Program Update – Program Update – FinancingFinancing• Took out $34 million in loans this year
• Extremely favorable terms• Paid back after project is completed• Borrowed as needed
• Will take out approximately $110 million in loans next year
• Not selling bonds this year• Doing well with low-interest loans
Program Update –Program Update –Metroparks PartnershipMetroparks Partnership• Wetland mitigation
• If we use wetlands for construction (mooring basin at plant) must restore wetlands 2 to 1
• City reimbursing Metroparks for $45,00 toward purchase of 10 acres of land in Spencer Township (Angola and Eber Roads)
• Stream bank mitigation• $12,000 for improvements at SideCut Metropark
River Road SSOsRiver Road SSOs
• 4 in the River Road Area
• Must be eliminated by November of 2006• Stiff penalties for missed deadlines
Past & Ongoing River Past & Ongoing River Road Area ProjectsRoad Area Projects• Sanitary sewer study – 2000/2001
• Storm sewer study – 2002/2003
• Sewer lining – 2002/ongoing
• Copland storm sewer – 2002
• Beverly/Medford storm sewer – 2004/ongoing
Proposed River Road Proposed River Road Area ProjectsArea Projects• Underground Equalization Basin – River Road
Park
• Underground Pump Station – River Road Park
• New Force Main Sewer – Brookford Drive
• New Relief Sewer– Beverly and River Road
• Beverly Pump Station – West of Trail
Project SchedulesProject Schedules
• Projects will be built concurrently
• Construction bids – October/November 2004
• Break Ground – Spring 2005
• Completed by November 2006
Equalization BasinEqualization Basin
• Underground facility
• 3 million gallon storage capacity
• 120 ft. x 240 ft.
• 17 ft. deep
• To be located at River Road Park ball diamond site• Tanks from old Toledo Water Plant currently
located there
Equalization BasinEqualization Basin
EQ Basin EQ Basin Issues & DiscussionIssues & Discussion• Construction
Access Road• From River Road
to site (between playgrounds)
• Reduces amount of construction equipment entering site from Brookford
• Could disrupt playground areas
Issues and DiscussionIssues and Discussion
• Baseball field• Will be lost for one season due to construction• Alternative options for replacement of the field
River Road Park River Road Park Pump StationPump Station• Located next to
Equalization Basin• Bulk of facility
underground• Control panel above
ground• Will pump waste from
River Road sewer to equalization basin
Beverly Pump StationBeverly Pump Station
• Underground – with control panel(s) above ground
• Will pump waste from Beverly sewer to new EQ basin
Force Main SewerForce Main Sewer
• New sewer from Beverly pump station on west side of Anthony Wayne Trail down Brookford to the Equalization Basin
• To be located on south side of Brookford• Shouldn’t disturb street – except for crossings at
OLPH and Island Avenue• Traffic maintained
• Will work with committee to minimize disruption
New Relief SewersNew Relief Sewers
• From River Road, Midland or Hemlock down River Road to Brookford
• New water line will be installed at same time• Should help resolve water pressure problems
• Preferred sewer location is in east lane of River Road
New Relief SewersNew Relief Sewers
• On Beverly from Brookford to Medford
• Both relief sewer lines should help alleviate basement flooding in area
Future MeetingsFuture Meetings
• Next meeting date?
• Best time and location?