Creating Our Future - carnamah.wa.gov.au
Transcript of Creating Our Future - carnamah.wa.gov.au
Creating Our Future Shire of Carnamah Strategic Community Plan
and Corporate Business Plan 2021 - 2031
Adopted 16 June 2021
Prepared with assistance from
CONTENTS
Message From The President ........................................................................................ 1
1. Key Points of the Plan .............................................................................................. 2
2. Community Profile ................................................................................................... 5
3. Community Engagement Summary ......................................................................... 6
4. Key Assumptions ...................................................................................................... 7
5. Shire Services ........................................................................................................... 8
6. Strategies to Achieve the Priorities ......................................................................... 9
7. Organisation Chart and Summary of Our Service Plans ........................................ 13
8. Capital Works ......................................................................................................... 18
9. Long Term Financial Profile (Projected Rates Setting Statement) ................................ 20
10. Strategic Risk Management ................................................................................... 23
11. How Will We Know if the Plan is Succeeding? ....................................................... 24
Appendix 1: Community Profile Detail ......................................................................... 26
Appendix 2: Detailed Community Engagement Results .............................................. 27
Appendix 3: Project Assessment Criteria ..................................................................... 35
1 | P a g e Creating Our Future 2021 – 2031
MESSAGE FROM THE PRESIDENT
On behalf of the Shire of Carnamah Council, it is my pleasure to
present “Creating Our Future”, the 2021 – 2031 Strategic Community
Plan and Corporate Business Plan (the Plan).
Thank you to the people who contributed to the development of the
Plan through attending a workshop, participating in the community
survey, and/or making a submission on the draft Plan.
We listened to the community’s vision and aspirations for the future.
These are reflected in the draft Plan. Our ambitions are balanced with
affordability. We know with more resources we could do so much
more. We will use the clear priorities and community support evident
in this Plan to attract external funding and support.
We cannot implement the Plan alone. This is a Plan for the whole community. We commit to working
in partnership to secure our future together.
Councillor Merle Isbister ASM, OAM
President, Shire of Carnamah
2 | P a g e Creating Our Future 2021 – 2031
1. KEY POINTS OF THE PLAN
Introduction
‘Creating Our Future’ has been developed to show the community’s aspirations, and set the vision,
priorities, strategies and what the Council will deliver. The document also includes how the Plan will
be resourced.
The Plan is part of the Shire of Carnamah’s Integrated Planning and Reporting (IPR) framework,
followed by all local governments in Western Australia1.
The draft Plan was endorsed for community consultation at the Ordinary Council Meeting of 19 May
2021. It was open for submissions from 27 May 2021 to 8 June 2021. Following final revisions, it was
adopted at the Ordinary Council Meeting of 16 June 2021. It will be reviewed in 2022/2023 (minor
review) and 2024/2025 (major review).
Why is this Plan important?
This Plan will:
▪ guide Council’s detailed plans and annual budgets
▪ provide the basis for working with our community and partners to achieve the vision
▪ enable us to pursue funding by showing how projects align with our community and the Plan
▪ provide a framework for monitoring progress
Vision
A growing community where people, families and
businesses thrive
Outcomes
Close-knit and family-friendly
Rich in economic opportunities and jobs
Visually enticing, distinctive and well-maintained
Open, collaborative and empowered
1 See the Department of Local Government, Sport and Cultural Industries website for more details:
https://www.dlgsc.wa.gov.au/local-government/strengthening-local-government/intergrated-planning-and-reporting
3 | P a g e Creating Our Future 2021 – 2031
Priorities
Outcome Focus Area Priorities
Close-knit and family-friendly
Secondary and tertiary education
▪ Advocate for, facilitate and promote local and regional secondary and tertiary education opportunities
Community and recreation facilities
▪ Improve the standard and utilisation of community and recreation facilities
Medical and aged care services
▪ Advocate for and facilitate continued and improved medical and aged care services
Accommodation ▪ Increase the availability of suitable key
worker and independent living dwellings
Rich in economic opportunities and jobs
Economic development and tourism
▪ Support the retention, attraction and growth of businesses
▪ Capitalise on the district’s distinctive arts, cultural, heritage and natural assets
Visually enticing, distinctive and well-maintained
Sustainable use of resources
▪ Increase reuse and recycling opportunities, education and promotion
▪ Improve presentation of landfill sites
Infrastructure ▪ Advocate for improved infrastructure
(underground power and Restricted Access Vehicle network)
Open, collaborative and empowered
Efficiency and effectiveness
▪ Improvement in efficient and effective service delivery
Communication, community partnerships and advocacy
▪ Improvement in communication, effective community partnerships and advocacy
4 | P a g e Creating Our Future 2021 – 2031
Financing the Plan
▪ 3% annual rates increases
▪ Existing debt repaid in 2024/25. Possible new debt later in the Plan for the construction of unit-style dwellings
▪ Reserves overall held at the same level
▪ Any additional projects dependent on grants
What is happening to our assets?
Transport assets
The Shire’s transport assets are predominantly in good to average condition. Over the period of this Plan,
renewal expenditure is sufficient to maintain this standard. Subject to additional grant funding, the Shire
will improve these assets to a good to very good condition.
Recreation assets
The condition of the Shire’s recreation assets has yet to be formally rated but is considered to be
predominantly average. Over the period of this Plan, renewal expenditure is sufficient to maintain
the current condition. Raising the standard of these facilities is a priority in the Plan and will be a
focus for grant funding.
Property assets
The Shire’s buildings are predominantly in average condition. Over the period of this Plan, renewal
expenditure is sufficient to maintain and improve buildings that are being used. Towards the end of
the Plan, replacement of some facilities will be considered, subject to grant funding.
Fleet, equipment and IT assets
The Shire’s fleet, equipment and IT assets are predominantly in good to very good condition. Over
the period of this Plan, renewal expenditure is sufficient to maintain these assets in this condition.
People power
Number of employees
The Shire of Carnamah currently has 26 permanent full time and part time positions, which equates
to 22 full time equivalent (FTE) positions. Approximately half of the positions are in the works area.
