COVER PS (1)

25
UP UP 2 2 3 4 5 6 7 2.8 2.3 B D E F 1 C OFFICE 106 OFFICE 107 OFFICE 108 OFFICE 109 OFFICE CORRIDOR 104 OFFICE 105 OFFICE 102 OFFICE 103 OFFICE 116 OFFICE 117 OFFICE 118 CONFERENCE 119 MEN 114 WOMEN 113 OFF. CORRIDOR 115 TELECOM 111 MECHANICAL ROOM 120 WALK IN COOLER 137 LARVAL REARING 2 135 FREEZER 130 AQ. EQUIP. RM. 155 FISH HEALTH LAB 140 AQ. EQUIP. RM. 153 QUARANTINE ROOM 152 BROODSTOCK HOLDING & CONDITIONING 1 131 AQUACULTURE EQUIPMENT 128 BROODSTOCK HOLDING & CONDITIONING 2 127 AQUACULTURE EQUIPMENT 126 ELECTRICAL 147 OFFICE 145 WOMEN 143 MEN 142 TRUCK TRANSFER 141 LOBBY 100 STAIR 156 STAFF 144 SHOP/FEED STORAGE 148 7' - 8" 11' - 6" LIVE FEED (ARTEMIA) 122 LIVE FEED (ROTIFERS) 123 HATCHERY CORRIDOR 121 5' - 6" SHOWER 149 AQUACULTURE EQUIPMENT 124 DECAPSULATION ROOM 125 7' - 10 5/8" 9' - 4 3/4" JAN 112 BROODSTOCK Q/C 133 40' - 0" 40' - 0" 38' - 8" 30' - 0" 8' - 8" 16' - 8" 76' - 8" 17' - 8" 8' - 0" 19' - 0" 4' - 3" 8' - 3 31/32" 15' - 8" 42' - 4" 6' - 3 5/8" 53' - 0" 15' - 11 1/2" 13' - 0" 10' - 4" 8' - 8" 5' - 4" 17' - 4" 104' - 7 13/16" 18' - 0" 15' - 0" 8' - 8" 7' - 5" 24' - 8" 151' - 4" STORAGE 139 JAN 138 QUARANTINE ROOM 154 TEL. 132 15' - 5" 8' - 8" 8' - 8" 10' - 0" 10' - 0 1/2" 7' - 0" 7' - 4" 24' - 8 1/2" 6' - 0" 9' - 10" 13' - 0" LARVAL REARING 1 134 FOOD PREP 129 STORAGE 150 STORAGE 151 A 25' - 4" 14' - 6" 21' - 8" 16' - 7 13/16" 14' - 0" 23' - 3 3/8" 8' - 8" 14' - 11 3/8" 38' - 4" 14' - 4" 9' - 4" 8' - 4" 8' - 4" 13' - 0" 13' - 11 1/2" 26' - 0 1/16" 11' - 0" 4' - 11" 11' - 9" 11' - 10" 11' - 11" 11' - 0" 11' - 8" 14' - 8" 9' - 8" 9' - 8" 16' - 2" MECHANICAL 157 8' - 0" COVERED WATER STORAGE 158 COVERED PRE QUARANTINE AREA 159 QAUALITY CONTROL 136 17' - 6" 11' - 0" 8' - 6" 6' - 8" 8' CHAIN LINK FENCE 6' GATE 25' - 2" 11' - 0" 13' - 4 3/16" 11' - 2" 21' - 8" 4' - 2" 22' - 0" 19' - 4" SEE S-111 FOR WALL EXTENSION 12' - 8" 11' - 4" 7' - 6" 7' - 8" 5' - 6" 6' GATE 18' - 0" 5' - 4" 18' - 8" CAST IN PLACE CONCRETE COLUMNS (SEE S-101 & S-102 FOR DIMENSIONS) 5' - 4" 8' - 0" 4' - 0" 5' - 8 3/8" 5' - 8" 39' - 2" 8' - 8" 16' - 8" 5' - 4" 3' - 9" 16' - 3 3/8" 13' - 8" 14' - 8" 14' - 4" METAL BUILDING STRUCTURE SEE S-112 FOR DIEMSNIONS Z:\Projects\A-H|BDI-Fish Hatchery|Drawings|ansi-D-New Logo.dwg Jul 01, 2016 1 2 3 4 5 C B A C B A D D PROJECT NO: DESIGNED BY: DRAWN BY: CHEK'D BY: PROJ. MGR: DKH PROJECT NO: FDEP GULF STATES MARINE FISHERIES HATCHERY NO. DATE APPR. REVISION/ACTION TAKEN 37701.01 1 3 4 5 2 1 10, 24, 2017 MM BID DOCUMENTS RELEASED FOR CONSTRUCTION MJM JJZ A101 FIRST FLOOR DIMENSIONED PLAN N 3/32" = 1'-0" 1 FIRST FLOOR DIMENSIONED PLAN NOTE: SEE STRUCTURAL FOR OPENING AND OTHER DIMENSIONS

Transcript of COVER PS (1)

Page 1: COVER PS (1)

UP

UP

22

3

4

5

6

7

2.8

2.3

B D E F

1

C

OFFICE106

OFFICE107 OFFICE

108

OFFICE109

OFFICECORRIDOR

104OFFICE105

OFFICE102

OFFICE103

OFFICE116

OFFICE117

OFFICE118

CONFERENCE119

MEN114

WOMEN113

OFF.CORRIDOR

115

TELECOM111

MECHANICALROOM

120

WALK INCOOLER

137

LARVALREARING 2

135

FREEZER130

AQ. EQUIP.RM.155

FISH HEALTHLAB140

AQ. EQUIP.RM.153

QUARANTINEROOM

152

BROODSTOCKHOLDING &

CONDITIONING1

131

AQUACULTUREEQUIPMENT

128

BROODSTOCKHOLDING &

CONDITIONING2

127

AQUACULTUREEQUIPMENT

126

ELECTRICAL147

OFFICE145

WOMEN143

MEN142

TRUCKTRANSFER

141 LOBBY100

STAIR156

STAFF144

SHOP/FEEDSTORAGE

148

7' -

8"11

' - 6

"

LIVE FEED(ARTEMIA)

122

LIVE FEED(ROTIFERS)

123

HATCHERYCORRIDOR

121

5' - 6"

