Contents 1. Introduction and Contacts..………………….P1 2. Qualifications Pack……….……...................P2 3. Glossary of Key Terms …………………………P4 4. OS Units……………………..…….….................P5 5. Assessment Criteria…..….….....................P47 Qualifications Pack – Foreman – Electrical Works (Construction) Introduction SECTOR: CONSTRUCTION SUB-SECTOR: Real Estate and Infrastructure Construction OCCUPATION: CONSTRUCTION ELECTRICAL WORKS REFERENCE ID: CON/Q0604 ALIGNED TO: NCO-2004/7137.2 Foreman Electrical Works: This job role installs and maintains heavy machineries and monitors electrical works required for Construction activities at project sites. Brief Job Description: This job role is responsible for conducting installation, repair, maintenance of critical electrical connections/ equipment or machineries while planning and utilizing resources to meet electrical work requirements at construction sites or permanent structures. Personal Attributes: The job role requires the job holder to be well aware of the concepts, working principle and behaviors of electrical circuits in connections, equipments and machineries. Additionally the workman should know the statutory requirements applicable to LV electrical works, health, safety and environmental norms, specifications, relevant code of practices and organizational policies applicable at workplace. The individual should be mentally and physically fit to work in harsh environment of construction sites and able to communicate/ instruct clearly to superiors/ subordinates respectively in order to complete task within specified timeline. OS describe what individuals need to do, know and understand in order to carry out a particular job role or function OS are performance standards that individuals must achieve when carrying out functions in the workplace, together with specifications of the underpinning knowledge and understanding CSDCI 204, Aashirwad Complex, D-1, Green Park, New Delhi - 110016 E-mail: standards@csdcindia. org QUALIFICATIONS PACK - OCCUPATIONAL STANDARDS FOR CONSTRUCTION INDUSTRY

Transcript of CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per...

Page 1: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

Contents

1. Introduction and Contacts..………………….P1

2. Qualifications Pack……….……...................P2

3. Glossary of Key Terms …………………………P4

4. OS Units……………………..…….….................P5

5. Assessment Criteria…..….….....................P47

Qualifications Pack – Foreman – Electrical Works

(Construction)

SECTOR: INFORMATION TECHNOLOGY- INFORMATION TECHNOLOGY ENABLED SERVICES (IT-

ITES)ces Helpdesk Attendant

Introduction

SECTOR: INFORMATION TECHNOLOGY- INFORMATION TECHNOLOGY ENABLED SERVICES

(IT-ITES)ces Helpdesk Attendant SECTOR: CONSTRUCTION

SUB-SECTOR: Real Estate and Infrastructure Construction

OCCUPATION: CONSTRUCTION ELECTRICAL WORKS

REFERENCE ID: CON/Q0604

ALIGNED TO: NCO-2004/7137.2

Foreman Electrical Works: This job role installs and maintains heavy machineries and monitors electrical works required for Construction activities at project sites.

Brief Job Description: This job role is responsible for conducting installation, repair, maintenance of critical electrical connections/ equipment or machineries while planning and utilizing resources to meet electrical work requirements at construction sites or permanent structures. Personal Attributes: The job role requires the job holder to be well aware of the concepts, working principle and behaviors of electrical circuits in connections, equipments and machineries. Additionally the workman should know the statutory requirements applicable to LV electrical works, health, safety and environmental norms, specifications, relevant code of practices and organizational policies applicable at workplace. The individual should be mentally and physically fit to work in harsh environment of construction sites and able to communicate/ instruct clearly to superiors/ subordinates respectively in order to complete task within specified timeline.

OS describe what

individuals need to do, know and understand in order to carry out a particular job role or function

OS are

performance standards that individuals must achieve when carrying out functions in the workplace, together with specifications of the underpinning knowledge and understanding

CSDCI 204, Aashirwad Complex, D-1, Green Park, New Delhi - 110016 E-mail: [email protected]

QUALIFICATIONS PACK - OCCUPATIONAL STANDARDS FOR CONSTRUCTION INDUSTRY

Page 2: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

Qualifications Pack For Foreman – Electrical Works (Construction)

2

Qualifications Pack Code CON/Q0604

Job Role Foreman Electrical Works (Construction)

Credits (NSQF) TBD Version number 1.0

Sector Construction Drafted on 07/05/2015

Sub-sector Real Estate and Infrastructure Construction

Last reviewed on 23/05/2015

Occupation Construction Electrical Works

Next review date 23/05/2017

NSQC Clearance on 05/08/2015

Job Role Foreman Electrical Works (Construction)

Role Description

This job role is responsible for conducting installation, repair, maintenance of critical electrical connections/ equipments and machineries, planning and utilizing resources to meet work requirement electrician and as per applicability.

NSQF level

Minimum Educational Qualifications

Maximum Educational Qualifications

5

Preferably 10th standard / Low Voltage license from any Govt.

recognized licensing authority

N.A

Training (Suggested but not mandatory)

Recommended training period of 16-20 weeks as per QP of Foreman - Electrical Works (Construction) Basic computer literacy

Minimum Job Entry Age 18 years

Experience

Desirable: 1. Non trained worker : 8 years site experience in same

occupation 2. Trained worker: 3 years site experience as a certified

Construction Electrician LV

Applicable National Occupational

Standards (NOS)

Compulsory:

1. CON/N0611: Monitor regular electrical works (installation,

maintenance and repairing) at a construction site

2. CON/N0612: Establish electrical connections during

erection of plant and heavy construction machineries

3. CON/N0613: Conduct permanent wiring, maintenance

work in buildings

4. CON/N8001: Work effectively in a team to deliver desired

results at the workplace

5. CON/N8002: Plan and organize work to meet expected

outcomes

6. CON/N8003: Supervise, monitor and evaluate

performance of subordinates at workplace

Job

Det

ails

Page 3: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

Qualifications Pack For Foreman – Electrical Works (Construction)

3

7. CON/N9002: Manage workplace for safe and healthy work

environment

Optional: N.A.

Performance Criteria As described in the relevant OS units

Page 4: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

Qualifications Pack For Foreman – Electrical Works (Construction)

4

Keywords / Terms Description

Sector Sector is conglomeration of different business operations having similar business and interests. It may also be defined as a distinct subset of the economy whose components share similar characteristics and interests.

Sub-Sector Sub-Sector is derived from a further breakdown based on the characteristics and interests of its components

Occupation Occupation is a set of job roles, which perform similar/related set of

functions in an industry Job role Job role defines a unique set of functions that together form a unique

employment opportunity in an organization.

Occupational Standards (OS)

OS specify the standards of performance an individual must achieve when carrying out a function in the workplace, together with the knowledge and understanding they need to meet the standard consistently. Occupational Standards are applicable both in the Indian contexts.

Performance Criteria Performance Criteria are statements that together specify the standard of performance required when carrying out a task.

Qualifications Pack (QP) Qualifications Pack comprises the set of OS, together with the educational, training and other criteria required to perform a job role. A Qualification Pack is assigned a unique qualification pack code

Qualification Pack Code Qualification Pack Code is a unique reference code that identifies a qualifications pack.

National Occupational Standards (NOS)

NOS are Occupational Standards which apply uniquely in the Indian context. Scope Scope is the set of statements specifying the range of variables that an

individual may have to deal with in carrying out the function which have a critical impact on the quality of performance required.

Knowledge and Understanding

Knowledge and Understanding are statements which together specify the technical, generic, professional and organizational specific knowledge that an individual needs in order to perform to the required standard

Organizational Context Organizational Context includes the way the organization is structured and how it operates, including the extent of operative knowledge managers have of their relevant areas of responsibility.

Technical Knowledge Technical Knowledge is the specific knowledge needed to accomplish specific designated responsibilities.

Core Skills / Generic Skills Core Skills or Generic Skills are a group of skills that are key to learning and working in today’s world. These skills are typically needed in any work environment. In the context of the OS, these include communication related skills that are applicable to most job roles.

Keywords /Terms Description

CON Construction

NSQF National Skill Qualifications Framework

QP Qualification Pack

OS Occupational Standards

TBD To Be Decided

Def

init

ion

s

Acr

on

yms

Page 5: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0611 Monitor regular electrical works (installation, maintenance and repairing) at a

construction site

5

----------------------------------------------------------------------------------------------------------------------------- ----------

Overview This NOS covers the skills and knowledge required by a workman to be proficient in monitoring regular electrical works (installation, maintenance and repairing) at construction sites

Page 6: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0611 Monitor regular electrical works (installation, maintenance and repairing) at a

construction site

6

Unit Code CON/N0611

Unit Title (Task)

Monitor regular electrical works (installation, maintenance and repairing) at a construction site

Description This unit describes the skills and knowledge required to monitor regular electrical works (installation, maintenance and repairing) in construction sites

Scope

This scope covers the following:

Monitor and check wiring / connections for LV works at a construction site.