There are no significant implications arising out of this Plan for the Workforce Plan.
Local partnerships and participation
The Shire will develop and strengthen local partnerships and community participation in the
implementation of this Plan and ongoing planning for the future.
5 | P a g e Creating Our Future 2021 – 2031
2. COMMUNITY PROFILE
The Shire of Carnamah is a large area in the Mid West region of Western Australia, encompassing 2,876
square kilometres. There are two townships. One is Carnamah, which is situated on the Midlands Road,
308 kilometres north of Perth. The other is Eneabba, which is situated on the Brand Highway, 278
kilometres north of Perth, 65 kilometres west of Carnamah and 30 kilometres east of Leeman. The
friendliness and diversity of the two towns make for a relaxed lifestyle.
The district supports the principal industry of agriculture (grain and sheep farming) with rural suppliers,
machinery dealership, automotive and smash repair businesses, primary and high schools, and various
retail and service outlets. Carnamah is one of the largest primary grain receival points in the region.
Tourism is an emerging industry, with the Shire being one of the richest areas in the state for wildflowers
from August to October, and having a number of other natural, cultural and heritage attractions.
The figure below summarises key information about the make-up of the community. See Appendix 1 for
more detail.
6 | P a g e Creating Our Future 2021 – 2031
3. COMMUNITY ENGAGEMENT SUMMARY
Process
The community engagement process was designed to elicit the community’s vision and priorities. It
consisted of two in-person community workshops and a survey. The workshops were held in Carnamah
(10 March 2021) and Eneabba (11 March 2021). The survey was open from 12 – 28 March 2021.
There were 46 participants in the workshop and 57 participants in the survey2. The results are
summarised below. See Appendix 2 for the detailed participation and results.
The draft Plan was released for public submissions between 27 May 2021 to 8 June 2021. Six
submissions were received. These resulted in a number of improvements to the Plan, particularly:
▪ community profile
▪ visibility of tourism, culture and arts
▪ alignment with recent adoption of Eneabba Economic Revival Strategy
▪ success measures (work in progress)
▪ general improvements to layout and wording
Summary of Results
The community saw the main challenge for the coming decade as maintaining and growing population,
especially families. The people love their community, and want it to provide a full range of the things they
need – shops, services (especially medical), and activities. They value the natural and built environment.
They envision thriving local businesses, providing for their needs and generating employment.
The highest priorities for improvement for the community as whole were:
▪ Economic Development and Tourism
▪ GP/Medical Centre
▪ Roads, Footpaths and Drainage
▪ Community Development and Events
▪ Waste Management
▪ Seniors Support and Aged Accommodation
2 Note that community members were able to participate in both the survey and the workshops.
7 | P a g e
4. KEY ASSUMPTIONS
2021/22 2022/23 2023/24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31
EXPENSES
Wage Price Index % Increase 1.40% 1.80% 2.00% 2.20% 2.80% 3.00% 3.25% 3.50% 3.50% 3.50%
Consumer Price Index % Increase 0.90% 1.50% 1.80% 2.00% 2.25% 2.75% 3.00% 3.25% 3.50% 3.50%
Local Government Cost Index % Increase 1.80% 2.00% 2.20% 2.50% 3.00% 3.00% 3.25% 3.50% 3.50% 3.50%
REVENUES
Rates - Annual Increases % 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0%
Rates - Natural Growth in Rate Base % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Rates - Annual Discount % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Interest Earnings 0.2% 0.5% 1.0% 1.6% 2.0% 2.5% 3.0% 3.0% 3.0% 3.0%
Fees and Charges % Increase 2.8% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0%
Operating Grants, Subsidies, Contributions % Increase 1.0% 1.0% 1.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0%
Non-operating Grants, Subsidies, Contributions % Increase 1.0% 1.0% 1.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0%
Direct Maintenance Grant % Increase 1.5% 1.5% 1.5% 1.5% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0%
Other Expenditure items for Consideration
Electricity Utility Charges % Increase 3.0% 3.0% 3.0% 3.0% 3.5% 3.5% 3.5% 3.5% 3.5% 4.0%
Water Utility Charges % Increase 3.5% 3.5% 3.5% 3.5% 3.5% 3.5% 3.5% 3.5% 3.5% 4.0%
Interest Expense (based on estimated borrowings) 1.9% 1.9% 3.0% 4.0% 5.0% 6.0% 6.0% 6.0% 6.0% 6.0%
Insurance Expense % Increase 0.9% 1.5% 2.5% 2.5% 2.5% 2.8% 3.0% 3.3% 3.5% 3.5%
Other Expenditure 1.8% 2.0% 2.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 4.0%
CAPITAL GRANTS
General Purpose Grant 938,091 947,472 956,947 976,086 995,607 1,015,519 1,035,830 1,056,546 1,077,677 1,099,231
Local Road Grant 413,310 417,443 421,618 430,050 438,651 447,424 456,373 465,500 474,810 484,306
Regional Road Group Grant
Roads to Recovery Grant
8 | P a g e
5. SHIRE SERVICES
Close-knit and family-friendly Rich in economic opportunities and
jobs Visually enticing, distinctive and
well-maintained Open, collaborative and
empowered
▪ Community Development and Events
▪ GP/Medical Centre
▪ Shire Buildings and Leases
▪ Library
▪ Sport, Recreation and Leisure
▪ Seniors Support and Aged Accommodation
▪ Emergency Management
▪ Ranger Services
▪ Environmental Health
▪ Cemetery and Burial Services
▪ Licencing and Registration Services
▪ Economic Development and Tourism
▪ Roads, Footpaths and Drainage
▪ Town Planning
▪ Heritage
▪ Waste Management
▪ Building Administration/ Regulation
▪ Council Leadership, Partnerships and Advocacy
▪ Community Engagement and Communications
▪ Customer Service
▪ Financial Planning and Management
▪ Asset Planning and Management