SHOWER149

AQUACULTUREEQUIPMENT

124DECAPSULATION

ROOM125

7' - 10 5/8"

9' -

4 3/

4"

JAN112

BROODSTOCKQ/C133

40' - 0" 40' - 0"38

' - 8

"30

' - 0

"8'

- 8"

16' -

8"

76' -

8"

17' -

8"

8' -

0"

19' -

0"

4' -

3"

8' -

3 31

/32"

15' -

8"

42' - 4"

6' - 3 5/8" 53' - 0" 15' - 11 1/2"

13' -

0"

10' - 4" 8' - 8" 5' - 4"

17' -

4"

104' - 7 13/16"

18' - 0" 15' - 0"

8' -

8"

7' - 5"

24' - 8" 151' - 4"

STORAGE139

JAN138

QUARANTINEROOM

154

TEL.132

15' - 5"

8' -

8"8'

- 8"

10' - 0" 10' - 0 1/2"

7' - 0" 7' - 4" 24' - 8 1/2"

6' -

0"

9' - 10"

13' - 0"

LARVALREARING 1

134

FOOD PREP129

STORAGE150

STORAGE151

A25' - 4"

14' - 6"

21' -

8"

16' -

7 1

3/16

"

14' -

0"

23' -

3 3

/8"

8' -

8"14

' - 1

1 3/

8"38

' - 4

"14

' - 4

"

9' -

4"8'

- 4"

8' -

4" 13' -

0"

13' - 11 1/2"

26' - 0 1/16"

11' -

0"

4' -

11"

11' -

9"

11' -

10"

11' -

11"

11' -

0"

11' - 8" 14' - 8"

9' -

8"9'

- 8"

16' - 2"

MECHANICAL157

8' - 0"

COVEREDWATER

STORAGE158

COVERED PREQUARANTINE

AREA159

QAUALITYCONTROL

136

17' - 6"

11' -

0"

8' - 6"

6' -

8"

8' CHAIN LINK FENCE 6' GATE

25' - 2"

11' -

0"

13' - 4 3/16"

11' -

2"

21' -

8"

4' -

2"22' - 0"

19' -

4"

SEE S-111 FOR WALL EXTENSION 12' - 8"

11' - 4"

7' -

6"7'

- 8"

5' -

6"

6' GATE

18' -

0"

5' - 4"

18' -

8"

CAST IN PLACE CONCRETE COLUMNS(SEE S-101 & S-102 FOR DIMENSIONS)

5' -

4"

8' -

0"4'

- 0"

5' -

8 3/

8" 5' -

8"

39' - 2"

8' - 8"

16' - 8"

5' -

4"3'

- 9"

16' -

3 3

/8"

13' - 8"14' -

8"

14' - 4"

METAL BUILDING STRUCTURESEE S-112 FOR DIEMSNIONS

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MJM

JJZ

A101

FIR

ST F

LOO

RD

IMEN

SIO

NED

PLA

N

N

3/32" = 1'-0"1 FIRST FLOOR DIMENSIONED PLAN

NOTE: SEE STRUCTURAL FOR OPENING AND OTHER DIMENSIONS

Page 2: COVER PS (1)

UP

UP

2A201

3A201

22

3

4

5

6

7

2.8

2.3

B D E F

1

C

2A202

4A202

1A202

2A203

3A202

4A203

5A203

122 SF

OFFICE106

114 SF

OFFICE107

174 SF

OFFICE108

111 SF

OFFICE109

OFFICECORRIDOR

104127 SF

OFFICE105

128 SF

OFFICE102

128 SF

OFFICE103

118 SF

OFFICE116

117 SF

OFFICE117 121 SF

OFFICE118 188 SF

CONFERENCE119

196 SF

MEN114

196 SF

WOMEN113

OFF.CORRIDOR

115

60 SF

TELECOM111

176 SF

MECHANICALROOM

120

193 SF

WALK INCOOLER

137

1245 SF

LARVALREARING 2

135

60 SF

FREEZER130

183 SF

AQ. EQUIP.RM.155

297 SF

FISH HEALTHLAB140

178 SF

AQ. EQUIP.RM.153

1044 SF

QUARANTINEROOM

152

1562 SF

BROODSTOCKHOLDING &

CONDITIONING1

131573 SF

AQUACULTUREEQUIPMENT

128

1434 SF

BROODSTOCKHOLDING &

CONDITIONING2

127

504 SF

AQUACULTUREEQUIPMENT

126

89 SF

ELECTRICAL147

155 SF

OFFICE145

62 SF

WOMEN143

62 SF

MEN142

454 SF

TRUCKTRANSFER

141

2760 SF

LOBBY100

194 SF

STAIR156

198 SF

STAFF144

265 SF

SHOP/FEEDSTORAGE

148

326 SF

LIVE FEED(ARTEMIA)

122314 SF

LIVE FEED(ROTIFERS)

123

1983 SF

HATCHERYCORRIDOR

121

73 SF

SHOWER149

177 SF

AQUACULTUREEQUIPMENT

124187 SF

DECAPSULATIONROOM

125

59 SF

JAN112

107 SF

BROODSTOCKQ/C133

102

103 112

105

106 107

108

109

120

113

104

114

115

116

117

118

119

121

122126

128

127A131A

133138

140

124

147

145

143

142

144

141A

157

149

153

156

127

127B131B

50 SF

STORAGE139

50 SF

JAN138

610 SF

QUARANTINEROOM

154

51 SF

TEL.132

1578 SF

LARVALREARING 1

134

116 SF

FOOD PREP129

66 SF

STORAGE150

64 SF

STORAGE151

2

2

1

1 1

2

1

1

1 1

1

8

1

1

1

1

1

5

6

7

10

11 10

10

11

11

11

11

15

11

9

9

12 12

9

12

910

11 11

10

11

15

128

12

13

12

14

3

99

11

11

112 SF

QAUALITYCONTROL

136

1

2

10

7

7

9

9

6

7

11

A

10

150

151

134

136

126A

125

128A

268 SF

STAIR101

5

5

48 SF

ELECTRICAL104A

104A

132

135

139

11

MW1

MW2

MW3

MW4

MW5

MW 6

MW 7

MW8

MW9

MW10111

102A

155

146

G

E

F

H

G

E

F

H

D

HA A A

A

C

C

A

A

AAA

B B3BB3

A1

A

L

P

TTA

T

N N N N N N N N

FECFECFECFEC

FEC FEC FEC

FEC

FEC

FE

148

101

156 SF

MECHANICAL157

A3002

A3009

A1022

A1024

A1027

15

12

12

COVEREDWATER

STORAGE158

COVERED PREQUARANTINE

AREA159

B2B2 R

P

P

VABOVE

MCJ MCJ MCJ

MCJ MCJ MEJ

MEJ

MCJ

MCJ

MCJ

BEJ

BEJ

BEJ

BEJ BEJ BEJ

BEJ BEJ

BEJ

BEJ

BEJ

BEJ

BEJ

1A201

----4

A101A

----

A101A5

158

A102A4

6A203

REF

7A202

A1

ICE MAKER

GENERATOR

HVAC UNITS.

