ProjectProject
“A project is a series of activities directed to the accomplishment of a desired objective.”
![Page 3: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/3.jpg)
HistoryHistory
PERT was developed by the US Navy for the planning and control of the Polaris missile program and the emphasis was on completing the program in the shortest possible time. In addition PERT had the ability to cope with uncertain activity completion times (e.g. for a particular activity the most likely completion time is 4 weeks but it could be anywhere between 3 weeks and 8 weeks).
CPM was developed by Du Pont and the emphasis was on the trade-off between the cost of the project and its overall completion time (e.g. for certain activities it may be possible to decrease their completion times by spending more money - how does this affect the overall completion time of the project?)
Developed in the 1950s
![Page 4: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/4.jpg)
CPM - Critical Path MethodCPM - Critical Path Method
Definition: In CPM activities are shown as a network of precedence relationships using activity-on-node network construction– Single estimate of activity time– Deterministic activity times
USED IN : Production management - for the jobs of repetitive in nature where the activity time estimates can be predicted with considerable certainty due to the existence of past experience.
![Page 5: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/5.jpg)
PERT - PERT - Project Evaluation & Review Project Evaluation & Review
TechniquesTechniques Definition: In PERT activities are shown as a network of
precedence relationships using activity-on-arrow network construction– Multiple time estimates – Probabilistic activity times
USED IN : Project management - for non-repetitive jobs (research and development work), where the time and cost estimates tend to be quite uncertain. This technique uses probabilistic time estimates.
![Page 6: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/6.jpg)
The Project NetworkThe Project Network
Use of nodes and arrows
Arrows An arrow leads from tail to head directionally– Indicate ACTIVITY, a time consuming effort that is
required to perform a part of the work.
Nodes A node is represented by a circle- Indicate EVENT, a point in time where one or more
activities start and/or finish.
![Page 7: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/7.jpg)
– An activity is a time-consuming effort that is required to complete part of a project. Shown as an arrow on the diagram
– An event is denoted by a circle and defines the end of one activity and beginning of the next. An event may be a decision point.
Activity Event
The Project NetworkThe Project Network
![Page 8: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/8.jpg)
Activity SlackActivity Slack
Each event has two important times associated with it :
- Earliest time , Te , which is a calendar time when an event can occur when all the predecessor events completed at the earliest possible times
- Latest time , TL , which is the latest time the event can occur with out delaying the subsequent events and completion of project.
Difference between the latest time and the earliest time of an event is the slack time for that event
Positive slack : Slack is the amount of time an event can be delayed without delaying the project completion
![Page 9: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/9.jpg)
Critical PathCritical Path
Is that the sequence of activities and events where there is no “slack” i.e.. Zero slack
Longest path through a network
minimum project completion time
![Page 10: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/10.jpg)
Questions Answered by CPM & PERTQuestions Answered by CPM & PERT
Completion date?
On Schedule?
Within Budget?
Critical Activities?
How can the project be finished early at the least cost?
