CP-43:Back to Basics with Revenue:Revenue Recognition in Costpoint
Andy Unwin, Deltek
Course Description
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 2
Description: If you're new to revenue
setup or looking for a refresher, this
session is for you. We'll review Orgs,
Ceilings, Rates Schedules, Rates and
more. At the end of this session you'll:
Have a better understanding of what
makes up the revenue calculation. Know
how to troubleshoot revenue issues
ObjectivesBy the conclusion of this session, you will be able to :
» Name the key tables used in Revenue Calculations.
» Identify the steps to clean the Project Ledger of erroneous revenue.
» Describe the protocol for properly recalculating revenue.
» Document the “before” and “after” views of the Project Ledger.
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 3
Agenda» Introduction.
» Part 1: Where Do I Begin?
» Part 2: Revenue Roadmap.
» Part 3: The Process.
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 4
Part 1
» Introduction
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 5
What is “PROJ_SUM”…
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 6
» PROJ_SUM: the key table underlying the Project Ledger.
» It stores data by Project, Account, and Organization for Fiscal Year,
Period, and Sub-Period.
» It is a compressed view of transaction data from the General Ledger.
» Burden is stored at “Actual” and “Target” by Pool in the companion table
known as PROJ_BURD_SUM.
» PROJ_SUM is the basis for the computation of revenue.
» The Project Ledger is always reconciled back to the General Ledger.
PROJ_SUM
What is “LAB_HS”…
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 7
» LAB_HS: the key “hours-based” table underlyingthe Project Ledger.
» It stores Hours and Cost data by Labor Category [GLC, PLC], Employee/Vendor, Project, Account, and Organization for Fiscal Year, Period, and Sub-Period.
» It is the repository of all Hours based information regardless of the Journal Type. [AJE, LD, APV]
» It is the basis for “Loaded Labor” [T&M] revenue computations.
» It ties back to the detailed transactions in the General Ledger.
LAB_HS
Revenue Computations
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 8
» For most Revenue Formulas, the
calculation originates in
PROJ_SUM.
» Revenue can be reviewed on the
PSR and Revenue Summary prior
to posting.
» Revenue should only be posted to
the General Ledger when its
accuracy has been validated.
PROJ_SUM
GL_POST_
SUMPost
Revenue Setup
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 9
The Revenue Formula is associated with a Project at a specific level.
Generally, this is at the same level as Billing and Funding. [Exceptions exist.]
Revenue is either posting to the Owning Org of the Project or the Performing
Orgs where the transactions occurred.
Revenue Setup
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 10
Revenue troubles can begin when:
» The Revenue Recognition formula is modified.
» The level associated with the formula is changed.
» The Owning Org of the Project is changed.
» Revenue Journal Entries are recorded.
» Revenue ceilings are established at the inappropriate levels of the Project.
» On T&M Projects, the Rate Sequence Table is omitted.
Where Do I Begin…
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 11
» Troubleshooting Revenue is a complex situation.
» Consider “where” your first “experience” should occur.
» Best to do in “Test” versus “Production”.
» Document every step; otherwise, replicating your results is unlikely.
» Tackle a “single top level Project” within confines of a “single year”.
» Capture “Before” and “After” snapshots of key Project data.
» Don’t touch the General Ledger until you’re satisfied with the results in the Project Ledger.
What’s Wrong with the Revenue…
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 12
» The calculation makes no sense. It’s illogical.
» It’s too high; it’s too low.
» It does not tie to the General Ledger.
» The system is “backing out” some or all of the revenue.
What Have I Done to Worsen the Situation…
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 13
» Modified “Revenue Info” without following proper protocols.
» Changed the level of “Revenue Info” setup.
» Recorded “Journal Entries” to “straighten” things out.
» Created “Revenue Adjustments” to compensate for system entries.
» Intervened with external scripts to fix the Project Ledger.
Part 2
» Revenue Reprocessing Roadmap
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 14
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 15
Document the
“Before” View
PSR
Revenue
Worksheet
Revenue
Summary
PROJ_SUM
Rows
Change
Revenue
Formula*
* = Must be to any formula other than “Do Not Compute/NONE”
Designate
Current Fiscal
Year
PROJ_SUM
Cleared
Reset Revenue
Formula to
Appropriate
Designate
Current Fiscal
Year
Recalculate
Revenue:
Period 1 to
Current
Regenerate
Project Reports
PSR
Revenue
Worksheet
Revenue
Summary
PROJ_SUM
Rows
Reconcile
Results
Post Revenue
in Current
Period
Validate
Setup
1 2 3 4 5 6
7
What You Need To Know…
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 16
» This approach does not utilize “Back Door” magic or scripts.
» We use standard techniques and processing to “clean and re-do”.
» All revenue fixes occur within the boundaries of a fiscal year.
» Always work through revenue in the Project Ledger first.
» Only post to the General Ledger when revenue is satisfactory.
Validation of Project Setup
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 17
Prior to redoing any revenue
computations…
Examine all elements of
Project Setup.
Exercise caution: Setup at
the inappropriate Project
level is a common error.
Validate proper usage of
“BARN” codes on ceiling
screens.
Part 3
» The Revenue Re-Do Protocol
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 18
1: Documenting “Before”…
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 19
» Before making changes to setup or processing, document existing results.
