CRANK HANDLE KEYSspan (1x1.83m) rcc slab k k crank handle ch-1 ch-2 span (2x2x3.05m) rcc box c.l. of...
Transcript of CRANK HANDLE KEYSspan (1x1.83m) rcc slab k k crank handle ch-1 ch-2 span (2x2x3.05m) rcc box c.l. of...
CH-2
CRANK HANDLE KEYS
Z
CH-1
Z YX
CH-3
CRANK HANDLE KEYS
CRANK HANDLE
CH-4
T
BLOCK INSTT.BLOCK INSTT.
C.L. OF BR. NO. 2SPAN (2X2.60M) RCC BOX
S3B.C3.SH7
SH12
KIR END
101S16
GATE NO. KJ-3 AT KM-4/0-1C.L. OF 'C' CLASS L-XING(M)
B
S2
103 S12
S3A.C3.SH7
S3C.C3.SH7
104
S14 SH14
AB
C
P C
UD C3 S3
102T
L/HUT
SH16102SH7
DN.
KTKGATE NO. KJ-4 AT KM-6/4-5
S47
113
SH37
(STR.-STR.)OA1TL-2 OA2T
CSL-686M
(STR.-STR.)OC1TL-3
CSL-686MOC2T
BA
111S37
S46C112
114
SH39S.B
(STR.-STR.)
S35SH35OB1TL-1
CSL-686MOB2T
T
S39L/HUT
B
C P
DDC46
JBN END
KM.7.802RAUTARA
C.L. OF 'C' CLASS L-XING(M)
UP N
I
(`B' CLASS/STD.II(R)/PI)
AT KM.6.10 FROM KIR
DALAN
KKSPAN (1X1.83M) RCC SLAB
CRANK HANDLE
CH-2CH-1
SPAN (2X2X3.05M) RCC BOXC.L. OF BR.No. 6
BLOCK INSTT.
CH-4CH-3
T
BLOCK INSTT.
T
KIR END
C.L. OF 'C' CLASS L-XING (M) GATE NO. KJ-8 AT KM-14/2-3
OB1T
101S16
S2GOOMTY
C.L. OF BR.No. 7
B
S12 SH12
S3A.C3.SH7 OA1T
S3C.C3.SH7 OC1T104
S14 SH14
103
P
C
BAC
UD C3 S3
L/HUT
102T S3B.C3.SH7
102SH7 113
S37SH37
(STR.-STR.)L-2 CSL-686MOA2T
(STR.-STR.)OC2TL-3 CSL-686M
B111
C
I
112
L/HUT GOOMTY
T
A
SH39
S.B
(STR.-STR.)OB2T
CSL-686M
SH35SH16
L-1
S39
BS35114
RAUTARAAT KM.13.902 FROM KIR
DN.
C.L. OF 'C' CLASS L-XING(M) GATE NO. KJ-7 AT KM-12/1-2
UP N
(`B' CLASS/STD.II(R)/PI)
C.L. OF 'C' CLASS L-XING (M)
PC
JBN END
GATE NO. KJ-9 AT KM-16/1-2
C.L. OF BR.No. 8
KM.7.231RANIPATRA
103
S14
T
C.L. OF 'C' CLASS L-XING(M)
RAUTARAKM-7.231
S2
B
GATE NO. KJ-10 AT KM-19/0-1
P
KIR END
GOOMTYT
AC
C
BUD S3C3
DN.
CH-4CH-3CH-1 CH-2
CRANK HANDLE
BLOCK INSTT. BLOCK INSTT.
GATE NO. KJ-12 AT KM-21/9-22/0
S16101
SH12S3A.C3.SH7
OA1TS12
S3C.C3.SH7 OC1T104
SH14
S.B
111L-2OA2T
112OC2TL-1
L/HUT
KT
S3B.C3.SH7 OB1T
L/HUT
102SH16SH7
K
OB2TL-3 114
113
C
GOOMTY
B
CSH44 A P
JBN ENDDD
S47B
UP
I
N
RANIPATRAAT KM.21.133 FROM KIR
(`B' CLASS/STD.II(R)/PI)
C.L. OF 'C' CLASS L-XING(M)
CRANK HANDLE
BLOCK INSTT.
