Creation Process: A “Life Cycle” Approach to Concept thru Fabrication/Production Pre-determined Sites/Planning Access Control Perimeter Control Population and Visitor Management • Match Asset Availability with Population Cradle to Grave – Design thru Implementation Engineering Fabrication Mass Production User Deployability Life Cycle Asset Management

description

Creation Process: A “Life Cycle” Approach to Concept thru Fabrication/ Production. • Pre-determined Sites/Planning • Access Control • Perimeter Control • Population and Visitor Management • Match Asset Availability with Population - PowerPoint PPT Presentation

Transcript of Creation Process:

Page 1: Creation Process:

Creation Process:A “Life Cycle” Approach to Concept thru Fabrication/Production

• Pre-determined Sites/Planning• Access Control• Perimeter Control• Population and Visitor Management

• Match Asset Availability with Population• Cradle to Grave – Design thru Implementation

• Engineering • Fabrication

• Mass Production• User Deployability• Life Cycle Asset Management

Page 2: Creation Process:

MODULAR, PANELIZED ENCLOSURES THAT SURROUND AND CONTAIN

MISSION CRITICAL FACILITIES, PREVENTING HUMAN OR ENVIRONMENTALLY

CAUSED FAILURE BY PROVIDING AN UNCOMPROMISED LEVEL OF

STRUCTURAL SECURITY™

PRODUCTS THAT PROTECT

MISSION CRITICAL TECHNOLOGY AND ASSETS, PREVENTING INCIDENTS FROM BECOMING EVENTS WITH:

The Modular SMT iBunker™

THE MODULAR MCF iFORTRESS™

iFORTRESS:

Page 3: Creation Process:

• THE i19/i23 RACK BUNKER™

• THE iMODAL iFORTRESS™

• THE iMARC™

Self containedWatertightMT ResistantSecure

iFORTRESS PRODUCT LINE

Page 4: Creation Process:

iFORTRESS PRODUCT LINE

The iFORTRESS Modular TranShelter™

Page 5: Creation Process:

Challenges Faced:

Displaced Population Separated Families/Friends Fear/Panic Civil Unrest Lack of:

Community Belonging

Order Where to go/What to do

Services Medical Police Communications Postal

Basic Human Provisions Food/Water/Power Shelter

RESPONSE AND DESIGN CRITERIA

Prime Objective: Determine most beneficial, least cost option available to manage, secure, own, and operate FEMA’s short term and long term “Crisis Management Assets”.

Page 6: Creation Process:

Challenges Faced with a Disaster of Mass/Societal Scale

Anticipate Complex Psycho-Social, fGeographical, Environmental, Economic .dynamics

Provide Sense of Preparedness Re-Establish Authority/Services Re-Establish Community Create Order/Familiarity

Provide Shelters that provide jtrue sense of Thought/Care/Security

Provide rapidly deployed, dscalable, and orderly solutions/settings

Allocate structural resources/assets that are: Effective Flexible Manageable Can be easily Inventoried/Maintained Re-deployable

RESPONSE AND DESIGN CRITERIA

Page 7: Creation Process:

iFORTRESS PHILOSOPHYExcellence Without Exception

Modular Factory Engineered Rapidly Deployed Intuitive

Few Tools Few Men (Manpower)

Structural Security™ Fully Tested/Comprehensive Assembly Four Principles of Structural Security™

Structural Hydro-dynamic Fire/Thermal Environmental

Page 8: Creation Process:

The iFORTRESS Modular TranShelter™

• Transportable• Road/Sea/Air

• Self-contained• Lightweight• Quickly Deployed• Weather tight (r49)• Manageable Asset – Bar coded - CMMS

Conceptual Inspiration Plus Purpose

Page 9: Creation Process:

The iFORTRESS Modular

TranShelter™• 20’ or 40’• Modular TranShelter™ t tethered or lifted off trailer • Self contained 1,200 Ft²

Page 10: Creation Process:

The iFORTRESS Modular

TranShelter™• 20’ or 40’• Modular TranShelter™ t tethered off trailer • Self contained 1,200 Ft²• Accommodate 1 – 72 Occupants

