    CHANGA PANI PROGRAMME

    CDGLUC-60

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    3/53

    Location : 313305 N & 7424 56 E

    3

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    4/53

    Project Area

    4

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    5/53

    SITUATION BEFORE

    CHANGA PANIPROGRAM

    5

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    6/53

    Economic Profile

    After conducting survey of Bader Colony

    the following data came into knowledge:

    Most of the people are Muslims & Punjabi

    speaking but small number of non-Muslims(Christians) are also residing in the area.

    Most of people are illiterate.

    Average income of residents is

    approximately 5000.

    6

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    7/53

    Most of the diseases are due to poor quality

    of Water & Sanitation in the locality.

    Electricity is available in each household &70% have Sui gas connections .

    For drinking purpose most of the people

    extract water from shallow depth withEjector pump.

    More than 80% people have access to TV

    while 28% have access to cable . 47% of the household have no kitchen so

    they usually cook in open air or in the

    rooms. 7

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    8/53

    70 % of house hold have proper toiletfacility but there is no properarrangement of waste water & solid wastedisposal.

    Soakage Pit were use for disposal of

    waste water and often it mixed with underground water and contaminate U/G waterwhich was used by the residents.

    70% households have only 1 or 2 rooms.

    Majority have their own houses and

    average area of plot-size is 5 marlas.8

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    9/53

    9

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    10/53

    10

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    11/53

    11

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    12/53

    12

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    13/53

    13

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    14/53

    14

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    15/53

    15

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    16/53

    Community Situation

    16

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    17/53

    17

    CommunitySituation

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    18/53

    18

    Community Situation

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    19/53

    Changa Pani Programme

    Project aims to providewater and sanitation

    facilities, health andhygiene education to 20,000people in low income areaof Lahore (UC-60 Badar

    Colony ) Policy Learning Model for

    Replications in WASAs/Cities of Punjab

    19

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    20/53

    PARTNERS

    Urbin Unit (P&D)

    WASA Lahore

    ASB ( Anjuman Samaji Bhebood)

    CDG L( UC 60) WASCO

    20

    Ch P i P A l i

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    21/53

    Changa Pani Program- A learningSocial Policy Model for Urban Water

    Sector in Punjab

    Component Sharing

    (External & Internal) B/WWASA and Community/(WASCO)Water &Sanitation Committee.

    Partnership Model forPerformance improvement

    21

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    22/53

    Salient Features of Changa Pani

    Steering Committee Urbin Unit, WASA, UC -60 and

    ASB ( Civil Society)

    Integrated Approach Water and Sanitation

    Overhead Tank ( 50,000 Gallons)-

    One tube well ( 4 cusecs)

    2860 households- 20,000 peoplePhase 1

    Health , Hygiene and Conservation Education

    Community Mobilization on Lanes

    Women Water Groups22

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    23/53

    Key Project Component

    Government of PunjabFunded WASA from CMPackage for Large Cities

    External InfrastructureWASA

    Internal InfrastructureCommunity / WASCO

    Community Mobilization andGroup Formation at Lane,

    Mohalla and UC Level Formation of Women Water

    Groups to address genderconcerns

    23

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    24/53

    Project Quality Assurancethrough MOU by Steering Committee

    As this is a partnership model MOU defines the key

    partnership parameters

    WASA Design ,Implementation, of the Hard Ware

    Component , Project Support office and financialmanagement

    Urban Unit : Overall Programme Design, Training &Policy Learning , Coordination and Quality Assurance

    ASB : Community Mobilization Advice UC -60 : Facilitate Community Financing and

    Mobilization

    24

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    25/53

    SALIENT FEATURES OF THEPROJECT

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    26/53

    GENERAL INFORMATION OF THEPROJECT AREA

    LOCATION

    Total Population

    Total No of Houses

    Dated of Start:

    Source of water & sewerage( before implementation ofCPP)

    Badar colony near RangerHead Quarter Barki roadLahore.

    20,000

    2860

    2008

    Bored Contaminated waterused for drinking and soakpits used to dispose offsewage.

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    27/53

    External Component = 104.84 M

    Funded by = Government of the Punjab(CM Package for Big Cities)

    Total Internal Component = 36.40 M

    WASCO collected Rs: 6600 per House from community for executionof internal component.

    %age of External Component = 64 %

    %age of Internal Component = 36 %

    27

    Project Financing

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    28/53

    EXTERNAL COMPONENT

    (By WASA)

    Sewer 12 To 48 Dia

    (Total length) (23400 Rft)

    Water supply 6 To 12 Dia(Total length) (28000Rft)

    Tube well 1No 4 cfs capacity

    Overhead Reservoir 1No (50000 G)

    Disposal Station 1No ( 4 x 6Cfs)

    All Works are Completed and functional

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    29/53

    29

    INTERNAL COMPONENT

    (By WASCO)

    Sewer 9 DiaTotal Length 25000-Rftsewer laid 23750 Rft.Progress 95%

    Water supply 3 To 4 DiaTotal Length 32157-Rftw/s laid 30549 Rft.Progress 95%

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    30/53

    FUNDS POSITION OF PROJECT

    Total Funds Released = 95.115 Million

    Total Funds Utilized = 95.115 Million

    FUNDS REQUIRED

    Loan to Poorest Household = 2.10 Million

    Loan for smart Meters = 12.33 Million

    Other Liabilities = 10.325 Million

    Total Funds Required = 24.775 Million

    30

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    31/53

    PLAN FOR EXTERNAL & INTERNAL W/S

    31

    PLAN OF WATERSUPPLY. External &Internal Component

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    32/53

    32

    PLAN OFSEWERAGE.External &Internal Component

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    33/53

    OPERATION & MAINTENANCE

    9 Hrs water supply is being provided tothe community at present.

    WASA is carrying out Operation &Maintenance of External Components i.eTubwell,Overhead reservoir ,Main Water

    supply & Sewer lines, and Disposalworks Whereas,

    WASCO is maintaining the internal

    component by it self. 33

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    34/53

    FINANCIAL REVIEW(O&M)

    WASCO is collecting Rs 250/- per House/connection per month.

