ML Store
CSSO
BSQM START
Team
* BSQM need to decide on the max stock at every level of storage
Proposed process-KIV until further agreement between BSQM & CSM
Finalised process
Set max stock level atevery Main/ Mini store &
teamRecei
Return
Main Store/ Mini Store(Replenish from ML)
Requstock le
Mini Store(Replenish from Main
Store)
Requesstock le
Requesmax
su
-
8/8/2019 CPE Process Flow V1 28th Jul10
2/17
ML Store
CSSO
BSQM
Team START
Proposed process-KIV until further agreement between BSQM & CSM
Finalised process
Receive & verify DSR form. Creareservation for individual Main/Mini s
Receive & verify SCCV & DSR forReturn endorsed DSR to Main/Mini s
Main Store/ Mini Store(Replenish from ML)
Request CPE from BSQM to replenishlevel-Fill in SCCV& DSR form and su
to BSQM State
Mini Store(Replenish from Main
Store)
Request CPE from Main store to replstock level-Fill in SCCV & DSR form
submit to Main store
Request CPE from Mini/Main storereplenish stock level-Fill in CCV & D
form and submit to Mini Store/Main sRecord CPE stock-out in XXX log bo
-
8/8/2019 CPE Process Flow V1 28th Jul10
3/17
RETURN
ML Store
CSSO
BSQM
Team START
Received returned faulty new CPacknowledge MLRM11 form
Main Store/ Mini Store
(Replenish from ML)
Return faulty new CPE to ML storeSCCV & MLRM11 form. Submit ML
form to ML and SCCV form to BSQM
Received returned faulty new CPacknowledge MLRM11 form
Mini Store(Replenish from Main
Store)
Return faulty new CPE to Main storeSCCV & MLRM11 form and submit t
store
Received returned faulty new CPacknowledge MLRM11 form
Return faulty new CPE to Mini/MainFill in CCV & MLRM11 form and sub
Mini Store/Main store
-
8/8/2019 CPE Process Flow V1 28th Jul10
4/17
REPLENISHMENT OF STOCK LEVEL
ML Store
CSSO
BSQM
Main Store/ Mini Store
(Replenish from ML)
Mini Store
(Replenish from Main Store)
Team
-
8/8/2019 CPE Process Flow V1 28th Jul10
5/17
Record
1. SCCV Form (copy-from main/mini store)
2. DSR Form (copy-from main/mini store)
3. Reservation Slip (copy-from main/mini store)
4. MLRM11 Form (copy from main/mini store)
1. CCV Form (copy-from team)
2. SCCV Form (endorsed -to BSQM)
3. SCCV Form (copy -from mini store)
4. DSR Form (endorsed- to BSQM)
5. DSR Form (copy-from mini store/team)
6. Reservation Slip (endorsed-to ML)
7. MLRM11 Form (endorsed-to ML)
8. MLRM11 Form (copy-from mini store/team)
9. CPE Stock Log Book
1. CCV Form (copy-from team)
2. SCCV Form (endorsed -to main store)3. DSR Form (copy-from team)
4. DSR Form (endorsed- to main store)
5. MLRM11 Form (endorsed-to main store)
6. MLRM11 Form (copy-from team)
7. CPE Stock Log Book
1. CCV Form (endorsed-to main/mini store)
2. DSR Form (endorsed- req from main/mini store)
3. MLRM11 Form (endorsed-to main/mini store)
4. CPE Stock Log Book
-
8/8/2019 CPE Process Flow V1 28th Jul10
6/17
TELEKOM MALAYSIA BERHAD ( 128740 P )
APPENDIX III-6
DSR FORM
DISTRICT STORE REQUESTION FORM
Ref Num:
Name of Work : (Team @ Contractor @ Main@ Mini Store
Maintenance Order No. :
Requestor Name :
Date of Request :
No. Material No. Material Description Issued Unit
1
2
3
4
5
6
Requested By :
Signature : ________________
Name : _________________
I/C No . : _________________
Date : _________________
Contractor Stamp:
APPENDICES TO TECHNICAL SPECIFICATIONS PAGE 6
QuantityRequired
Approved By (RNO Supervisor) :
Signature: _______________
Name : ______________
Designation : ______________
Date : ______________
Issued By (Store Ke
Signature: ___________
Name : _________
Designation : ________
Date : _______
-
8/8/2019 CPE Process Flow V1 28th Jul10
7/17
CPE Consumption Verification Form (CCV) V1.0
(Te
(A)-Please fill in these columns for NI or TR ONLY
No
2. Date
4. Service Num 5. Order/TR Num (refer to sef code)
1 NI RDS
2 NI RDS
3 NI RDS
4 NI RDS
5 NI RDS
6 NI RDS
7 NI RDS
8 NI RDS
9 NI RDS
10 NI RDS
11 NI RDS
12 NI RDS
13 NI RDS
14 NI RDS
15 NI RDS
16 NI RDS
17 NI RDS
18 RDS
19 RDS
20
To be filled by NI/TR team (including contractor) To be filled by Zone SupervisorPrepared By: Verified By:
CP
Name:___________________________
Staff Num:_______________________
1. R
3.Choose ONE of
the activity(NI/TR)
6. For DEL ONLY,please tick( ) if
CPEO7
(Post Completed/
TR ClosedDD/MM/YY)
11.
