Crossrail Line 1Assessment of Lighting Impacts: Technical Report
Crossrail Line 1 Assessment of Lighting Impacts Technical Report Volume 2 of 2 1E0324-G0E00-00001
5
23
1
4
O
O
C
O
O
O
B
L
L
M
3
O
O
C
O
O
O
O
O
O
C
O
B
L
L
5
O
O
O
O
C
O
B
L
L
L
4
O
B
L
L
H
2
O
O
O
O
C
O
B
L
L
H
1
Receptors Location
Other
B - Baseline C - Construction O - Operation Site Activity
Criteria + Magnitude
Workplace
ResidentialC - CriticalH - High M - ModerateL - Low
Receptor Group + Sensitivity
Other
Built Environment
Ecological
Dark Area
Astronomers
Pedestrian
Vehicular
Dim
Neutral
Security
Exterior Amenity
Exterior Vehicular/Pedestrian
Exterior Emergency
Exterior Workplace
BrightPerceived Brightness+ Impact
Interior WorkplaceN - Normal Working E - Extended Daytime O - Dusk Till DawnI - Infrequent/TestingA - Dusk Till 12:30amU - Unlit
Illumination Function+ Operational Hours
Site DescriptionExisting road bridge with adjacent pedestrian footbridge.
Receptors:1. Residents of Lansdowne Avenue2. Residents of Pickfords Gardens3. Horlicks Factory4. Network Rail Facility5..Traffic on Stoke Poges Lane
Lighting Scheme
There is no artificial lighting on either of the bridge structures. Local street lighting comprises 10-12 metre high approx. columns utilising low pressure sodium (SOX) luminaires.
W19Route WindowStoke Poges Lane Bridge Site
E2Environmental ZoneSlough Station to Burnham StationLocation
Baseline Scoping
Design Proposals and Scoping Assessment Pro-formaSite Location
N/AN/AEngineering Information provided by Crossrail
N/A
Revision
N/A
Date
Relevant Parliamentary Plan Sheets
Reference Documents
Proposals Assessment
CR - Rain M - Mist O - Overcast C - ClearClimatic Conditions
W19-10 to W19-17 InclusivePhotographic Record
05.10.04DateKeith Miller and Efren CartasPersonnel
Assessment
Site DescriptionThe existing bridge and footbridge will be raised by approximately 300mm. The work will require a substantial number of weekday and weekend track possessions. Temporary worksites are identified within the Network Rail site to the north of the bridge and in a area adjacent to Salt Hill Pleasure Grounds to the south.
Lighting SchemeThe Construction Planning Report states that:“….Night time working will require additional task lighting over and above that provided by street lighting. This will be provided by local tower/tripod lighting sets with power from smaller or self-contained petrol diesel generator sets. No change in the existing level of light pollution is envisaged.”
Construction Design Proposals: Scheme description + Site Diagram
Site DescriptionThe site reverts to the baseline condition.
Lighting SchemeNo details of any permanent lighting to either bridge available at the time of daytime scoping survey 05.10.2004.
Baseline Installation Proposals: Scheme description + Site Diagram
Operation Design Proposals: Scheme description + Site Diagram
2
2
Stoke Poges Lane Bridge
5
23
1
4
5
23
1
4
Site Boundary
Crossrail Line 1Assessment of Lighting Impacts: Technical Report
Crossrail Line 1 Assessment of Lighting Impacts Technical Report Volume 2 of 2 1E0324-G0E00-00001
Scoping and Proposals Analysis Pro-forma Site Location
L
L
M
3
L
L
5
L
L
L
4
L
L
H
2
L
L
H
1
Receptors LocationCriteria + Magnitude
Workplace
ResidentialC - CriticalH - High M - ModerateL - Low
Receptor Group + Sensitivity
Other
Built Environment
Ecological
Dark Landscape
Astronomers
Pedestrian
Vehicular
OCOCOCOCOCSite Activity Compared to Baseline C - Construction O - Operation
Construction Mitigation
IAIAIAIAIAIdentify Significance ( I ) of Impact or Proceed with Analysis ( A )
P+ PARTICULARLY SIGNIFICANT POSITIVES+ SIGNIFICANT POSITIVENS NOT SIGNIFICANTS- SIGNIFICANT NEGATIVEP- PARTICULARLY SIGNIFICANT NEGATIVE
Residual Impact
Secondary Mitigation
Primary Mitigation
CCCCCCCCCCConclude Assessment ( C ) orIdentify Mitigation ( M )
Action
AAAAAIdentify Significance ( I ) of Impact orProceed with Analysis ( A )
Action
NSNSNSNSNSNSNSNSNSNSP+ PARTICULARLY SIGNIFICANT POSITIVES+ SIGNIFICANT POSITIVENS NOT SIGNIFICANTS- SIGNIFICANT NEGATIVEP- PARTICULARLY SIGNIFICANT NEGATIVE
Significance of ImpactReceptor Sensitivity
MMMMMN - NEGLIGIBLEM - MODERATE ADVERSES - SUBSTANTIAL ADVERSE
Potential ImpactDuration of Change
Action
N M N NMNMMNM
Conclude Assessment ( C ) orInstigate Detailed Assessment ( D)
Result
B - BENEFICIALN - NEGLIGIBLEM - MODERATE ADVERSES - SUBSTANTIAL ADVERSE
Magnitude of ChangeBrightness Comparison
AnalysisW19Route WindowStoke Poges Lane Bridge Site
E2Environmental ZoneSlough Station to Burnham StationLocation
Crossrail Line 1Assessment of Lighting Impacts: Technical Report
Crossrail Line 1 Assessment of Lighting Impacts Technical Report Volume 2 of 2 1E0324-G0E00-00001
Design Proposals and Scoping Assessment Pro-formaSite Location
W19-10
W19-15
W19-11 W19-12 W19-13 W19-14
W19-16 W19-17
W19Route WindowStoke Poges Lane Bridge Site
E2Environmental ZoneSlough Station to Burnham StationLocation