CHANGA PANI PROGRAMME
CDGLUC-60
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
3/53
Location : 313305 N & 7424 56 E
3
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
4/53
Project Area
4
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
5/53
SITUATION BEFORE
CHANGA PANIPROGRAM
5
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
6/53
Economic Profile
After conducting survey of Bader Colony
the following data came into knowledge:
Most of the people are Muslims & Punjabi
speaking but small number of non-Muslims(Christians) are also residing in the area.
Most of people are illiterate.
Average income of residents is
approximately 5000.
6
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
7/53
Most of the diseases are due to poor quality
of Water & Sanitation in the locality.
Electricity is available in each household &70% have Sui gas connections .
For drinking purpose most of the people
extract water from shallow depth withEjector pump.
More than 80% people have access to TV
while 28% have access to cable . 47% of the household have no kitchen so
they usually cook in open air or in the
rooms. 7
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
8/53
70 % of house hold have proper toiletfacility but there is no properarrangement of waste water & solid wastedisposal.
Soakage Pit were use for disposal of
waste water and often it mixed with underground water and contaminate U/G waterwhich was used by the residents.
70% households have only 1 or 2 rooms.
Majority have their own houses and
average area of plot-size is 5 marlas.8
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
9/53
9
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
10/53
10
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
11/53
11
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
12/53
12
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
13/53
13
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
14/53
14
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
15/53
15
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
16/53
Community Situation
16
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
17/53
17
CommunitySituation
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
18/53
18
Community Situation
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
19/53
Changa Pani Programme
Project aims to providewater and sanitation
facilities, health andhygiene education to 20,000people in low income areaof Lahore (UC-60 Badar
Colony ) Policy Learning Model for
Replications in WASAs/Cities of Punjab
19
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
20/53
PARTNERS
Urbin Unit (P&D)
WASA Lahore
ASB ( Anjuman Samaji Bhebood)
CDG L( UC 60) WASCO
20
Ch P i P A l i
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
21/53
Changa Pani Program- A learningSocial Policy Model for Urban Water
Sector in Punjab
Component Sharing
(External & Internal) B/WWASA and Community/(WASCO)Water &Sanitation Committee.
Partnership Model forPerformance improvement
21
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
22/53
Salient Features of Changa Pani
Steering Committee Urbin Unit, WASA, UC -60 and
ASB ( Civil Society)
Integrated Approach Water and Sanitation
Overhead Tank ( 50,000 Gallons)-
One tube well ( 4 cusecs)
2860 households- 20,000 peoplePhase 1
Health , Hygiene and Conservation Education
Community Mobilization on Lanes
Women Water Groups22
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
23/53
Key Project Component
Government of PunjabFunded WASA from CMPackage for Large Cities
External InfrastructureWASA
Internal InfrastructureCommunity / WASCO
Community Mobilization andGroup Formation at Lane,
Mohalla and UC Level Formation of Women Water
Groups to address genderconcerns
23
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
24/53
Project Quality Assurancethrough MOU by Steering Committee
As this is a partnership model MOU defines the key
partnership parameters
WASA Design ,Implementation, of the Hard Ware
Component , Project Support office and financialmanagement
Urban Unit : Overall Programme Design, Training &Policy Learning , Coordination and Quality Assurance
ASB : Community Mobilization Advice UC -60 : Facilitate Community Financing and
Mobilization
24
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
25/53
SALIENT FEATURES OF THEPROJECT
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
26/53
GENERAL INFORMATION OF THEPROJECT AREA
LOCATION
Total Population
Total No of Houses
Dated of Start:
Source of water & sewerage( before implementation ofCPP)
Badar colony near RangerHead Quarter Barki roadLahore.
20,000
2860
2008
Bored Contaminated waterused for drinking and soakpits used to dispose offsewage.
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
27/53
External Component = 104.84 M
Funded by = Government of the Punjab(CM Package for Big Cities)
Total Internal Component = 36.40 M
WASCO collected Rs: 6600 per House from community for executionof internal component.
%age of External Component = 64 %
%age of Internal Component = 36 %
27
Project Financing
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
28/53
EXTERNAL COMPONENT
(By WASA)
Sewer 12 To 48 Dia
(Total length) (23400 Rft)
Water supply 6 To 12 Dia(Total length) (28000Rft)
Tube well 1No 4 cfs capacity
Overhead Reservoir 1No (50000 G)
Disposal Station 1No ( 4 x 6Cfs)
All Works are Completed and functional
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
29/53
29
INTERNAL COMPONENT
(By WASCO)
Sewer 9 DiaTotal Length 25000-Rftsewer laid 23750 Rft.Progress 95%
Water supply 3 To 4 DiaTotal Length 32157-Rftw/s laid 30549 Rft.Progress 95%
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
30/53
FUNDS POSITION OF PROJECT
Total Funds Released = 95.115 Million
Total Funds Utilized = 95.115 Million
FUNDS REQUIRED
Loan to Poorest Household = 2.10 Million
Loan for smart Meters = 12.33 Million
Other Liabilities = 10.325 Million
Total Funds Required = 24.775 Million
30
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
31/53
PLAN FOR EXTERNAL & INTERNAL W/S
31
PLAN OF WATERSUPPLY. External &Internal Component
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
32/53
32
PLAN OFSEWERAGE.External &Internal Component
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
33/53
OPERATION & MAINTENANCE
9 Hrs water supply is being provided tothe community at present.
WASA is carrying out Operation &Maintenance of External Components i.eTubwell,Overhead reservoir ,Main Water
supply & Sewer lines, and Disposalworks Whereas,
WASCO is maintaining the internal
component by it self. 33
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
34/53
FINANCIAL REVIEW(O&M)
WASCO is collecting Rs 250/- per House/connection per month.
