CS Group Project Kickoff 2011 Alan Blackwell. Allocated project topics Preferences for topics were...
-
Upload
alexina-anthony -
Category
Documents
-
view
212 -
download
0
Transcript of CS Group Project Kickoff 2011 Alan Blackwell. Allocated project topics Preferences for topics were...
CS Group Project Kickoff 2011CS Group Project Kickoff 2011
Alan Blackwell
Allocated project topicsAllocated project topics
• Preferences for topics were considered.
• There were no guarantees - you may not have received your first (or second, or third) preferences.
• You will be grouped with people you don’t know - this is the whole point.
• Any serious reasons why you can’t work with this group must be communicated to me within the next hour.
Special notes:Special notes:
Alpha: African SMS RadioAlpha: African SMS Radio
• No special notes
Bravo: Crowd ControlBravo: Crowd Control
• No special notes
Charlie: Digit[Ov]al automated cricket commentaryCharlie: Digit[Ov]al automated cricket commentary
• Involves special hardware• Collect a box, to be returned with
hardware at end of project.
Delta: Hand Wave, Hand WaveDelta: Hand Wave, Hand Wave
• Involves special hardware• Collect a box, to be returned with
hardware at end of project.
Echo: iZoopraxiscope - Interactive Handheld ProjectorEcho: iZoopraxiscope - Interactive Handheld Projector
• The Samsung projector phone has been delivered to your client
• He will hand it over at first project meeting.
Foxtrot: Lounge StarFoxtrot: Lounge Star
• Will use Android phone• The phone has previously been
used by Masters students, and may need hard reset.
• Note that a Google account is necessary to initialise the phone.
• Return phone with packaging at end of project.
Golf: The Energy ForecastGolf: The Energy Forecast
• No special notes
Hotel: Top TipsHotel: Top Tips
• You will need to contact client to get details of available data
India: True Mobile CoverageIndia: True Mobile Coverage
• Will use Android phone• The phone has previously been
used by Masters students, and may need hard reset.
• Note that a Google account is necessary to initialise the phone.
• Return phone with packaging at end of project.
Juliet: Twitter DashboardJuliet: Twitter Dashboard
• No special notes
Kilo: Walk out of the UndergroundKilo: Walk out of the Underground
• Will use Android phone• The phone has previously been
used by Masters students, and may need hard reset.
• Note that a Google account is necessary to initialise the phone.
• Return phone with packaging at end of project.
Lima: Who is my Customer?Lima: Who is my Customer?
• No special notes
Access to PWF/Linux filespaceAccess to PWF/Linux filespace
• Workstation room is upstairs.• Filespaces have been created for
each group:– ${CLTEACH}/grpproj/alpha/– ${CLTEACH}/grpproj/bravo/– ${CLTEACH}/grpproj/charlie/– etc …
• Your CRSID has been assigned permission to access your group directory.
Review meeting appointmentsReview meeting appointments
• The whole group must attend the three one-hour meetings with your client:– 1. Requirements specification– 2. Implementation and test results– 3. Demo and final report
• Time and location have been negotiated with each client, as reported in handout
• If you know of a commitment that will prevent you attending a meeting please report immediately!
Next steps:Next steps:
• Meet members of your group right now
• Allocate project roles• Arrange future meetings and review
times• Start work on requirements
specification.
• Anyone with a problem about group allocation, see me right now, or email within the next hour.