7

A102A

SEATING WALLSEE DETAIL ON L-103

T

T

Q

10

9

1010

CONDENSERS

NS

U

SEE S-111 FOR WALL EXTENSION

QABOVE

100101A

100A

DOOR OPERATORCONTROLSREF

REFMWV

FRZ

REF

12

131

REF2

15A204

152154

MCJ MCJ MCJ

MCJMCJ

MCJ

MCJ

MCJ

EJ

EJ

----5

A102A

BACKER ROD & SEALANTOFFSET E.J. BY ONE BRICK

INSULATION BOARD

SPRAY APPLIEDAIR BARRIER

NEOPRENE EXPANSION MATERIAL

1' - 7 5/8"1' - 8"

1' - 7 5/8"

1' -

7 5/

8"2'

- 8"

1' -

4"

5' -

7 5/

8"

8" 16 GA STUDS

1 /2" CDX PLYWOOD

SPRAY APPLIEDMOISTURE BARRIER

BRICK TIES

3' -

3 5/

8"

1' -

7 5/

8"1'

- 8"

1' - 4 7/8"

2' - 8 13/16"

8" 16 GA STUDS

1 /2" CDX PLYWOOD

SPRAY APPLIEDMOISTURE BARRIERBRICK TIES BED INMOISTURE BARRIER

METAL WALLPANELS TYPE 2BACKER ROD & SEALANT

INSULATION BOARD

SPRAY APPLIEDAIR BARRIER

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

MM

A101A

FIR

ST F

LOO

RR

EFER

ENC

ED P

LAN

N

3/32" = 1'-0"1 FIRST FLOOR REFERENCE PLAN 1 1/2" = 1'-0"2 MASONRY CONTROL JOINT (MCJ)

3/4" = 1'-0"5 SOUTH SIDE COLUMN PLAN 3/4" = 1'-0"4 NORTHSIDE COLUMN PLAN

1 1/2" = 1'-0"3 BRICK EXPANSION JOINT (BEJ)

Page 3: COVER PS (1)

DN

DN 8' -

8"

275 SF

STAIR101

566 SF

BALCONY200

OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOW OPEN TO BELOW

OPEN TO BELOW

1173 SF

CLASSROOM201

22

3

4

5

6

7

2.8

2.3

B D E

8' -

8"30

' - 0

"

OPEN TO BELOWOPEN TO BELOW

17' -

8"

8' -

0"

16' -

8"

38' -

8"

C24' - 8" 151' - 4" 40' - 0"

212 SF

CHAIRSTORAGE

200A

342 SF

MECH.203

F

8' - 0"8' - 0"4' - 0"8' - 0"

2' - 4 5/16"8' - 0"4' - 0"8' - 0"

4' - 0"

5' - 4" 8' - 0" 4' - 8 3/16"

A

76' -

8"

25' - 4"

8' -

8"

7' - 1 3/16"

10' -

6"

7' - 10 5/8"

9' -

4 3/

4"

8' -

0"

2' - 4 3/16"

9' - 4"

22' - 1 3/16"

22' -

7 1

3/16

"

7' -

0"

28' - 3 1/2"6' - 3 13/16"

6' - 8 3/16"

29' - 0 3/16"

19' -

0"

15' - 8 19/32"

12' - 0"

SUN SHADE

SUN SHADE

VEWCORRIDOR

202

3' - 4"4' - 0"3' - 4"4' - 0"

1,574 SF

1' - 6" 3' - 6"

3' - 0" 3' - 0" 3' - 2" 7' - 2 15/32"

1' - 4" 4' - 4 1/2"

5' -

0"

WOMEN113

MEN114

9' -

1 3/

4"

21' - 5"

9' -

1 3/

4"

B

BAA

A A

CCCC

C C

D

D D

D

E E E E

F

F

G

G G

G

1' - 6"

SHOWER149

3' - 4"4' - 8"

3' -

0"1'

- 0"

5' -

0 1/

4"

JK

L, M, N

O

1' -

6" 3' -

0"3'

- 0"

2' - 0"

8' -

8"

1' -

3"

1' -

10"

3' -

0"

1' -

5"

1' -

7"

3' -

0"

2' - 0"

1' -

5" 3' -

0"

8' -

0"

3' -

0"3'

- 0"

2' - 0"

2' -

3"

8' -

0"

1' - 6"

7' - 10 1/4"

7' -

10 1

/8"

7' -

10 5

/16"

1' - 6"

A

A

D

D G

GB

C

C

B

E

WOMEN143

MEN142

ABBREVIATIONS KEY & MOUNTING HEIGHTS

ITEM MOUNTING HEIGHT

A. TOWEL DISPENSER (SURFACE MOUNT) 40" TO BOTTOMB. GRAB BARS 36" & 42" 27" TO CENTERC. TOILET PAPER DISPENSER. 6" ABOVE GRAB BARD. TILT MIRROR 36" TO BOTTOM E. NAPKIN DISPOSAL 23" TO BOTTOM F. BABY CHANGING STATION 34" TO BOTTOMG. SOAP DISPENSER 38" TO BOTTOM H. STAINLESS STEEL SHELVES 48" TO BOTTOMI. MOP & BROOM HOLDERS 72" TO BOTTOMJ. SHOWER/TUB GRAB BARS 34" TO BOTTOMK. FOLDING SHOWER SEAT 18" TO BOTTOML. SHOWER CURTAIN HOOK ON CURTAIN RODM. SHOWER CURTAIN 7' TO BOTTOMN. SHOWER ROD 7' TO BOTTOMO. BENCH FLOOR MOUNT