▪ Risk Management
▪ Workforce Planning and Management
9 | P a g e
6. STRATEGIES TO ACHIEVE THE PRIORITIES Outcome 1: Close-knit and family-friendly
Item Outcome 1 Priorities and Strategies Years of the plan
1 2 3 4 5 6 7 8 9 10
1.1 Advocate for, facilitate and promote local and regional secondary and tertiary education opportunities
1.1.1 Engage with school, TAFE, Departments of Education and Training and Workforce Development, and
the North Midlands Project (Learning Hub at The Exchange) ● ● ● ●
1.1.2 Promote opportunity for advanced secondary education (ATAR) ● ● ● ●
1.1.3 Explore demand for training and facilitate provision (eg horticulture and trades) ● ● ● ● ● ● ● ● ● ●
1.1.4 Strengthen link between local industry and job opportunities for local young people ● ● ● ● ● ● ● ● ● ●
1.1.5 Continue to advocate for and promote local and regional secondary and tertiary education opportunities ● ● ● ● ● ●
1.2 Improve the standard and utilisation of community and recreation facilities
1.2.1 Review and rationalise surplus property ● ● ● ●
1.2.2 Work with the community to improve utilisation of community and recreation facilities ● ● ● ● ● ● ● ● ● ●
1.2.3 Improve the condition of recreation facilities, with an early focus on change rooms and kitchen facilities ● ● ● ● ● ● ● ● ● ●
1.2.4 Construct a right size, fit-for-purpose multi-function centre, subject to needs assessment,
feasibility, and grant funding
● ● ● ● ● ●
1.3 Advocate for and facilitate continued and improved medical and aged care services
1.3.1 Improve access to medical care in Eneabba ● ● ● ●
1.3.2 Advocate for retaining residential aged care at hospital ● ● ● ●
1.3.3 Ongoing advocacy and facilitation for continued and improved medical and aged care services ● ● ● ● ● ●
10 | P a g e
Item Outcome 1 Priorities and Strategies Years of the plan
1 2 3 4 5 6 7 8 9 10
1.4 Increase the availability of suitable key worker and independent living dwellings
1.4.1 Build unit style accommodation (suitable for key worker housing, older persons independent living etc)
to rent on a commercial basis, subject to feasibility and loan funding
● ● ● ● ● ●
Outcome 2: Rich in economic opportunities and jobs
Item Outcome 2 Priorities and Strategies Years of the plan
1 2 3 4 5 6 7 8 9 10
2.1 Support the retention, attraction and growth of businesses
2.1.1 Work with business community to develop action plan to support their retention and growth ●
2.1.2 Business engagement, ‘buy local’, strengthening link between local business and young people,
supporting business growth initiatives (subject to action plan) ● ● ● ● ● ● ● ● ●
2.1.3 Active promotion of the Eneabba Economic Revival Strategy/Green Hydrogen Hub ● ● ● ● ● ● ● ● ● ●
2.1.4 Create and promote a prospectus to market business opportunities ● ● ● ● ● ●
2.2 Capitalise on the district’s distinctive arts, cultural, heritage and natural assets
2.2.1 Improve coordination of tourism marketing (subject to tourism strategy under development) ● ● ● ● ● ● ● ● ● ●
2.2.2 Support regional tourism initiatives, including Wildflower Country (eg Regional Trails Master Plan, a
grant funded Wildflower Country project) ● ● ● ● ● ● ● ● ● ●
11 | P a g e
Outcome 3: Visually enticing, distinctive and well-maintained
Item Outcome 3 Priorities and Strategies Years of the plan
1 2 3 4 5 6 7 8 9 10
3.1 Increase reuse and recycling opportunities, education and promotion
3.1.1 Clean up Lions area and set up cardboard recycling (and provide feedstock for worm farm) ● ● ● ●
3.1.2 Reuse and recycling education and promotion (eg cans and bottles at daycare centre) ● ● ● ●
3.1.3 Continue to increase reuse and recycling opportunities, education and promotion ● ● ● ● ● ●
3.2 Improve presentation of landfill sites
3.2.1 Tidy up landfill sites, improve signage, and divert cardboard (see above) ● ● ● ●
3.3 Advocate for improved infrastructure (underground power and Restricted Access Vehicle network)
3.3.1 Advocate for key roads to be reclassified at level 7 in the RAV network ● ● ● ●
3.3.2 Advocate for underground power ● ● ● ● ● ●
Outcome 4: Open, collaborative and empowered
Item Outcome 4 Priorities and Strategies Years of the plan
1 2 3 4 5 6 7 8 9 10
4.1 Improvement in efficient and effective service delivery
4.1.1 Focus on costs savings (eg work with WALGA to aggregate demand with other local governments
to achieve power cost savings) and efficiencies in works delivery ● ●
4.1.2 Continuous improvement in efficient and effective service delivery ● ● ● ● ● ● ● ●
12 | P a g e
Item Outcome 4 Priorities and Strategies Years of the plan
1 2 3 4 5 6 7 8 9 10
4.2 Improvement in communication, effective community partnerships and advocacy
4.2.1 Trial a monthly email newsletter, focusing on highlights of previous month and month ahead ● ● ● ● ● ● ● ● ● ●
4.2.2 (i) Strengthening Shire-community partnerships to implement the priorities of the Plan ● ● ● ● ● ● ● ● ● ●
(ii) Strengthening Shire-community partnerships across community outcomes generally ● ● ● ● ● ● ● ● ● ●
4.2.3 Advocate for improved community outcomes in education, medical and aged care services,
infrastructure, and seek external grants ● ● ● ●
4.2.4 Initiate a formal engagement process with the Yamatji Southern Region Corporation ● ● ● ● ● ● ● ● ● ●
4.2.5 Continued focus on communication, effective community partnerships and advocacy ● ● ● ● ● ●
13 | P a g e
7. ORGANISATION CHART AND SUMMARY OF OUR SERVICE PLANS This section sets out the organisation chart and the various services provided by the Council. The services are grouped according to the strategic
outcomes. The tables describe the nature of the service, current level of service and the proposed change, if any, over the next four years. Changes in
service levels are by and large driven by the priorities set out earlier. They are mainly achieved through either refocusing existing resources and/or
external grant funding.