![Page 11: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/11.jpg)
ExampleExample1. Construct the CPM Network using the details below and determine the critical path
Activity Immediate Predecessor
Duration
A - 1
B A 4
C A 2
D A 2
E D 3
F D 3
G E 2
H F,G 1
I C,H 3
J B 2
![Page 12: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/12.jpg)
1 2
CPM NETWORK
A
![Page 13: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/13.jpg)
1 7
4
2
3
CPM NETWORK
A
B
D
C
![Page 14: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/14.jpg)
1 7
6
5
4
2
3
CPM NETWORK
A
B
DF
E
C
![Page 15: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/15.jpg)
1 7
6
5
4
2
3
CPM NETWORK
A
B
DF
GE
C
![Page 16: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/16.jpg)
1 7
6
5
4
2
3
CPM NETWORK
A
B
DF
GE
C
H
![Page 17: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/17.jpg)
1 7
6
5
4
2 8
3
CPM NETWORK
A
B
DF
GE
C
IH
![Page 18: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/18.jpg)
1 7
6
5
4
2 8
3
CPM NETWORK
A
J
B
DF
GE
C
IH
![Page 19: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/19.jpg)
1 7
6
5
4
2 8
3
CPM NETWORK with duration of each activity
A(1)
J(2)
B(4)
D(2)
F(3)G(2)
E(3)
C(2)
I(3)
H(1)
![Page 20: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/20.jpg)
1 7
6
5
4
2 8
3
To find the Critical Path
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
0
LFT EST
![Page 21: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/21.jpg)
1 7
6
5
4
2 8
3
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
0 0 1
LFT EST
To find the Critical Path
![Page 22: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/22.jpg)
1 7
6
5
4
2 8
3
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
0 0 1
0 3
To find the Critical Path LFT EST
![Page 23: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/23.jpg)
1 7
6
5
4
2 8
3
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
0
0 6
0 1
0 3
To find the Critical Path LFT EST
![Page 24: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/24.jpg)
1 7
6
5
4
2 8
3
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
0
0 6
0 1
0 3
0 8
To find the Critical Path LFT EST
![Page 25: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/25.jpg)
1 7
6
5
4
2 8
3
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
00 9
0 6
0 1
0 3
0 8
To find the Critical Path LFT EST
![Page 26: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/26.jpg)
1 7
6
5
4
2 8
3
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
0 0 9
0 6
0 5
0 1
0 3
0 8
To find the Critical Path LFT EST
![Page 27: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/27.jpg)
1 7
6
5
4
2 8
3
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
00 9
0 12
0 6
0 5
0 1
0 3
0 8
To find the Critical Path LFT EST
![Page 28: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/28.jpg)
1 7
6
5
4
2 8
3
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
00 9
12 12
0 6
0 5
0 1
0 3
0 8
To find the Critical Path LFT EST
![Page 29: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/29.jpg)
1 7
6
5
4
2 8
3
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
09 9
12 12
0 6
0 5
0 1
0 3
0 8
To find the Critical Path LFT EST
![Page 30: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/30.jpg)
1 7
6
5
4
2 8
3
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
09 9
12 12
0 6
0 5
0 1
0 3
8 8
To find the Critical Path LFT EST
![Page 31: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/31.jpg)
1 7
6
5
4
2 8
3
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
09 9
12 12
6 6
0 5
0 1
0 3
8 8
To find the Critical Path LFT EST
![Page 32: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/32.jpg)
1 7
6
5
4
