CSA S478 Guideline on Durability in Buildings David Kayll, FMA, P.Eng. Principal, Building Science Specialist MORRISON HERSHFIELD, Ottawa May 8, 2014
The Durability Process
![Page 2: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/2.jpg)
Take a deep breath…
2
![Page 3: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/3.jpg)
1 What Determines Durability?
Durability is not a material property
Durability is a function of a material and its environment
Durability is also a function of installation, future maintenance and replacements
3
Durability
![Page 4: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/4.jpg)
1 Service Environment
4
Durability
Location & Exposure
Interior Loads
![Page 5: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/5.jpg)
1 Required function(s) of:
5
Durability
That depends on whether we are manufacturing open web joists or underwear.” Ted Kesik
Buildings: Institutional, Industrial, Commercial, Residential…
Materials:
“What’s better – steel or cotton?
![Page 6: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/6.jpg)
Durable requires the Team to perform their roles and responsibilities from Conception to Occupancy.
Roles & Responsibilities
The Roles need to be clearly defined for each of the following:
Owner(s) Architect Durability Specialist Building Envelop Consultant Structural Consultant Other Consultants General Contractor Sub-Contractors Manufacturers
![Page 7: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/7.jpg)
1
7
A Durability Plan
Creating a Durability Plan
![Page 8: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/8.jpg)
1 The CSA S478 guideline provides: Set of recommendations to assist designers
Framework for durability targets
Generic advice
Model documents
Appendix with expanded discussions
8
A Durability Plan
![Page 9: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/9.jpg)
Tables, Design review, Field review
Sample MH Durability Plan
![Page 10: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/10.jpg)
1
10
A Durability Plan
![Page 11: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/11.jpg)
1
11
Service Life
Service Life: “The actual time during which the
building or any of its components performs without unforeseen costs or disruption for maintenance and repair.” (CSA S478)
Design Service Life (DSL) vs. Predicted Service Life (PSL)
Components will last for 10, 20, 30, 50, 100+ years?
![Page 12: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/12.jpg)
1
12
Predicted Service Life
Historical Materials – We know these ones…
![Page 13: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/13.jpg)
1
13
Predicted Service Life
Innovative Materials – Do we know these ones…???
![Page 14: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/14.jpg)
14
Agents of Destruction
Agent Type
Moisture Solid (ice, snow) Liquid (rain, condensation) Gas (water vapour, humidity)
Air Constituents O2, CO2
Air Contaminants Oxides, particulates, sea spray
Ground constituents Sulphates and other salts, acids (from decomposition of organic matter)
Ground contaminants Chemicals from spills and leaks, chlorides from road salt, induced electrical currents
Biological agents Microorganisms, insects, other animals, plants
![Page 15: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/15.jpg)
15
Agents of Destruction
Agent Type
Temperature Fluctuations
Solar radiation UV (ultraviolet radiation)
Incompatible chemicals
Corrosion
Differential movements
Between components (shrinkage and swelling), within massive materials (temperature gradient response), creep/flow
Use or exposure
Loading, abrasion, overloading
![Page 16: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/16.jpg)
1
16
How To Predict Service Life?
How do we predict the service life of a material or assembly?
PSL of components within assembly (shortest outside, longest inside)
Use many methods in parallel
Some components will be less
Some components will be more
![Page 17: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/17.jpg)
1
17
How To Predict Service Life?
ISO 15686-1 Factor Method: ESL = RSL x A x B x C x D x E x F x G
A. Quality of components as supplied to the project
B. Design level of a component (e.g. how protected it is from elements which may degrade it)
C. Work execution level or skill level of the installers
D. Indoor environment (e.g. where the component will be utilized)
E. Outdoor environment (e.g. northern climate, coastal climate, southern climate)
F. In-use conditions (refers to specific use conditions of the building)
G. Maintenance level (what is the level of maintenance possible, and likely, for the particular component for the span of its useful life?)