Conduct installation/ maintenance of construction equipment and

machineries.

Performance Criteria (PC) w.r.t. the Scope

Element Performance Criteria

Monitor and check wiring / connections for LV works at a construction site.

To be competent, the user / individual on the job must be able to

PC1. ensure that preventive maintenance of electrical wiring, equipment and

fixtures deployed at construction works is being carried out regularly as per

requirement

PC2. check and ensure materials, fixtures and devices being used in repairing or

maintenance works are ISI certified

PC3. inspect completed LV electrical arrangements for conformance with

specifications, requirements and compliance with applicable statutory and

HSE requirements

PC4. check & ensure that lighting arrangements and its components are in safe

condition working properly

PC5. conduct periodical checks/ tests to insulation, joints, physical condition and

termination of wires and cables to ensure safe working of wiring systems

PC6. check condition and safety of isolation and ensure safe condition for

undertaking maintenance/ repairing in wires, cables, lights and fixtures

PC7. diagnose malfunctioning of wiring systems, circuits, temporary panels and

its components, using appropriate measuring equipment and hand tools

PC8. carry out troubleshooting and take immediate actions in case of emergency

repairing requirements related to short circuit or malfunction in wiring

systems, temporary electrical panels or lighting arrangements

Conduct installation/ maintenance of construction equipment and machineries.

PC9. ensure proper functioning of power tools and diagnostic tools by conducting

maintenance as per manufacturer’s guidelines at scheduled intervals

PC10. develop hand sketches relevant to electrical circuit diagrams using standard

wiring symbols as per work requirements

PC11. supervise electrical works by providing instructions, directions ensuring

completion of the same within specified time as per applicable schematics,

specification, guidelines and safety norms

PC12. adhere to schedule of calibration (if any) and conduct calibration periodically

Nat

ion

al O

ccu

pat

ion

al S

tan

dar

d

Page 7: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0611 Monitor regular electrical works (installation, maintenance and repairing) at a

construction site

7

to ensure correct working of testing equipment and ensure removal of

faulty

ones from worksite

PC13. check condition and safety of isolation and ensure safe condition for

undertaking maintenance/ repairing in construction equipments

PC14. conduct installation, electrical maintenance and repair of equipment like

electrical distribution panels and its accessories, common construction

equipment like bar cutting/bending machine, different types of common

pumps used in construction sites, transformers and tower cranes

PC15. ensure proper termination of cables as per applicability at power source and

equipment

PC16. prepare schedule of maintenance for common equipment and machineries

such as motor, bar cutting/ bending machines, vibratos, tower cranes etc.

PC17. determine potential hazards prior to conduct any maintenance/ repairing

work to the equipment or circuits

PC18. take necessary steps or report to concerned authorities on observing any

hazardous conditions at work place

PC19. ensure erection of safety signage and barricading, surrounding the faulty or

electrically hazardous equipment/ locations to avoid unsafe conditions

PC20. carry out checks for adverse situation like vicinity of water, fire prior, during

and after establishing any electrical system at regular intervals

PC21. ensure proper earthing of electrical circuits as per relevant specifications or

manufacturer’s guidelines

PC22. ensure occurrence of trial run and obtain clearance from respective

authority relevant to electrical works prior to leave any equipment for

working

PC23. ensure upkeep of valuable electrical fixtures and perform checks at electrical

stores to ensure safe condition

PC24. prepare data sheet, report and note readings as per applicability according

to organizational procedures

PC25. ensure electrical safety to workers, equipment, materials and fixtures by

adopting standard safe working procedures as per organizational norms, at

workplace

Knowledge and Understanding (K)

A. Organizational Context

(Knowledge of

the company /

organization and

its processes)

The user/individual on the job needs to know and understand:

KA1. standard practices for monitoring regular electrical works

KA2. safety rules and regulations for handling and storing required electrical

tools,

equipment and materials

KA3. personal protection including the use of related safety gears & equipment

Page 8: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0611 Monitor regular electrical works (installation, maintenance and repairing) at a

construction site

8

KA4. how to request for tools and materials as per set procedures maintenance

of tools and equipment

B. Technical

Knowledge

The user/individual on the job needs to know and understand:

KB1. guidelines provided in Indian Standard code of practice applicable for

establishing and inspecting electrical wiring works

KB2. statutory guidelines provided by ISI for LV wiring operations

KB3. electrical safety norms as per standard practice and organizational policy,

procedure of providing CPR, first aids, use of regular and job specific PPEs as

per requirement

KB4. classification of fire and use of fire protection devices

KB5. read and interpret drawings, SLDs related schematics for single and three

phase wiring system

KB6. how to develop electrical drawings using appropriate symbols and

abbreviations as per standard practice

KB7. how to estimate required material quantity from electrical drawings

KB8. sequencing of electrical works to be carried out depending upon

requirement of construction works

KB9. acceptance criteria of electrical materials, devices, fixtures and protective

arrangements

KB10. how to verify authentication of ISI mark provided with electrical materials,

fixtures and devices

KB11. principles of electrical theory as applied to electrical circuits and wiring

systems

KB12. understand working principle of complex electrical circuits and

manufacturer's guidelines/ specifications of repairing

KB13. concept of electrical isolation procedures and their applications in LV

electrical works

KB14. area of application & specification of electrical protective devices

KB15. correct alternative use of electrical parts if required one is unavailable

KB16. detailed concept of 3 phase connections and its distribution at construction

sites

KB17. detailed concept of AC and DC circuits, their properties and area of

application

KB18. concept about safe procedure of troubleshooting in 3 phase connections

KB19. concept of working principle and components of electrical panels and

transformers and generators

KB20. operational characteristics of electrical panels and power distribution

through the same

KB21. advance troubleshooting in electrical panels, transformers and generators

KB22. working principle and connection of AC single phase and AC three phase

motors, submersible pumps and their maintenance

Page 9: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0611 Monitor regular electrical works (installation, maintenance and repairing) at a

construction site

9

KB23. selection and use of starters such as DOL, Star Delta, Step down Transformer

starter

KB24. line and phase voltage, current and power in a 3 phase circuits with

balanced and unbalanced load

KB25. principle of different methods of earthing. i.e. Pipe, Plate, etc.

KB26. measurement of Earth resistance by earth tester, testing of Earth Leakage by

ELCB and relay, etc.

KB27. use of electrical power tools and their maintenance

KB28. use of measuring and diagnostic tools in electrical circuits

KB29. standards procedure of storing, stacking electrical tools and equipment

KB30. computer basics – MS Office, Internet, E-mail

KB31. basic arithmetic and use of calculator

KB32. methods and techniques of inspection that are approved by the organization

KB33. calibration of equipment and authorization procedures as per the

organization policy

KB34. calibration schedule of equipment and machineries

KB35. quality control systems and site documentation procedures for electrical

connections

Skills (S)

A. Core Skills/

Generic Skills

Writing Skills

The user/ individual on the job needs to know and understand how to:

SA1. write in at least two languages, preferably in the local language of the site and

basic English

SA2. provide clear and simple written instructions to the workers at site regarding

errors and suggestive corrective action

SA3. record and document key details during the related works like actual and

expected outcomes, deviations from tolerance levels, etc.

SA4. prepare basic status updates for the supervisor in the prescribed format as

per the requirements of the client / contractor

Reading Skills

The user/ individual on the job needs to know and understand how to:

SA5. read in at least two language, preferably in the local language of the site and

basic English

SA6. read electrical drawings, technical specifications to determine required

quantity of resource and sequencing of activities

SA7. read instructions, guidelines, sign boards, safety rules and safety tags at the

respective construction site

Oral Communication (Listening and Speaking skills)

Page 10: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0611 Monitor regular electrical works (installation, maintenance and repairing) at a

construction site

10

The user/ individual on the job needs to know and understand how to:

SA8. speak in at least one language, preferably in one of the local language of the

site

SA9. listen and interpret instructions / communication by co-workers

SA10. convey information clearly and concisely to the co-worker

B. Professional

Skills

Decision Making

The user/individual on the job needs to know and understand how to:

SB1. decide on appropriate inspection equipment to be used

SB2. decide intervals/ dates of electrical inspection as applicable to the equipment

SB3. assign electrical works to subordinates as per complexity of task

SB4. decide to change/ replace electrical parts as per requirement

SB5. decide whether the work place is safe for working and also relevant task is not

creating hazardous condition for others

SB6. decide whether work is adequately defined for the day , work front is clear and

adequate materials and tools are available for performing work

Plan and Organize

The user/individual on the job needs to know and understand how to:

SB7. plan work & organize required resource in coordination with team members

and superior

Customer centricity

The user/individual on the job needs to know and understand how to:

SB8. complete work as per agreed time schedule and quality

SB9. ensure electrical safety norms is observed during carrying out any electrical

works

SB10. ensure use of electrical materials, protective devices and fixtures conform

with required specification and certified by ISI

Problem solving

The user/individual on the job needs to know and understand how to:

SB11. conduct repair of electrical equipment like temporary electrical distribution

panels and its accessories along with other common construction equipment

SB12. resolve and solve any conflict within the team

SB13. assess quantity and quality of materials for day work

SB14. check for quality of scaffolding/working platform from all aspects of safety

SB15. dispose of construction debris & keep workplace safe and tidy for working

Analytical Thinking

The user/individual on the job needs to know and understand how to:

Page 11: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0611 Monitor regular electrical works (installation, maintenance and repairing) at a

construction site

11

SB16. diagnose malfunctioning systems, circuits, temporary panels and

components, using test equipment and hand tools

SB17. troubleshoot lighting and low voltage issues including control circuitry

SB18. optimize resources efficiently

SB19. minimize wastage in the workplace

SB20. start and finish levels for day work

SB21. reconcile material consumption

Critical Thinking

The user/individual on the job needs to know and understand how to:

SB22. assess, analyze and ensure nature of preventive maintenance of electrical

wiring, equipment, and fixtures

SB23. evaluate the complexity of the task and seek assistance and support

wherever required

SB24. bring to the notice of the superiors any requirement of the requisite

material and resources

SB25. bring to the notice of the superiors violation of any safety norms which may

lead to accidents

Page 12: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0611 Monitor regular electrical works (installation, maintenance and repairing) at a

construction site

12

NOS Version Control

NOS Code CON/N0611

Credits (NSQF) TBD Version number

1.0

Industry Construction Drafted on 07/05/2015

Industry Sub-sector Real Estate and Infrastructure Construction Last reviewed on

23/05/2015

Occupation Construction Electrical Works Next review date

23/05/2017

Page 13: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0612 Establish electrical connections during erection of plant and heavy construction

machineries

13

----------------------------------------------------------------------------------------------------------------------------- ----------

Overview

This NOS covers the skills and knowledge required by a workman to be proficient in establishing

electrical connections during erection of plant and heavy construction machineries.

Page 14: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0612 Establish electrical connections during erection of plant and heavy construction

machineries

14

Unit Code CON/N0612

Unit Title (Task)

Establish electrical connections during erection of plant and heavy construction machineries

Description This unit describes the skills and knowledge required to establish electrical connections during erection of plant and heavy construction machineries.

Scope

This scope covers the following:

Organize resources prior to taking up electrification of heavy machineries

Conduct electrification of heavy plant & machineries such as batching, hot

mix plant, tower cranes, diesel generators, transformers

Performance Criteria (PC) w.r.t. the Scope

Element Performance Criteria

Organize resources prior to taking up electrification of heavy machineries

To be competent, the user / individual on the job must be able to

PC1. read manufacturer’s guidelines to ascertain electrical requirement of the

machinery to be installed

PC2. prepare material requirement from electrical drawing/ diagram if available

with machinery as per standard practice

PC3. derive specification of electrical materials to be used in circuits/ electrical

systems

PC4. pass material requirement to senior authority after checking with material

availability at store

PC5. perform visual inspection of available material in terms of their specification

and physical condition

PC6. coordinate with superiors for allocation of desired manpower

Conduct electrification of heavy plant & machineries such as batching, hot mix plant, tower cranes, diesel generators, transformers

PC7. provide inputs in planning and preparing work schedules required to

complete

the erection

PC8. check for completion of required preparatory works and availability of safety

devices at workplace, prior to starting installation works

PC9. carry out or inspect electrical isolation at the main and secondary power

source as per standard procedure and ensure work safety prior to

conducting

maintenance to electrical units

PC10. inspect electrical panel, transformers to ensure conformance to

manufacturer’s specification, compatibility of devices, power ratings of

devices to be connected adhering electrical safety norms

PC11. erect electrical panel as power source if required and get it activated

PC12. conduct and carry out electrical connection works between machinery and

power source

Nat

ion

al O

ccu

pat

ion

al S

tan

dar

d

Page 15: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0612 Establish electrical connections during erection of plant and heavy construction

machineries

15

PC13. install earthing arrangement and protective devices at appropriate locations

as per manufacturer’s guidelines

PC14. ensure safe joining (straight through joint as per applicability), and

termination of cables as per standard practice

PC15. conduct required electrical tests using appropriate measuring and diagnostic

devices to ensure safe and desired working of machineries

PC16. conduct trial run and required tests to ensure safe working of plant and

machineries

PC17. check panels, transformers, machineries for factors responsible for electrical

distribution system failure like loose connections/ parts, moisture, line

disturbance, defective/ inadequate insulations, short circuiting, collision,

overloading, dust/dirt or oil accumulation and other possible unsafe acts

PC18. conduct preventive maintenance to electrical panels and electrical

machineries parts as and when necessary

PC19. ensure electrical safety to workers, equipment, materials and fixtures by

adopting standard safe working procedures as per organizational norms, at

workplace

PC20. prepare field reports, hand sketches etc. as and when necessary for

documentation of related works

Knowledge and Understanding (K)

A. Organizational Context

(Knowledge of

the company /

organization and

its processes)

The user/individual on the job needs to know and understand:

KA1. standard practices for establishing electrical connections during erection of

plant and heavy construction machinery

KA2. safety rules and regulations for handling and storing required electrical

tools,

equipment and materials

KA3. personal protection including the use of related safety gears & equipment

KA4. how to request for tools and materials as per set procedures maintenance

of tools and equipment

B. Technical

Knowledge

The user/individual on the job needs to know and understand:

KB1. guidelines provided in Indian Standard code of practice applicable for

establishing and inspecting electrical wiring works

KB2. statutory guidelines provided by ISI for LV wiring operations

KB3. electrical safety norms as per standard practice and organizational policy,

procedure of providing CPR, first aids, use of regular and job specific PPEs as

per requirement

KB4. classification of fire and use of fire protection devices

KB5. read and interpret drawings, SLDs related schematics for single and three

phase wiring system

Page 16: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0612 Establish electrical connections during erection of plant and heavy construction

machineries

16

KB6. how to develop electrical drawings using appropriate symbols and

abbreviations as per standard practice

KB7. how to estimate required material quantity from electrical drawings

KB8. sequencing of electrical works to be carried out depending upon

requirement of construction works

KB9. acceptance criteria of electrical materials, devices, fixtures and protective

arrangements

KB10. how to verify authentication of ISI mark provided with electrical materials,

fixtures and devices

KB11. principles of electrical theory as applied to electrical circuits and wiring

systems

KB12. complex electrical circuits including schematics, SLDs, etc.

KB13. area of application & specification of electrical protective devices

KB14. correct alternative use of electrical parts if required one is unavailable

KB15. detailed concept of 3 phase connections and its distribution at construction

sites

KB16. detailed concept of AC and DC circuits, their properties and area of

application

KB17. concept about safe procedure of troubleshooting in 3 phase connections

KB18. concept of working principle and components of electrical panels and

transformers and generators

KB19. operational characteristics of electrical panels and power distribution

through the same

KB20. concept of electrical isolation procedures and their applications in LV

electrical works

KB21. advance troubleshooting in electrical panels, transformers and generators

KB22. working principle and connection of AC single phase and AC three phase

motors, submersible pumps and their maintenance

KB23. selection and use of starters such as DOL, Star Delta, Step down Transformer

starter

KB24. line and phase voltage, current and power in a 3 phase circuits with

balanced and unbalanced load

KB25. principle of different methods of earthing. i.e. Pipe, Plate, etc.

KB26. measurement of Earth resistance by earth tester, testing of Earth Leakage by

ELCB and relay, etc.

KB27. use of electrical power tools and their maintenance

KB28. use of measuring and diagnostic tools in electrical circuits

KB29. standards procedure of storing, stacking electrical tools and equipment

KB30. computer basics – MS Office, Internet, E-mail

KB31. basic arithmetic and use of calculator

KB32. methods and techniques of inspection that are approved by the organization

Page 17: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0612 Establish electrical connections during erection of plant and heavy construction

machineries

17

KB33. calibration of equipment and authorization procedures as per the

organization policy

KB34. calibration schedule of equipment and machineries

KB35. quality control systems and site documentation procedures for electrical

connections

Skills (S)

A. Core Skills/

Generic Skills

Writing Skills

The user/ individual on the job needs to know and understand how to:

SA1. write in at least one language, preferably in the local language of the site

SA2. provide clear and simple written instructions to the workers at site regarding

errors and suggestive corrective action

SA3. record and document key details during the related works like actual and

expected outcomes, deviations from tolerance levels, etc.