Organisation Chart
14 | P a g e
Summary of our service plans
Service Current level of service Change? Change over 4 years
Close-knit and family-friendly
Community Development and Events
▪ Support for community-led initiatives, including arts and cultural initiatives
▪ Astrotourism event ▪ In-kind support for community-run events, including arts and
cultural events
No
GP/Medical Centre
▪ Contribute to regional service based in Three Springs, providing weekly clinic in Carnamah
▪ No medical service provided in Eneabba Yes
▪ Facilitate provision of medical service in Eneabba
Shire Buildings and Leases
▪ Administration Centre and other Shire buildings (Shire purposes) ▪ Carnamah Town Hall ▪ Leasing of Shire buildings (community purposes)
No
Library ▪ Public libraries in Carnamah and Eneabba No
Sport, Recreation and Leisure
▪ Ovals and recreation buildings and facilities Yes
▪ Improvements to change rooms and kitchen in 2025 (grant dependent)
▪ Working with Clubs in a regional context to support them to grow and expand opportunities for participation
Seniors Support and Aged Accommodation
▪ Yarra Yarra Village - Carnamah Retirement Homes, joint venture between the Shire and the Department of Housing and Works
No
Emergency Management
▪ Emergency management planning ▪ Bushfire prevention activities and education ▪ Maintain mobile number register for SMS messages ▪ Disaster management and and recovery
Uncertain ▪ Provision of emergency
management services under review
15 | P a g e
Service Current level of service Change? Change over 4 years
Ranger Services ▪ Dog and cat control
▪ Camping control Uncertain
▪ Provision of ranger services under review
Environmental Health ▪ Environmental health matters including food premise inspections ▪ Septic tank applications
No
Cemetery and Burial Services
▪ Winchester Cemetery operated jointly by the Shires of Carnamah and Coorow, administered by the Shire of Carnamah
No
Licencing and Registration Services
▪ Vehicle and Driver Licensing ▪ Dog and Cat registrations
No
Rich in economic opportunities and jobs
Economic Development and Tourism
▪ Maintain Business Directory ▪ Development of Eneabba Economic Plan ▪ Explore economic opportunities ▪ Support Visitor Information Centre ▪ Carnamah Caravan Park, Lake Indoon Campsite and Eneabba
short stay accommodation
Yes
▪ Include Directory on new website
▪ Landowners and investors working together on renewable energy project
▪ Actively investigating feasibility of identified economic development opportunities
▪ Better coordination of the Wildflower tourist season
Visually enticing, distinctive and well-maintained
Roads, Footpaths and Drainage
▪ Provide and maintain a rural road network ▪ Provide and maintain an urban road network ▪ Provide and maintain a footpath network ▪ Provide and maintain a drainage system
Yes
▪ Where possible expand the Shire’s RAV 7 network to include more local roads that meet the requirements for a RAV 7 rating
Town Planning ▪ Develop and implement Local Planning Strategy ▪ Administer Local Planning Scheme
No
Heritage ▪ Maintain museum and Macpherson Homestead (operated by
Carnamah Historic Society) – link with tourism No
16 | P a g e
Service Current level of service Change? Change over 4 years
Waste Management
▪ Weekly rubbish collection ▪ A recycling area in conjunction with the Lions Club ▪ Annual Drum Muster ▪ Landfill sites
Yes
▪ Clean up historic site to have an area ready to take advantage of any funding opportunities as they occur
▪ Local commercial or Shire worm farm operation in place
▪ Improve landfill sites with better fencing, signage and tipping areas
Building Administration/ Regulation
▪ Building applications No
Open, collaborative and empowered
Council Leadership, Partnerships and Advocacy
▪ Regional collaboration ▪ Community partnerships ▪ Advocacy to achieve community priorities ▪ Attract funding to implement community priorities
Yes
▪ Resource sharing and cooperation with other Shires
▪ Pursue education, training and employment opportunites for youth
▪ Support community groups individually and in collaboration
▪ More active pursuit of grants and other support to fund community priorities
Community Engagement and Communications
▪ Community engagement in Integrated Planning and Reporting ▪ Carnamah Mat and Eneabba News ▪ Community input on key decisions
Yes ▪ New monthly newsletter (trial first)
Customer Service ▪ General enquiries No
Financial Planning and Management
▪ Long Term Financial Plan ▪ Rates ▪ Fees and Charges
▪ Debtors and Creditors ▪ Payroll
No
17 | P a g e
Service Current level of service Change? Change over 4 years
Asset Planning and Management
▪ Asset Management Plans ▪ Asset Management Improvement
No
Risk Management ▪ Maintain, implement and monitor strategic and operational risk
registers and systems No
Workforce Planning and Management
▪ Workforce Plan ▪ Human Resources Management
No
18 | P a g e
8. CAPITAL WORKS
Planned capital expenditure for the next ten years is shown in the following table. Additional capital projects will be subject to grant funding. New
proposed projects will be assessed in accordance with the criteria in Appendix 3 before being considered for approval.
