CSB Investigation: Chevron Refinery Pipe Rupture and Fire
Transcript of CSB Investigation: Chevron Refinery Pipe Rupture and Fire
![Page 1: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/1.jpg)
CSB Investigation:Chevron Refinery Pipe Rupture and FireRichmond, California
Southern California Society For Risk Analysis26th Annual MeetingMay 30, 2013
![Page 2: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/2.jpg)
Chevron Refinery Pipe Rupture and FireRichmond, California
Background
Incident Review
Sulfidation Corrosion
Review of Findings and Recommendations
2
![Page 3: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/3.jpg)
3
Chevron Richmond Refinery
![Page 4: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/4.jpg)
Atmospheric Crude Column
8-inch “4-sidecut” line
Line Constructed of Carbon Steel
Process Fluid is Light Gas Oil
P = 55 psigT = 640 ⁰F
4
![Page 5: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/5.jpg)
5
![Page 6: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/6.jpg)
6
![Page 7: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/7.jpg)
7
![Page 8: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/8.jpg)
8
![Page 9: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/9.jpg)
9
![Page 10: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/10.jpg)
10
![Page 11: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/11.jpg)
11
![Page 12: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/12.jpg)
12
![Page 13: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/13.jpg)
13
![Page 14: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/14.jpg)
14
![Page 15: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/15.jpg)
15
![Page 16: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/16.jpg)
16
![Page 17: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/17.jpg)
17
![Page 18: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/18.jpg)
18
![Page 19: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/19.jpg)
19
![Page 20: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/20.jpg)
20
![Page 21: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/21.jpg)
21
![Page 22: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/22.jpg)
22
![Page 23: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/23.jpg)
23
![Page 24: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/24.jpg)
OccuMechanics of Sulfidation Corrosion
Occurs in high temperature process fluidSulfur Compounds React with Iron Contained in Steel
24
![Page 25: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/25.jpg)
Sulfidation Rates of Various Alloys
25Curves can be found in API RP 939-C
![Page 26: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/26.jpg)
Carbon Steel Corrosion Rate Variability
26Graph from API RP 939-C
![Page 27: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/27.jpg)
Low-Silicon Carbon Steel
>.1% SiliconCarbon Steel
9-Chrome Stainless Steel
INHERENTLY SAFER
90 % Wall Loss 65% Wall Loss 9% Wall Loss < 1% Wall Loss
Chevron 4-sidecut Material of Construction
27
Inherently Safer Materials of ConstructionThinning resulting from 15 years of operation (Estimated)
![Page 28: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/28.jpg)
Corrosion Monitoring of Carbon Steel Piping
http://ftp2.bentley.com/dist/collateral/docs/plantspace_isometrics/PlantSpace_Isometrics_3D_Pipe.jpg
Measurement Location
Straight-RunComponents
Elbow Components
Generic Piping Configuration
28
![Page 29: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/29.jpg)
http://ftp2.bentley.com/dist/collateral/docs/plantspace_isometrics/PlantSpace_Isometrics_3D_Pipe.jpg
Generic Piping Configuration
http://ftp2.bentley.com/dist/collateral/docs/plantspace_isometrics/PlantSpace_Isometrics_3D_Pipe.jpg
Measurement Location
Measurement Location
Measurement Location
Measurement Location
Measurement Location
Measurement Location
Measurement Location
Measurement Location
Measurement Location
29
100 Percent Component Inspection IdentifiesLow-Silicon Components
![Page 30: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/30.jpg)
Inherently Safer Metallurgy Reduces Hazard
http://ftp2.bentley.com/dist/collateral/docs/plantspace_isometrics/PlantSpace_Isometrics_3D_Pipe.jpg 30
![Page 31: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/31.jpg)
Low-Silicon 4-Sidecut Component Not Monitored
Measurement Location
WeldHigh-Silicon
Elbow Component
Low-SiliconPipe Component
31
![Page 32: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/32.jpg)
32
Low-Silicon 4-Sidecut Component Not Monitored
![Page 33: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/33.jpg)
33
![Page 34: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/34.jpg)
34
![Page 35: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/35.jpg)
35
![Page 36: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/36.jpg)
36
![Page 37: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/37.jpg)
