CSO Long Term Control Plan · 2016. 12. 29. · July 1, 2016 – December 31, 2016 CIVIL ACTION NO....
Transcript of CSO Long Term Control Plan · 2016. 12. 29. · July 1, 2016 – December 31, 2016 CIVIL ACTION NO....
www.delcora.org
Delaware County Regional Water Quality Control Authority Chester, Pennsylvania
CSO Long Term Control Plan
Consent Decree
Semi-Annual Report No. 3
For the Reporting Period of July 1, 2016 – December 31, 2016
CIVIL ACTION NO. Case 2:15-cv-04652-RB Filed: 11/10/15
NPDES Permit Number PA0027103 A-1
December 31, 2016
Delaware County Regional Water Quality Control Authority
CSO Long Term Control Plan Update
SEMI-ANNUAL REPORT FY 2016 DECEMBER
Reporting Period of July 1, 2016 - December 31, 2016 i.
Table of Contents Section 1 Introduction .................................................................................................. 1
Section 2 Consent Decree Progress Reports ............................................................. 1
Section 3 Items Requiring Government Action .......................................................... 1
Section 4 Deadlines ...................................................................................................... 1
Section 5 Description of Work Completed Within the Six-Month Period and
Projection of Work ........................................................................................................ 2
Section 6 Summary of All Contacts with EPA AND PADEP ...................................... 2
Section 7 Statement of Exceedances of NPDES Permit LImitations ........................ 2
Section 8 Summary of All CSOs, SSOs and Unpermitted Discharges Occuring
within the Six-Month Period ......................................................................................... 2 List of Tables Table 1 Items Requiring Government Action ................................................................................................................ 3 Table 2 Deadlines for this Reporting Period of CD ....................................................................................................... 7 Table 3 Work Completed Within the Six-Month Period and to be Completed in the Next Six-Month Period .............. 11 Table 4 Summary of All Contacts with the EPA and the PaDEP ................................................................................ 17 Table 5 Summary of Any Exceedances of NPDES Permit Limitations ....................................................................... 21 Table 6 Summary of CSOs, SSOs and Unpermitted Discharges ............................................................................... 25
Appendices
Appendix 1 Additional Correspondence ...................................................................................................................... 29 Appendix 2 Notification Letters ................................................................................................................................... 31 Appendix 3 NPDES Permit Exceedance Report ......................................................................................................... 63 Appendix 4 CSOs, SSOs and Unpermitted Discharges Correspondence .................................................................. 65
Delaware County Regional Water Quality Control Authority
CSO Long Term Control Plan Update
SEMI-ANNUAL REPORT FY 2016 DECEMBER
Reporting Period of July 1, 2016 - December 31, 2016 1.
Section 1 Introduction
The Delaware County Regional Water Quality Control Authority (DELCORA) entered into a Consent Decree (CD) with the United States Government to establish a schedule for implementation of Long Term Control Plan Update (LTCPU) to achieve full compliance with the Clean Water Act and the regulations and Clean Streams Law and regulations. The lodging of this Consent Decree was entered by the court on August 17, 2015 in Civil Action Case 2:15-cv-04652-RB Document 4 by the United States District Court for the Delaware County Regional Water Quality Control Authority. The Consent Decree was signed and filed on November 10, 2015 by the United States District Court for the Eastern District of Pennsylvania. Section 2 Consent Decree Progress Reports
On the first Day of each Semi-Annual Period after the Date of Lodging of this Consent Decree and continuing until termination of this Consent Decree, DELCORA will submit to EPA and PADEP a progress report (“Semi-Annual Progress Report”) regarding the implementation of the requirements of the Consent Decree in the previous Semi-Annual Period. The Semi-Annual Progress Report will include at a minimum:
a. A statement setting forth the deadlines and other terms that DELCORA was required by the Consent Decree to meet since the date of the last Semi-Annual Progress Report, whether and to what extent DELCORA has met these requirements, and the reasons for any noncompliance;
b. A general description of the work completed within the prior Semi-Annual Period, and a
projection of work to be performed pursuant to this Consent Decree during the next or succeeding Semi-Annual Period;
c. A summary of all contacts with EPA and PADEP during the reporting period relating to
CSOs, SSOs, or implementation of this Consent Decree; d. A statement of any exceedances of NPDES Permit limitations; and, e. A summary of all CSOs, SSOs, Unauthorized Releases, and Unpermitted Discharges
occurring within the Semi-Annual Period including the actual or estimated frequency, duration, and volume of each CSO, SSO, Unauthorized Release, and Unpermitted Discharge.
Section 3 Items Requiring Government Action
Table 1 is a status report for items requiring government action this reporting period. This may include items such as permits and information requests from government agencies. Appendix 1 – Additional Correspondence contains the letters of correspondence to government agencies. Section 4 Deadlines
Table 2 is a status report of 1) the deadlines and other terms that DELCORA was required by this Consent Decree to meet since the date of the last Semi-annual Progress Report; 2) whether and to what extent DELCORA has meet these requirements; and 3) the reasons for any non-compliance.
Delaware County Regional Water Quality Control Authority
CSO Long Term Control Plan Update
SEMI-ANNUAL REPORT FY 2016 DECEMBER
Reporting Period of July 1, 2016 - December 31, 2016 2.
Section 5 Description of Work Completed Within the Six-Month Period and Projection of Work
Table 3 is a status report of 1) a general description of the work completed within the six-month period; and 2) a projection of work to be performed pursuant to this Consent Decree during the next or succeeding six-month period. Section 6 Summary of All Contacts with EPA AND PADEP
Table 4 is a summary of all contacts with the USEPA and PADEP during the report period relating to implementation of this Consent Decree. Table 4 indicates all correspondence requiring USEPA and PADEP response and date of response. Appendix 2 – Notification Letters contains all the letters that were sent to EPA and PADEP which are summarized in Table 4. Section 7 Statement of Exceedances of NPDES Permit LImitations
Under National Pollutant Discharge Elimination System (NPDES) Permit No. PA0027103, issued and administered by the Pennsylvania Department of Environmental Protection (PADEP), DELCORA is authorized to discharge from the Western Regional Treatment Plant (Outfall 001), four storm water outfalls at the WRTP (028-031) and from 26 combined sewer overflow (CSO) outfalls (002-026, 032, 033) that ultimately discharge to the Delaware River, Chester Creek and/or Ridley Creek. Table 5 is a summary of any exceedances of NPDES Permit limitations. Appendix 3 – NPDES Permit Exceedance Report contains the NPDES Permit exceedance reports generated within this six-month reporting period. Section 8 Summary of All CSOs, SSOs and Unpermitted Discharges Occuring within the Six-Month Period
Table 6 is a summary of all CSOs, SSOs and Unpermitted Discharges occurring within the six-month reporting period including the actual or estimated frequency, duration and volume of each CSO, SSO and unpermitted discharge. Appendix 4 – CSOs, SSOs and Unpermitted Discharges Correspondence contains all CSO correspondence and inspections for the reporting period.
Table 1
Items Requiring Government Action
3.
4.
