Craig Moyer Graduate Architectural Portfolio 2015
-
Upload
craig-moyer -
Category
Documents
-
view
216 -
download
0
description
Transcript of Craig Moyer Graduate Architectural Portfolio 2015
CRAIGE L L I SMOYER
[email protected](937) 829 - 5630
451 Ludlow Avenue Apartment #110
Cincinnati, Ohio 45220
EDUCATION
SKILLSArcGISAdobe CSAutoCAD3DS MaxRevit
SketchUPGrasshopper
Microsoft OfficeRhinoceros3D
Vray
Unity3DMaya
EcotectPhotoshop
Illustrator
EXPERIENCEIntern Architect Aug. 2013-Present
FRCH Design Worldwide. Cincinnati, OHDeveloped construction documentation for large-scale retail projects for national and international clients. Included creating details, permit and bid set documentation and design development.
Teaching Assistant April 2013-PresentUniversity of Cincinnati.Teaching assistant for professor Ming Tang. Assisted in teaching digital visualization and rapid prototyping skills to 3rd year undergraduate and graduate architecture students.
Research Assistant April 2013-Aug 2013University of CincinnatiFunded research through professor Ming Tang. Focus of research was agent-based simulation studies and architectural visualization. Paper submitted to ACADIA conference.
Master of Architecture 2012-PresentUniversity of CincinnatiSchool of Architecture & Interior DesignCollege of DAAPSAID Graduate Teaching ScholarshipdForm treasurer
Bachelor of Urban Planning 2006-2011University of CincinnatiSchool of PlanningCollege of DAAP
Photographs
Architectural Center, Columbus Indiana
Interlocking Puzzle
Professional Work
MetroLAB 5-Points Alley
Mapping & Analysis
Prospect Hill Residence
1.
3.
5.
7.
9.
11.
13.
1 |
During the summer of 2014 I had the opportunity to work in a design-build studio through UC’s MetroLAB program, an interdisciplinary studio with a community-based focus. The studio was unique in the sense that we were able to develop designs and implement them directly on-site, a derelict abandoned parking lot in Walnut Hills.
While working on this studio I developed a lighting system (pictured here), which was intended to highlight the unique paving conditions of the alley, which also was constructed from parts ordinarily found in the hardware store.
Additionally, I also developed a shading system of suspended cables and fabrics held in tension to alleviate the intense summer exposure which the site was hampered by.
MetroLAB 5-Points Alley
2 |
3 |
Architectural Center, Columbus Indiana
Was
hing
ton
Stre
et
6th Street
7th Street
Basement 1/16” = 1’
Auditorium
Archives
1
2
3
4
5
6
7
8
9
10
6
5
4
3
2
1
6
5
4
3
2
1
6
5
4
3
2
1
6
5
4
3
2
1
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
LoadingDock
Lobby
Was
hing
ton
Stre
et
6th Street
7th Street
Ground Level 1/16” = 1’
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
10
11
19
12
13
20
1
2
21
3
4
22
5
6
23
7
8
24
9
10
25
11
12
26
27
28
29
30
31
32
33
13
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
9
52
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
6
7
8
Was
hing
ton
Stre
et
6th Street
7th Street
Level 01 1/16” = 1’
Visitor’sCenter
TemporaryExhibition
Apartment #1
Apartment #2
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
6
7
8
9
10
11
12
13
1
Was
hing
ton
Stre
et
6th Street
7th Street
Level 02 1/16” = 1’
Library
Studio #2
Studio #1
Perm. Exhibition
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
Was
hing
ton
Stre
et
6th Street
7th Street
Level 03 1/16” = 1’
Bookstore
Cafe
Sculpture Garden
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
Professional Work
13 |
This selection of work illustrates my accquired knowledge over the course of two COOP semes-ters in which I had the opportuni-ty to work on large-scale retail projects for national and interna-tional clients.
During this time I had several opportunities to develop details and work on built projects all across the country.
The work shown here is a small selection of details I worked out on buildings which have since been completed.
14 |