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

MM

A102

SEC

ON

D F

LOO

RD

IMEN

SIO

NED

PLA

N

3/32" = 1'-0"1 SECOND FLOOR DIMENSIONED PLANN

1/4" = 1'-0"2 RESTROOMS 113 & 114 3/16" = 1'-0"4 SHOWER 149

1/4" = 1'-0"5 WOMENS ROOM 113 ELEVATION

1/4" = 1'-0"6 MENS RESTROOM 113 ELEVATION 1/4" = 1'-0"8 SHOWER 149 ELEVATION

1/4" = 1'-0"3 RESTROOMS 142 & 143 ELEVATIONS1 1/4" = 1'-0"7 RESTROOMS 142 & 143

NOTE: TILE TO CEILING ON PLUMBING WALLS ONLY.OTHER WALLS ARE TO RECEIVE TILE BASE.(SEE I102 FOR TILE PATTERN.)

NOTE: SEE STRUCTURAL FOR OPENING AND OTHER DIMENSIONS

Page 4: COVER PS (1)

DN

DN

2A201

3A201

2

3

4

5

6

B D EC

2A202

4A202

1A202

3A203

2A203

3A202

1A203

5A203

5A202

A

275 SF

STAIR101

566 SF

BALCONY200

OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOW OPEN TO BELOW

OPEN TO BELOW

1173 SF

CLASSROOM201

OPEN TO BELOWOPEN TO BELOW

201

202

202A

203212 SF

CHAIRSTORAGE

200A

342 SF

MECH.203

200A

201A

G

ABOVE

K

ABOVE

M

J J

J J

J

D

E

F

H

LOUVER ABOVE

D1

KW

MW 11

MW 12

101B

FEC

FEC

FEC

FE

A3001

A3004

A30010

OPEN TO BELOW

15

4

10

1010

10

10

10

10

12 12

4

3

12

12

12

12

12

1A201

SUN SHADE

SUN SHADE

VEWCORRIDOR

202

M M

6A203

FLOOR E.J.(SEE 6/A102A)

WALL EXPANSION JOINT(SEE 5/A102A)

1,572 SF

13

S

L

15A204

8"

3A102A

46' - 8"

20' -

1 1

/8"

WALL EXPANSION JOINT COVER

COMPRESSIBLE FIRE BARRIER

CMU WALL6 1/4"

EXPANSION JOINT SEE STRUCTURAL

1"

7"

EXPANSION JOINT COVERPIN TO SLAB

COMPRESSIBLE FIRE BARRIER

EXPANSION JOINTSEE STRUCTURAL

VAR

IES

SEE

STR

UC

TUR

ALVA

RIE

S SE

E ST

RU

TUR

AL

PREFINISHED ALUM.CAP FLASHING. CAULK SEAMS

CONT. CLEAT

P.T 3/4" PLYWOOD

P.T. 2X BLOCKING1/2" A.B. @ 32" O.C.

PAINTED CMU WALL

SPRAY APPLIEDMOISTURE BARRIER

FINISHED FLOOR ELEV.GROUT SOLID BELOW GRADE

CONT. FLEXIBLE FLASHINGWEEPS @ 32" O.C.

PEEL & STICK MEMBRANE

WALL TIES

7' -

4"1'

- 3

21/3

2"

6C A

CC

ENT

BRIC

K2C

AC

ENT

BRIC

K

PRE-FINISHED ALUM. CAPCAULK SEAMS

P.T. 2X BLOCKING

SURFACE APPLIED SIGN

CONC. FOORTINGSEE STRUCTURAL

WEEPS # 32" O.C.

FLEXIBLE FLASHING

GROUT SOLID BELOW GRADE

1' - 7"

3/4" P.T. PLYWOOD

SOLID GROUTED CMU WALLSEE STRUCTURAL FOR REINFORCING

PEEL & STICK MEMBRANE

WALL TIES @ 16"O.C. EACH WAY

METAL WALL PANELS

1/2" CDX PLYWOOD

1 1/2" INSULATION BOARD

1 1/2" HAT CHANNELS @ 16"O.C. HORIZONTALLY

SPRAY APPLIED AIR BARRIER

METAL FLASHING W/ BACKERROD & SEALANT

METAL FLASHING

ALUMINUM 2x2x1/4" ANGLE

ATTACH TO WALL HERE ONLY

1 1/2" MASONRY BOARD INSULATION

SPRAY APPLIED AIR BARRIER

WALL TIES @ 16" O.C. EACH WAY

BACKER ROD & SEALANT

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

MM

A102A

SEC

ON

D F

LOO

RR

EFER

ENC

ED P

LAN

N

3/32" = 1'-0"1 SECOND FLOOR REFERNCE PLAN

1/4" = 1'-0"4 SCREEN WALL PLAN

1 1/2" = 1'-0"5 WALL EXP. JOINT DETAIL 1 1/2" = 1'-0"6 FLOOR EXP. JOINT DETAIL

3/4" = 1'-0"3 SCREEN WALL SECTION

3/4" = 1'-0"2 SIGN WALL SECTION

1 1/2" = 1'-0"7 MASONRY EXPANSION JOINT (MEJ)

SEE S-111 FOR WALL EXTENTS

BUILDING CORNER

Page 5: COVER PS (1)

DN

.

SLOP

E DO

WN

3.5/

12

SLOPE DOWN 3.5/12.

SLOPE DOWN 3.5/12.

95' - 8 21/32"

36' -

3 3

/4"

.

SLOP

E DO

WN

3.5/

12

2

3

4

5

6

7

2.8

2.3

B D E F

1

CA

SLOP

E DO

WN

3.5/

12.

29' - 4 1/2" 145' - 9 13/32"

57' -

0"

26' - 2"

DSDS

DS

DS

DS

DS

DS

DS

DS

DS

DSDS

DSDSDSDS

KICK OUT FLASHING

KICK OUT FLASHING

3A107

5A107

3A107

A1076

A1074

14A107

A1073

5A107

A1074

5A107

5A107

2"

GUTTER CAP

GUTTER

FASTEN ANGLE TOBRICK WITH LEADSHIELDS

1 1/2" X 1 1/2" X 1/8"ALUM. ANGLE

#6SS BOLT & NYLOKNUT

SEPERATE DISSIMILARMETALS

PREFINISHED .032 5" X 5"DOWNSPOUT

1/8" GUTTER SUPPORT @32" O.C.