SA4. prepare basic status updates for the supervisor in the prescribed format as

per the requirements of the client / contractor

Reading Skills

The user/ individual on the job needs to know and understand how to:

SA5. read in at least two language, preferably in the local language of the site

and

basic English

SA6. read electrical drawings, technical specifications to determine required

quantity of resource and sequencing of activities

SA7. read instructions, guidelines, sign boards, safety rules and safety tags at the

respective construction site

Oral Communication (Listening and Speaking skills)

The user/ individual on the job needs to know and understand how to:

SA8. speak in at least one language, preferably in one of the local language of the

site

SA9. listen and interpret instructions / communication by co-workers

SA10. convey information clearly and concisely to the co-worker

B. Professional

Skills

Decision Making

The user/individual on the job needs to know and understand how to:

SB1. derive and decide on specification of electrical materials to be used in circuits/

electrical systems

SB2. decide on areas where AC or DC current may be required

Page 18: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0612 Establish electrical connections during erection of plant and heavy construction

machineries

18

SB3. decide whether the work place is safe for working and also relevant task is not

creating hazardous condition for others

SB4. decide whether work is adequately defined for the day , work front is clear and

adequate materials and tools are available for performing work

Plan and Organize

The user/individual on the job needs to know and understand how to:

SB5. plan work & organize required resource in coordination with team members

and superior

Customer centricity

The user/individual on the job needs to know and understand how to:

SB6. complete work as per agreed time schedule and quality

Problem solving

The user/individual on the job needs to know and understand how to:

SB7. conduct required tests to ensure safe working of plant and machineries

SB8. assess quantity and quality of materials for day work

SB9. check quality of scaffolding/working platform from all aspects of safety

SB10. ensure disposal of construction debris and keep work place safe and tidy for

working

Analytical Thinking

The user/individual on the job needs to know and understand how to:

SB11. derive and analyze specification of electrical materials to be used in circuits/

electrical systems

SB12. optimize resources efficiently

SB13. minimize wastage in the workplace

SB14. start and finish levels for day work

SB15. reconcile material consumption

Critical Thinking

The user/individual on the job needs to know and understand how to:

SB16. provide inputs in planning and preparing work schedules required to

complete the erection

SB17. evaluate the complexity of the task and seek assistance and support

wherever required

SB18. bring to the notice of the superiors any requirement of the requisite

material and resources

SB19. bring to the notice of the superiors violation of any safety norms which may

lead to accidents

Page 19: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0612 Establish electrical connections during erection of plant and heavy construction

machineries

19

NOS Version Control

NOS Code CON/N0612

Credits (NSQF) TBD Version number

1.0

Industry Construction Drafted on 07/05/2015

Industry Sub-sector Real Estate and Infrastructure Construction Last reviewed on

23/05/2015

Occupation Construction Electrical Works Next review date

23/05/2017

Page 20: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0613 Conduct permanent wiring, maintenance work in buildings

20

----------------------------------------------------------------------------------------------------------------------------- ----------

Overview

This NOS covers the skills and knowledge required by a workman to be proficient in conducting

permanent wiring, maintenance work in buildings.

Page 21: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0613 Conduct permanent wiring, maintenance work in buildings

21

Unit Code CON/N0613

Unit Title (Task)

Conduct permanent wiring, maintenance work in buildings

Description This unit describes the skills and knowledge required to conduct permanent wiring,

maintenance work in buildings.

Scope

This scope covers the following:

Calculate material requirement from drawing specifications or as per

customer requirement following standard practice

Conduct installation/ maintenance of wiring, electrical fixtures, and

equipment as per requirement /specification ensuring safety of equipment

Performance Criteria (PC) w.r.t. the Scope

Element Performance Criteria

Calculate material requirement from drawing specifications or as per customer requirement following standard practice

To be competent, the user / individual on the job must be able to

PC1. go through electrical drawing, guidelines to ascertain electrical requirement

of the work to be undertaken

PC2. calculate electrical material requirement considering customer requirement

and preferences or standard requirements of home electrical systems as per

standard practice if drawing / diagram is not available

PC3. derive list of electrical equipment and fixtures to be used in circuits/

electrical systems from drawing for considering power rating of the

equipment

PC4. calculate requirement of wiring materials as per drawing customer

requirement and standard practice

PC5. prepare and document as- built drawing of temporary and permanent –

embedded electrical lines/ connection in order to be available in the final as

built drawing

Conduct installation/ maintenance of wiring, electrical fixtures, and equipment as per requirement /specification ensuring safety of equipment

PC6. monitor and ensure wall chasing work as per standard procedure prior to

laying conduit

PC7. conduct conduit laying for RCC structures and ensure specification of

conduits are as per requirement

PC8. conduct cable laying through conduit and ensure right specification of

cables are being used considering electrical voltage/ load requirement

PC9. conduct/ carry out concealed, exposed, electrical wiring work as per

standard method and customer’s requirement

PC10. carry out or inspect electrical isolation at the main and secondary power

source as per standard procedure and ensure work safety prior to

conducting maintenance to electrical wiring or pre-installed units

PC11. fix complex electrical fixtures, installs fire alarm systems as per requirement

PC12. conduct/ carry out earthing of installed electrical circuit as per standard

method and using standard earthing components

Nat

ion

al O

ccu

pat

ion

al S

tan

dar

d

Page 22: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0613 Conduct permanent wiring, maintenance work in buildings

22

PC13. conduct required tests/ inspections as and when necessary to ensure safe

working of electrical circuits or to determine any fault in the circuit

PC14. suggest suitable methods of maintenance of a part of electrical circuit and

conduct/ carry out maintenance work as per requirement adhering

specification of parts and general electrical guidelines

PC15. change parts, fixture, wirings as per requirement

PC16. carry out basic maintenance of household equipment like water pump,

motor etc.

Knowledge and Understanding (K)

A. Organizational Context

(Knowledge of

the company /

organization and

its processes)

The user/individual on the job needs to know and understand:

KA1. standard practices for conduct permanent wiring and maintenance work

KA2. safety rules and regulations for handling and storing required electrical

tools, equipment and materials

KA3. personal protection including the use of related safety gears & equipment

KA4. how to request for tools and materials as per set procedures maintenance

of tools and equipment

B. Technical

Knowledge

The user/individual on the job needs to know and understand:

KB1. guidelines provided in Indian Standard code of practice applicable for

establishing and inspecting electrical wiring works

KB2. statutory guidelines provided by ISI for LV wiring operations

KB3. electrical safety norms as per standard practice and organizational policy,

procedure of providing CPR, first aids, use of regular and job specific PPEs as

per requirement

KB4. classification of fire and use of fire protection devices

KB5. read and interpret drawings, SLDs related schematics for single and three

phase wiring system

KB6. how to develop electrical drawings using appropriate symbols and

abbreviations as per standard practice

KB7. how to estimate required material quantity from electrical drawings

KB8. acceptance criteria of electrical materials, devices, fixtures and protective

arrangements

KB9. how to verify authentication of ISI mark provided with electrical materials,

fixtures and devices

KB10. principles of electrical theory as applied to electrical circuits and wiring

systems

KB11. properties of different components used in electrical earthing work

KB12. acceptance criteria of material to be used during performing earthing work

KB13. current tentative market rate of common electrical items

KB14. common brands and their products

KB15. customer preferences regarding brands and trends

KB16. right procedure for handling electrical fixtures

Page 23: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0613 Conduct permanent wiring, maintenance work in buildings

23

KB17. standard practice of joining, termination and color coding of cables and

wires

KB18. concept of electrical isolation procedures and their applications in LV

electrical works

KB19. use of circuit breakers and its replacement

KB20. use of ladders, scaffolds during working/ performing electrical works

KB21. basic maintenance of common household equipment

KB22. use of electrical power tools and their maintenance

KB23. use of measuring and diagnostic tools in electrical circuits

KB24. standards procedure of storing, stacking electrical tools and equipment

KB25. computer basics – MS Office, Internet, E-mail

KB26. basic arithmetic and use of calculator

KB27. methods and techniques of inspection that are approved by the organization

KB28. calibration of equipment and authorization procedures as per the

organization policy

KB29. calibration schedule of equipment and machineries

KB30. quality control systems and site documentation procedures for electrical

connections

Skills (S)

A. Core Skills/

Generic Skills

Writing Skills

The user/ individual on the job needs to know and understand how to:

SA1. write in at least one language, preferably in the local language of the site

SA2. provide clear and simple written instructions to the workers at site regarding

errors and suggestive corrective action

SA3. record and document key details during the related works like actual and

expected outcomes, deviations from tolerance levels, etc.