Name: Kamal Bin Darus
IC Num: 620630-07-5267
-
8/8/2019 CPE Process Flow V1 28th Jul10
8/17
Company Name/Zone: PJ EXCH LTS,SBJ,BUG Date:___________________________
-
8/8/2019 CPE Process Flow V1 28th Jul10
9/17
10. Please fill in the Serial Num.
(Totalnd no.9)
-
8/8/2019 CPE Process Flow V1 28th Jul10
10/17
-
8/8/2019 CPE Process Flow V1 28th Jul10
11/17
Summary of CPE Consumption Verification Form (SCCV) V1.0(Main@Mini Store ID/Month/Year/Run
(A)-Please fill in these columns for NI or TR ONLY
No
To be filled by Mini/Main Store Keeper To be filled by Mini/Main Store Supervisor
Prepared By: Verified By:
Name:___________________________ Name:___________________________
IC Num:__________________________ Staff Num:_______________________
Company Name/Zone:________________ Date:___________________________
1. Reference Num (Complusory):_______
2. Choose ONE of the TM's faulty CPE
(Tel./Modem /CDMA/NT/etc.)
3.Choose ONE of the
activity (NI/TR)
4. Customer
Segment
5. Total Quantity
(Qty)
-
8/8/2019 CPE Process Flow V1 28th Jul10
12/17
ning Number)_______________________________
(B)-Please fill in this column for new faulty set ONLY (ifany)
6. Choose ONE of the TM's faulty
CPE (Tel./Modem /CDMA/NT/etc.)
7. Total Quantity
(Qty)
-
8/8/2019 CPE Process Flow V1 28th Jul10
13/17
RETURN MATERIAL
Plant ID 1 3 Reference No.(Team @ Contracto
Project / Cost Centre Type Of Work
(refer to the original
Work Order No / Network no.
No. Material No. Description Drum No.
Note : Returnee must cap the excess pressurised cables at the point of cutting for reissue.
1. Returned By: 2. Inspected & Approved By: (Returnee) (SP /Executive & above / Technical Manager)
Signature Signature
Name Name
Designation Designation
Date Date
1 Returnee 2 Approving Officer
A. New Item - Excess To Requirement A. Fit For Issue
B. Recovered Item- Fit For Issue B. Unfit For Issue/scrap
C. Warranty C. Repair
D. Scrap
Notes to fill column: Inspected & Approved
Fit for issue : new or recovered but can be used eg. Poles
Unfit for issue : scrap item
Repair : For items under warranty
Recovered Item - Can be fit for issue or scrap. Choose either 1B or 1D.
-
8/8/2019 CPE Process Flow V1 28th Jul10
14/17
Store ID:
Store Description:
Material Num:
Material Description:
Max. Stock Level:
IN
(Tick (x)only ONE) (Tick (x)only ONE)
Date
Reservation
DSR
MLRM11 Doc. Num Qty Date
DSR
MLRM11
-
8/8/2019 CPE Process Flow V1 28th Jul10
15/17
-
8/8/2019 CPE Process Flow V1 28th Jul10
16/17
OUT
Doc. Num Qty
-
8/8/2019 CPE Process Flow V1 28th Jul10
17/17