Rep
ort
ing
Per
iod
of
July
1, 2
01
6 –
Dec
emb
er 3
1, 2
016
T
able
1 P
age
1 o
f 1
TA
BL
E 1
IT
EM
S R
EQ
UIR
ING
GO
VE
RN
ME
NT
AC
TIO
N
DE
LC
OR
A S
EM
I A
NN
UA
L R
EP
OR
T (
7/1
/201
6 –
12/3
1/2
016)
Refe
ren
ce
R
eq
uest
Dead
lin
e in
CD
S
tatu
s /
Co
mm
en
t D
raft
Fin
an
cia
l Ca
pab
ility
A
ssessm
en
t re
subm
itta
l
US
EP
A e
ma
il to
Bla
nk R
om
e L
LP
, st
atin
g
rece
ipt
of
resu
bm
itta
l fo
r D
raft
Fin
ancia
l C
ap
ab
ility
Ass
ess
me
nt. U
SE
PA
to
re
vie
w
su
bm
itta
l a
nd
re
spon
d to
DE
LC
OR
A
Se
e T
ab
le 4
C
on
tro
l N
o 2
6 a
nd
3
3
No
re
spo
nse
fro
m U
SE
PA
/ P
AD
EP
ha
s b
ee
n r
ece
ive
d to
da
te
rela
ting
to
Dra
ft F
CA
re
sub
mitta
l o
r m
ee
ting r
eq
ue
st.
Se
mi A
nn
ua
l Re
po
rt N
o 2
an
d
Ra
infa
ll a
nd
Flo
w M
on
ito
rin
g
Qu
art
erly
Re
po
rt N
o.
1 a
nd 2
Re
po
rt h
as b
ee
n s
ub
mitt
ed t
o U
SE
PA
an
d
PA
DE
P p
er
Co
nse
nt
Ord
er
req
uire
me
nts
.
Se
e T
ab
le 4
C
on
tro
l N
o 2
0,
21
, 2
2 a
nd
30
DE
LC
OR
A c
on
sid
ers
Co
nse
nt D
ecre
e r
eq
uire
me
nts
ha
ve b
ee
n
me
t du
e to
no
com
me
nts
fro
m U
SE
PA
/ P
AD
EP
.
5.
6.
Table 2
Deadlines for this Reporting Period of Consent Decree
7.
8.
Rep
ort
ing
Per
iod
of
July
1, 2
01
6 –
Dec
emb
er 3
1, 2
016
T
able
2 P
age
1 o
f 1
TA
BL
E 2
D
EA
DL
INE
S F
OR
TH
IS R
EP
OR
TIN
G P
ER
IOD
OF
CO
NS
EN
T D
EC
RE
E
DE
LC
OR
A S
EM
I A
NN
UA
L R
EP
OR
T (
7/1
/201
6 –
12/3
1/2
016)
Refe
ren
ce
R
eq
uir
em
en
t D
ead
lin
e in
CD
S
tatu
s (
Met
Req
uir
em
en
t o
r an
y N
on
-co
mp
lian
ce
C
D V
II.A
.42
: P
M a
nd R
ep
ort
ing
C
onsent
Decre
e S
ect
ion
VII
.A.4
2 r
eq
uires o
n
the f
irst da
y of
each s
em
i-a
nnua
l perio
d a
fter
the D
ate
of
Lodg
ing
, D
ELC
OR
A w
ill s
ubm
it to
E
PA
and P
AD
EP
a S
em
i-A
nnua
l P
rogre
ss
Report
re
gard
ing
the
imple
menta
tion o
f th
e
requirem
ents
of
the C
onse
nt D
ecre
e in t
he
pre
vio
us
sem
i-annu
al peri
od.
7/1
/16
M
et R
equ
irem
ent
(Subm
itted o
n 6
/30/1
6)
CD
V.A
.14.e
: In
itia
te R
ain
fall
and F
low
Mon
itori
ng
(1
st
Quart
er,
Marc
h –
Jun
e 3
1,
2016)
Consent
Decre
e S
ect
ion
V.A
.14
.e r
equir
es a
ll ra
infa
ll an
d f
low
monito
ring c
arr
ied o
ut in
support
of
the H
&H
model t
o b
e d
ocum
ente
d in
quart
erl
y te
chn
ical m
em
ora
nda d
ocum
entin
g
results
an
d q
ualit
y of
the
rain
fall
and f
low
m
onito
ring.
Due 0
8/0
1/1
6
Met R
equ
irem
ent
(Subm
itted o
n 0
8/0
1/1
6)
CD
V.A
.14.e
: In
itia
te R
ain
fall
and F
low
Mon
itori
ng
(2
nd
Quart
er,
July
1 –
Sep
tem
ber
30,
2016)
Consent
Decre
e S
ect
ion
V.A
.14
.e r
equir
es a
ll ra
infa
ll an
d f
low
monito
ring c
arr
ied o
ut in
support
of
the H
&H
model t
o b
e d
ocum
ente
d in
quart
erl
y te
chn
ical m
em
ora
nda d
ocum
entin
g
results
an
d q
ualit
y of
the
rain
fall
and f
low
m
onito
ring.
Due 1
1/0
1/1
6
Met R
equ
irem
ent
(Subm
itted o
n 1
0/2
5/1
6)
CD
V.A
.17:
Dra
ft F
ina
ncia
l C
apa
bili
ties
Ass
essm
ent
With
in 6
0 D
ays
follo
win
g r
eceip
t of
an
y notice
fr
om
EP
A d
isappro
vin
g a
subm
ittal o
r directing
modific
atio
n o
f a s
ubm
ittal purs
uant
to t
he
pre
cedin
g P
ara
gra
ph
(or
within
such long
er
time
set fo
rth in
the n
otice
or
agre
ed t
o b
y th
e
Part
ies),
DE
LC
OR
A s
hall
subm
it a m
odifie
d
subm
ittal t
o E
PA
and P
AD
EP
for
ap
pro
val.
11/2
0/1
6
Met R
equ
irem
ent
(Subm
itted o
n 1
1/1
7/1
6)
CD
VII
.A.4
2:
PM
and R
ep
ort
ing
C
onsent
Decre
e S
ect
ion
VII
.A.4
2 r
eq
uires o
n
the f
irst da
y of
each s
em
i-a
nnua
l perio
d a
fter
the D
ate
of
Lodg
ing
, D
ELC
OR
A w
ill s
ubm
it to
E
PA
and P
AD
EP
a S
em
i-A
nnua
l P
rogre
ss
Report
re
gard
ing
the
imple
menta
tion o
f th
e
requirem
ents
of
the C
onse
nt D
ecre
e in t
he
pre
vio
us
sem
i-annu
al peri
od.
12/3
1/1
6
Met R
equ
irem
ent
(Subm
itted o
n 1
2/2
9/1
6)
9.
10.
Table 3
Work Completed Within the Six-Month Period and to be Completed in the Next
Six-Month Period
11.
12.