SA4. prepare basic status updates for the supervisor in the prescribed format as

per the requirements of the client / contractor

Reading Skills

The user/ individual on the job needs to know and understand how to:

SA5. read in at least two language, preferably in the local language of the site

and basic English

SA6. read electrical drawings, technical specifications to determine required

quantity of resource and sequencing of activities

SA7. read instructions, guidelines, sign boards, safety rules and safety tags at the

respective construction site

Oral Communication (Listening and Speaking skills)

The user/ individual on the job needs to know and understand how to:

Page 24: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0613 Conduct permanent wiring, maintenance work in buildings

24

SA8. speak in at least one language, preferably in one of the local language of the

site

SA9. listen and interpret instructions / communication by co-workers

SA10. convey information clearly and concisely to the co-worker

B. Professional

Skills

Decision Making

The user/individual on the job needs to know and understand how to:

SB1. derive and decide on list of electrical equipment and fixtures to be used in

circuits/ electrical systems from drawing for considering power rating of the

equipment

SB2. decide whether the work place is safe for working and also relevant task is

not creating hazardous condition for others

SB3. decide whether work is adequately defined for the day , work front is clear

and adequate materials and tools are available for performing work

Plan and Organize

The user/individual on the job needs to know and understand how to:

SB4. plan work & organize required resource in coordination with team members

and superior

Customer centricity

The user/individual on the job needs to know and understand how to:

SB5. identify customer preferences regarding brands and trends for electrical

work

SB6. complete work as per agreed time schedule and quality

Problem solving

The user/individual on the job needs to know and understand how to:

SB7. carry out basic maintenance of household equipment like water pump,

motor etc.

SB8. assess quantity and quality of materials for day work

SB9. check quality of scaffolding/working platform from all aspects of safety

SB10. ensure disposal of construction debris and keep work place safe and tidy for

working

Analytical Thinking

The user/individual on the job needs to know and understand how to:

SB11. derive and assess list of electrical equipment and fixtures to be used in

circuits/electrical systems from drawing for considering power rating of the

equipment

SB12. optimize resources efficiently

SB13. minimize wastage in the workplace

Page 25: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0613 Conduct permanent wiring, maintenance work in buildings

25

SB14. start and finish levels for day work

SB15. reconcile material consumption

Critical Thinking

The user/individual on the job needs to know and understand how to:

SB16. evaluate the complexity of the task and seek assistance and support

wherever required

SB17. bring to the notice of the superiors any requirement of the requisite

material and resources

SB18. bring to the notice of the superiors violation of any safety norms which may

lead to accidents

Page 26: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N0613 Conduct permanent wiring, maintenance work in buildings

26

NOS Version Control

NOS Code CON/N0613

Credits (NSQF) TBD Version number

1.0

Industry Construction Drafted on 07/05/2015

Industry Sub-sector Real Estate and Infrastructure Construction Last reviewed on

23/05/2015

Occupation Construction Electrical Works Next review date

23/05/2017

Page 27: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N8001 Work effectively in a team to deliver desired results at the workplace

27

----------------------------------------------------------------------------------------------------------------------------- ----------

Overview

This NOS covers the skill and knowledge required to work effectively within a team to achieve the

desired results.

Page 28: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N8001 Work effectively in a team to deliver desired results at the workplace

28

Unit Code CON/N8001

Unit Title (Task)

Work effectively in a team to deliver desired results at the workplace

Description This unit describes the skills and knowledge required to work effectively within a

team to achieve the desired results.

Scope

The scope covers the following:

Interact and communicate effectively with co-workers, superiors and sub-

ordinates across different teams

Support co-workers, superiors and sub-ordinates within the team and across

interfacing teams to ensure effective execution of assigned task

Performance Criteria (PC) w.r.t. the Scope

Element Performance Criteria

Interact and communicate in effective and conclusive manner

To be competent, the user / individual on the job must be able to:

PC1. pass on work related information/ requirement clearly to the team

members

PC2. inform co-workers and superiors about any kind of deviations from work

PC3. address the problems effectively and report if required to immediate

supervisor appropriately

PC4. receive instructions clearly from superiors and respond effectively on the

same

PC5. communicate to team members/subordinates for appropriate work

technique

and method

PC6. seek clarification and advice as per the requirement and applicability

Support co-workers to execute project requirements

PC7. hand over the required material, tools tackles, equipment and work fronts

timely to interfacing teams

PC8. work together with co-workers in a synchronized manner

Knowledge and Understanding (K)

A. Organizational Context

(Knowledge of

the company /

organization and

its processes)

The user/individual on the job needs to know and understand:

KA1. own roles and responsibilities

KA2. importance of effective communication and establishing strong working

relationships with co-workers

KA3. risks of a failure in teamwork in terms of effects on project outcomes,

timelines, safety at the construction site, etc.

KA4. different modes of communication, and its appropriate usage

KA5. importance of creating healthy and cooperative work environment among

the gangs of workers

Nat

ion

al O

ccu

pat

ion

al S

tan

dar

d

Page 29: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N8001 Work effectively in a team to deliver desired results at the workplace

29

B. Technical

Knowledge

The user/individual on the job needs to know and understand:

KB1. different activities within his work area where an interaction with other

workers is required

KB2. applicable techniques of work, properties of materials used, tools and

tackles used, safety standards that co- workers might need as per the

requirement

KB3. importance of proper and effective communication and the expected

adverse effects in case of failure relating to quality, timelines, safety, risks at

the construction project site

KB4. importance and need of supporting co-workers facing problems for smooth

functioning of work

Skills (S)

A. Core Skills/

Generic Skills

Writing Skills

The user/ individual on the job needs to know and understand how to:

SA1. write in one or more languages, preferably in the local language of the site

Reading Skills

The user/ individual on the job needs to know and understand how to:

SA2. read in one or more languages, preferably in the local language of the site

SA3. read communication from team members regarding work completed,

materials used, tools and tackles used, support required

Oral Communication (Listening and Speaking skills)

The user/ individual on the job needs to know and understand how to:

SA4. speak in one or more languages, preferably in one of the local languages of

the site

SA5. listen and follow instructions / communication shared by superiors/ co-

workers regarding team requirements or interfaces during work processes

SA6. orally communicate with co-workers regarding support required to

complete the respective work

B. Professional

Skills

Decision Making

The user/individual on the job needs to know and understand how to:

SB1. decide on what information is to be shared with co-workers within the team

or from interfacing gang of workers

Plan and Organise

The user/individual on the job needs to know and understand how to:

SB2. plan work and organize required resources in coordination with team

members

Page 30: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N8001 Work effectively in a team to deliver desired results at the workplace

30

Customer centricity

The user/individual on the job needs to know and understand how to:

SB3. complete all assigned task in coordination with team members

Problem solving

The user/individual on the job needs to know and understand how to:

SB4. take initiative in resolving issues among co-workers or report the same to

superiors

Analytical Thinking

The user/individual on the job needs to know and understand how to:

SB5. ensure best ways of coordination among team members

SB6. communicate with co-workers considering their educational / social

background

Critical Thinking

The user/individual on the job needs to know and understand how to:

SB7. evaluate the complexity of task and determine if any guidance is required

from superiors

Page 31: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N8001 Work effectively in a team to deliver desired results at the workplace

31

NOS Version Control

NOS Code CON/N8001

Credits (NSQF) TBD Version number

1.0

Industry Construction Drafted on 07/05/2015

Industry Sub-sector Real Estate and Infrastructure Construction Last reviewed on

23/05/2015

Occupation Construction Electrical Works Next review date

23/05/2017

Page 32: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N8002 Plan and organize work to meet expected outcomes

32

----------------------------------------------------------------------------------------------------------------------------- ----------

Overview

This NOS covers the skills and knowledge required to plan and organize work in order to meet

expected quality in established time frame.

Page 33: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N8002 Plan and organize work to meet expected outcomes

33

Unit Code CON/N8002

Unit Title (Task)

Plan and organize work to meet expected outcomes

Description This unit describes the knowledge and the skills required for an individual to plan

and organize own work in order to meet expected outcome.

Scope

This scope covers the following:

Prioritize work activities to achieve desired results

Organize desired resources prior to commencement of work

Performance Criteria (PC) w.r.t. the Scope

Element Performance Criteria

Prioritize work activities to achieve desired results

To be competent, the user / individual on the job must be able to:

PC1. understand clearly the targets and timelines set by superiors

PC2. plan activities as per schedule and sequence

PC3. provide guidance to the subordinates to obtain desired outcome

PC4. plan housekeeping activities prior to and post completion of work

Organize desired resources prior to commencement of work

PC5. list and arrange required resources prior to commencement of work

PC6. select and employ correct tools, tackles and equipment for completion of

desired work

PC7. complete the work with allocated resources

PC8. engage allocated manpower in an appropriate manner

PC9. use resources in an optimum manner to avoid any unnecessary wastage

PC10. employ tools, tackles and equipment with care to avoid damage to the same

PC11. organize work output, materials used, tools and tackles deployed,

PC12. processes adopted to be in line with the specified standards and instructions

Knowledge and Understanding (K)

A. Organizational Context

(Knowledge of

the company /

organization and

its processes)

The user/individual on the job needs to know and understand:

KA1. importance of proper housekeeping

KA2. policies, procedures and work targets set by superiors

KA3. roles and responsibilities in executing the work for subordinates and self

B. Technical

Knowledge

The user/individual on the job needs to know and understand:

KB1. standard practices of work to be adopted for assigned task

KB2. how to use available resources in a judicious and appropriate manner to

minimize wastages or damage

Skills (S)

Nat

ion

al O

ccu

pat

ion

al S

tan

dar

d

Page 34: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N8002 Plan and organize work to meet expected outcomes

34

A. Core Skills/

Generic Skills

Writing Skills

The user/ individual on the job needs to know and understand how to:

SA1. write in one or more language, preferably in the local language of the site

SA1. list out the assigned works and targets

Reading Skills

The user/ individual on the job needs to know and understand how to:

SA2. read in one or more language, preferably in the local language of the site

SA3. read communication from co-workers, superiors and notices from other

departments as per requirement of the level

Oral Communication (Listening and Speaking skills)

The user/ individual on the job needs to know and understand how to:

SA4. speak in one or more language, preferably in one of the local language of the

site

SA5. listen and follow communication shared by co-workers regarding standard

work processes, resources available, timelines, etc.

