBOOK
Logo and contact details
included in the delegate handbook
Promote your organization to Emerging Asian Coal Markets
Logo on pre- and
post-event marketing
MARKETING
7
SPONSORSHIP & EXHIBITION OPPORTUNITIES
BRONZESPONSORS
CONFIRMED SPONSORS FOR 2014:SILVERSPONSOR
6
COALTRANS EMERGING ASIAN COAL MARKETS 5-6 November 2014SofitelSaigonPlaza,HoChiMinhCity,Vietnam
please quotethis reference
ITISIMPORTANTTOFILLOUTALLTHEINFORMATIONBELOWPleasephotocopythisformformultiplebookingsBYCOMPLETINGTHEDETAILSBELOWYOUAREAGREEINGTOOURCANCELLATIONTERMSANDCONDITIONS*
1st Delegate details
Mr/Mrs/Ms_______Firstname___________________________________________
Surname_______________________________________________________________
Jobtitle_________________________________________________________________
Tel_______________________________________Fax__________________________
Email___________________________________________________________________
Confirmationwillonlybesenttothee-mailaddressprovidedabove
2nd Delegate details
Mr/Mrs/Ms_______Firstname____________________________________________
Surname_______________________________________________________________
Jobtitle_________________________________________________________________
Tel_______________________________________Fax___________________________
Email___________________________________________________________________
Confirmationwillonlybesenttothee-mailaddressprovidedabove
3rd Delegate details
Mr/Mrs/Ms_______Firstname ____________________________________________
Surname________________________________________________________________
Jobtitle_________________________________________________________________
Tel_______________________________________Fax___________________________
Email___________________________________________________________________
Confirmationwillonlybesenttothee-mailaddressprovidedabove
CONFERENCE FEE PAyMENT All payments must be received by 22 October 2014, unless registering online at www.coaltrans.com/emergingasia
CANCELLATIONSConference fees: Bycompletingthisregistrationform,youareagreeingtothetermsandconditionswherebyyouareliableforthefullconferencefees.Allcancellationsmustbereceivedinwritingby6October2014forafullrefund,lessa10%administrationcharge.Wecannotacceptverbalcancellations.Cancellationsreceivedafter6October2014areliableforthefullconferencefeesandfieldtrip.However,substitutionscanbesenttoattendinyourplaceatnoextrachargefortheentireconferenceonlywithpriornotice.Registrationsreceivedafter6October2014arestillliableforthefullconferencefeeincaseofcancellation.Ifowingtoaforcemajeure,CoaltransConferencesisobligedtopostponeorcanceltheevent,CoaltransConferenceswillnotbeliableforanytraveloraccommodationexpensesincurredbydelegatesortheirorganisations.Badgeswappingwithotherregistered/non-registereddelegatesisagainstourcompanypolicyandwillnotbepermitted.Ifyourequirealetterifinvitation,pleasecontactCoaltransConferencesatpng@euromoneyplc.com.Invitationlettersonlybeissueduponreceiptoffullpayment.Cancellationsduetounsuccessfulvisaapplicationswillstillbesubjecttothecancellationpolicy.Data protection:TheinformationyouprovideonthisformwillbeusedbyEuromoneyInstitutionalInvestorPLCanditsgroupcompanies(“we”or“us”)toprocessyourorderanddelivertherelevantproducts/services.Wemayalsomonitoryouruseofthewebsite(s)relatingtoyourorder,includinginformationyoupostandactionsyoutake,toimproveourservicesandtrackcompliancewithourtermsofuse.Excepttotheextentyouindicateyourobjectionbelow,wemayalsouseyourdata(includingdataobtainedfrommonitoring)(a)tokeepyouinformedofourproductsandservices;(b)occasionallytoallowcompaniesoutsideourgrouptocontactyouwithdetailsoftheirproducts/services;or(c)forourjournaliststocontactyouforresearchpurposes.Asaninternationalgroup,wemaytransferyourdataonaglobalbasisforthepurposesindicatedabove,includingtocountrieswhichmaynotprovidethesamelevelofprotectiontopersonaldataaswithintheEuropeanUnion.Bysubmittingthisorder,youwillbeindicatingyourconsenttotheuseofyourdataasidentifiedabove.Furtherdetailonouruseofyourpersonaldataissetoutinourprivacypolicy,whichisavailableatwww.euromoneyplc.comorcanbeprovidedtoyouseparatelyuponrequest.Ifyoudonotwantustoshareyourinformationwithourjournalistsorothercompaniespleaseticktherelevantbox.Ifyouobjecttocontactbytelephone fax oremail orpost pleaseticktherelevantbox.