• Interlocking Panels• Internal “Bunk” System• Low voltage Int/Ext lighting (Battery)• Fixed Exterior Monitoring Devices• “GREEN” Environmentals

Page 11: Creation Process:

The iFORTRESS Modular

TranShelter™

• Reverse process• Modular TranShelter™ t return to inventory/maintenance • PDA Manageable

• Scan condition/damage• Determine Inventory or Maintenance

• Maintain inventory at Territorial Logistic f Center (TLC) for Storage/Re-deployment

Page 12: Creation Process:

FOOD

SUPPLIES

iModal™

surgi

cal

iModal™

supp

lies

iModal™iModal™

MAIN ST.

1ST AVE

SECOND ST.

FIRST ST.

2ND AVE

3RD AVE

iModal™

WELCOME - PROCESSING CENTER

US POST OFFICE

FOOD

SUPPLIES

1

6

5

4

3

2

7

Apprx. ¼ mile

Apprx. 1/8 m

ile

• 89 FAMILIES TO 6,408 INDIVIDUALS

• APPRX. 20 ACRES

• (89) RESIDENTIAL S SKU: MTRD 4030

• (2) MED. RESIDENTIAL S SKU: MTMR 4030• (1) POLICE RESIDENTIAL S SKU: MTPR 4030

• (3) POLICE COMMAND S SKU: MTPC 4030

• (3) MED. CLINIC S SKU: MTMC 4030• (1) SURGICAL iMODAL™ S SKU: iMSG 4030

• (4) GENERAL SUPPLY S SKU: MTSY 4030

• (3) COMMAND iMODAL™ S SKU: iMCD 4030

• (1) MED SPPLY iMODAL™ S SKU: iMSY 4030

SITUATION - ASSET MANAGEMENT

SHORT/LONG TERM

• Psycho-Socio:

• Understanding

• Compassion

• Restoration of . civil order with:

• Familiarity

• Community

• “Real” care

• Communication

• Services

• Economical

Page 13: Creation Process:

TERRITORIAL LOGISTICAL CENTER (TLC)

MAINTENANCE

CMMS: INVENTORY MANAGEMENT SYSTEM

• 89 FAMILIES TO 6,408 INDIVIDUALS

• APPRX. 20 ACRES

• (89) RESIDENTIAL S SKU: MTRD 4030

• (3) POLICE COMMAND S SKU: MTPC 4030

• (3) MED. CLINIC S SKU: MTMC 4030• (1) SURGICAL iMODAL™ S SKU: iMSG 4030

• (1) GENERAL SUPPLY S SKU: MTSY 4030

• (3) COMMAND iMODAL™ S SKU: iMCD 4030

• (1) MED SPPLY iMODAL™ S SKU: iMSY 4030

SITUATION - ASSET MANAGEMENT

SHORT/LONG TERM

PROTECTED – SELF CONTAINED INVENTORY

Page 14: Creation Process:

• “Keep Everyone . in the . Neighborhood”

• “Both Sides of . the River.”

• Stackability in . Deployment – . City Application

• Sense of . Community

• Visitor vs. . Indigent Population . Behavior Management

Page 15: Creation Process:

Excellence Without Exception

Modular TranShelter™ Standardized/Familiar (Home-like) Setting Create community environments Main Street/1st Avenue

Provide Entry Points Assign Residence (1 Main St) Create Rations Depot (General Stores)

iFortress iModal™ Create sterile medical facilities Establish Police and Communication NOCS Deploy Secure Frontline IT infrastructure

i19/i23 Rack Bunker™

Distributed Communication HUB’s Secure Remote Facilities

Page 16: Creation Process:

iFortress Provide:

Greatest Degree of Efficiency• Lower Operating Cost• Tax Benefit

• 2 to 5 year Lease Options * • Operating vs Capital Expense

Greatest Degree of Risk Mitigation• Engineered – Tested – Proven• Disaster Preparedness • Evolutionary paradigm

Greatest Degree of Flexibility• Modular and Life Cycle Approach• Inventory and Re-deployment Capable• Manageable Asset versus sunk or lost cost

acquisitions

LEAST COST OF OWNERSHIP