1/8" GUTTER STRAP @32" O.C.

6"

3"

PREFINISHED ALUM. FLASHINGINSTALL TAPE MASTIC BETWEENFLASHING AND GUTTER

P.T. BLOCKING

SEALANT AT UNDER ZEEPEEL AND STICK MEMBRANEOVER 1/2" DENS DECK

ZEE CLOSURES

TURN UP ENDS

ROOF INSULATION

PVC ROOF BOOT

ALUM. CRICKET FLASHING

ROOF VENT (SEE PLUMBING)

41/2" POLYISO INSULATION

1 3/4"

9"

3"

1/2"

RIDGE CAP

1/2" PLYWOOD

T&G WOOD DECK

8"

PREFINISHED .040 ALUM. GUTTERPREFINISHED .032 ALUMFLASHING

5"

5"

1 1/2"

1 1/2"

PRE-FINSIHED STANDING SEAM METAL ROOF

PEEL & STICK MEMBRANEROOF SHEATHING

4 1/2" POLYISO ROOF INSULATION

PLYWOOD DECKING

T&G ROOF DECKING

METAL SOFFIT PANELS

P.T. 2X BLOCKING

KERFED P.T. 2X10

2X BLOCKING

PRE- FINISHED ALUM. GUTTER

GLUE LAM BEAM COVERSEE DETAIL THIS SHEET

SEALANTPRE-FINISHED ALUM. EAVE FLASHING SEE DTL. 18

EAVE FLASHINGSEE DTL. 18

METAL SOFFIT PANEL

2X BLOCKING

ZEE FLASHING

DRIP FLASHING

KERFED 2X10

GLUE LAM BEAMCOVER SEE DETAILTHIS SHEET

T&G DECKING

PEEL & STICK MEMBRANE

SEALANT

SEALANT

RAKE EDGE FLASHING

STANDING SEAM ROOF OVERPEEL & STICK MEMBRANETURN UP PANEL END

P.T. 2X BLOCKING

ZEE FLASHING SET IN MASTIC

3' - 0"

1' -

0"

2' -

0"

2"

FASTEN END CAP TO SIDES OF COVERAPPLY SELANT TO JOINTS

DRIP EDGE

FASTENING FIN

SOLID SIDES AND BOTTOM

3.512

BACKER ROD & SEALANT

GLUE LAMINATED BEAM

INTERIOR FINISH 2X8INSULATION

BACKER ROD & SEALANT

PLYWOOD SHEAHTING (3/8" GAP AT GLULAM PENETRATIONS)

SPRAY APPLIED MOISTURE BARRIER(LAP OVER BEAM COVER TAB)

INSULATION BOARDMETAL WALL PANELS

BEAM COVER, SEE DRAWING THIS SHEET

1' -

4"

2' -

1"

3' - 0"

1 1/2"

3.512

FLUID APPLIED AIR BARRIER PEEL & STICK MEMBRANE

PEEL & STICK MEMBRANE

TURN UP PANEL ENDRAKE WALL FLASHING

ZEE CLOSURE SET IN MATIC

1/2" CDX PLYWOOD1 1/2" INSULATIONCMU WALL

METAL WALL PANELS

STANDING SEAM METAL ROOF

P.T. 2X BLOCKING

T&G WOOD DECK

INSULATION

NEOPRENE CLOSURE

HEMMED BASE FLASHING

FASTENER AND SEALANTCONT. CLEAT

SPRAY APPLIED AIR BARRIER

PRE-FINISHED ALUMINUM WALL PANELS

HEM EDGE

1/2" CDX PLYWOOD

BASE FLASHING

SPRAY APPLIED AIR BARRIER

METAL WALL PANELS

ZEE FLASHING SET IN MATICCAULK VERTICAL JOINT

TURN UP END OF ROOF PANEL

1/2" PLYWOOD SHEATHING

NEOPRENE CLOSURE

BASE FLASHING

NEOPRENE CLOSURE SPRAY APPLIED MOISTURE BAARRIER

PRE-FINISHED WALL PANEL

PLYWOOD SHEATHING

NEOPRENE CLOSURE

SPRAY APPLIED MOISTURE BAARRIER

PRE-FINISHED WALL PANEL

PLYWOOD SHEATHING

CAP FLASHING

FASTENER AND SEALANT

SPRAY APPLIED AIR BARRIER

PRE-FINISHED ALUMINUM WALLPANELS #2

CORNER TRIM

1/2" CDX PLYWOOD

3"

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

MM

A107

RO

OF

PLAN

& R

OO

F D

ETAI

LS

1/16" = 1'-0"1 ROOF PLANN

1 1/2" = 1'-0"3 TYPICAL LOWER ROOF EDGE DETAIL 1 1/2" = 1'-0"4 TYPICAL UPPER ROOF EDGE DETAIL

1 1/2" = 1'-0"5 ROOF RAKE DETAIL

1" = 1'-0"7

UPPER GLULAM BEAM RAFTER ENDCOVER

1" = 1'-0"9

TYP. GLU-LAM BEAM WALLPENETRATION PLAN DTL.

1" = 1'-0"8

LOWER GLULAM BEAM RAFTER ENDCOVER

1 1/2" = 1'-0"6 ROOF EXPANSION JOINT DETAIL

3" = 1'-0"10 WALL PANEL CORNER DETAIL

3" = 1'-0"11 BASE FLASHING

RIDGE DETAIL14 1 1/2" = 1'-0"

3" = 1'-0"12 WALL PANEL FLASHING DETAILS

(SPEC SECTION 076200)

NOTE: SEE SPEC SECTION 074113 FOR ROOF PANELS,076200 FOR FLASHING AND SHEET METAL AND 074213FOR METAL WALL PANELS AND SOFFITS.