2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31
$ 000 $ 000 $ 000 $ 000 $ 000 $ 000 $ 000 $ 000 $ 000 $ 000 Recreation Assets Sport Structures 0 100 60 70 0 117 50 117 50 50 Lighting, furniture, irrigation etc 0 55 61 61 40 51 5 41 61 21 Yarra Park 0 0 0 0 15 0 0 0 0 0 Property Staff Housing 0 110 45 0 390 0 0 0 0 Other Housing 0 25 0 0 0 0 0 0 0 0 Carnamah Hall, Recreation Centre & Pool 0 200 10 0 0 0 0 50 0 50 Eneabba Pool 0 0 0 15 0 0 0 0 0 0 Aged Care Units 0 300 0 0 0 0 0 0 0 0 Other 0 0 0 0 50 0 0 0 0 0 Fleet IT & Equipment Computer Server 0 0 30 0 0 0 0 35 0 0 Other office equipment 0 11 0 20 0 20 33 0 0 20 Multi Tyred Roller 165 0 0 0 0 0 0 0 0 0 Prime Mover 250 250 0 0 0 240 247 245 0 0 Side Tipping Trailer 110 0 0 0 0 0 0 0 141 145 Vehicles 159 55 163 56 166 57 170 58 175 62 Utes 35 40 0 0 42 40 0 0 0 67 Mowers / Slashers 24 31 8 39 17 8 8 39 28 0 Caravan Park Mowers 8 0 0 8 0 0 0 9 0 0 Grader 0 420 0 437 0 0 441 0 0 454
19 | P a g e
2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31
$ 000 $ 000 $ 000 $ 000 $ 000 $ 000 $ 000 $ 000 $ 000 $ 000 Front End Loader 0 0 390 0 402 0 0 0 402 0 Backhoe 0 0 0 309 0 0 0 0 0 0 Mono Roller 0 0 0 45 0 0 15 0 0 15 Small Truck 0 0 0 0 133 155 0 155 0 130 Compact Roller 0 0 285 0 0 0 0 0 0 0 Road Sweeper 35 0 0 0 0 0 0 0 0 0 Excavator 0 0 0 0 0 0 319 0 0 0 Tractor 0 0 0 0 0 0 0 48 40 0 Roads Carnamah Perenjori Rd 450 450 420 420 450 0 0 0 0 0 Carnamah Eneabba Rd 0 280 225 225 138 306 241 241 238 316 Eneabba Three Springs Rd 450 450 450 0 96 0 0 0 0 0 Innering Rd 0 0 0 400 0 0 0 0 0 0 Bunjil 0 0 0 0 326 450 206 140 0 0 Winchester West 0 0 0 0 0 0 450 0 0 0 Winchester East 0 0 0 0 0 0 0 450 450 450 Brand Mudge Rd 254 0 0 0 0 0 0 0 0 0 Other Roads (Yet to be decided) 450 450 420 420 450 0 0 0 0 0
TOTAL 2,650 2,629 2,463 2,777 2,646 2,270 2,546 1,613 2,262 1,865
20 | P a g e
9. LONG TERM FINANCIAL PROFILE (PROJECTED RATES SETTING STATEMENT)
2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31
OPERATING REVENUE
General Purpose Funding 1,415,247 1,429,953 1,444,971 1,474,123 1,503,987 1,534,612 1,566,021 1,598,080 1,624,801 1,661,021
Governance 12,433 12,806 61,081 23,473 13,994 14,413 14,846 17,364 27,619 16,222
Law &Order, Public Safety 44,595 45,168 45,755 46,736 47,749 48,786 49,852 50,947 52,067 53,213
Health 1,644 1,693 1,744 1,796 1,850 1,906 1,963 2,022 2,083 2,145
Education and Welfare 29,066 29,938 48,109 49,552 51,039 52,570 54,147 55,772 57,445 59,168
Housing 314,618 324,057 333,778 343,792 354,105 364,728 375,670 386,940 398,549 410,505
Community Amenities 141,600 145,849 150,224 154,731 159,373 164,154 169,078 174,151 179,375 184,757
Recreation and Culture 48,429 49,882 51,379 52,920 54,508 56,143 57,827 59,562 61,349 63,189
Transport 110,856 112,170 113,503 115,882 118,312 120,794 123,329 125,918 128,563 131,265
Economic Services 124,547 128,284 132,132 136,096 140,179 144,384 148,716 153,177 157,773 162,506
Other Property and Services 51,531 53,077 54,670 56,310 57,999 59,739 61,531 63,377 65,278 67,237
TOTAL REVENUE 2,294,567 2,332,876 2,437,346 2,455,412 2,503,095 2,562,230 2,622,981 2,687,310 2,754,902 2,811,226
LESS OPERATING EXPENDITURE
General Purpose Funding (154,668) (157,626) (161,585) (168,561) (169,726) (174,819) (180,492) (187,438) (197,691) (200,288)
Governance (138,891) (141,614) (144,905) (149,505) (152,678) (157,257) (162,361) (168,244) (175,363) (180,065)
Law &Order, Public Safety (237,276) (242,109) (247,698) (254,546) (261,471) (269,365) (278,128) (287,951) (298,718) (308,445)
Health (83,086) (84,709) (86,641) (89,189) (91,323) (94,057) (97,104) (100,578) (104,590) (107,675)
Education and Welfare (46,004) (46,980) (48,156) (49,805) (50,799) (52,353) (54,067) (56,040) (58,493) (60,003)
Housing (407,415) (413,966) (422,058) (433,934) (442,781) (456,262) (471,166) (488,250) (509,030) (522,779)
Community Amenities (266,003) (271,921) (277,439) (285,981) (292,315) (301,096) (311,684) (322,118) (335,486) (344,793)
Recreation and Culture (1,058,013) (1,086,852) (1,109,577) (1,141,864) (1,171,001) (1,206,939) (1,249,867) (1,290,857) (1,341,013) (1,383,153)
Transport (2,161,114) (2,247,821) (2,253,581) (2,406,873) (2,377,244) (2,448,897) (2,574,265) (2,711,352) (2,714,819) (2,804,176)
Economic Services (356,015) (363,164) (371,152) (381,828) (390,866) (402,665) (416,024) (430,664) (447,830) (461,152)
Other Property & Services 0 0 0 0 (0) 0 (0) 0 0 0
TOTAL EXPENSES (4,908,485) (5,056,761) (5,122,794) (5,362,085) (5,400,203) (5,563,709) (5,795,159) (6,043,490) (6,183,034) (6,372,529)
21 | P a g e
2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31
Increase(Decrease) (2,613,918) (2,723,885) (2,685,448) (2,906,673) (2,897,108) (3,001,479) (3,172,177) (3,356,180) (3,428,132) (3,561,303)
ADD
Depreciation Written Back 1,511,359 1,541,586 1,575,501 1,614,889 1,663,336 1,713,236 1,768,916 1,830,828 1,894,907 1,961,229
Sub Total 1,511,359 1,541,586 1,575,501 1,614,889 1,663,336 1,713,236 1,768,916 1,830,828 1,894,907 1,961,229
INVESTING ACTIVITIES
Purchase Buildings/Renewals 0 (635,000) (55,000) (15,000) 0 (390,000) 0 (50,000) 0 (50,000)
Infrastructure Assets - Roads (1,153,602) (1,433,602) (1,348,602) (1,298,602) (1,263,493) (1,009,602) (1,150,452) (1,084,577) (941,602) (1,019,602)
