![Page 1: CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.](https://reader036.fdocuments.net/reader036/viewer/2022081603/56649f1a5503460f94c2f92c/html5/thumbnails/1.jpg)
CRYOSTATS DESIGN
![Page 2: CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.](https://reader036.fdocuments.net/reader036/viewer/2022081603/56649f1a5503460f94c2f92c/html5/thumbnails/2.jpg)
WA105 – Cryostat Cut-out
![Page 3: CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.](https://reader036.fdocuments.net/reader036/viewer/2022081603/56649f1a5503460f94c2f92c/html5/thumbnails/3.jpg)
WA105 – external walls penetrations & GTT
All the information needed has been sent this morning to GTT, and they have started the engineering study on their side for ENH1-WA105. They will also check the heat loss at 1000mm of insulation (5W/m2 as at b. 182)
![Page 4: CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.](https://reader036.fdocuments.net/reader036/viewer/2022081603/56649f1a5503460f94c2f92c/html5/thumbnails/4.jpg)
Franco Sergiampietri
Integration of all the feedthroughs at the roof structure. Closely working with Franco Sergiampietri.
• 12 x Anode deck supports • 12 x Signal FT• 16 x Field Cage supports• 4 x Slow Control FT• 1 x High Voltage FT• 1 x ManholeTotal: 46 roof penetrations
![Page 5: CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.](https://reader036.fdocuments.net/reader036/viewer/2022081603/56649f1a5503460f94c2f92c/html5/thumbnails/5.jpg)
![Page 6: CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.](https://reader036.fdocuments.net/reader036/viewer/2022081603/56649f1a5503460f94c2f92c/html5/thumbnails/6.jpg)
We are expecting to deliver the structure in ENH1 at the first half of next year and to do the final pre-assembly in the second half. The plan is to pre-assemble as much as possible and store complete walls in the existing building.
Investigating a possibility to start the mechanical work even before the building extension is ready.
Currently working on the installation procedure in ENH1.
ENH1 - Layout
![Page 7: CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.](https://reader036.fdocuments.net/reader036/viewer/2022081603/56649f1a5503460f94c2f92c/html5/thumbnails/7.jpg)
The detector installation additional structure for b. 182 to be delivered in the next 10 days.
1x1x3 in b. 182
![Page 8: CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.](https://reader036.fdocuments.net/reader036/viewer/2022081603/56649f1a5503460f94c2f92c/html5/thumbnails/8.jpg)
Vacuum Box leak detection
1x1x3 in b. 182
![Page 9: CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.](https://reader036.fdocuments.net/reader036/viewer/2022081603/56649f1a5503460f94c2f92c/html5/thumbnails/9.jpg)
• Integrating the top cap to the structure
SBND
![Page 10: CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.](https://reader036.fdocuments.net/reader036/viewer/2022081603/56649f1a5503460f94c2f92c/html5/thumbnails/10.jpg)
• Optimized the main beam – now HL1100M
• Optimized the installation: Splitting some beams on smaller pieces• Roof long beam in two• Corner beam maximum height of
3000mm
LBNF
![Page 11: CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.](https://reader036.fdocuments.net/reader036/viewer/2022081603/56649f1a5503460f94c2f92c/html5/thumbnails/11.jpg)
Thank you!