Rep
ort
ing
Per
iod
of
July
1, 2
01
6 –
Dec
emb
er 3
1, 2
016
Ta
ble
3 P
age
1 o
f 3
TA
BL
E 3
WO
RK
CO
MP
LE
TE
D W
ITH
IN T
HE
SIX
-MO
NT
H P
ER
IOD
AN
D T
O B
E C
OM
PL
ET
ED
IN
TH
E N
EX
T S
IX-M
ON
TH
PE
RIO
D
DE
LC
OR
A S
EM
I A
NN
UA
L R
EP
OR
T (
7/1
/201
6 –
12/3
1/2
016)
Refe
ren
ce
W
ork
C
om
ple
ted
D
ate
P
roje
ct/
Acti
vit
y/R
eq
uest
Dead
lin
e in
C
D/N
MC
Sta
tus/C
om
men
t (M
et
Req
uir
em
en
t o
r an
y N
on
-C
om
plian
ce)
LT
CP
U
July
201
6 thru
D
ecem
ber
2016
Held
Mo
nth
ly P
rogre
ss M
eetin
gs w
ith G
ree
ley
and H
ansen
and s
ubconsultants
. P
repare
d M
onth
ly P
rogre
ss R
ep
ort
s.
Held
inte
rna
l coord
ination m
eetin
gs
and
te
leco
nfe
ren
ces.
Develo
ped
LT
CP
U s
ched
ule
. U
pdate
d O
vera
ll LT
CP
U S
chedu
le w
ith C
onsent
Decre
e
Sta
rt D
ate
. R
evi
ew
ed
pre
vious U
SE
PA
com
ments
on
LT
CP
.
02/1
7/1
9
On-g
oin
g, O
n s
ch
edu
le
Co
nsen
t D
ec
ree
V
.A.1
4:
Hyd
rolo
gic
an
d
Hyd
raulic
Mo
del (H
&H
M
ode
l) U
pdate
an
d
Calib
ration
Pla
n
July
201
6 thru
D
ecem
ber
2016
Hyd
rolo
gic
& H
ydra
ulic
Mo
del (
"H&
H M
ode
l")
Upd
ate
&
Calib
ration
Pla
n
Revie
w e
xis
ting f
low
mete
r data
.
Colle
ctio
n s
yste
m m
odel u
pdate
and
constr
uction.
Up
date
, ca
libra
te a
nd v
alid
ate
H&
H M
od
el.
Aug
ust 20
17
O
n-g
oin
g, O
n s
ch
edu
le
Co
nsen
t D
ec
ree
V
.A.1
4d
an
d V
.A.1
4e:
R
ain
fall
and F
low
M
on
itori
ng
July
201
6 thru
D
ecem
ber
2016
Rain
fall
and F
low
Mo
nitorin
g
Receiv
ed
an
d a
naly
zed
flo
w m
ete
r data
fro
m J
uly
thru
D
ecem
ber
2016.
Develo
ped
flo
w m
onito
ring a
na
lysis
spre
adshe
et.
D
evelo
ped
Ra
infa
ll an
d F
low
Mon
itori
ng
Quart
erl
y R
ep
ort
s.
Subm
itted 1
st Q
uart
erl
y R
eport
to U
SE
PA
and P
AD
EP
. S
ubm
itted 2
nd Q
uart
erl
y R
eport
to U
SE
PA
and P
AD
EP
. W
ork
ing to c
om
ple
te a
nd s
ubm
it 3
rd Q
uart
erl
y R
ep
ort
.
12 m
onth
s o
f flow
m
onito
ring
require
d, subm
it quart
erl
y te
chn
ical
mem
ora
nda
docum
entin
g
results
On-g
oin
g, F
low
monito
ring
sta
rted M
arc
h 1
8,
20
16.
Co
nsen
t D
ec
ree
V
.A.1
7:
Public
P
art
icip
atio
n P
lan
July
201
6 thru
D
ecem
ber
2016
Pub
lic P
art
icip
atio
n P
lan
Continu
e to h
old
Sta
kehold
ers
meetin
gs
with
CE
P.
Continu
e to d
eve
lop
Website
an
d n
ew
sle
tter
an
d o
ff-l
ine
reposito
ry B
inder.
D
eliv
ere
d b
inders
to o
ff-l
ine r
epositories.
U
pdate
d o
ff-l
ine r
eposito
rie
s b
ind
ers
.
2/1
7/1
9
On-g
oin
g, O
n s
ch
edu
le
Co
nsen
t D
ec
ree
V
.A.1
5:
Wate
r Q
ualit
y M
ode
l P
lan
July
201
6 thru
D
ecem
ber
2016
Wate
r Q
ualit
y M
ode
l P
lan
D
evelo
p o
utlin
e f
or
Wate
r Q
ualit
y M
onitorin
g a
nd M
od
elin
g
Work
Pla
n a
nd W
ate
r Q
ualit
y A
ssura
nce P
roje
ct P
lan
(QA
PP
).
Held
work
shop w
ith D
ELC
OR
A f
or
Wate
r Q
ualit
y M
on
itori
ng a
nd M
odelin
g W
ork
Pla
n a
nd W
ate
r Q
ualit
y A
ssura
nce P
roje
ct P
lan (
QA
PP
).
Pre
pare
d D
raft
Wate
r Q
ualit
y M
on
itori
ng a
nd M
odelin
g
01/1
3/1
7
Subm
it W
ate
r Q
ualit
y M
ode
ling
Pla
n 9
0 d
ays
aft
er
US
EP
A a
ppro
val of
the A
ltern
ative
E
valu
ation
Appro
ach R
eport
.
On-g
oin
g, O
n s
ch
edu
le
13.
Rep
ort
ing
Per
iod
of
July
1, 2
01
6 –
Dec
emb
er 3
1, 2
016
Ta
ble
3 P
age
2 o
f 3
TA
BL
E 3
WO
RK
CO
MP
LE
TE
D W
ITH
IN T
HE
SIX
-MO
NT
H P
ER
IOD
AN
D T
O B
E C
OM
PL
ET
ED
IN
TH
E N
EX
T S
IX-M
ON
TH
PE
RIO
D
DE
LC
OR
A S
EM
I A
NN
UA
L R
EP
OR
T (
7/1
/201
6 –
12/3
1/2
016)
Refe
ren
ce
W
ork
C
om
ple
ted
D
ate
P
roje
ct/
Acti
vit
y/R
eq
uest
Dead
lin
e in
C
D/N
MC
Sta
tus/C
om
men
t (M
et
Req
uir
em
en
t o
r an
y N
on
-C
om
plian
ce)
Work
Pla
n a
nd Q
AP
P.
Subm
itted D
raft
Wate
r Q
ualit
y M
on
itori
ng a
nd M
odelin
g
Work
Pla
n a
nd Q
AP
P t
o D
ELC
OR
A f
or
revie
w.
Co
nsen
t D
ec
ree
V.A
.18
: F
inancia
l C
apa
bili
ties
Ass
essm
ent
Septe
mber
2016
thru
N
ovem
ber
2016
Dra
ft F
inancia
l C
ap
ab
ilitie
s A
ssessm
ent (F
CA
) R
eceiv
ed
com
ments
fro
m U
SE
PA
on
09/2
0/1
6
Respon
ded t
o U
SE
PA
com
ments
and s
ubm
itted r
evi
se
d
report
to
US
EP
A 1
1/1
7/2
01
6.
60 d
ays
to r
espo
nd
to c
om
ments
. R
eceiv
ed
com
ments
09/2
0/1
6
Resubm
itted 1
1/1
7/1
6
Co
nsen
t D
ec
ree
V
II:
Re
port
ing
July
201
6 thru
D
ecem
ber
2016
Sem
i-A
nnu
al R
ep
ort
– D
evelo
ped D
raft
Report
.