Infrastructure Assets - Parks&Ovals 0 (155,000) (121,000) (131,000) (55,000) (168,000) (55,000) (158,000) (111,000) (71,000)
Infrastructure Assets - Other 0 0 0 0 (50,000) 0 0 0 0 0
Purchase Plant and Equip. (785,950) (796,200) (846,210) (893,750) (759,820) (500,250) (1,200,300) (554,010) (784,737) (873,330)
Purchase Furniture and Equip. 0 (11,000) (30,000) (20,000) 0 (20,000) (33,000) (35,000) 0 (20,000)
Proceeds from Sale of Assets 224,800 227,350 206,850 166,920 215,250 110,200 430,750 129,600 238,800 248,900
Development of Assets 853,602 1,845,268 983,602 950,269 926,863 952,602 851,502 807,586 712,268 764,269
Total Attributable to Investing Act. (861,150) (958,184) (1,210,360) (1,241,163) (986,200) (1,025,050) (1,156,500) (944,401) (886,271) (1,020,763)
FINANCING ACTIVITIES
Repayment of Loan Principal (30,218) (32,031) (33,953) (17,733) 0 0 0 0 0 0
Transfer to Reserves (576,910) (641,469) (561,583) (561,767) (587,003) (602,303) (610,342) (427,053) (707,444) (626,757)
Total Attributable to Financing Act. (607,128) (673,500) (595,536) (579,500) (587,003) (602,303) (610,342) (427,053) (707,444) (626,757)
FUNDING SOURCES
Transfers from Reserves 561,150 743,850 783,860 916,830 544,570 585,050 769,550 424,410 580,937 624,430
Opening Surplus/ (Deficit) 0 0 0 0 0 0 0 0 0 0
Closing (Surplus)/Deficit 0 0 0 0 0 0 0 0 0 0
TO BE MADE UP FROM GENERAL RATES
(2,009,687) (2,070,132) (2,131,982) (2,195,618) (2,262,406) (2,330,547) (2,400,554) (2,472,395) (2,546,003) (2,623,164)
Projected Rates 2,010,426 2,070,739 2,132,861 2,196,847 2,262,752 2,330,635 2,400,554 2,472,571 2,546,748 2,623,914
Surplus/(Deficit) 739 606 879 1,229 346 88 0 175 745 750
Total Rates % increase 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.03%
REVENUE
Rates 2,031,558 2,092,504 2,155,280 2,219,938 2,286,536 2,355,132 2,425,786 2,498,560 2,573,516 2,651,486
22 | P a g e
2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31
Operating Grants & Subsidies 1,592,833 1,610,837 1,676,974 1,672,653 1,697,155 1,732,266 1,768,114 1,806,788 1,853,955 1,880,241
Interest Earnings 31,329 31,537 31,895 32,435 33,106 33,946 34,964 36,013 31,093 35,026
Fees & Charges 634,852 653,883 690,760 711,475 732,819 754,803 777,452 800,784 824,817 849,571
Other Income 14,421 14,854 15,299 15,758 16,231 16,718 17,219 17,736 18,268 18,816
Development of Assets 853,602 1,845,268 983,602 950,269 926,863 952,602 851,502 807,586 712,268 764,269
Proceeds from Sale of Assets 224,800 227,350 206,850 166,920 215,250 110,200 430,750 129,600 238,800 248,900
SS Loans Principal Repayment 0 0 0 0 0 0 0 0 0 0
Transfers from Reserves 561,150 743,850 783,860 916,830 544,570 585,050 769,550 424,410 580,937 624,430
New Loans 0 0 0 0 0 0 0 0 0 0
Surplus B/Fwd 0 0 0 0 0 0 0 0 0 0
NET CASH REVENUE 5,944,545 7,220,082 6,544,519 6,686,278 6,452,530 6,540,717 7,075,337 6,521,477 6,833,655 7,072,739
EXPENSES
Employee Costs (1,755,038) (1,787,883) (1,824,853) (1,866,898) (1,920,511) (1,978,145) (2,042,458) (2,113,968) (2,187,957) (2,264,535)
Materials & Contracts (1,127,314) (1,200,882) (1,182,772) (1,326,614) (1,245,404) (1,282,774) (1,374,497) (1,468,410) (1,447,826) (1,469,611)
Utilities (308,745) (318,762) (329,120) (339,837) (351,697) (363,971) (376,692) (389,876) (403,522) (419,623)
Depreciation on Non-Current Assets (1,511,359) (1,541,586) (1,575,501) (1,614,889) (1,663,336) (1,713,236) (1,768,916) (1,830,828) (1,894,907) (1,961,229)
Interest Expenses (6,031) (4,218) (2,296) (391) 0 0 0 0 0 0
Insurances (137,733) (139,919) (143,343) (146,927) (150,729) (155,002) (159,721) (164,982) (170,756) (176,733)
Other Expenditure (62,265) (63,510) (64,907) (66,530) (68,526) (70,582) (72,876) (75,426) (78,066) (80,799)
Development of Assets (1,939,552) (3,030,802) (2,400,812) (2,358,352) (2,128,313) (2,087,852) (2,438,752) (1,881,587) (1,837,339) (2,033,932)
Loan Principal Repayments (30,218) (32,031) (33,953) (17,733) 0 0 0 0 0 0
Transfers to Reserves (576,910) (641,469) (561,583) (561,767) (587,003) (602,303) (610,342) (427,053) (707,444) (626,757)
Less Depreciation 1,511,359 1,541,586 1,575,501 1,614,889 1,663,336 1,713,236 1,768,916 1,830,828 1,894,907 1,961,229
Less LSL Accruals 0 0 0 0 0 0 0 0 0 0
NET CASH EXPENDITURE (5,943,806) (7,219,476) (6,543,640) (6,685,049) (6,452,184) (6,540,629) (7,075,337) (6,521,302) (6,832,910) (7,071,990)
NET BALANCE 739 606 879 1,229 346 88 0 175 745 750
23 | P a g e Creating Our Future 2021 – 2031
10. STRATEGIC RISK MANAGEMENT
Risk Risk Controls
Core changes to role of Local Government
and/or funding
▪ Long Term Financial Plan (LTFP)
▪ Lobbying and advocacy
▪ Community engagement
Breakdown in relationship between Shire
President/Council and CEO
▪ Code of Conduct and relevant policies
▪ Regular meetings CEO/Shire President
▪ CEO performance review process
▪ Councillor induction and training
Breakdown in relationships amongst
Councillors
▪ Code of Conduct and relevant policies
▪ Councillor induction and training
Lack of community awareness and
engagement with Council’s direction ▪ Communications and community engagement
Increased contractor and/or materials costs
putting pressure on capital program
▪ Long Term Financial Plan (LTFP)
▪ Asset Management Plans
▪ Budget process
▪ Rigor of project management
Employee cost rises above assumption
▪ Long Term Financial Plan (LTFP)
▪ Workforce Plan (WFP)
▪ Budget process