WASCO is paying Rs 140/- per House/
connection per month to WASA.
Total No. of Connection = 2640
Total Amount Collected by WASCO = Rs 6.56 M
(From September 2009 to March 2011)
Payment made by WASCO to WASA = Rs 4.48 M
Total Expenditure by WASA = Rs 7.07 M
Balance/Arrears/Deficit = Rs 2.59 M34
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
35/53
ACHIEVEMENTS( As per WASCO)
35
S.NO INDICATORS BEFORE CPPAFTER
CPPREMARKS
1 Water bornDiseases
35- 43% 5-10% Appreciable improvement in Healthfield especially in childrens.
2 Expenditure OnMedicine
10-20% of
Income
2 -5 % Saving has improved the Economic
Profile of public.
3 Attitude / Behavior Worse Prosper Social interaction increases. Publicbehavior changes to respectable
side. Crime ratio has also decreased.
4 Economic Saving Nil 10-20% Saving is being used for otherhousehold necessities .
5 Expenditure OnElectricity To
Extract Water
8-10 % of
Income
5 % Saving After Paying the Water Bills
6 Living Standard Very Poor Moderate Appreciable improvement in livingstandard.
7 EnvironmentalConditions
Worse Good Public is getting neat and clean
environment. No pollution of dirty
water and waste.
8 Awareness To OtherFields/Basic Rights
Unknown WellKnown
Awareness crop up among the publicfor their rights
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
36/53
WATER AND SANITATION COMMITTEE
WASCO
36
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
37/53
Members of WASCO
Mr. Waheed Gull (President)
Mr. Zafar Iqbal (S.Vice President)
Mr. Maqsod Gujjar (Vice President)
Mr. Nasrullah Khan (Fin. Secretary)
Mr. Tariq Awan (G. Secretary)
Mr. Ghulam Abbas (Joint Secretary)
Mr. M. Rafique (Member)
37
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
38/53
ACTIVITIES OF WASCO
Generate and distribute water/Sewerage bills
School Visits
Aware community about use of water
Deliver door to door message of program
Distribution of the pamphlets
Conduct Meetings(Male & Female)
Evaluate Progress of Community Groups Site visit to monitor the work progress internal
component
38
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
39/53
Responsibility of General Committee
(WASCO)
WASCO supervise the internal component WASCO pay monthly bill to WASA
WASCO conducts weekly community meeting
WASCO give the relaxation to poor people forinstallment of security
WASCO manage solid waste system
WASCO purchase the material of water andsanitation for internal component
WASCO employed the office and skilled field stafffor attending the water supply and sewerage
complaints of internal component. 39
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
40/53
WASCO hire contractor for construction of water
and Sewerage infrastructure.
WASCO attend all the complaints immediately
9 hours water supply is being provided to
community and community is getting ample
quantity of quality water.
Customers services and computerized billing isstarted by WASCO .
WASCO has arranged health care and vocational
centers 40
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
41/53
To aware the people about the importance of
health.
To aware the people that how to decrease the
environmental pollution by the use of
latrines.
To create awareness among the people about
water conservation.
41
Health and Hygiene Education
ACTIVITIES IN SOCIAL
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
42/53
ACTIVITIES IN SOCIALSECTORS
WASCO has established a Cricket Team of
UC-60, which is playing Cricket matches with
various cricket clubs successfully .
WASCO has also arranged a QASWA free
dispensary at WASCO office for basic
medical treatment for poor people.
43
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
43/53
Before & After CPP
44
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
44/53
Before & After CPP
45
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
45/53
Activities Profile in the Project
46
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
46/53
Meetings of WASCO
47
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
47/53
M.D WASA visit to CPP
48
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
48/53
International Delegation visit to CPP
49
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
49/53
D.C.O Lahore visit to CPP
50
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
50/53
Contryhead W.B visit CPP
51
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
51/53
THANKS
P j Fi i
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
52/53
A= Main Infrastructure Trunk Sewer : 30.0 M
B= Water Supply External : 24. 3 M
C= Sewerage External : 32.88 M
D= Office , Education, Research 3.38 M
E= Bulk Meter 0.25 M
F= loan for poor's 2.10 M
G =Water Meters 12.33M
Total External Component : 104.84 M
(Funded by Govt of Punjab.)
53
Project Financing(External Component)
Project Financing
-
8/2/2019 Cpp Presentation.xen.Sdo(Final=1)
53/53
Project Financing
Internal Component
H=Water Supply 5.74 M
I=Sewerage 14.31 M
J=Water Meters 12.33 M
Total Internal Component = 32.38 M
WASCO collected Rs: 6600 per House fromcommunity for execution of internal
component.%age of External Component = 64 %
%age of Internal Component = 36 %