Held
Pro
gre
ss M
eetin
g to d
iscuss o
n 1
2/0
7/1
6.
S
ubm
itted D
raft
report
to D
ELC
OR
A; F
ina
lize
d R
eport
.
Subm
itted F
inal R
eport
12/2
9/2
016.
01/0
1/1
7
On s
chedu
le-
All
data
in
this
sem
i-annua
l rep
ort
is
thro
ug
h D
ecem
ber
29
, 2016
. N
ext re
port
will
in
clu
de info
rmatio
n f
rom
D
ecem
ber
30
, 20
16.
Co
nsen
t D
ec
ree
V.A
.13
: A
ltern
ative
s
Eva
luation A
ppro
ach
July
201
6 thru
S
epte
mber
2016
Altern
ative
s E
valu
atio
n A
pp
roach
Receiv
ed
fin
al ap
pro
val f
rom
US
EP
A 1
0/1
3/1
6.
U
SE
PA
ap
pro
val o
n
10/1
3/1
6
Co
nsen
t D
ecre
e
V.B
.26:
Earl
y A
ctio
n
CS
O C
ontr
ol M
easure
s
Curr
ently
in
Desig
n P
hase
E
arl
y A
ctio
n Ite
ms.-
E
PS
-01 P
um
p S
tatio
n –
D
esig
n is
appro
xim
ate
ly 6
0 %
com
ple
te.
C
ontinu
ing
to d
eve
lop d
esig
n, p
erm
ittin
g a
nd lan
d
acquis
itio
n.
12/3
1/1
8
On-g
oin
g, D
ELC
OR
A h
as
requeste
d th
at th
is d
ead
line
date
be e
xte
nd
ed t
o
12/3
1/1
9 d
ue to c
oncern
s
such a
s la
nd a
cq
uis
ition
and p
erm
ittin
g.
Se
e
corr
esponde
nce T
able
4 o
f th
is r
ep
ort
. E
xtensio
n
den
ied.
A
nti
cip
ate
d a
cti
vit
ies
fo
r th
e n
ex
t 6
mo
nth
s
Co
nsen
t D
ec
ree
V
.A.1
4d
an
d V
.A.1
4e:
R
ain
fall
and F
low
M
on
itori
ng
January
20
17
thru
April 20
17
C
ontinu
e R
ain
fall
and F
low
Mon
itori
ng
C
ontinu
e to d
eve
lop
rain
fall
and f
low
monito
rin
g f
low
m
onito
ring a
na
lysis
spre
ad
sheet.
C
ontinu
e to d
eve
lop
dra
ft R
ain
fall
and F
low
Mon
itori
ng
Quart
erl
y R
eport
s.
Subm
it 3
rd Q
uart
erl
y R
eport
to U
SE
PA
an
d P
AD
EP
. S
ubm
it 4
th Q
uart
erl
y R
eport
to U
SE
PA
an
d P
AD
EP
.
12 m
onth
s o
f flow
m
onito
ring
require
d, subm
it quart
erl
y te
chn
ical
mem
ora
nda
docum
entin
g
results
On-g
oin
g, F
low
monito
ring
sta
rted M
arc
h 1
8,
20
16
14.
Rep
ort
ing
Per
iod
of
July
1, 2
01
6 –
Dec
emb
er 3
1, 2
016
Ta
ble
3 P
age
3 o
f 3
TA
BL
E 3
WO
RK
CO
MP
LE
TE
D W
ITH
IN T
HE
SIX
-MO
NT
H P
ER
IOD
AN
D T
O B
E C
OM
PL
ET
ED
IN
TH
E N
EX
T S
IX-M
ON
TH
PE
RIO
D
DE
LC
OR
A S
EM
I A
NN
UA
L R
EP
OR
T (
7/1
/201
6 –
12/3
1/2
016)
Refe
ren
ce
W
ork
C
om
ple
ted
D
ate
P
roje
ct/
Acti
vit
y/R
eq
uest
Dead
lin
e in
C
D/N
MC
Sta
tus/C
om
men
t (M
et
Req
uir
em
en
t o
r an
y N
on
-C
om
plian
ce)
Co
nsen
t D
ec
ree
V.A
.18
: F
inancia
l C
apa
bili
ties
Ass
essm
ent
January
20
17
thru
Marc
h
2017
Dra
ft F
inancia
l C
ap
ab
ilitie
s A
ssessm
ent (F
CA
) R
eceiv
e f
inal appro
val a
nd /
or
com
ments
fro
m U
SE
PA
R
espon
d to c
om
ments
as r
equ
ired. F
inaliz
e D
raft
Fin
ancia
l C
apa
bili
ties
Ass
essm
ent (F
CA
) an
d r
esubm
it final r
epo
rt to
US
EP
A a
s re
quire
d.
Respon
d w
ithin
60
da
ys o
f re
ceiv
ing
com
ments
On-g
oin
g, O
n s
ch
edu
le
Co
nsen
t D
ec
ree
V
.A.1
7:
Public
P
art
icip
atio
n P
lan
January
20
17
thru
June
20
17
P
ub
lic P
art
icip
atio
n P
lan
Continu
e to h
old
Sta
kehold
ers
meetin
gs
with
CE
P.
Subm
it m
eetin
g n
ote
s, re
sp
onsiv
e s
um
mary
and
pre
senta
tio
n to
US
EP
A.
Continu
e to d
eve
lop
website a
nd n
ew
sle
tter
an
d o
ff-l
ine
reposito
ry b
inder.
U
pdate
bin
ders
to o
ff-l
ine r
epositories.
Next P
ublic
Part
icip
ation m
eeting is
schedu
led f
or
July
2017
.
2/1
7/1
9
On-g
oin
g, O
n s
ch
edu
le
Co
nsen
t D
ec
ree
V
.A.1
4:
Hyd
rolo
gic
an
d
Hyd
raulic
Mo
del (H
&H
M
ode
l) U
pdate
an
d
Calib
ration
Pla
n
January
20
17
thru
June
20
17
H
&H
Mod
el U
pda
te
Revie
w e
xis
ting r
ain
fall
an
d f
low
mete
r data
. C
olle
ctio
n s
yste
m m
odel u
pdate
and
constr
uction.
Update
, ca
libra
te,
and
valid
ate
H&
H M
od
el.
Pre
pare
Dra
ft S
ew
er
Sys
tem
H&
H M
ode
l Re
port
. S
ubm
it D
raft
Se
wer
Sys
tem
H&
H M
ode
l Re
port
to
DE
LC
OR
A f
or
revie
w.
Base
d o
n D
EL
CO
RA
com
ments
, pre
pare
Fin
al S
ew
er
Sys
tem
H&
H M
od
el R
eport
.
06/1
6/1
7
On-g
oin
g, O
n s
ch
edu
le
Co
nsen
t D
ec
ree
V
.A.1
5:
Wate
r Q
ualit
y M
ode
l P
lan
January
20
17
W
ate
r Q
ualit
y M
ode
l P
lan
B
ase
d o
n D
EL
CO
RA
com
ments
, pre
pare
fin
al W
ate
r Q
ualit
y M
onitorin
g a
nd M
od
elin
g W
ork
Pla
n a
nd W
ate
r Q
ualit
y A
ssura
nce P
roje
ct
Pla
n (
QA
PP
).