![Page 18: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/18.jpg)
?
![Page 19: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/19.jpg)
1
19
CSA S478 Method Engineering judgment
Historical performance
Chemical evaluation
Modeling
Performance testing
Manufacturer’s estimates
Plus:
− Environmental conditions − Installation − Operating & Maintenance procedures
How To Predict Service Life?
![Page 20: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/20.jpg)
1 Owner’s expectation of Design Service Life
Ownership type
Building use (present and future)
Future land development
Adaptability
20
A Durability Plan
How do you determine a building’s Design Service Life?
![Page 21: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/21.jpg)
1
21
A Durability Plan
Category DSL Examples
Temporary Up to 10 years * Non-permanent construction buildings (sales offices, bunkhouses) * Temporary exhibition buildings
Medium Life 25 to 49 years * Most industrial buildings * Most parking structures
Long Life
50 to 99 years
* Most residential, commercial and office buildings * Health and education buildings * Parking structures below buildings designed for long life category
Permanent 100 years minimum
* Monumental buildings * Heritage buildings
Design and construct with the intent that: Predicted Service Life ≥ Design Service Life
Table 2 in CSA S478
![Page 22: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/22.jpg)
1
22
A Durability Plan
Category DSL Examples
Temporary Up to 10 years * Non-permanent construction buildings (sales offices, bunkhouses) * Temporary exhibition buildings
Medium Life 25 to 49 years * Most industrial buildings * Most parking structures
Long Life
50 to 99 years
* Most residential, commercial and office buildings * Health and education buildings * Parking structures below buildings designed for long life category
Permanent 100 years minimum
* Monumental buildings * Heritage buildings
Design and construct with the intent that: Predicted Service Life ≥ Design Service Life
Table 2 in CSA S478
![Page 23: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/23.jpg)
1 Component DSL in accordance with Table 3 in CSA S478:
23
Service Life
Category Effects of failure Example
1 No exceptional problems Replacement of light fittings
2 Security compromised Broken door latch
3 Interruption of building use Repair requires discontinuation of service
4 Costly because repeated Window hardware replacement
5 Costly repair Extensive replacement/ scaffolding needed
6 Danger to health or ecological system Mold, dampness, asbestos
7 Risk of injury Loose handrail
8 Danger to life Collapse of structure
Components in Categories 6, 7 and 8 – Design to last the life of the building
Components in Categories 4 and 5 – Design to last at least half the life of the building
![Page 24: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/24.jpg)
1 Where:
Component(s)/Assembly DSL < Building DSL
24
A Durability Plan
What is “…readily replaced…”?
- Design and construct those component(s) and assemblies so that they can be readily replaced.
![Page 25: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/25.jpg)
1
25
A Durability Plan
DSL1
DSL3
DSL5
DSL4
DSL2
DSL6
General Rule: Shorter PSL outboard of longer PSL
![Page 26: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/26.jpg)
26
A Durability Plan
Concept Design Review
Review against the Owners Project Requirements
By someone not directly involved in the main design functions.
Could be separate specialist
Document that Concept Design Review was completed
![Page 27: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/27.jpg)
1
27
A Durability Plan
![Page 28: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/28.jpg)
1
28
A Durability Plan
![Page 29: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/29.jpg)
1
29
A Durability Plan
Design Review Sufficient Building Envelope reviews are
required to demonstrate compliance with good practice.
Reviews include managing: − Air leakage − Vapour diffusion − Heat transfer − Water penetration
Method may include: − Marked-up drawings − Letter report(s) − Meeting minutes
![Page 30: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/30.jpg)
1
30
A Durability Plan
Maintenance Requirements Maintenance Requirements & expectations developed during design:
Appropriate material selection (component by component)
Frequency & Access of Maintenance/Repair (future costs); Initial Cost vs. LCC
Risks associated with poor maintenance – Condos vs. Owner occupied
Document Owner acceptance of unusual decisions
Vs.