SA6. communicate effectively with co-workers and subordinates

B. Professional

Skills

Decision Making

The user/individual on the job needs to know and understand how to:

SB1. decide on what sequence is to be adopted for execution of work

Plan and Organise

The user/individual on the job needs to know and understand how to:

SB2. plan and organize the materials, tools, tackles and equipment required to

execute the work

Customer centricity

The user/individual on the job needs to know and understand how to:

SB3. complete all assigned task with proper planning and organizing

Problem solving

The user/individual on the job needs to know and understand how to:

SB4. arrange or seek help to arrange for material, tools and tackles in case of

shortfall

Analytical Thinking

The user/individual on the job needs to know and understand how to:

SB5. analyze areas of work which could result in a delay of work, wastage of

material or damage to tools and tackles

Page 35: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N8002 Plan and organize work to meet expected outcomes

35

Critical Thinking

The user/individual on the job needs to know and understand how to:

SB6. evaluate potential solutions to minimize avoidable delays and wastages at

the construction site

Page 36: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N8002 Plan and organize work to meet expected outcomes

36

NOS Version Control

NOS Code CON/N8002

Credits (NSQF) TBD Version number

1.0

Industry Construction Drafted on 07/05/2015

Industry Sub-sector Real Estate and Infrastructure Construction Last reviewed on

23/05/2015

Occupation Construction Electrical Works Next review date

23/05/2017

Page 37: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N8003 Supervise, monitor and evaluate performance of subordinates at workplace

37

-----------------------------------------------------------------------------------------------------

Overview

This NOS covers the skills and knowledge require by workmen to supervise, monitor and evaluate the

performance of subordinates at workplace.

Page 38: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N8003 Supervise, monitor and evaluate performance of subordinates at workplace

38

Unit Code CON/N8003

Unit Title (Task)

Supervise, monitor and evaluate performance of subordinates at workplace

Description This OS covers the skills and knowledge required by an individual to supervise,

monitor and evaluate performance of subordinates at work place

Scope

The scope covers the following:

Monitor all construction work activities performed by subordinates, evaluate

their performance and ensure strict adherence to quality instructions and

timelines as per organizational policies and procedures

Performance Criteria (PC) w.r.t. the Scope

Element Performance Criteria

Supervise, monitor and evaluate performance of all subordinates and ensure adherence to organizational policies and procedures

To be competent, the user/individual on the job must be able to:

PC1. fix expected targets for the respective gang as per site requirements

and allocate work to subordinates

PC2. establish expected performance standards and expectations for the

respective gang of workers to meet the desired outcomes

PC3. inspect assigned work to the respected gang of workers through progressive

checking

PC4. observe and verify the work activities performed by the subordinates at the

construction site

PC5. monitor overall performance of subordinates on the designed measures to

ensure quality requirements set by the concerned authority

PC6. ensure adherence to the organizational policies and procedures for all

relevant construction activities by the workmen subordinations

Knowledge and Understanding (K)

A. Organizational Context

(Knowledge of

the company /

organization and

its processes)

The user/individual on the job needs to know and understand:

KA1. policies, procedures and work targets for performance evaluation and

appraisals

KA2. organizational policies, procedures and protocol for smooth completion of

work at the respective workplace

B. Technical

Knowledge

The user/individual on the job needs to know and understand:

KB1. how to complete work/task accurately by following standard specifications

and procedures by optimized and correct used of materials , tools, tackles

and equipment

Skills (S)

Nat

ion

al O

ccu

pat

ion

al S

tan

dar

d

Page 39: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N8003 Supervise, monitor and evaluate performance of subordinates at workplace

39

A. Core Skills/

Generic Skills

Writing Skills

The user/ individual on the job needs to know and understand how to:

SA1. write in at one or more language, preferably in the local language of the site

Reading Skills

The user/ individual on the job needs to know and understand how to:

SA2. read in at one or more language, preferably in the local language of the site

Oral Communication (Listening and Speaking skills)

The user/ individual on the job needs to know and understand how to:

SA3. speak in at one or more language, preferably in one of the local languages of

the site

SA4. effectively communicate with team members at workplace

B. Professional

Skills

Decision Making

The user/individual on the job needs to know and understand how to:

SB1. rectify errors, select workman according to the performance and carry out

appropriate allocation of task

SB2. motivate the subordinate for better quality work

Plan and Organize

The user/individual on the job needs to know and understand how to:

SB3. plan work as per right sequence and organize required resources in

coordination with the team members

Customer centricity

The user/individual on the job needs to know and understand how to:

SB4. complete work as per the requirement

Problem solving

The user/individual on the job needs to know and understand how to:

SB5. solve any anomalies in work processes, critical problems & cause for delays

at workplace

Analytical Thinking

The user/individual on the job needs to know and understand how to:

SB6. sort workers activities in order of sequence and importance workers

SB7. identify root cause and effects of workers conflicts at workplace

Critical Thinking

The user/individual on the job needs to know and understand how to:

Page 40: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N8003 Supervise, monitor and evaluate performance of subordinates at workplace

40

SB8. evaluate and find solutions to minimize errors and suggest improvements for

optimizing resource utilization

SB9. assess which situations would require intervention of superiors

Page 41: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N8003 Supervise, monitor and evaluate performance of subordinates at workplace

41

NOS Version Control

NOS Code CON/N8003

Credits (NSQF) TBD Version number

1.0

Industry Construction Drafted on 07/05/2015

Industry Sub-sector Real Estate and Infrastructure Construction Last reviewed on

23/05/2015

Occupation Construction Electrical Works Next review date

23/05/2017

Page 42: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N9002 Manage workplace for safe and healthy work environment

42

----------------------------------------------------------------------------------------------------------------------------- ---------

Overview

This NOS covers the skills and knowledge required by a workman to be proficient in maintaining a

healthy & safe working environment for the group of people working under an individual.

Page 43: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N9002 Manage workplace for safe and healthy work environment

43

Unit Code CON/N9002

Unit Title (Task)

Manage workplace for safe and healthy work environment

Description This unit describes the skill and knowledge required to maintain a healthy & safe

working environment for the group of people working under an individual

Scope

The scope covers the following:

Ensure healthy and safe working environment for subordinates.

Ensure effective implementation of health, safety and environment policies

and procedures

Identify and respond to risks / fire and emergencies associated with the

work practices, workplace and ensure related organizational & statuary

requirement as followed

Performance Criteria (PC) w.r.t. the Scope

Element Performance Criteria

Ensure a healthy and safe working environment for subordinates.

To be competent, the user / individual on the job must be able to:

PC1. ensure proper housekeeping at workplace

PC2. implement safe handling , stacking methods at workplace / store

PC3. ensure that health and safety plan is followed by all subordinates

PC4. identify any hazard in workplace and notify them to appropriate authority

PC5. ensure that all safety and protection installation are correctly placed &

adequate

PC6. ensure safe access is available at work place for movement of workers &

materials

PC7. ensure safe use of tools and tackles by the workmen as per applicability

PC8. ensure appropriate use of following Personal Protective Equipment (PPE)

as per applicability:

Head Protection (Helmets)

Ear Protection

Fall Protection

Foot Protection

Face and Eye Protection,

Hand &Body Protection

Respiratory Protection

PC9. maintain entrances & exit from confined spaces , excavated pits and other

location in concurrence with safety parameters or instruction form safety

personals

Identify and respond to risks / emergencies

PC10. ensure organizational policies and procedures are followed for health ,

safety and welfare, in relation to:

Nat

ion

al O

ccu

pat

ion

al S

tan

dar

d

Page 44: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N9002 Manage workplace for safe and healthy work environment