Reduced external grants/funding
▪ Long Term Financial Plan (LTFP)
▪ Budget process
▪ Lobbying and advocacy
Misappropriation of funds ▪ Policies and Procedures
▪ Audit controls
Low business growth ▪ Economic development facilitation
▪ Long Term Financial Plan (LTFP)
Lack of available skilled staff ▪ Workforce Plan (WFP)
High staff turnover ▪ Workforce Plan (WFP)
Lack of available skilled contractors/
suppliers
▪ Tender and Procurement Process
▪ Workforce Plan
Disasters i.e. COVID 19 re-emergence/other
pandemic/bushfire/flood/storm
▪ Council policies and management policies, Local Emergency Management Risk Mitigation, Planning, Response and Recovery Arrangements
24 | P a g e Creating Our Future 2021 – 2031
11. HOW WILL WE KNOW IF THE PLAN IS SUCCEEDING?
The Council closely monitors implementation of the Plan. The following measures give a good
indication of the Shire’s performance, responsiveness and the quality of its management. The
financial and asset ratio targets are based on the guidelines provided by the Department of Local
Government, Sport and Cultural Industries.
Outcome Indicators
Outcome Indicators Desired Trend/Target
Close-knit and family-friendly
Happiness index (community survey) Increasing
Healthy school roll Increasing
Rich in economic opportunities and jobs
Population growth Increasing
Employment growth (number of jobs) Increasing
Visitor numbers (indicator/s to be developed) Increasing
Visually enticing, distinctive and well-maintained
Community satisfaction (community survey) Increasing
Open, collaborative and empowered
Savings/efficiencies achieved Set annual target (power cost savings 2021/22)
Project grants obtained Percentage success rate (at least 50%)
Stakeholder rating (stakeholder survey) Improving (set baseline first)
Key Program/Service Indicators
Key Program/Service Indicators Desired Trend/Target
Community satisfaction Increasing
Capital Program Delivery 85% on time, on budget
Responsiveness Customer service standards met
25 | P a g e Creating Our Future 2021 – 2031
Financial Management
Financial Management Indicators Desired Trend/Target
Operating Surplus Ratio – The extent to which revenues raised cover operational expense only or are available for capital funding purposes.
≥0.01
Current Ratio – The liquidity position of a local government that has arisen from the past years’ transactions.
≥1.0
Debt Service Cover Ratio – The ratio of cash available for debt servicing to interest, principal and lease payments.
≥2.0
Own Source Revenue Coverage Ratio – An indicator of a local government’s ability to cover its costs through its own revenue efforts.
≥0.4
Asset Management
Asset Management Indicators Desired Trend/Target
Asset Consumption Ratio – The ratio highlights the aged condition of the local government’s stock of physical assets.
≥0.5
Asset Sustainability Ratio – This measures the extent to which assets managed by the local government are being replaced as they reach the end of their useful lives.
≥0.9
Asset Renewal Funding Ratio – This indicates whether the local government has the financial capacity to fund asset renewal as required, and can continue to provide existing levels of services in future, without additional operating income; reductions in operating expenses; or an increase in net financial liabilities above what is currently projected.
≥0.75
Workforce Management
The following measures are from the Shire’s Workforce Plan
Workforce/HR Management Indicators Measure
Ability to attract staff Time to recruit
Employee pride and willingness to recommend Shire as a
place to work From staff survey
Workers Compensation claims From Occupational Safety and
Health data
26 | P a g e Creating Our Future 2021 – 2031
APPENDIX 1: COMMUNITY PROFILE DETAIL
Item Carnamah
2011
Carnamah
2016
Change
2011-2016 WA 2016
Population 546 548 +2 2,474,410
Aboriginal and Torres Strait Islander peoples 3.5% 3.4% -0.1% 3.1%
Male:Female ratio 52:48 53:47 +1:-1 50:50
People with disability (core need for assistance) 2.2% 3.6% +1.4% 3.9%
Median age 45 46 +1 36
Children and young teens (0-14) 20.9% 19.3% -1.6% 19.2%
Working age (15-64) 63.5% 63.3% -0.2% 67.0%
Seniors (65+) 14.1% 17.3% +3.2% 14.0%
Born overseas 13.2% 15.1% +1.9% 32.2%
Volunteering 33.3% 34.8% +1.5% 19.0%
Total business counts* *ABS Counts of Australian Businesses
87 (2019) 89 (2020) +2 N/A
Number of jobs 370 (2011/12) 400 (2016/17) +30 N/A
Top three industries by employment
Agriculture, Forestry and
Fishing; Public Administration
and Safety; Education and
Training
Agriculture, Forestry and
Fishing; Public Administration
and Safety; Education and
Training
Minimal change N/A
Unemployment rate 0.0% 6.3% +6.3% 7.8%
Participation rate 61.6% 60.6% -1.0% 62.9%
Median weekly household income $1,007 $1,136 +$129 $1,595
Completed Yr 12+ Unavailable 47.6% - 62.5%
Tertiary qualification Unavailable 31.3% - 46.5%
Rental affordability (Rent and % of average weekly household income)
$95
9.4%
$100
8.8%
+$5
-0.6%
$347
21.8%
Household internet 71.5% 80.6% -9.1% 85.1%
SEIFA disadvantage index 1000 984 -16 1015
27 | P a g e Creating Our Future 2021 – 2031
APPENDIX 2: DETAILED COMMUNITY ENGAGEMENT RESULTS
Overview
Workshops
Community engagement took place over two sessions:
▪ Carnamah – 10 March 2021
▪ Eneabba – 11 March 2021
Survey
The survey was open from 12 to 28 March 2021.