![Page 31: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/31.jpg)
1
31
A Durability Plan
Maintenance Requirements
![Page 32: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/32.jpg)
1
32
A Durability Plan
Commissioning the Building Envelope BECx activities should be incorporated into specifications. These may include:
Testing requirements (manufacturer or on-site)
Shop drawing submittals
Material submittals
Material Compatibility Testing
Mock-ups
Manufacturer’s field reviews
Sample removals/renewals
![Page 33: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/33.jpg)
1
33
A Durability Plan
![Page 34: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/34.jpg)
1
34
A Durability Plan
Quality Assurance makes sure you are doing the right things, the right way. Quality Control makes sure the results of what you've done are what you expected.
Quality Management
Whose job is Quality?
![Page 35: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/35.jpg)
35
A Durability Plan
Key for all projects: Sub-contractor’s workmanship & quality control
Potential transition issues
The contractor’s Quality Assurance activities
The Architect’s or BEP’s Quality Review activities
The expected quality of installation (assists in finalizing the PSLs)
The roles and responsibilities of all team members
Mock-ups
![Page 36: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/36.jpg)
1
36
A Durability Plan
To assess installation quality control,
Address “one-off” details
Quality assurance activities are documented.
A final review is required to confirm compliance with the Project Documents.
Frequency is dependent on team make-up and requirements
Periodic Site Review
![Page 37: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/37.jpg)
1
37
A Durability Plan
![Page 38: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/38.jpg)
1
38
A Durability Plan
The Durability Plan must be endorsed by the Owner (critical step)
The Contractor must state that the building was constructed in general conformance with the Project documents.
Final Sign-off
![Page 39: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/39.jpg)
1
39
A Durability Plan
Appendices and Tables
![Page 40: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/40.jpg)
QUESTIONS?
![Page 41: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/41.jpg)
1 Durable (synonyms):
Long-lasting, hard-wearing, heavy-duty, tough, resistant, strong, sturdy, stout, sound, substantial, imperishable, indestructible, made to last, …
Durability (from CSA S478):
“The ability of a building or any of its components to perform its required functions in its service environment over a period of time without unforeseen cost for maintenance or repair.”
42
Durable vs. Durability
![Page 42: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/42.jpg)
SO WHAT?
43
![Page 43: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/43.jpg)
Building Life vs. Component Life
44
Durability
![Page 44: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/44.jpg)
Roles & Responsibilities
![Page 45: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/45.jpg)
Roles & Responsibilities
Role Responsibility
Owner(s) Establish Building DSL
Architect Establish preliminary assembly DSL
Durability Specialist Consult on appropriate DSL + PSL
Bldg. Env. Consultant Consult on regional risks and agents
Structural Consultant Consult on regional loads
Other Consultants Roofing, leak detection, testing,…
General Contractor Establish QC plan
Sub-Contractors Consult on constructability / establish QA
Manufacturers Consult on PSL
![Page 46: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/46.jpg)
1 Common Issues: Design service lives for buildings and materials rarely
considered, especially at the start
Applicable building industry knowledge is often there…
… but how to use it not known.
Roles and responsibilities not well understood
Understanding of how to document the information not known
47
A Durability Plan
![Page 47: CSA S478 Guideline on Durability in Buildings](https://reader038.fdocuments.net/reader038/viewer/2022102505/55ce477fbb61eb346f8b464c/html5/thumbnails/47.jpg)
48
Predicting Service Life
In the design phase, DSL goes from generic to specific: Generic Assembly Specific Assembly
Example:
Composite Panel ABC Alum-Composite Panel (DSL 60+) (DSL 45 years) 50 mm Z-girt (90 Gauge) (DSL 30) 50 mm rigid insulation type IV (DSL 60+) ABC a/v/m barrier (DSL 40) ABC sheathing w/ xxx screws (DSL 50) etc…