(SPEC SECTION 076200)

3" = 1'-0"13 WALL PANEL 2 CORNER DETAILPLUMBING VENT DETAIL

151 1/2" = 1'-0"

EAVE FLASHING16

1 1/2" = 1'-0"

GUTTER17

1 1/2" = 1'-0"

DOWNSPOUT18

1 1/2" = 1'-0"

GUTTER CAP19

1 1/2" = 1'-0"

Page 6: COVER PS (1)

3A201

1A202

FISH SCALE WALL PANELS #2STANDING SEAM METAL ROOF

BRICK

BRICK SCREEN WALL

ALUMINUM LOUVERSEE MECHANICAL DRAWINGS

METAL WALL PANELS #1

METAL WALL PANELS #1

A A AF D

B3 B B2 B B2 B3 A1 A1

K KBUILDING SIGN (SEE 5/A200)

3.512

GLUE LAMINATED BEAMS

ALUMINUM OLOUVERSEE MECHANICAL DRAWINGS

QTR T T S

P

W

10A107

13A107

15A204

10A107

2A201

STANDING SEAM METAL ROOF

DOWNSPOUT

METAL WALL PANELS #1

DOWNSPOUT

BRICK

HH

A A A

C C

CURTAIN WALL

SUN SHADE

BRICK COLUMN

SUN SHADE

SPANDREL GLASS

S

2A201

4A202

123.5

1A203

METAL WALL PANELS

BRICK

GLUE LAMINATED BEAMS

STANDING SEAM METAL ROOF

FIBERGLASS DOORS& FRAMES

METAL BUILDING FRAMESEE S-308 FOR DETAILS

123.5

WATER STORAGE TANKSSEE AQ PLANS

ALUMINUM LOUVERS

SCREEN WALL

A

CONCRETE COLUMM

P

U

P

8 FT. CHAIN LINK FENCE

METAL WALL PANELS TYPE 2

3A201

1A202

A A AG

GLUE LAMINATED BEAM

METAL WALL PANELS #1

SUN SHADESSPANDREL GLASS

ALUMINUM LOUVERSEE STRUCTURAL

STANDING SEAM METAL ROOF

DOWNSPOUTS

FIBERGLASS DOORS & FRAMES

ALUMINUM STOREFRONTWINDOWS

ALUMINUM CURTAIN WALL

3.512

SPANDREL GLASS

N

V

N N N N N N N

3.512

GLUE LAMINATED BEAM

CONCRETE COLUMNSALUMINUM LOUVERS10

A107

15A204

FLORIDA GULF COASTMARINE FISHERIES HATCHERYENHANCEMENT CENTERFunding for this project was provided through the NaturalResources Damage Assesment Early Restoration Programfrom the Deepwater Horizon Oil Spill

4' -

0"

12' - 6"

FLORIDA GULF COASTMARINE FISHERIES HATCHERY

ENHANCEMENT CENTER451 MAIN ST.

3' -

4"3'

- 4"

8"

10' - 0"

7' -

4"

9' - 0"

2A102A

SEE C-100 FOR LOCATION

APPLIED SIGN (2 EACH) (SEE ALLOWANCES)

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

MM

A200

BUIL

DIN

G E

LEVA

TIO

NS

3/32" = 1'-0"1 NORTH ELEVATION

3/32" = 1'-0"2 EAST ELEVATION 3/32" = 1'-0"3 WEST ELEVATION

3/32" = 1'-0"4 SOUTH ELEVATION

3/16" = 1'-0"5 BUILDING SIGN

3/16" = 1'-0"6 SITE SIGN

APPLIED SIGN (SEE ALLOWANCES)

METAL WALL PANELS #1

BRICK

Page 7: COVER PS (1)

12

3.5

GUTTER

STANDING SEAM METAL ROOF

ROOF INSULATION

T&G WOOD ROOF DECK

ACOUSTICAL CEILING

METAL WALL PANELS TYPE2ON CMU WALL

GYP. BOARD CEILING

MAT FOOTING

ALUMINUM CURTAIN WALL

BRICK ON CMU WALL

GYP. BD. FURR DOWN

LOBBY100WOMEN

113

OFFICE103

LIVE FEED(ROTIFERS)

123

GLUE LAMINATED BEAM

CERAMIC TILE

DE

F

8' -

0"

CEILING FURR DOWN

ALUMINUM RAILINGSEE 10/A301

19' -

5 1

5/32

"

ELEVATOR SHAFT

SEE STRUCTURAL FOR BEARING HEIGHT

SEE STRUCTURAL FOR BEARING HEIGHT

SEE STRUCTURAL FOR BEARING HEIGHT

SUSPENDED ACOSSTICAL CEILING FISH SCALE WALLPANELS #2

ACOUSTICAL CEILING

ACOUSTICALCEILING

----4

A203

----1

A203

----3

A203

G

G

2A201

STANDING SEAM METAL ROOF

ROOF INSULATION

T&G WOOD DECK

ACOUSTICAL CEILING

FLOOR SLAB

ACOUSTICAL CEILING

ALUMINUM RAILINGSEE 9/A301

PENDANT LIGHTS(SEE ELECTRICAL)

SUN SHADES

METAL PANELS OVER STUD WALL

ALUMINUM CURTAINWALL

ALUMINUM CURTAIN WALL

ELEVATOR PIT BEYONDCOCNRETE SLAB

EXPOSED CEILING

LOBBY100

1173 SF

CLASSROOM201566 SF

BALCONY200

267

2.8 2.3

A2032

1A203

METAL PANEL SOFFIT

A2017

CEILING FURR DOWN

CEILING FURR DOWNSEE DETAIL 2/A400

8A301

8" HIGH CAST IN PLACE CURB

E

RECEPTION DESK(MW-2)

H

6" STUD WALL

ACOUSTICALCEILING

ACOUSTICALCEILING

METAL SOFFIT PANELS

SUN SHADES

N

PAINTED CMU WALL

----5

A107

13

A107

----5

A107

.032 STANDINGSEAM ROOF

P.T. 2X BLOCKING

.040 ALUM GUTTER

ALUM. SOFFITPANELS

3.5

12

3' - 0"

2' -

0"1'

- 4"

1' -

4"5'

- 4"

8"

6 C.

ACC

ENT

BRIC

K3

C. A

CCEN

T BR

ICK

FLEXIBLE FLASHING

WEEPS @ 32" O.C. MORTAR NET

FF

GROUT SOLID BELOW GRADECONCRETE BRICK

1-1/2" RIGID INSULATION

SPRAY APPLIEDAIR BARRIER

PEEL & STICK MEMBRANE

CONCRETE BOND BEAM

WR GYP. BOARD

THERMAL CAVITY INSULATION

P.T. 2X8 STUD WALL

T&G WOOD DECKPLYWOOD SHEATING

4 1/2" ROOF INSULATION

1/2" CDX PLYWOOD

BRICK TIES @ 16" O.C. EACH WAY

BEAM END COVERSEE 8/A107

VAPOR BARRIERTURN UP BEHIND EXPANSION BOARD

SEE STRUCTURAL FOR BEARING HT.