37
![Page 38: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/38.jpg)
Many Chevron Recommendations to Inspect or Upgrade 4-Sidecut
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Pipe Ruptures
Recommendations to 100 Percent Inspect 4-Sidecut
Recommendations to Upgrade Metallurgy of 4-Sidecut
38
![Page 39: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/39.jpg)
Process Hazard Analysis
Process Hazard Analysis Required by OSHA PSM Program– Enforceable by Cal/OSHA and City of Richmond
PHA team DID evaluate “leak or rupture” of 4-sidecut line
PHA team did not identify 4-sidecut Sulfidation vulnerabilities– PHA team not knowledgeable of 4-sidecut corrosion hazards– PHA team did not seek out additional corrosion expertise
No PHA recommendations to improve 4-sidecut safeguards
39
![Page 40: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/40.jpg)
Damage Mechanism Hazard Reviews
These hazard reviews:
– Analyze all process equipment failure mechanisms including:
• Corrosion• Cracking
– Identify potential safeguards to control or eliminate hazard
Not required by regulators or by current Chevron standards
May have prompted PHA team to recommend replacing 4-sidecut line
CSB recommended to Chevron and State of California to require Damage Mechanism Hazard Reviews as part of PHA cycle
40
![Page 41: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/41.jpg)
Adequacy of PHA Safeguards
Safeguard Evaluation Methodologies; accepted methods include:– Quantitative, e.g., Quantitative Risk Analysis– Semi-Quantitative, e.g., Layers of Protection Analysis, and – Qualitative, e.g., NFPA Fire Codes
Chevron PHAs do not use these safeguard evaluation methodologies– Reliability of safeguards were not adequately verified– Rely on PHA team experiences, beliefs, and areas of expertise
CSB recommended to California Regulators to require a fully documented, rigorous analysis of safeguards using established methods such as LOPA
41
![Page 42: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/42.jpg)
Implementation of Inherently Safer Systems (ISS)
Contra Costa County process facilities are required consider inherently safer design opportunities in PHAs and for new construction
But many more opportunities exist: – Management of Change (MOCs)– Process Unit Rebuilds– Major Repairs– Corrective actions from incident investigation recommendations
Chevron did not document the analysis of ISS alternatives.
CSB recommended more rigorous ISS requirements by: – City of Richmond / Contra Costa County– State of California
42
![Page 43: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/43.jpg)
Multi-Agency Regulatory Approach Needed
Program will improve public accountability and process safety performance
Sharing of data and operational coordination will help regulators prevent major incidents
Regulators have cited the need for greater multi-agency cooperation
CSB recommended multi-agency regulatory cooperation
![Page 44: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/44.jpg)
Transparency Drives Process Safety
Transparency is the public disclosure of process safety information
Minimal transparency exists between refineries, regulators, and the public
The CSB recommended that the multi-agency group establish procedures for greater transparency between local officials, regulators, the workforce, and the public.
Tawanda Kanhema/Richmond Confidential
![Page 45: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/45.jpg)
Many Factors Contributed to Incident
Immediate Causes
– Failure caused by sulfidationcorrosion in low-silicon carbon steel
– Chevron failed to shut down unit when leak was found
Latent Causes
– Chevron never fully inspected or replaced the 4-sidecut despite many recommendations
– Chevron PHA process failed to identify sulfidation corrosion hazard
45
![Page 46: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/46.jpg)
Many Factors Contributed to Incident
Regulations did not require rigorousISS implementation
Regulations did not require damage mechanism hazard review
Regulations did not require evaluationof safeguard effectiveness
Multi-agency cooperation and transparency needed in California
46
![Page 47: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/47.jpg)
Additional Items Still Under Investigation
California– Refinery regulatory regime
Chevron– Safety culture
– Management system
– Mechanical integrity systems
– Emergency planning,notification, and response
– Process safety indicators
47
![Page 48: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/48.jpg)
48
![Page 49: CSB Investigation: Chevron Refinery Pipe Rupture and Fire](https://reader034.fdocuments.net/reader034/viewer/2022042611/586677de1a28ab1b408b479c/html5/thumbnails/49.jpg)
CSB Investigation:Chevron Refinery Pipe Rupture and FireRichmond, California
Southern California Society For Risk Analysis26th Annual MeetingMay 30, 2013