2 8
3
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
09 9
12 12
6 6
0 5
0 1
3 3
8 8
To find the Critical Path LFT EST
![Page 33: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/33.jpg)
1 7
6
5
4
2 8
3
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
09 9
12 12
6 6
0 5
1 1
3 3
8 8
To find the Critical Path LFT EST
![Page 34: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/34.jpg)
1 7
6
5
4
2 8
3
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
09 9
12 12
6 6
10 5
1 1
3 3
8 8
To find the Critical Path LFT EST
![Page 35: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/35.jpg)
1 7
6
5
4
2 8
3
A(1)
J(2)
B(4)
D(2)F(3)
G(2)E(3)
C(2)
I(3)H(1) 0
09 9
12 12
6 6
10 5
1 1
3 3
8 8
Critical Path
Critical Path
A – B – E – G – H - I
Critical Path
1 - 2 - 4 – 5 – 6 – 7 - 8
![Page 36: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/36.jpg)
CPM - ExampleCPM - Example
Critical Path
1 - 2 - 4 – 5 – 6 – 7 – 8
Critical Path
A – B – E – G – H - IProject Completion Time = 12 months
![Page 37: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/37.jpg)
PERTPERTProbabilisticThree estimates
– to (a) – optimistic time
– tp (b) – pessimistic time
– tl (m) – most likely time
Mean µ = (to + 4* tl + tp)/6
Variance σ2 = [(tp – to)/6]2
![Page 38: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/38.jpg)
Activity Predecessor
a m b
A - 6 7 8
B - 1 2 9
C - 1 4 7
D A 1 2 3
E A,B 1 2 9
F C 1 5 9
G C 2 2 8
H E,F 4 4 4
I E,F 4 4 10
J D,H 2 5 14
K G,I 2 2 8
PERT – Example: PERT – Example: Construct Project network, find the Construct Project network, find the expected duration and variance for each activity & find the expected duration and variance for each activity & find the
critical path and expected project completion timecritical path and expected project completion time
![Page 39: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/39.jpg)
Activity
Predecessor
a m b µte
A - 6 7 8 7
B - 1 2 9
C - 1 4 7
D A 1 2 3
E A,B 1 2 9
F C 1 5 9
G C 2 2 8
H E,F 4 4 4
I E,F 4 4 10
J D,H 2 5 14
K G,I 2 2 8
PERT – Example: PERT – Example: Mean µ = (tMean µ = (too + 4* t + 4* tll + t + tpp)/6)/6 Variance Variance σσ22 = [(t = [(tpp – t – too)/6])/6]22
![Page 40: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/40.jpg)
Activity
Predecessor
a m b µte
A - 6 7 8 7
B - 1 2 9 3
C - 1 4 7
D A 1 2 3
E A,B 1 2 9
F C 1 5 9
G C 2 2 8
H E,F 4 4 4
I E,F 4 4 10
J D,H 2 5 14
K G,I 2 2 8
PERT – Example: PERT – Example: Mean µ = (tMean µ = (too + 4* t + 4* tll + t + tpp)/6)/6 Variance Variance σσ22 = [(t = [(tpp – t – too)/6])/6]22
![Page 41: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/41.jpg)
Activity
Predecessor
a m b µte
σ2
A - 6 7 8 7
B - 1 2 9 3
C - 1 4 7 4
D A 1 2 3 2
E A,B 1 2 9 3
F C 1 5 9 5
G C 2 2 8 3
H E,F 4 4 4 4
I E,F 4 4 10 5
J D,H 2 5 14 6
K G,I 2 2 8 3
PERT – Example: PERT – Example: Mean µ = (tMean µ = (too + 4* t + 4* tll + t + tpp)/6)/6 Variance Variance σσ22 = [(t = [(tpp – t – too)/6])/6]22
![Page 42: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/42.jpg)
Activity
Predecessor
a m b µte
σ2
A - 6 7 8 7 0.11
B - 1 2 9 3
C - 1 4 7 4
D A 1 2 3 2
E A,B 1 2 9 3
F C 1 5 9 5
G C 2 2 8 3
H E,F 4 4 4 4
I E,F 4 4 10 5
J D,H 2 5 14 6
K G,I 2 2 8 3
PERT – Example: PERT – Example: Mean µ = (tMean µ = (too + 4* t + 4* tll + t + tpp)/6)/6 Variance Variance σσ22 = [(t = [(tpp – t – too)/6])/6]22
![Page 43: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/43.jpg)
Activity
Predecessor
a m b µte
σ2
A - 6 7 8 7 0.11
B - 1 2 9 3 1.78
C - 1 4 7 4
D A 1 2 3 2
E A,B 1 2 9 3
F C 1 5 9 5
G C 2 2 8 3
H E,F 4 4 4 4
I E,F 4 4 10 5
J D,H 2 5 14 6
K G,I 2 2 8 3