T&G WOODDECK2XBLOCKINGPRE-FINISHED ALUM.SOFFIT.032 PRE-FINISHED ALUM.COVERGLUE LAMINATED BEAM

5 1/2"

2' -

0 1/

2"

WEEPS @ 32" O.C.

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

JJZ

A201

BUIL

DIN

G S

ECTI

ON

S&

WAL

L SE

CTI

ON

3/16" = 1'-0"2 LOBBY SECTION 2

3/16" = 1'-0"3 LOBBY SECTION

3/4" = 1'-0"1 TYPICAL EXTERIOR WALL SECTION

1 1/2" = 1'-0"7

TYPICAL EXTERIOR GLUE LAM BEAMDETAIL

ALUMINUMLOUVER

Page 8: COVER PS (1)

2

56

2.8 2.3

1

3.512

3.512

QUARANTINEROOM

152TRUCK

TRANSFER141

MEN142

WOMEN143

STAFF144

COVEREDWATER

STORAGE158

SHOP/FEEDSTORAGE

148A

HAND WASH SHINK

10

A107

----A2

S-308

CHAIN LINK FENCE

WR GP. BOARD WITH J TRIM

2X8 STUDS @ 16" O.C.

1/2" CDX PLYWOOD

CMU CROSSOVER

4X6 GALV. ANGLE

FLEXIBLE FLASHING

WEEPS @ DOOR CORNERS

FIBERGLASS DOOR & FRAME

1 1/2" MASONRY BOARD INSULATION

ALUMINUM SILL SET IN MASTIC

GLUE LAMINATED BEAM

ROOF SHEATHINGROOF INSULATION

T&G DECKING

1/2" PLYWOOD

SPRAY APPLIED AIR BARRIER

SPRAY APPLIED AIR BARRIER

MAT FOUNDATION

TURN DOWN SLAB EDGE

SLOPE PAVING UP TO DOOR OPENING

GLUE LAMINATED BEAM

METAL SOFFIT PANEL

THERMAL WALL CAVITY INSULATION

----

----

DA500

FA500

WALL TIES @ 16" O.C. EACH WAY

SEE STRUCTURAL FOR BEARING HEIGHT

VAPOR BARRIER

PAINTED 1X TRIM

3.5

12

2' - 6"

11' -

0"

DOOR SEAL

RECESS SLAB AT DOOR OPENINGSLOPE TO DRAIN

TURN DOWN SLAB EDGE

GLAV. STEEL CHANNEL JAMB

SPRAY APPLIED AIR BARRIER

T&G ROOF DECK

PLYWOOD SHEATHING

ROOF INSULATION

ROOF DECK

PEEL & STICK MEMBRANE

ALUMINUM STANDING SEAM ROOF

ALUMINUM SOFFIT

BRICK

GALV. ANGLE

FLEXIBLE FLASHING

WEEPS @ 32" O.C.

DOOR TRACK

CAST IN PLACE CONCRETE WALL RAKE

WR GYP. BOARD WITH J TRIM

A1075

MAT FOUNDATION

CONCRETE CROSSOVER SEE STRUCTURAL

WALL TIES @ 16" O.C.EACH WAY

VAPOR BARRIER

4' - 0"

10 3/4"

8"

GROUT SOLID BELOW SLAB

1" RIGID INSUALTION

SPRAY APPLIED AIR BARRIER

BASE FLASHING (TYPICAL FORHORIZONTAL METAL PANEL ANDBRICK INTERSECTION)

1 1/2" RIGID INSULATION

1 1/2" HAT CHANNELS @ 16" O.C.

1/2" CDX PLYWOOD

SPRAY APPLIED AIR BARRIER

ALUMINUM WALL PANELS

ROWLOCK SILL

2X8 FRAMING @ 16" O.C.

WR GYP. BOARD WITH J TRIM

THERMAL WALL CAVITY INSULATION

3.5

12

MAT FOUNDATION

FLEXIBLE FLASHING, WEEPS @ 32" o.c.

PRE-FINISHED ALUM. SOFFIT T&G DECKING

SEE STRUCTURAL FOR BEARIING HEIGHT

WR GYP. BOARD WITH J TRIM

2X8 STUDS @ 16" O.C.

THERMAL CAVITY WALL INSULATION

CMU CROSSOVER

4X6 GALV. ANGLE

FLEXIBLE FLASHING

WEEPS @ WINDOW CORNERS

ALUMINUM STOREFRONT WINDOW

MARBLE SILLAND SKIRT

ALUMINUM SILL FLASHING

1 1/2" MASONRY BOARD INSULATION

FLEXIBLE FLASHING

GROUT FILL SOLID BELOW GRADE

1 1/2" MASONRY BOARD INSULATION

GLUE LAMINATED BEAM

EAVE FLASHING

.032 STANDINGSEAM ROOF

PEEL & STICKMEMBRANE

ROOF SHEATHINGROOF INSULATION

1/2" PLYWOOD

SPRAY APPLIED AIR BARRIER

AIR & MOISTURE BARRIER

BRICK

.040 ALUM GUTTER

ALUM. SOFFITPANELS

8' -

0"

MAT FOUNDATION

CONCRETE SLAB

3.512

2' -

8"

1' - 1 1/4"

3' - 0"

A1073

FLEXIBLE FLASHING, WEEPS @32" O.C.