44

associated with the work practices, workplace

methods of receiving or sourcing information

dealing with accidents and emergencies associated with the work

and environment

reporting

stooping work

evacuation

fire risks and safe exit procedures

PC11. follow procedures for accident recording and reporting as per organizational

and statuary requirements

PC12. ensure effective adherence to response to emergency procedures /

protocols

PC13. report any case of emergency / risks to the concern people at the

construction site

PC14. report any perceived risk hazards to the superiors / concerned EHS

PC15. demonstrate the use of fire protection equipments for different type of fire

hazard

PC16. implement control measures to reduce risk & meet legal requirement as per

organizational policies

Knowledge and Understanding (K)

A. Organizational Context

(Knowledge of

the company /

organization and

its processes)

The user/individual on the job needs to know and understand:

KA1. the policies, procedures and protocol set up by the EHS Department With

respect to Health , Safety and Environment at the respective construction

site

KA2. reporting procedures in cases of breaches or hazards in site safety, accidents

or emergency situations

KA3. safe working practices for tools, tackles and equipment

KA4. workplace policies and health and safety requirements for dealing with

potential risks as defined by the EHS department

B. Technical

Knowledge

The user/individual on the job needs to know and understand:

KB1. how to respond to accidents & emergencies

KB2. the appropriate personal protective equipment to be used based on various

working conditions

KB3. how to use necessary material ,tools, tackles and equipment in a safe and

appropriate manner as specified by site EHS for each level and respective

workman gang

KB4. how to monitor working in workplace keeping safety & health in mind

Skills (S)

A. Core Skills/

Generic Skills

Writing Skills

The user/ individual on the job needs to know and understand how to:

SA1. write in one or more languages

Page 45: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N9002 Manage workplace for safe and healthy work environment

45

Reading Skills

The user/ individual on the job needs to know and understand how to:

SA2. read in one or more languages

SA3. read instructions, rules, guidelines, sign boards related to safety as per the requirements

Oral Communication (Listening and Speaking skills)

The user/ individual on the job needs to know and understand how to:

SA4. speak in one or more language, preferably in one of the local languages of the site

SA5. listen and follow instructions shared by site EHS and superiors regarding site safety

SA6. communicate reporting of site conditions, hazards, accidents, etc.

B. Professional

Skills

Decision Making

The user/individual on the job needs to know and understand how to:

SB1. decide upon the appropriate application & installation of safety equipments like barricades and nets

SB2. decide upon the tools box talks contents

Plan and Organise

The user/individual on the job needs to know and understand how to:

SB3. identify any hazards in workplace organize safety equipments prior to commencing work

Customer centricity

The user/individual on the job needs to know and understand how to:

SB4. work to ensure safe and healthy environmental conditions at workplace

Problem solving

The user/individual on the job needs to know and understand how to:

SB5. identify analysis & report hazards, accidents, health and safety risks, etc. or seek help from the appropriate authorities to address the same as per the guidelines laid down by site EHS

Analytical Thinking

The user/individual on the job needs to know and understand how to:

SB6. analyze areas of work which are potential safety hazards and could result

in damage to life or property for the respective gang at the construction site

Critical Thinking

The user/individual on the job needs to know and understand how to:

SB7. respond to critical health risks or accidents on an urgent basis through appropriate actions

Page 46: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

CON/N9002 Manage workplace for safe and healthy work environment

46

NOS Version Control

NOS Code CON/N9002

Credits (NSQF) TBD Version number

1.0

Industry Construction Drafted on 07/05/2015

Industry Sub-sector Real Estate and Infrastructure Construction Last reviewed on

23/05/2015

Occupation Construction Electrical Works Next review date

23/05/2017

Page 47: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

Assessment Criteria for Foreman – Electrical Works (Construction)

47

CRITERIA FOR ASSESSMENT OF TRAINEES

Job Role Foreman – Electrical Works (Construction)

Qualification Pack CON/Q0604

Sector Skill Council Construction

Marks Allocation

Assessment outcomes

Assessment Criteria for outcomes Total Mark

Out Of Theory Skills Practical

CON/N0611: Monitor regular electrical works (installation, maintenance and repairing) in

PC1. ensure that preventive maintenance of electrical wiring, equipment and fixtures deployed at construction works is being carried out regularly as per requirement 100

3 1 2

PC2. check and ensure materials, fixtures and devices being used in repairing or maintenance works are ISI certified

5 2 3

Guidelines for Assessment 1. Criteria for assessment for each Qualification Pack will be created by the Sector Skill Council. Each

Performance Criteria (PC) will be assigned marks proportional to its importance in NOS. SSC will also lay

down proportion of marks for Theory and Skills Practical for each PC.

2. The assessment for the knowledge part will be based on knowledge bank of questions created by

Assessment Bodies subject to approval by SSC

3. Individual assessment agencies will create unique question papers for knowledge/theory part for

assessment of candidates as per assessment criteria given below

4. Individual assessment agencies will create unique evaluations for skill practical for every student at each

examination/training center based on assessment criteria.

5. The passing percentage for each QP will be 70%. To pass the Qualification Pack, every trainee should score

a minimum of 70% individually in each NOS.

6. The Assessor shall check the final outcome of the practices while evaluating the steps performed to

achieve the final outcome.

7. The trainee shall be provided with a chance to repeat the test to correct his procedures in case of improper

performance, with a deduction of marks for each iteration.

8. After the certain number of iteration as decided by SSC the trainee is marked as fail, scoring zero marks for

the procedure for the practical activity.

9. In case of successfully passing only certain number of NOS's, the trainee is eligible to take subsequent

assessment on the balance NOS's to pass the Qualification Pack within the specified timeframe set by SSC.

10. Minimum duration of Assessment of each QP shall be of 4hrs/trainee.

Page 48: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

Assessment Criteria for Foreman – Electrical Works (Construction)

48

a construction site

PC3. inspect completed LV electrical arrangements for conformance with specifications, requirements and compliance with applicable statutory and HSE requirements

5 2 3

PC4. check & ensure that lighting arrangements and its components are in safe condition working properly

3 1 2

PC5. conduct periodical checks/ tests to insulation, joints, physical condition and termination of wires and cables to ensure safe working of wiring systems

3 1 2

PC6. check condition and safety of isolation and ensure safe condition for undertaking maintenance/ repairing in wires, cables, lights and fixtures

5 2 3

PC7. diagnose malfunctioning of wiring systems, circuits, temporary panels and its components, using appropriate measuring equipment and hand tools

5 2 3

PC8. carry out troubleshooting and take immediate actions in case of emergency repairing requirements related to short circuit or malfunction in wiring systems, temporary electrical panels or lighting arrangements

5 2 3

PC9. ensure proper functioning of power tools and diagnostic tools by conducting maintenance as per manufacturer’s guidelines at scheduled intervals

5 2 3

PC10. develop hand sketches relevant to electrical circuit diagrams using standard wiring symbols as per work requirements

5 2 3

PC11. supervise electrical works by providing instructions, directions ensuring completion of the same within specified time as per applicable schematics, specification, guidelines and safety norms

5 2 3

PC12. adhere to schedule of calibration (if any) and conduct calibration periodically to ensure correct working of testing equipment and ensure removal of faulty ones from worksite

3 1 2

PC13. check condition and safety of isolation and ensure safe condition for undertaking maintenance/ repairing in construction equipments

5 2 3

PC14. conduct installation, electrical maintenance and repair of equipment like electrical distribution panels and its accessories, common construction equipment like bar cutting/bending machine, different types of common pumps used in construction sites, transformers and tower cranes

3 1 2

Page 49: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

Assessment Criteria for Foreman – Electrical Works (Construction)

49

PC15. ensure proper termination of cables as per applicability at power source and equipment

5 2 3

PC16. prepare schedule of maintenance for common equipment and machineries such as motor, bar cutting/ bending machines, vibratos, tower cranes etc.