Paymentmaybemadeinoneofthreeways–pleasetickappropriatebox
1.Tomakeapaymentbycreditcard,pleasevisitwww.coaltrans.com/emergingasia
2.PaymentbyBANKTRANSFERshouldbemadethroughLloydsBankplc,POBox72,BaileyDrive,GillinghamBusinessPark,KentME80LS,USDollar$AccountNumber11127713,SortCode30-12-18,SwiftCode:LOYDGB2LCTY,IBAN:GB67LOYD30121811127713(allchargestobepaidbysender)Optiononlyavailablebefore22October2014.
3.CHEQUESshouldbemadepayabletoCoaltransConferencesLtd.Areceiptedinvoicewillbesenttoalldelegates.Optiononlyavailablebefore22October2014.
Please ensure the invoice number and the company and delegate names are stated on the payment form. Please complete and return this form together with a copy of your bank transfer or cheque, payable in US$ to Coaltrans Conferences Ltd, and send by post to:Coaltrans Conferences Ltd, Nestor House, Playhouse yard, London EC4V 5EX, UK, Tel: +44 20 7779 7222, [email protected], www.coaltrans.com/emergingasia
Twoother ways to
register
Post:CoaltransConferencesLtd
NestorHouse,PlayhouseYardLondonEC4V5EX,UK
To enquireabout theconference
Email:[email protected](quotingbrochureref:)
Telephone:(UK)+442077797222(HK)+85229128038
HOTEL:
AccommodationisavailableattheSofitelSaigonPlaza–HoChiMinhCityatpreferentialratestoregistereddelegatesoftheconference.
Roomratesstatedbelowdonotincludetax(10%)orservicecharge(5%),butdoincludebreakfast.
Superiorroomforsingleoccupancy$148++Superiorroomfordoubleoccupancy$166++
Forbookinginformationpleasevisitwww.coaltrans.com/emergingasiaandclickonthehoteltab,wheredetailedinstructionsonhowtosecurethepreferentialratesandbookaccommodationaregiven.
Fee includes:1.Attendancetoallconferencesessions2.Fullconferencedocumentation,whichincludesaccesstoallavailablespeakers'papers3.Refreshments,lunchesandeveningreceptions
Organisation details
CompanyName________________________________________________________
Address________________________________________________________________
________________________________________________________________________
Postcode___________________________Country_____________________________
Email(groupcontact)_____________________________________________________
Invoice will be sent to the e-mail address provided above.
EARLy bIRD FEE $1699 (by19September2014) - STANDARD FEE $1899 (after19September2014)
The easiest way to register is online at www.coaltrans.com/emergingasia
DELEGATE RATES
Delegate by 19 September 2014 After 19 September 2014 DISCOUNT
1st $1699 $1899
2nd $1499 $1699 $200
3rd+ $1199 $1399 $500
END USER RATE*: $999
*Please note eligibility to these fees will be at the sole discretion of Coaltrans Conferences.
Complementary field trip
Complementary field trip
Complementary field trip
Please select those criteria from the below list that best describe your company’s interest areas:
Coal buying Coal trading Coal: Financial sector Coal: Logistics and shipping Coal production Coal: Consultancy/ Journalism/ Research / Law Coal: Government Coal: Mining services provider
8