CH-2CH-1
BLOCK INSTT.
CH-4CH-3
YZ
Z X
P
B
GOOMTY S2
KIR ENDBUD C3 S3ACP
C
DN.
T
112
S37SH37L-2S12 CSL-686M (STR.-STR.)
OC1TL-1
104S3C.C3.SH7
SH12
SH14
103
S14
L/HUT
OC2T
L/HUT
CSL-686M (STR.-STR.)
S.B
SH16
L-3OB1T
OA1T
KK
S3B.C3.SH7
102
S3A.C3.SH7
S16101
GOOMTY
L/HUTSH7
T
SH35CSL-686M (STR.-STR.)
OB2T
OA2T
CSH44 A
B111
GOOMTYDD
C
S47
B
S39
S35114
113
SH39
C.L. OF BR.NO.20(SPAN 1X1.80M RCC BOX)
I
UP
N
AT KM.35.891 FROM KIR
KASBA (`B' CLASS/STD.II(R)/PI)
JBN END
KM.-40.14 FROM KIR.
UP
GARHBANAILI (`D' CLASS)
JALALGARH
KM.-51.52 FROM KIR.
UP
SATAR HALT
KUSHIARGAON
KM.-65.44 FROM KIR.
UP
ARARIYA COURT (`D' CLASS)
ARARIYA
KM.-76.00 FROM KIR.
UP
HALDIA BIHAR HALT
CH-1
CRANK HANDLE
BLOCK INSTT.
CH-2
BLOCK INSTT.
CH-3 CH-4
GATE NO. KJ-56 AT KM-85/8-9C.L. OF 'B' CLASS L-XING(M)
C.L. OF BR.NO.39SPAN(3X6.1M) PSC SLAB
DN.B
S2
SPAN(1X1.8M) RCC BOXC.L. OF BR.NO.38
GATE NO. KJ-53 AT KM-79/7-8C.L. OF 'C' CLASS L-XING(U/M)
KIR END
P
BS3UD C3SH7
C3T
C
2AT
A
K
S39
114T
S37
S46A.C46.SH44S3A.C3.SH7101
SH12
103OA1TS12101/103T
S3C.C3.SH7OC1T104T
SH14S14
RBG ROOM
104SH37
CSL-686M (STR.-STR.)OA2T
S46C.C46.SH44(STR.-STR.)CSL-686M
S.B
OC2TL-1
OB1TS3B.C3.SH7102T
S16SH1610
2
SH39
CSL-686M (STR.-STR.)S46B.C46.SH44
OB2TL-3
S35SH35
L-2
114
T
C46T47AT
B
CA
111
C46S46112T
CSH44
112
P
DD
K
S47GOOMTY
B
46T
113
C.L. OF BR.NO.39ASPAN(1X11.78M) ROB
(`B' CLASS/STD.II(R)/PI)
T
UP
N
KM.-81.5043 FROM KIR
SIMRAHA
GATE NO. KJ-54 AT KM-81/8-9C.L. OF 'C' CLASS L-XING(M)
GATE NO. KJ-55 AT KM-82/7-8C.L. OF 'C' CLASS L-XING(U/M)
I
JBN END
KM.4.616('D' CLASS)GOGIPOTHIA
('D' CLASS)KM.7.719
DHOLBAJA
KM.13.237FORBESGANJ
KM.-85.39 FROM KIR.
UP
GOGIPOTHIA HALT
KM.-88.71 FROM KIR.
UP
(`D' CLASS)DHOLBAJA
BLOCK INSTT.GATE NO. KJ-62 AT KM.93/2-3C.L. OF 'B' CLASS L-XING(M)
X
CH-2CH-1
CRANK HANDLE
IB
C B
C
BLOCK INSTT.