Subm
it W
ate
r Q
ualit
y M
onitoring a
nd M
ode
ling W
ork
Pla
n
and W
ate
r Q
ualit
y A
ssura
nce P
roje
ct P
lan (
QA
PP
) to
U
SE
PA
.
01/1
3/1
7
On-g
oin
g, O
n s
ch
edu
le
15.
16.
Table 4
Summary of All Contacts with the EPA and the PADEP
17.
18.
Rep
ort
ing
Per
iod
of
July
1, 2
01
6 –
Dec
emb
er 3
1, 2
016
T
able
4 P
age
1 o
f 2
TA
BL
E 4
U
SE
PA
/ P
AD
EP
CO
RR
ES
PO
ND
EN
CE
LO
G
DE
LC
OR
A S
EM
I A
NN
UA
L R
EP
OR
T (
7/1
/201
6 –
12/3
1/2
016
)
Da
te o
f L
ett
er
De
sc
rip
tio
n
Co
ntr
ol
No
. R
es
po
ns
e
Re
qu
ire
d
Da
te o
f P
AD
EP
R
es
po
ns
e
Da
te o
f U
SE
PA
R
es
po
ns
e
No
tes
6/3
0/1
6
DE
LC
OR
A le
tte
r to
US
EP
A s
ub
mittin
g C
on
sen
t D
ecre
e S
em
i An
nu
al R
ep
ort
No
2,
Re
po
rtin
g
Pe
rio
d J
anu
ary
1, 2
01
6 –
Ju
ne 3
0,
20
16
.
20
Se
e
No
te 3
N
/A
N/A
C
ivil
Actio
n N
um
be
r C
ase 2
:15-c
v-0
46
52
-RB
&
DO
J C
ase
Num
be
r 9
0-5
-1-1
-10
97
2
Co
nse
nt
De
cre
e S
em
i A
nn
ua
l Re
po
rt N
o 2
. R
epo
rt
Fro
m M
ich
ael J.
DiS
an
tis
7/2
9/1
6
DE
LC
OR
A le
tte
r to
US
EP
A s
ub
mittin
g t
he
D
EL
CO
RA
Ra
infa
ll a
nd F
low
Mo
nito
rin
g Q
ua
rte
rly
Re
po
rt N
o. 1
Pe
rio
d o
f M
arc
h 1
8,
201
6 –
Jun
e 3
0,
20
16
.
21
Se
e
No
te 3
N
/A
N/A
C
ivil
Actio
n N
um
be
r C
ase 2
:15-c
v-0
46
52
-RB
&
DO
J C
ase
Num
be
r 9
0-5
-1-1
-10
97
2
Ra
infa
ll a
nd
Flo
w M
on
ito
rin
g Q
ua
rte
rly
Re
po
rt N
o.
1.
Fro
m M
ich
ae
l J.
DiS
an
tis
7/2
9/1
6
DE
LC
OR
A le
tte
r to
US
EP
A s
ub
mittin
g t
he
up
da
ted
ra
infa
ll an
d flo
w m
on
itorin
g s
che
du
le f
or
the
H
ydro
log
ic a
nd
Hyd
rau
lic M
od
el U
pd
ate
an
d
Ca
libra
tion P
lan
.
22
Se
e
No
te 3
N
/A
N/A
C
ivil
Actio
n N
um
be
r C
ase 2
:15-c
v-0
46
52
-RB
&
DO
J C
ase
Num
be
r 9
0-5
-1-1
-10
97
2
Hyd
rolo
gic
an
d H
ydra
ulic
Mo
de
l U
pd
ate
an
d
Ca
libra
tion P
lan
Up
date
d S
che
du
le
Fro
m M
ich
ael J.
DiS
an
tis
8/1
8/1
6
Em
ail
to U
SE
PA
fro
m D
EL
CO
RA
tra
nsm
ittin
g
Fin
ancia
l Re
cove
ry P
lan
Ch
est
er
da
ted
07
/15/2
01
6
an
d c
heckin
g s
tatu
s o
f E
AI
ext
en
sio
n r
eq
uest.
23
YE
S
Se
e C
on
tro
l N
o.
24
Se
e C
on
tro
l N
o.
24
Se
e C
on
tro
l N
o.
24
Civ
il A
ctio
n N
um
be
r C
ase 2
:15-c
v-0
46
52
-RB
&
DO
J C
ase
Num
be
r 9
0-5
-1-1
-10
97
2.
Fro
m M
ich
ael J.
DiS
an
tis
9/9
/16
Em
ail
to D
EL
CO
RA
fro
m U
SE
PA
re
sp
on
din
g to
D
EL
CO
RA
re
qu
est fo
r E
arly
Action
Ite
ms
(EA
I)
ext
en
sio
n w
ith
atta
chm
en
ts.
24
N
O
9/9
/16
Se
e C
on
tro
l N
o.
17
9/9
/16
Se
e C
on
tro
l N
o.
17
Su
bje
ct:
Civ
il A
ctio
n N
um
be
r C
ase
2:
15
-cv-
04
65
2-
RB
& D
OJ
Ca
se
Num
be
r 9
0-5
-1-1
-10
97
2
Se
ctio
n 5
.B.2
6 E
arl
y A
ctio
n Ite
ms.
Fro
m M
ich
ael J.
DiS
an
tis
9/1
5/1
6
US
EP
A le
tte
r to
Bla
nk R
om
e L
LP
, D
EL
CO
RA
C
ou
nsel, d
en
yin
g a
pp
rova
l and
pro
vid
ing
co
mm
en
ts fo
r th
e d
raft F
ina
ncia
l C
ap
ab
ility
A
ssessm
en
t (F
CA
) R
ep
ort
.
25
YE
S
By
DE
LC
OR
A
Se
e C
on
tro
l N
O.
31
N
/A
N
/A
Su
bje
ct:
DE
LC
OR
A D
raft
Fin
an
cia
l Ca
pa
bili
ty
Assessm
en
t.
Fro
m:
An
dre
w D
insm
ore
, A
ctin
g
Ch
ief
NP
DE
S E
nfo
rcem
en
t B
ran
ch.
9/2
2/1
6
Em
ail
to U
SE
PA
fro
m M
arg
are
t H
ill s
end
ing
se
con
d
req
uest
for
a m
ee
ting
with
US
EP
A f
or
a m
ee
ting
on
th
e F
CA
.
26
YE
S
No
re
sp
on
se t
o
da
te.
No
re
sp
on
se t
o
da
te.
Su
bje
ct:
FC
A R
esp
on
se /
Se
con
d R
eq
ue
st f
or
Me
etin
g.
Se
e T
ab
le 1
of
this
re
po
rt.
10
/13
/16
Em
ail
to D
EL
CO
RA
fro
m U
SE
PA
tra
nsm
ittin
g
ap
pro
val l
ette
rs fo
r th
e R
evi
sed
Id
en
tific
atio
n o
f S
en
siti
ve A
rea A
na
lysi
s (
RIS
SA
) a
nd
Alte
rna
tive
s
Eva
lua
tion
Ap
pro
ach
Re
po
rt (
AE
AR
).