» Save PDFs of key reports: PSR, Revenue Summary, and Revenue
Worksheet.
» Export to Excel rows from the PROJ_SUM table
[Available by accessing View Project Ledger Activity].
» From the General Ledger… print out Project Ledger Detail for the Project
to be “reprocessed”.
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 20
Retain Copies of Key Project Reports…
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 21
Capture the PROJ_SUM Table Rows for a “Before & After Look”
Views of
PROJ_SUM are
best seen via
“View Project
Ledger Activity”
Cut and paste
the rows into
Excel for
analysis.
2: Change the Revenue Formula
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 22
Why am I changing the revenue formula if its correct?
» This is the most natural way of clearing the PROJ_SUM table.
» Costpoint will prompt for the Fiscal Year.
» It will clear all revenue-related columns in the PROJ_SUM,
PROJ_BURD_SUM, and LAB_HS tables.
» Failure to complete this step will cause unreliable results in the Project
Ledger.
» Provides a “fresh slate” for redoing revenue computations.
Before
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 23
PROJ_SUM
prior to
making
changes to
the revenue
formula.
After
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 24
PROJ_SUM
after making
changes to
the revenue
formula.
Key
columns are
cleared.
What else happens to the PROJ_SUM table…
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 25
» Direct expense remains untouched.
» Columns labeled “Allowable” change because the manner in which these
columns are populated vary based on the revenue formula.
» Caution! If revenue formula level was shifted downward, you will have to
temporarily reset back in order to clear “Plug Lines”.
» Use the setting of Project Level = “0” to see all rows and levels of the
Project. All LEVELS MUST BE CLEARED!
When activity in PROJ_SUM goes astray…
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 26
Level 1
has a
trapped
Revenue
plug. It
will
distort
revenue.
What is a “Revenue Plug”?
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 27
» Occur at the revenue formula level; not the transaction level.
» Naturally occurs when there is a revenue adjustment or an over total
ceiling amount.
» On non-transaction based formulas, this is typically the portion of revenue
– usually profit – that cannot be correlated with cost.
» Revenue plugs can become orphaned when revenue formulas are simply
deleted without following the protocol to clear PROJ_SUM
3: Reset Revenue to the Appropriate Formula..
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 28
» If there was nothing wrong with the original formula, reset to what it was
in order to do the recalculation.
» However, if there are “revenue plugs” above the formula level, then it will
be necessary to set the formula at the higher level temporarily, change it
to get the prompt to clear, and then delete the setup.
» Always validate that the PROJ_SUM table is completely clear before you
do the final setup using the appropriate formula at the proper level.
4: Revenue Recalculation
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 29
Load Labor Rates
[T&M Projects]
Start with
Period 1Compute Revenue
Current
Accounting
Period?
Update & Create
Project Report
Tables
No.
Repeat Cyclefor next period
Proceed to
Reconciliation
Yes.
Options & Alternatives…
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 30
Can I simply calculate revenue in the Current Accounting Period and skip
the period-by-period processing?
» Sure, most revenue formulas are year-to-date, BUT…
» The PROJ_SUM table will plug everything into one column.
» The Revenue Worksheet loses is relevance as the adjustment is
displayed as a “plug”.
» Does not provide clear picture of the calculations month-by-month.
5: Regenerate Reports
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 31
Should I regenerate reports for each Accounting Period?
» Might be more time consuming to do.
» More accurately reflect the updated Project Ledger.
» General Ledger will only tie to Project Ledger reports on a Year-To-Date
in the current Accounting Period.
6: Reconcile Revenue Results
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 32
» Do the PSR, Revenue Summary, and Revenue Worksheet all tie out to
each other?
» Do the numbers appear reasonable?
» Does the Revenue Worksheet make sense?
» Look at PROJ_SUM: Are there any “revenue plugs” at or above the
revenue formula level.
7: Post to the General Ledger
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 33
» No one wants sloppy General Ledger with multiple postings to the
Revenue Account.
» Do a “print preview” to determine whether the proposed posting will get
the ledgers in sync.
» Remember: Journal Entries should rarely occur. One exception: Revenue
Level changes. Back out the Revenue and Unbilled for the former level
ONLY!
» After posting…
Is revenue in the Project Ledger in sync with the General Ledger?
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 34
Reconciliation: YTD-Basis
All reports
tie.
What if the Ledgers still don’t tie?
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 35
» Once again, take a closer look at the PROJ_SUM table for anomalous
conditions like “revenue plugs” and revenue appearing at more than two
levels of the Project.
» In the General Ledger, validate that revenue postings are STRICTLY at
one level of the Project. Look for extraneous postings from journals that
are not marked as “SJ”.
» Go through the cycle again, and don’t panic.
In Summary
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 36
» Revenue issues can be frustrating; sometimes the results appear baffling and unexplainable.
» Refrain from making journal entries and revenue adjustments for a “quick fix”.
» Review all aspects of setup first.
» Using the protocols defined in this presentation, clear the Project Ledger and rerun the revenue computation process for each month in the fiscal year.
» Review the results and reconcile.
Questions & Answers
CONFIDENTIAL © Deltek, Inc. All Rights Reserved. 37
For further discussion or questions, schedule an appointment at”
“Meet the Experts”