CH-4CH-3
VU U
JZ P
JY
U
OPERATED ONLY WHEN THE1) STAND BY BOOMS TO BE
LIFTING BARRIER BECOME I''
INDICATION KEY `U' IS2) FOR GATE CLOSEDINOPERATIVE.
UV
INSERTED & TURNED.
ARRANGEMENT OF STAND
NOTE:- (SLIDING TYPE)BY 'E' & 'F' BOOM
AT KM.94.742 FROM KIR
FORBESGANJ JN.(BG)
SH35
OA2T
OB2T
OC2T
GATE NO. KJ-63 AT KM-94/2-3
S3
SH7
S2
KIR END
C3
P
C
UD
S16101
S3A.C3.SH7
S3C.C3.SH7
103 S12
104
S14
L/HUT
SH14
B
OA1T(STR.-STR.)L-2
SH12CSL-686M
(STR.-STR.)L-1 OC1T
CSL-686M
S.B
S3B.C3.SH7102TB
C 102A
C.L. OF BR.NO.45 SPAN(1X1.83M) RCC SLAB
(STR.-STR.)CSL-686M
SH16
L-3 OB1T
GATE NO. KJ-61 AT KM-91/8-9C.L. OF 'C' CLASS L-XING(U/M)
C.L. OF 'B' CLASS L-XING(M)
DN. UP
C.L. OF 'SPL' CLASS L-XING(M)
G
113
B111S37
C112
L/HUT
SH44
I'
ASH37IV
AIV
C
C46S46
B
S39SH39
S35114
III
G
JBN END
P
AT GATE KJ-65
GATE NO. KJ-65 AT KM-96/1-2
KM.6.027BATHNAHA
WHEN THE LIFTING BARRIER BERRIER BECOME NOTE:- STAND BY BOOMS TO BE OPERATED ONLY
ARRANGEMENT OF STAND BY 'A' & 'B'N
INOPERATIVE.
C.L. OF 'A' CLASS L-XING(M)
BOOM (SLIDING)
(`B' CLASS/STD.II(R)/PI)
AT GATE KJ-64
S.B
CH-2
T
CH-1 CH-3CH-5
CRANK HANDLE
CH-6CH-4
BLOCK INSTT.BLOCK INSTT.
102
SH14
L/HUT
101
S12
C
104S2
B
S14
103
KIR END
CP
UD
I
KKT
T
SH7GOOMTYC3
AS3 D B
113
(STR.-STR.)CSL-795M
OA2T L-2S3A.C3.SH7 OA1T
OC2T L-1CSL-830.345M
S3C.C3.SH7 OC1T
SH12S37
S35SH35
112SH37
L/HUT(STR.-STR.)
111
(STR.-STR.)
(STR.-STR.)
OD2TCSL-686M
L-4
OB2T L-3
S3D.C3.SH7
CSL-686M
SH18106
105S18
S3B.C3.SH7
SH16S16
OB1T
OD1T
S41SH41
116
SH39 115S39
114
DN.
AT KM.100.769 FROM KIR
UP
N
(`B' CLASS/STD.II(R)/PI) BATHNAHA
KM.7.251
DBAC
C P
JBN END
B JOGBANI
FS.BCSL-686M
T
CH-1 CH-2
T
CH-6CH-3 CH-4 CH-5
CRANK HANDLE
I(DS-FM)
K
T/101
BLOCK INSTT.
X
SH7
2AT15KMPHKIR END
3T
S2
BC
AC BC3 S3
P
UD (STR.-STR.)
SH35
(STR.-STR.)
(STR.-STR.)
107S3A.C3.SH7
S3C.C3.SH7
S12105
S16
106
104
S14
SH20
SH18
K
108103
OA2TOA1T L-2
CSL-686M
OC1T OC2T L-1SH12
SH14CSL-686M
S3B.C3.SH7 OB1T OB2T L-3
SH16CSL-686M
113
S37
111
S35
SH37
112
SH44
F
112T
114TS39SH39
114
(`B' CLASS/STD.I(R)/PI/TERMINAL STN.)
AT CH.108020.00 FROM KIR
DN. UP
JOGBANI
N