27
N
O
N/A
N
/A
Su
bje
ct:
Ap
pro
vals
fo
r R
ISA
A a
nd
AE
AR
10
/13
/16
US
EP
A le
tte
r to
DE
LC
OR
A p
rovi
din
g a
pp
rova
l o
f th
e R
evi
sed
Id
en
tific
atio
n o
f S
en
siti
ve A
rea
An
aly
sis
(RIS
SA
).
28
NO
N
/A
N/A
S
ub
ject:
Civ
il A
ctio
n N
um
be
r C
ase
2:
15
-cv-
04
65
2-
RB
& D
OJ
Ca
se
Num
be
r 9
0-5
-1-1
-10
97
2
Fro
m A
nd
rew
F.
Se
ligm
an
19.
Rep
ort
ing
Per
iod
of
July
1, 2
01
6 –
Dec
emb
er 3
1, 2
016
T
able
4 P
age
2 o
f 2
TA
BL
E 4
U
SE
PA
/ P
AD
EP
CO
RR
ES
PO
ND
EN
CE
LO
G
DE
LC
OR
A S
EM
I A
NN
UA
L R
EP
OR
T (
7/1
/201
6 –
12/3
1/2
016
)
Da
te o
f L
ett
er
De
sc
rip
tio
n
Co
ntr
ol
No
. R
es
po
ns
e
Re
qu
ire
d
Da
te o
f P
AD
EP
R
es
po
ns
e
Da
te o
f U
SE
PA
R
es
po
ns
e
No
tes
10
/13
/16
US
EP
A le
tte
r to
DE
LC
OR
A p
rovi
din
g a
pp
rova
l o
f th
e A
ltern
ativ
es E
valu
atio
n A
pp
roa
ch R
epo
rt
(AE
AR
)
29
NO
N
/A
N/A
S
ub
ject:
Civ
il A
ctio
n N
um
be
r C
ase
2:
15
-cv-
04
65
2-
RB
& D
OJ
Ca
se
Num
be
r 9
0-5
-1-1
-10
97
2
Fro
m A
nd
rew
F.
Se
ligm
an
10
/25
/16
DE
LC
OR
A le
tte
r to
US
EP
A s
ub
mittin
g t
he
D
EL
CO
RA
Ra
infa
ll a
nd F
low
Mo
nito
rin
g Q
ua
rte
rly
Re
po
rt N
o. 2
Pe
rio
d o
f Ju
ly 1
, 2
01
6-
Se
pte
mb
er
30
, 2
01
6.
30
Se
e
No
te 3
N
/A
N/A
C
ivil
Actio
n N
um
be
r C
ase 2
:15-c
v-0
46
52
-RB
&
DO
J C
ase
Num
be
r 9
0-5
-1-1
-10
97
2
Ra
infa
ll a
nd
Flo
w M
on
ito
rin
g Q
ua
rte
rly
Re
po
rt N
o.
2.
Fro
m M
ich
ae
l J.
DiS
an
tis.
11
/17
/16
DE
LC
OR
A le
tte
r to
US
EP
A s
ub
mittin
g r
evi
sed
D
raft
Fin
an
cia
l Ca
pab
ilitie
s A
sse
ssm
en
t R
ep
ort
(R
evi
se
d N
ove
mb
er
20
16
).
31
YE
S
11
/22
/16
S
ee
Co
ntr
ol
No
. 3
3.
11
/22
/16
S
ee
Co
ntr
ol
No
. 3
3.
Su
bje
ct:
Civ
il A
ctio
n N
um
be
r C
ase
2:
15
-cv-
04
65
2-
RB
& D
OJ
Ca
se
Num
be
r 9
0-5
-1-1
-10
97
2
Dra
ft F
ina
nci
al C
ap
ab
ility
Asse
ssm
en
t R
ep
ort
(F
CA
) (r
evi
se
d N
ove
mbe
r 2
016
) F
rom
Mic
ha
el J.
DiS
an
tis.
11
/18
/16
Gre
ele
y a
nd H
an
sen
Tra
nsm
itta
l to
US
EP
A /
P
AD
EP
tra
nsm
ittin
g C
om
me
nt –
Re
spo
nse
sh
ee
t fo
r D
raft
Fin
an
cia
l C
ap
ab
ilitie
s A
ssessm
en
t R
ep
ort
(4
tra
nsm
itta
ls to
ea
ch U
SE
PA
, P
AD
EP
an
d D
OJ
rep
rese
nta
tive
).
32
Y
ES
1
1/2
2/1
6
Se
e C
on
tro
l N
o.
33
.
11
/22
/16
S
ee
Co
ntr
ol
No
. 3
3.
Su
bje
ct:
Civ
il A
ctio
n N
um
be
r C
ase
2:
15
-cv-
04
65
2-
RB
& D
OJ
Ca
se
Num
be
r 9
0-5
-1-1
-10
97
2
Re
sp
onse
to
US
EP
A a
nd
PA
DE
P C
om
me
nts
on
th
e r
evi
se
d D
raft
FC
A R
epo
rt (
Re
vise
d N
ove
mb
er
20
16
) F
rom
Gre
ele
y a
nd
Ha
nse
n L
LC
1
1/2
2/1
6
US
EP
A e
ma
il to
Bla
nk R
om
e L
LP
, st
atin
g r
ece
ipt
of
resu
bm
itta
l fo
r D
raft
Fin
an
cia
l C
ap
ab
ility
A
ssessm
en
t. U
SE
PA
to
re
vie
w s
ub
mitta
l a
nd
re
sp
on
d to
DE
LC
OR
A.
33
YE
S
No
re
sp
on
se t
o
da
te.
No
re
sp
on
se t
o
da
te.
Em
ail
Su
bje
ct: D
EL
CO
RA
T
o:
Ma
rga
ret
Hill
fro
m P
hili
p Y
ea
ny
Se
e T
ab
le 1
of
this
re
po
rt.
12
/30
/16
DE
LC
OR
A le
tte
r to
US
EP
A s
ub
mittin
g C
on
sen
t D
ecre
e S
em
i An
nu
al R
ep
ort
No
3,
Re
po
rtin
g
Pe
rio
d J
uly
1,
20
16
– D
ecem
be
r 3
0, 2
016
.
34
Se
e
No
te 3
N
/A
N/A
C
ivil
Actio
n N
um
be
r C
ase 2
:15-c
v-0
46
52
-RB
&
DO
J C
ase
Num
be
r 9
0-5
-1-1
-10
97
2
Co
nse
nt
De
cre
e S
em
i A
nn
ua
l Re
po
rt N
o. 3
Re
po
rt
Fro
m M
ich
ael J.
DiS
an
tis.
NO
TE
S:
1.
Co
pie
s o
f C
orr
esp
on
de
nce
are
in A
ppe
ndix
2
2.
Co
ntr
ol n
um
be
rs 1
th
ru 1
9 a
re in
clu
ded
in
th
e C
orr
esp
on
de
nce
Lo
g s
ub
mitt
ed
un
de
r S
em
i-A
nn
ua
l Re
po
rt N
o.
2
3.
Re
po
rt h
as b
ee
n s
ub
mitt
ed t
o U
SE
PA
an
d P
AD
EP
pe
r C
on
sen
t O
rde
r re
quire
me
nts
. W
itho
ut
notific
atio
n o
therw
ise
, D
EL
CO
RA
co
nsid
ers
Co
nse
nt
De
cre
e r
eq
uir
em
en
ts h
ave
bee
n m
et.