Participation
Workshops
46 participants
Survey
57 participants
Male46%
Female54%
Gender 0-190%
20-290%
30-3911%
40-4924%
50-594%
60-6946%
70+15%
Age
Male37%
Female60%
Prefer not to say/ Unanswered
3%
Gender 0-190%
20-293%
30-3916%
40-4919%
50-5921%
60-6930%
70+11%
Age
28 | P a g e Creating Our Future 2021 – 2031
Results
Key challenges (combined)
▪ Depopulation/losing families/impact on school/ageing population
▪ Drying/warmer climate
▪ Attracting and retaining staff (across Shire and businesses)
▪ Accommodation
▪ State and Federal Government policies, funding etc
▪ Increased drugs and alcohol abuse
What do you love the most? (Combined)
29 | P a g e Creating Our Future 2021 – 2031
Community vision (combined)
30 | P a g e
Importance of services – weighted average (survey)
4.734.57 4.48 4.46 4.45 4.45 4.43 4.34 4.32 4.31 4.18 4.09 4.07
3.76 3.70 3.61 3.60 3.46
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
31 | P a g e
Satisfaction with services – weighted average (survey)
3.67 3.60 3.51 3.48 3.45 3.45 3.36 3.31 3.31 3.27 3.24 3.21 3.17 3.16 3.07 3.02 3.02 2.94
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
32 | P a g e Creating Our Future 2021 – 2031
Importance vs satisfaction (survey)
1. GP/Medical Centre
2. Community Facilities (Halls, Recreation etc.)
3. Community Development and Events
4. Sport, Recreation and Leisure
5. Waste Management
6. Emergency Management
7. Roads, Footpaths and Drainage
8. Seniors Support and Aged Accommodation
9. Economic Development and Tourism
10. Council Leadership, Partnerships and Advocacy
11. Environmental Health
12. Town Planning
13. Heritage
14. Building Administration/Regulation
15. Vehicle and Driver Licencing Services
16. Cemetery and Burial Services
17. Library
18. Ranger Services
33 | P a g e Creating Our Future 2021 – 2031
Improve
▪ Economic Development and Tourism
Maintain
▪ GP/Medical Centre
▪ Community Facilities (Halls, Recreation etc.)
▪ Community Development and Events
▪ Sport, Recreation and Leisure
▪ Waste Management
▪ Emergency Management
▪ Roads, Footpaths and Drainage
▪ Seniors Support and Aged Accommodation
▪ Council Leadership, Partnerships and Advocacy
▪ Environmental Health
▪ Town Planning
▪ Heritage
▪ Building Administration/Regulation
▪ Vehicle and Driver Licencing Services
▪ Cemetery and Burial Services
▪ Library
▪ Ranger Services
What should the Council focus on for improvement? (Combined)
▪ Economic Development and Tourism
▪ GP/Medical Centre
▪ Roads, Footpaths and Drainage
▪ Community Development and Events
▪ Waste Management
▪ Seniors Support and Aged Accommodation
34 | P a g e Creating Our Future 2021 – 2031
Is there anything you would pay more rates for?
Workshops Survey
If yes, what service area?
▪ Waste management
▪ Medical
Is there anything you would forego to pay lower rates?
Workshops Survey
If yes, what service area?
▪ Library
▪ Ranger services
▪ Licensing
One big idea
▪ Big Tractor
▪ Tourist attractions (Lakes)
▪ Camping facilities
▪ Improve hotel
▪ RAV 7
Yes66%
No34%
Yes40%
No53%
Unanswered7%
Yes59%
No41% Yes
34%
No55%
Unanswered11%
35 | P a g e Creating Our Future 2021 – 2031
APPENDIX 3: PROJECT ASSESSMENT CRITERIA
Step 1: Pass/Fail Gate
Step 2: Assessment against criteria
Criteria Factors to take into account
Compliance Legislative requirements
Consistency with standards expected of local government
Meeting financial and asset sustainability ratios
Capacity Cost and sources of finance (eg grants, rates, reallocation of resources, borrowing)
Revenue generation potential
Life-cycle costs/Capital/Maintenance/Operations/renewals
Are there other delivery models/Partnerships
Sustainability Integrated and balanced consideration of social, environmental, economic and
governance impacts in the long term (positive and negative)
Community
vision and
priorities
Contribution to vision and priorities expressed in the SCP
Community demand, views and feedback
Ability to develop and/or build capacity of community
Fairness Distribution of benefits (population and geographic factors eg age, gender, rural, urban)
Addressing disadvantage
Intergenerational equity – balancing who carries cost and who benefits over time
Risks Consider risks using risk management matrix and ensure residual risk is within the
acceptable risk tolerance of the Council
Yes No
Is it within our remit and aligned with our strategic direction?
Shire of Carnamah
Postal Address: PO Box 80 Carnamah WA 6517
Phone: 08 9951 7000
Fax: 08 9951 1377
Email: [email protected]