5 2 3

PC17. determine potential hazards prior to conduct any maintenance/ repairing work to the equipment or circuits

5 2 3

PC18. take necessary steps or report to concerned authorities on observing any hazardous conditions at work place

3 1 2

PC19. ensure erection of safety signage and barricading, surrounding the faulty or electrically hazardous equipment/ locations to avoid unsafe conditions

3 1 2

PC20. carry out checks for adverse situation like vicinity of water, fire prior, during and after establishing any electrical system at regular intervals

3 1 2

PC21. ensure proper earthing of electrical circuits as per relevant specifications or manufacturer’s guidelines

5 2 3

PC22. ensure occurrence of trial run and obtain clearance from respective authority relevant to electrical works prior to leave any equipment for working

5 2 3

PC23. ensure upkeep of valuable electrical fixtures and perform checks at electrical stores to ensure safe condition

3 1 2

PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures

5 2 3

PC25. ensure electrical safety to workers, equipment, materials and fixtures by adopting standard safe working procedures as per organizational norms, at workplace

3 1 2

Total 100 40 60

CON/N0612 : Establish electrical connections during erection of plant and heavy

PC1. read manufacturer’s guidelines to ascertain electrical requirement of the machinery to be installed

100

5 2 3

PC2. prepare material requirement from electrical drawing/ diagram if available with machinery as per standard practice

5 2 3

PC3. derive specification of electrical materials to be used in circuits/ electrical systems

5 2 3

Page 50: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

Assessment Criteria for Foreman – Electrical Works (Construction)

50

construction machineries

PC4. pass material requirement to senior authority after checking with material availability at store

5 2 3

PC5. perform visual inspection of available material in terms of their specification and physical condition

5 2 3

PC6. coordinate with superiors for allocation of desired manpower

5 2 3

PC7. provide inputs in planning and preparing work schedules required to complete the erection

5 2 3

PC8. check for completion of required preparatory works and availability of safety devices at workplace, prior to starting installation works

5 2 3

PC9. carry out or inspect electrical isolation at the main and secondary power source as per standard procedure and ensure work safety prior to conducting maintenance to electrical units

5 2 3

PC10. inspect electrical panel, transformers to ensure conformance to manufacturer’s specification, compatibility of devices, power ratings of devices to be connected adhering electrical safety norms

8 3 5

PC11. erect electrical panel as power source if required and get it activated

5 2 3

PC12. conduct and carry out electrical connection works between machinery and power source

3 1 2

PC13. install earthing arrangement and protective devices at appropriate locations as per manufacturer’s guidelines

5 2 3

PC14. ensure safe joining (straight through joint as per applicability), and termination of cables as per standard practice

5 2 3

PC15. conduct required electrical tests using appropriate measuring and diagnostic devices to ensure safe and desired working of machineries

5 2 3

PC16. conduct trial run and required tests to ensure safe working of plant and machineries

5 2 3

PC17. check panels, transformers, machineries for factors responsible for electrical distribution system failure like loose connections/ parts, moisture, line disturbance, defective/ inadequate insulations, short circuiting, collision, overloading, dust/dirt or oil accumulation and other possible unsafe acts

5 2 3

PC18. conduct preventive maintenance to electrical panels and electrical machineries parts as and when necessary

5 2 3

Page 51: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

Assessment Criteria for Foreman – Electrical Works (Construction)

51

PC19. ensure electrical safety to workers, equipment, materials and fixtures by adopting standard safe working procedures as per organizational norms, at workplace

5 2 3

PC20. prepare field reports, hand sketches etc. as and when necessary for documentation of related works

5 2 3

Total 100 40 60

CON/N0613 : Conduct permanent wiring, maintenance work in buildings

PC1. go through electrical drawing, guidelines to ascertain electrical requirement of the work to be undertaken

100

5 2 3

PC2. calculate electrical material requirement considering customer requirement and preferences or standard requirements of home electrical systems as per standard practice if drawing / diagram is not available

5 2 3

PC3. derive list of electrical equipment and fixtures to be used in circuits/ electrical systems from drawing for considering power rating of the equipment

5 2 3

PC4. calculate requirement of wiring materials as per drawing customer requirement and standard practice

5 2 3

PC5. prepare and document as- built drawing of temporary and permanent – embedded electrical lines/ connection in order to be available in the final as built drawing

8 3 5

PC6. monitor and ensure wall chasing work as per standard procedure prior to laying conduit

5 2 3

PC7. conduct conduit laying for RCC structures and ensure specification of conduits are as per requirement

8 3 5

PC8. conduct cable laying through conduit and ensure right specification of cables are being used considering electrical voltage/ load requirement

8 3 5

PC9. conduct/ carry out concealed, exposed, electrical wiring work as per standard method and customer’s requirement

8 3 5

PC10. carry out or inspect electrical isolation at the main and secondary power source as per standard procedure and ensure work safety prior to conducting maintenance to electrical wiring or pre installed units

8 3 5

PC11. fix complex electrical fixtures, installs fire alarm systems as per requirement

8 3 5

Page 52: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

Assessment Criteria for Foreman – Electrical Works (Construction)

52

PC12. conduct/ carry out earthing of installed electrical circuit as per standard method and using standard earthing components

8 3 5

PC13. conduct required tests/ inspections as and when necessary to ensure safe working of electrical circuits or to determine any fault in the circuit

8 3 5

PC14. suggest suitable methods of maintenance of a part of electrical circuit and conduct/ carry out maintenance work as per requirement adhering specification of parts and general electrical guidelines

5 2 3

PC15. change parts, fixture, wirings as per requirement

5 2 3

PC16. carry out basic maintenance of household equipment like water pump, motor etc.

5 2 3

Total 100 40 60

CON/N8001: Work effectively in a team to deliver desired results at the workplace

PC1. pass on work related information/ requirement clearly to the team members

100

10 4 6

PC2. inform co-workers and superiors about any kind of deviations from work

10 4 6

PC3. address the problems effectively and report if required to immediate supervisor appropriately

20 8 12

PC4. receive instructions clearly from superiors and respond effectively on the same

10 4 6

PC5. communicate to team members/subordinates for appropriate work technique and method

10 4 6

PC6. seek clarification and advice as per the requirement and applicability

10 4 6

PC7. hand over the required material, tools tackles, equipment and work fronts timely to interfacing teams

15 6 9

PC8. work together with co-workers in a synchronized manner

15 6 9

Total 100 40 60

CON/N8002: Plan and organize work to meet expected outcomes

PC1. understand clearly the targets and timelines set by superiors

100

13 5 8

PC2. plan activities as per schedule and sequence 10 4 6

PC3. provide guidance to the subordinates to obtain desired outcome

13 5 8

PC4. plan housekeeping activities prior to and post completion of work 8 3 5

PC5. list and arrange required resources prior to commencement of work 10 4 6

PC6. select and employ correct tools, tackles and equipment for completion of desired work 8 3 5

Page 53: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

Assessment Criteria for Foreman – Electrical Works (Construction)

53

PC7. complete the work with allocated resources 8 3 5

PC8. engage allocated manpower in an appropriate manner 5 2 3

PC9. use resources in an optimum manner to avoid any unnecessary wastage 5 2 3

PC10. employ tools, tackles and equipment with care to avoid damage to the same

5 2 3

PC11. organize work output, materials used, tools and tackles deployed,

10 4 6

PC12. processes adopted to be in line with the specified standards and instructions

8 3 5

Total 100 40 60

CON/N8003: Supervise, monitor and evaluate performance of subordinates at workplace

PC1. fix expected targets for the respective gang as per site requirements and allocate work to subordinates

100

15 6 9

PC2. establish expected performance standards and expectations for the respective gang of workers to meet the desired outcomes

15 6 9

PC3. inspect assigned work to the respected gang of workers through progressive checking 20 8 12

PC4. observe and verify the work activities performed by the subordinates at the construction site

20 8 12

PC5. monitor overall performance of subordinates on the designed measures to ensure quality requirements set by the concerned authority

15 6 9

PC6. ensure adherence to the organizational policies and procedures for all relevant construction activities by the workmen subordinations

15 6 9

Total 100 40 60

CON/N9002: Manage workplace for safe and healthy work environment

PC1. Ensure proper housekeeping at workplace

5 2 3

PC2. Implement safe handling , stacking methods at workplace / store

5 2 3

PC3. Ensure that health and safety plan is followed by all subordinates

8 3 5

PC4. Identify any hazard in workplace and notify them to appropriate authority

5 2 3

PC5. ensure that all safety and protection installation are correctly placed & adequate

5 2 3

PC6. Ensure safe access is available at work place for movement of workers & materials.

5 2 3

PC7. Ensure safe use of tools and tackles by the workmen as per applicability

5 2 3

Page 54: CSDC India - ontents - Foreman...PC24. prepare data sheet, report and note readings as per applicability according to organizational procedures PC25. ensure electrical safety to workers,

Assessment Criteria for Foreman – Electrical Works (Construction)

54

PC8. ensure appropriate use of following Personal Protective Equipment (PPE) as per applicability: • Head Protection (Helmets) • Ear Protection • Fall Protection • Foot Protection • Face and Eye Protection, • Hand &Body Protection • Respiratory Protection

5 2 3

PC9. Maintain entrances & exit from confined spaces , excavated pits and other location in concurrence with safety parameters or instruction form safety personals.

5 2 3

PC10. Ensure organizational policies and procedures are followed for health , safety and welfare, in relation to: • methods of receiving or sourcing information • dealing with accidents and emergencies associated with the work and environment • reporting • stooping work • evacuation • fire risks and safe exit procedures

8 3 5

PC11. follow procedures for accident recording and reporting as per organizational and statuary requirements

8 3 5

PC12. ensure effective adherence to response to emergency procedures / protocols

8 3 5

PC13. report any case of emergency / risks to the concern people at the construction site

8 3 5

PC14. report any perceived risk hazards to the superiors / concerned EHS

8 3 5

PC15. demonstrate the use of fire protection equipments for different type of fire hazard

8 3 5

PC16. implement control measures to reduce risk & meet legal requirement as per organizational policies

8 3 5

Total 100 40 60