Se
e a
lso
Ta
ble
1 o
f th
is r
epo
rt.
20.
Table 5
Summary of any Exceedances of NPDES Permit Limitations
21.
22.
Rep
ort
ing
Per
iod
of
July
1, 2
01
6 –
Dec
emb
er 3
1, 2
016
Tab
le 5
Pag
e 1
of
1
TA
BL
E 5
S
UM
MA
RY
OF
AN
Y E
XC
EE
DA
NC
ES
OF
NP
DE
S P
ER
MIT
LIM
ITA
TIO
NS
D
EL
CO
RA
PE
RM
IT N
O. P
A0
02
710
3 A
3
D
EL
CO
RA
SE
MI
AN
NU
AL
RE
PO
RT
(7
/1/2
01
6 –
12
/31
/2016
) D
ate
E
xc
eed
an
ce / V
iola
tio
n
Lo
cati
on
/ E
ven
t C
om
men
t
(NO
NE
TH
IS P
ER
IOD
)
23.
24.
Table 6
Summary of All CSOs, SSOs and Unpermitted Discharges Occurring within
the Six-Month Period
25.
26.
Rep
ort
ing
Per
iod
of
July
1, 2
01
6 t
o D
ecem
ber
31
, 20
16
T
able
6 P
age
1 o
f 1
TA
BL
E 6
S
UM
MA
RY
OF
AL
L C
SO
s, S
SO
s a
nd
UN
PE
RM
ITT
ED
DIS
CH
AR
GE
S
OC
CU
RR
ING
WIT
HIN
TH
E S
IX-M
ON
TH
PE
RIO
D (
7/1
/2016
– 1
2/3
1/2
016)
D
EL
CO
RA
Pe
rmit
No
. P
A0027
103
D
ate
o
f O
ccu
rren
ce
L
ocati
on
E
ven
t F
req
uen
cy
D
ura
tio
n
Vo
lum
e
Co
mm
en
t
7/1
2/1
6
600 b
lock
W.1
2th
Str
eet
SS
O
Once
S
tart
tim
e –
unkno
wn. C
all
receiv
ed a
t 3:1
2 p
m. E
nde
d 7
/12/1
6 a
t 6:0
0 p
m.
Unknow
n
Report
se
nt Ju
ly 1
3,
201
6 w
ithin
5
da
ys o
f occurr
ence
. C
alle
d P
AD
EP
on 7
/12/1
6, sam
e d
ay
of
occurr
ence.
11/2
7/1
6
Marc
us H
ook
Pum
pin
g S
tatio
n
SS
O
Once
S
tart
tim
e –
unkno
wn. C
all
receiv
ed a
t 9:2
9 A
M. E
nde
d 1
1/2
7/1
6 a
t 10
:30
AM
.
Unknow
n
Report
se
nt N
ovem
ber
29,
2016
, w
ithin
5 d
ays
of
occurr
ence
. C
alle
d
PA
DE
P o
n 1
1/2
7/1
6, sam
e d
ay
of
occurr
ence.
12/5
/16
M
arc
us H
ook
Pum
pin
g S
tatio
n
SS
O
Once
S
tart
tim
e –
unkno
wn. S
taff
observ
ed
min
or
leak a
t 12/5
/16 7
:30 A
M.
Unknow
n
Report
Se
nt a
nd c
all
made t
o
PA
DE
P D
ecem
ber
5, 2
016,
sam
e
da
y of
occurr
ence.
1.
DW
O –
Dry
Weath
er
Ove
rflo
w; S
SO
– S
anitary
Se
wer
Ove
rflo
w; C
SO
– C
om
bin
ed S
ew
er
Ove
rflo
w
2.
Cop
y of
Rep
ort
s a
re in A
pp
end
ix 4
27.
28.
Appendix 1
Additional Correspondence (None included)
29.
30.
Appendix 2
Notification Letters
31.
32.
33
33.
34.
35.
36.
37.
38.
1
Finizio, Marlene
From: DiSantis, Michael <[email protected]>
Sent: Thursday, August 18, 2016 1:32 PM
To: 'Seligman, Andrew'
Subject: Follow Up to Phone Conversation on 8-17-16
Attachments: FILED_Financial_Recovery_Plan_Chester_07152016.pdf
Andrew: As discussed yesterday, please find attached a copy of the report that I mentioned on the financial condition of the City of Chester. To summarize the discussion on the other items we covered, we can expect a response from EPA on both the Alternatives Evaluation Report and the re-submitted Identification of Sensitive Areas and Pollutants of Concern Report within the next week or so. Additionally, our Counsel will be receiving a letter in the near future responding to the Draft FCA Report. Lastly, once we have received the letter, DELCORA will have the opportunity to discuss the FCA with EPA and/or PA DEP. There was one item that I failed to mention during our call. What is the status of DELCORA’s request for an extension of the EPS-1 early action item deadline? We are progressing with the project as quickly as we can. However, as noted in the request letter, there are procedural and permitting requirements (land acquisition, local municipality, and regulatory), in which we can’t control the time frame, that must be addressed for the project to be completed. We are looking for guidance in the area and would be glad to discuss further if needed, so please advise. Thanks, Mike
Michael J. DiSantis
Director of Operations and Maintenance Delaware County Regional Water Quality Control Authority P.O. Box 999 Chester, PA 19016 Office: 610.876.5523, ext. 264 Cell: 484.574.7704 Fax: 610.497.7951 e-mail: [email protected] www.delcora.org
39.
1
Finizio, Marlene
From: Seligman, Andrew <[email protected]>
Sent: Friday, September 09, 2016 2:03 PM
To: DiSantis, Michael
Cc: Yeany, Philip; Smolski, Robert; Marcello Mollo; McGuigan, David; Dinsmore, Andrew;
Zolandz, Mark; Marcello Mollo; Gelles, William H
Subject: Deadline Extension fir Early Action Item EPS-1
Attachments: Seligman-USEPA-Deadline Extension for Early Action Item for EPS-1 PS - 6-17-2016.pdf
Mike, I have spoken with Bob Smolski one of EPA Region IIIs attorneys. I have been advised your June 17, 2016 request to extend the schedule for the new EPS-1 pump station appears to require a modification to Paragraph V.26 of the Consent Decree which includes a schedule to place in operation that pump station by December 31st, 2018. I suggest you talk to your attorney and determine whether your request requires a modification of the CD. Andrew F. Seligman Environmental Scientist & Enforcement Officer NDPES Enforcement Branch 1650 Arch Street, 3WP42 Philadelphia, Pennsylvania 19103 (215)814-2097 "The Wind and Waves are always on the side of the ablest Navigators"
Edward Gibbon, English Historian 1734-1794
“There is no education like adversity”
Benjamin Disraeli, British Prime Minister
40.
41.
42.
43.
44.