PERT – Example: PERT – Example: Mean µ = (tMean µ = (too + 4* t + 4* tll + t + tpp)/6)/6 Variance Variance σσ22 = [(t = [(tpp – t – too)/6])/6]22
![Page 44: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/44.jpg)
Activity
Predecessor
a m b µte
σ2
A - 6 7 8 7 0.11
B - 1 2 9 3 1.78
C - 1 4 7 4 1.00
D A 1 2 3 2 0.11
E A,B 1 2 9 3 1.78
F C 1 5 9 5 1.78
G C 2 2 8 3 1.00
H E,F 4 4 4 4 0
I E,F 4 4 10 5 1.00
J D,H 2 5 14 6 4.00
K G,I 2 2 8 3 1.00
PERT – Example: PERT – Example: Mean µ = (tMean µ = (too + 4* t + 4* tll + t + tpp)/6)/6 Variance Variance σσ22 = [(t = [(tpp – t – too)/6])/6]22
![Page 45: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/45.jpg)
1
4
2
3
A(7)
J(6)
B(3)
D(2)
F(5)
G(3)
E(3)
C(4) I(5)
H(4)
6 6
To find the Critical Path LFT EST
K(3)
![Page 46: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/46.jpg)
1
4
26
3
A(7)
J(6)
B(3)
D(2)
F(5)
G(3)
E(3)
C(4) I(5)
H(4)
6 6
To find the Critical Path LFT EST
K(3)
![Page 47: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/47.jpg)
1
6
5
4
2
3
A(7)
J(6)
B(3)
D(2)
F(5)
G(3)E(3)
C(4) I(5)
H(4)
6 6
To find the Critical Path LFT EST
K(3)
![Page 48: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/48.jpg)
1
6
5
4
2
3
A(7)
J(6)
B(3)
D(2)
F(5)
G(3)E(3)
C(4) I(5)
H(4)
6 6
To find the Critical Path LFT EST
K(3)
![Page 49: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/49.jpg)
1
7
6
5
4
2
3
A(7)
J(6)
B(3)
D(2)
F(5)
G(3)
E(3)
C(4) I(5)
H(4)
6 6
To find the Critical Path LFT EST
K(3)
![Page 50: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/50.jpg)
1
7
6
5
4
2
3
A(7)
J(6)
B(3)
D(2)
F(5)
G(3)
E(3)
C(4) I(5)
H(4)
6 6
To find the Critical Path LFT EST
K(3)
![Page 51: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/51.jpg)
1
7
6
5
4
2
3
A(7)
J(6)
B(3)
D(2)
F(5)
G(3)
E(3)
C(4) I(5)
H(4)
6 6
To find the Critical Path LFT EST
K(3)
![Page 52: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/52.jpg)
1
7
6
5
4
2
83
A(7) J(6)
B(3)
D(2)
F(5)
G(3)
E(3)
C(4) I(5)
H(4)
6 6
To find the Critical Path LFT EST
K(3)
![Page 53: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/53.jpg)
1
7
6
5
4
2
83
A(7)J(6)
B(3)
D(2)
F(5)
G(3)
E(3)
C(4) I(5)
H(4)
6 6
To find the Critical Path LFT EST
K(3)
![Page 54: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/54.jpg)
1
7
6
5
4
2
83
A(7) J(6)
B(3)
D(2)
F(5)
G(3)
E(3)
C(4) I(5)
H(4) 0 0
To find the Critical Path LFT EST
K(3)
1414
4 5
7 7
77
10 10
15 17
20 20
![Page 55: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/55.jpg)
1
7
6
5
4
2
83
A(7) J(6)
B(3)
D(2)
F(5)
G(3)
E(3)
C(4) I(5)
H(4) 0 0
K(3)
1414
4 5
7 7
77
10 10
15 17
20 20
Critical path 1 – 2 – 3 – 5 – 6 – 8
Critical path A – Dummy – E – H – J
![Page 56: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/56.jpg)
PERT - ExamplePERT - Example What is the probability of completing the project within
25 weeks?
Σσ2 = 5.89 σ = √(Σσ2) = 2.43 Ts (Scheduled time) = 25 weeks Z = (Ts – Te) / σ = (25 – 20) / 2.43 = 2.06 From z table (normal table) z(2.06) = 97.68 %
Activities
Variance
A 0.11
Dummy 0
E 1.78
H 0
J 4
![Page 57: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/57.jpg)
PERT - ExamplePERT - Example What is the probability of completing the project within
15 weeks?
Σσ2 = 5.89 σ = √(Σσ2) = 2.43 Ts (Scheduled time) = 15 weeks Z = (Ts – Te) / σ = (15 – 20) / 2.43 = -2.06 From z table (normal table) z(-2.06) = 100 - 97.68 %
• = 2.02 %
Activities
Variance
A 0.11
Dummy 0
E 1.78
H 0
J 4
![Page 58: CPM PERT](https://reader031.fdocuments.net/reader031/viewer/2022013114/546ae19db4af9fea158b4eec/html5/thumbnails/58.jpg)
Limitations of CPM/PERTLimitations of CPM/PERT
Clearly defined, independent and stable activities
Specified precedence relationships Over emphasis on critical paths