Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6...
Transcript of Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6...
![Page 1: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/1.jpg)
1
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Location | London
Date | 6th May 09
Crossrail - Case study BS1192:2007
Adrian BurgessGroup Collaboration Manager – Scott Wilson Ltd
![Page 2: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/2.jpg)
2
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Agenda
• Introduction to Scott Wilson plc
• What is BS1192
• BIM – Building Information Modelling
• BS1192 on Crossrail
![Page 3: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/3.jpg)
3
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Scott Wilson Group plc
• Scott Wilson Group plc is a global integrated design and engineering consultancy for the built and natural environments.
Environment &
Natural Resources
21%
Buildings &Infrastructure
30%
Railways
14%
StrategicConsultancy
14%
Roads
21%
Note: Percentage show proportion of H1 2008/09 revenue
![Page 4: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/4.jpg)
4
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Scott Wilson Ltd
• Staff – Approximately 6,000 staff
• Offices – Network of 80 offices worldwide
• Regions – UK, Asia Pacific, Europe, India and Middle East
• Floated – The business floated in 2006 on the London Stock Exchange
• Doubled in size over past few years
• Ranked 9th largest UK owned engineering consultancy(NCE 2008)
• Revenue ‐ £360m
![Page 5: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/5.jpg)
5
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
BS1192
BS1192-5:2007 is a code of practise for managing the production, distribution and quality of construction Information.
Traditional Common Data Environment
![Page 6: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/6.jpg)
6
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
BS1192
.
• Defined Naming conventions & standard codes[ Project Ref] – [Originator code]‐ [Zones / Asset ref] – [ Doc type]– [ Role ] – [ Number ]
• Standard ‘ Suitability Codes’ & Revision Codes[ Suitability Codes S1 –S4, D1‐ D4, A AB] & [rev seq P1 ‐99 C1 – 99 minor version for WIP]
• Common origins and Orientation[ Models to use common origin and orientation, use Cartesian axis, common units be at 1:1]
• Layer conventions [ ISO compatible, layer naming and coding strategy, to minimize the no of diff layers used ]
• Data exchange principals[Common interoperable format]
![Page 7: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/7.jpg)
7
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
BS1192 – Common Data Environment
![Page 8: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/8.jpg)
8
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
BS1192
• Objectives• Manage disparate engineering teams & data centrally.
• Improve the control of information.
• Increase productivity and efficiency of engineering workflow
• Easily share data with 3rd party organisations
• Spatially Coordinate design information
• Improve the accuracy/currency and quality of AEC information
• Reduce the amount of re work on site.
• De risk projects.
![Page 9: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/9.jpg)
9
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Building Information Modeling (BIM)
Building Information Modeling (BIM) is the process of generating and managing building information during its life cycle.
![Page 10: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/10.jpg)
10
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Building Information Modeling (BIM)
2D 3D
BIMs
iBIM
AIM
BS
IM
FIMSIM
BR
IM
CPICAVANTI
BS1192: 2007User Guides CPIC, Avanti, BSI
ISO BIM
Drawings, lines arcs text etc. Models, objects, collaboration
IFCIDM
IFD
Integrated, Interoperable Data
Bui
ldin
gLi
fecy
cle
Man
agem
ent
Bew - Richards 2008
SWG in April 2009
![Page 11: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/11.jpg)
11
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Building Information Modeling (BIM)
BIM Tools BS1192
![Page 12: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/12.jpg)
12
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Crossrail - Case Study
![Page 13: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/13.jpg)
13
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Crossrail - Case Study
• Largest Infrastructure Project In Europe
• £16 Billion
• Up to 100 mph over groundUp to 60mph underground
• Service ready – 2017
• Trains carry 1500 people
• 24 trains per hour at peak
• 160,000 passengers in morning rush hour
![Page 14: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/14.jpg)
14
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Crossrail – Case study
Tools
1 Configured common data environment
Processes
2 Wrote specific Crossrail procedures
People
For Every One
Course 1)
Introductions to Bs1192 ProcessesProject Wise & ProjectSpace
For Document Controllers :
Course 2)
Upload & Issue to Business Collaborator
Managing TQsManaging Change Requests EWN etc
For CAD Coordinators:
Course 3)
Spatial CoordinationQA Complance Checking
3 Designed and delivered training
![Page 15: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/15.jpg)
15
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Crossrail – Tools
Bentley ProjectWiseEDMS
Business CollaboratorProject Extranet
Tools
![Page 16: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/16.jpg)
16
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Crossrail – Tools
Tools
Internal Data Environment( IDE) – Bentley ProjectWiseProject Data Environment ( PDE) – Business Collaborator
![Page 17: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/17.jpg)
17
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Crossrail – Processes
Processes
Wrote specific Crossrail procedures
• Managing production, validation and Publishing of Model files
• Process of Managing In‐bound 3rd Party Models
• Process of Production, Validating and Publishing Drawings
• Process of Production, Validating and Sharing of Engineering Document Components
• Process of Managing In‐bound 3rd Party Engineering Document Components
• Process of Production, Validation and Publishing of Engineering Reports
![Page 18: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/18.jpg)
18
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Crossrail – Case study
1 2
3
1.Engineering Check2.Spatial Coordination Check3. Remove XREFs4. QA Check
1. Upload & Issue to PDE
1. Automatic Notifications
2. Check download into your WIP area
processes
![Page 19: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/19.jpg)
19
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Crossrail – Training
People• Developed and are delivering 3 courses
– Introduction ( 500 people)
– Document controllers ( 10 )
– CAD Coordinators ( 4 people )
For Every One
Course 1)
Introductions to Bs1192 ProcessesProject Wise & ProjectSpace
For Document Controllers :
Course 2)
Upload & Issue to Business Collaborator
Managing TQsManaging Change Requests EWN etc
For CAD Coordinators:
Course 3)
Spatial CoordinationQA Complance Checking
![Page 20: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/20.jpg)
20
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Crossrail – Benefits Overall
• Manage disparate engineering teams & data centrally.
• Improve the control of information.
• Increase productivity and efficiency of engineering workflow
• Easily share data with 3rd parties
• Spatially Coordinate design information
• Improve the accuracy/currency andquality of AEC information
• Reduce the amount of re work on site.
• De risk projects.
![Page 21: Crossrail - Case study BS1192:2007 - CIRIAciria.org/buildoffsite/pdf/scott wilson bim 6 may.pdfBuilding Information Modeling (BIM) 2D 3D BIMs iBIM AI M BSI M FI SI M M BR I M CPIC](https://reader034.fdocuments.net/reader034/viewer/2022051510/5ff335ee104af22bb0069868/html5/thumbnails/21.jpg)
21
www.scottwilson.com
passionate | ambitious | collaborative | knowledgeable
Location | London
Date | 6th May 09
Crossrail - Case study BS1192:2007
Adrian BurgessGroup Collaboration Manager – Scott Wilson Ltd