1
Finizio, Marlene
From: Hill, Margaret A. <[email protected]>
Sent: Thursday, September 22, 2016 9:14 PM
To: DiSantis, Michael
Subject: FW: FCA Response/ SECOND REQUEST FOR MEETING
Mike FYI Peg -----Original Message----- From: Hill, Margaret A. Sent: Thursday, September 22, 2016 9:11 PM To: Marcello Mollo ([email protected]) <[email protected]> Subject: FW: FCA Response/ SECOND REQUEST FOR MEETING Marcello Copying you as my hope is that you may enable a response to come from EPA. So far, I have heard nothing from EPA except Phil was going to pass on the request. This is reminiscent of my emails to EPA prior to DOJ's involvement: they went unanswered for a long time so this time -- given the provisions of the Consent Decree -- I will send an email every day until I receive a response. I have not received any phone calls back either. Obviously, time is of the essence in trying to resubmit within 60 days which means that DELCORA first needs to understand EPA's comments which were prepared in a very summary fashion as you already know. Thank you, Margaret -----Original Message----- From: Hill, Margaret A. Sent: Thursday, September 22, 2016 6:16 PM To: 'Yeany, Philip' <[email protected]> Cc: 'Smolski, Robert' <[email protected]>; '[email protected]' <[email protected]> Subject: RE: FCA Response/ SECOND REQUEST FOR MEETING Importance: High Phil ~ I called Andrew Dinsmore yesterday and left a voicemail requesting a meeting. I also spoke with you yesterday requesting a meeting to discuss EPA's letter regarding the draft FCA submitted on behalf of DELCORA. I am requesting (again) a meeting with EPA, as suggested and offered in Andrew Dinsmore's letter, and as provided in the Consent Decree. Also, as discussed yesterday, pursuant to the Consent Decree, DELCORA has 60 days from the receipt date of your 9/15/2016 letter to resubmit a revised draft FCA to the Agency. We received the 9/15/2016 letter on September 20, 2016. DELCORA has already initiated a review of the draft FCA in conjunction with EPA's letter; however, a meeting with EPA , as provided for in the Consent Decree, would be extremely useful before DELCORA begins to revise the draft FCA. Margaret Anne Hill Partner and Chair, Energy, Environment and Mass Torts Practice Group Blank Rome LLP One Logan Square Philadelphia, PA 19103 215-569-5331 (P) 215-832-5331 (F)
45.
2
215-500-7585 (Cell) And 1825 Eye Street, NW Washington, D.C. 20006 202-772-5811 [email protected] -----Original Message----- From: Hill, Margaret A. Sent: Wednesday, September 21, 2016 11:49 AM To: 'Yeany, Philip' <[email protected]> Cc: Smolski, Robert <[email protected]> Subject: FCA Response Importance: High Phil As discussed on my call with you, I received Andrew Dinsmore's letter yesterday in the mail which was 9/20/2016 although the letter was stamped/15/2016. We are responding to the letter which asks if we want a meeting to discuss. Yes, we are requesting a meeting as soon as possible. Thank you, Peg . ******************************************************************************************************** This message and any attachments may contain confidential or privileged information and are only for the use of the intended recipient of this message. If you are not the intended recipient, please notify the sender by return email, and delete or destroy this and all copies of this message and all attachments. Any unauthorized disclosure, use, distribution, or reproduction of this message or any attachments is prohibited and may be unlawful. ********************************************************************************************************
46.
1
Finizio, Marlene
From: Seligman, Andrew <[email protected]>
Sent: Thursday, October 13, 2016 9:35 AM
To: DiSantis, Michael
Cc: Smolski, Robert; Yeany, Philip
Subject: Approvals for RISAA and AEAR
Attachments: image2016-10-13-085340.pdf
Hi Mike, See enclosed. Thanks Andrew F. Seligman Environmental Scientist & Enforcement Officer NDPES Enforcement Branch 1650 Arch Street, 3WP42 Philadelphia, Pennsylvania 19103 (215)814-2097 “You have enemies? Good. That means you stood up for something, sometime in your life.” Winston Churchill, British Prime Minister
“There is no education like adversity” Benjamin Disraeli, British Prime Minister
From: [email protected] [mailto:[email protected]] Sent: Thursday, October 13, 2016 8:54 AM To: Seligman, Andrew <[email protected]> Subject:
47.
48.
49.
50.
51
51.
52.
53.
54.
55.
56.
57.
58.
1
Finizio, Marlene
From: DiSantis, Michael <[email protected]>
Sent: Friday, November 25, 2016 1:06 PM
To: Hurst, Charles; Bothwell, Ed; Pileggi, John; Hope, Michael; Finizio, Marlene
Subject: Fwd: DELCORA
FYI Michael J. DiSantis Director of Operations and Maintenance DELCORA 100 E. 5th Street Chester, PA 19013 Office - 610.876.5523 ext. 264 Cell - 484.574.7704 Fax - 610.497.7951 [email protected]<mailto:[email protected]> www.delcora.org<http://www.delcora.org> Begin forwarded message: From: "Hill, Margaret A." <[email protected]<mailto:[email protected]>> Date: November 25, 2016 at 12:31:28 PM EST To: "Michael J. DiSantis" <[email protected]<mailto:[email protected]>>, "[email protected]<mailto:[email protected]>" <[email protected]<mailto:[email protected]>> Subject: FW: DELCORA Bob and Mike I hope that you both had a fun Thanksgiving Day! Please see EPA's email below, Peg -----Original Message----- From: Hill, Margaret A. Sent: Tuesday, November 22, 2016 11:45 AM To: 'Yeany, Philip' <[email protected]<mailto:[email protected]>> Cc: Smolski, Robert <[email protected]<mailto:[email protected]>>; Dinsmore, Andrew <[email protected]<mailto:[email protected]>>; Seligman, Andrew <[email protected]<mailto:[email protected]>>; Horner-Hanley, Amy <[email protected]<mailto:[email protected]>> Subject: RE: DELCORA Thank you, Peg -----Original Message----- From: Yeany, Philip [mailto:[email protected]] Sent: Tuesday, November 22, 2016 11:37 AM To: Hill, Margaret A. <[email protected]<mailto:[email protected]>> Cc: Smolski, Robert <[email protected]<mailto:[email protected]>>; Dinsmore, Andrew <[email protected]<mailto:[email protected]>>; Seligman, Andrew <[email protected]<mailto:[email protected]>>; Horner-Hanley, Amy <[email protected]<mailto:[email protected]>> Subject: RE: DELCORA Peg: I wanted to let you know that we have received DELCORA's Draft Financial Capability Assessment (Revised November 2016) and the Responses to USEPA and PADEP Concerns (dated November 17, 2016). We will provide you with EPA's reaction after we have had a chance to review the DELCORA documents.
59.
2
Phil Philip Yeany Senior Assistant Regional Counsel Desk: 215-814-2495 Fax: 215-814-2602 Email: [email protected]<mailto:[email protected]> ******************************************************************************************************** This message and any attachments may contain confidential or privileged information and are only for the use of the intended recipient of this message. If you are not the intended recipient, please notify the sender by return email, and delete or destroy this and all copies of this message and all attachments. Any unauthorized disclosure, use, distribution, or reproduction of this message or any attachments is prohibited and may be unlawful. ********************************************************************************************************
60.
61.
62.
Appendix 3
NPDES Permit Exceedance Report
(NO REPORTS SUBMITTED DURING JULY 2016 TO DECEMBER 2016)
63.
64.
Appendix 4
CSOs, SSOs and Unpermitted Discharges Correspondence
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
www.delcora.org
Delaware County Regional Water Quality Control Authority
100 E. Fifth Street P.O. Box 999
Chester, PA 19013