    WASCO is paying Rs 140/- per House/

    connection per month to WASA.

    Total No. of Connection = 2640

    Total Amount Collected by WASCO = Rs 6.56 M

    (From September 2009 to March 2011)

    Payment made by WASCO to WASA = Rs 4.48 M

    Total Expenditure by WASA = Rs 7.07 M

    Balance/Arrears/Deficit = Rs 2.59 M34

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    35/53

    ACHIEVEMENTS( As per WASCO)

    35

    S.NO INDICATORS BEFORE CPPAFTER

    CPPREMARKS

    1 Water bornDiseases

    35- 43% 5-10% Appreciable improvement in Healthfield especially in childrens.

    2 Expenditure OnMedicine

    10-20% of

    Income

    2 -5 % Saving has improved the Economic

    Profile of public.

    3 Attitude / Behavior Worse Prosper Social interaction increases. Publicbehavior changes to respectable

    side. Crime ratio has also decreased.

    4 Economic Saving Nil 10-20% Saving is being used for otherhousehold necessities .

    5 Expenditure OnElectricity To

    Extract Water

    8-10 % of

    Income

    5 % Saving After Paying the Water Bills

    6 Living Standard Very Poor Moderate Appreciable improvement in livingstandard.

    7 EnvironmentalConditions

    Worse Good Public is getting neat and clean

    environment. No pollution of dirty

    water and waste.

    8 Awareness To OtherFields/Basic Rights

    Unknown WellKnown

    Awareness crop up among the publicfor their rights

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    36/53

    WATER AND SANITATION COMMITTEE

    WASCO

    36

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    37/53

    Members of WASCO

    Mr. Waheed Gull (President)

    Mr. Zafar Iqbal (S.Vice President)

    Mr. Maqsod Gujjar (Vice President)

    Mr. Nasrullah Khan (Fin. Secretary)

    Mr. Tariq Awan (G. Secretary)

    Mr. Ghulam Abbas (Joint Secretary)

    Mr. M. Rafique (Member)

    37

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    38/53

    ACTIVITIES OF WASCO

    Generate and distribute water/Sewerage bills

    School Visits

    Aware community about use of water

    Deliver door to door message of program

    Distribution of the pamphlets

    Conduct Meetings(Male & Female)

    Evaluate Progress of Community Groups Site visit to monitor the work progress internal

    component

    38

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    39/53

    Responsibility of General Committee

    (WASCO)

    WASCO supervise the internal component WASCO pay monthly bill to WASA

    WASCO conducts weekly community meeting

    WASCO give the relaxation to poor people forinstallment of security

    WASCO manage solid waste system

    WASCO purchase the material of water andsanitation for internal component

    WASCO employed the office and skilled field stafffor attending the water supply and sewerage

    complaints of internal component. 39

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    40/53

    WASCO hire contractor for construction of water

    and Sewerage infrastructure.

    WASCO attend all the complaints immediately

    9 hours water supply is being provided to

    community and community is getting ample

    quantity of quality water.

    Customers services and computerized billing isstarted by WASCO .

    WASCO has arranged health care and vocational

    centers 40

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    41/53

    To aware the people about the importance of

    health.

    To aware the people that how to decrease the

    environmental pollution by the use of

    latrines.

    To create awareness among the people about

    water conservation.

    41

    Health and Hygiene Education

    ACTIVITIES IN SOCIAL

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    42/53

    ACTIVITIES IN SOCIALSECTORS

    WASCO has established a Cricket Team of

    UC-60, which is playing Cricket matches with

    various cricket clubs successfully .

    WASCO has also arranged a QASWA free

    dispensary at WASCO office for basic

    medical treatment for poor people.

    43

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    43/53

    Before & After CPP

    44

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    44/53

    Before & After CPP

    45

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    45/53

    Activities Profile in the Project

    46

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    46/53

    Meetings of WASCO

    47

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    47/53

    M.D WASA visit to CPP

    48

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    48/53

    International Delegation visit to CPP

    49

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    49/53

    D.C.O Lahore visit to CPP

    50

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    50/53

    Contryhead W.B visit CPP

    51

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    51/53

    THANKS

    P j Fi i

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    52/53

    A= Main Infrastructure Trunk Sewer : 30.0 M

    B= Water Supply External : 24. 3 M

    C= Sewerage External : 32.88 M

    D= Office , Education, Research 3.38 M

    E= Bulk Meter 0.25 M

    F= loan for poor's 2.10 M

    G =Water Meters 12.33M

    Total External Component : 104.84 M

    (Funded by Govt of Punjab.)

    53

    Project Financing(External Component)

    Project Financing

  • 8/2/2019 Cpp Presentation.xen.Sdo(Final=1)

    53/53

    Project Financing

    Internal Component

    H=Water Supply 5.74 M

    I=Sewerage 14.31 M

    J=Water Meters 12.33 M

    Total Internal Component = 32.38 M

    WASCO collected Rs: 6600 per House fromcommunity for execution of internal

    component.%age of External Component = 64 %