----

----

EA502

GA502

WALL TIES # 16" O.C. EACH WAY

SEE STRUCTURAL FOR BEARING HEIGHTPAINTED 1X TRIM

BEAM END COVERSEE 8/A107

VAPOR BARRIER TURNUP BEHIND EXPANSION BOARD

GLUE LAMINATED BEAM(NO BEAM COVER)

ROOF SHEATHING

ROOF INSULATION

T&G DECKING

1/2" PLYWOOD

PREFINISHED ALUMINUM SOFFFIT

PEEL & STICK MEMBRANE

STANDING SEAMALUMINUM ROOF

GLUE LAMINATED BEAM

SLOPE TOP OF CONCRETE COLUMN

CAST IN PACE CONCRETE COLUMNSEE STRUCTURAL

CONCRETE PAVINGSEE CIVIL

3' - 0"

P.T. 2X10 KERFEDPREFINISHED ALUM. FLASHING

PREFINISHED ALUM. GUTTER

RUBBED CONCRETE FINISH

ELASTOMERIC PAINT

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

JJZ

A202

BUIL

DIN

G S

ECTI

ON

& W

ALL

SEC

TIO

NS

3/16" = 1'-0"1 HATCHERY SECTION

3/4" = 1'-0"5 WALL SECTION 4 3/4" = 1'-0"4 WALL SECTION 3

3/4" = 1'-0"3 WALL SECTION 2

3/4" = 1'-0"2 WALL SECTION 1

R-VALUES:BRICK WALLS - 11.3METAL PANEL WALLS - 10.3ROOF - 27.5

BEAM END COVERSEE 8/A108

VAPOR BARRIER TURN UPBEHIND EXPANSION BAORD

5A202

SUSPENDED ACOUSTICAL CEILINGGYP. BOARD CEILING

OPEN TO BEYOND .

12A107

3A107

Page 9: COVER PS (1)

4' -

0"

SLOPE EXTERIOR SLAB UP AT DOOR

ALUMINUM SUN SHADE

SPANDREL GLASS PANEL

ATTACH CURTAIN WALL TO SLAB EDGESEE STRUCTURAL

ALUMINUM WALL PANELS

1/2" CDX PLYWOOD

10" 16 GA. METAL STUDS @ 16" O.C.

7 13/16" CURTAIN WALL

ALUMINUM SUN SHADE

ACOUSTICAL CEILING

THERMAL CAVITY WALL INSULATION

ALUMINUM WALL PANELS

SPRAY APPLIED AIR BARRIER

ALUMINUM SOFFIT PANELS

ALUMINUM SILL SET IN MASTICPRE-STRIPE BEFORE INSTALLING SILL

ALUMINUM STOREFRONT DOOR

TURN DOWN SLAB EDGE

SEE STRUCTURE FOR STEEL BAR JOIST FLOOR FRAMING

MAT FOUNDATION

3' - 0"

BASE FLASHING

RETURN GYP. BOARD TO WINDOWJ TRIM AT WINDOW

----A

A502

----C

A500

P.T. 2X8

SEE STRUCTURAL FOR WALL FRAMING

VAPOR BARRIER

GLUE LAMINATED BEAM

METAL WALL PANELS TYPE 2

1/2" CDX PLYWOOD

1 1/2" INSULATION BOARD

1 1/2" HAT CHANNELS @ 16"O.C. HORIZONTALLY

SPRAY APPLIED AIR BARRIER

EXPANSION JOINT BASE FLASHING

1/2"CDX PLYWOOD

THERMAL CAVITY WALL INSULATION

GYP. BOARD WITH J TRIM

3' - 0"

METAL SOFFIT

A1074

A1076

2X8 FRAMING @ 16" O.C.

SEE STRUCTURAL FOR BEARING HEIGHT

BEAM END COVER SEE 7/A107

12

3.5

MARBLE SILL & SKIRT

ALUMINUM SILL

FLEXIBLE FLASHING, DAM ENDSWEEPS @ CORNERS OF WINDOWSBRICKINSULATION BOARD

SPRAY APPLIED AIR BARRIER

CONT. FLEXIBLE FLASHINGWEEPS @ 32" O.C.

GALV. ANGLESEE STRUCTURAL

FLEXIBLE FLASHING, DAM ENDSWEEPS @ CORNERS OF WINDOWS

GYP. BOARD OVER 1 1/2" FURRINGCHANNELS @ 16" O.C.

CONC. SLABSEE STRUCTURAL

1 1/2" T&G WOOD DECK

RUBBER BASE

PEEL & STICKMEMBRANE

2' -

8"5'

- 4"

3' - 0"

STANDING SEAM METAL ROOF

STEEL BAR JOIST SEE STRUCTURALTHERMAL CAVITY WALL INSULATION

GYP. BOARD CEILING

MAT FOUNDATION

VAPOR BARRIER TURN UP BEHINDEXPANSION BOARD

----

----

EA502

GA502

WALL TIES @ 16" O.C.

J TRIM

GYP. BOARD OVER 1 1/2" FURRINGCHANNELS @ 16" O.C.

SEE STRUCTURAL FOR BEARING HEIGHT

12

3.5

3' - 0"

4' -

0"

GYP. BOARD

2X8 FRAMING @ 16" O.C.

THERMAL WALL CAVITY INSULATION

1 1/2" RIGID INSULATION

1 1/2" HAT CHANNELS AT 16" O.C.,VERTICALLY

1/2" CDX PLYWOOD

SPRAY APPLIED AIR BARRIER

ALUMINUM WALL PANELS

CONCETE SLABSEE STRUCTURAL

ACOUSTICAL CEILING

ACOUSTICAL CEILING

CONCRETE FLOOR SLABSEE STRUCTURAL

PREFINISHED ALUM. SOFFIT

CAST IN PLACE BEAM

3.5

12

STEEL BAR JOISTSSEE STRUCTURAL

3A107

10' -

0"

SEE STRUCTURAL FOR BEARING HEIGHT

BEAM END COVER SEE 8/A107

VAPOR BARRIER

J-TRIM

SEE STRUCTURAL FOR BEARING HEIGHT

----

----11

A107

4' -

0"4'

- 0"

3' - 0"

5/8" GYP. BOARDRETURN TO WINDOW

THERMAL WALL CAVITY INSULATION

2X8 FRAMING @ 16" O.C.

CAST IN PLACE CONCRETE BEAM

1/2" CDX PLYWOOD

METAL WALL PANELS

ALUMINUM STOREFRONT

BASE FLASHING

HOLLOW METAL FRAME

PAINTED CMU WALL

MAT FOUNDATION

SHEATHING BOARD4 1/2" INSULATION BOARD

INSULATION BOARD

GLUE LAMINATED BEAM

CMU CROSSOVER

GLUE LAMINATED BEAM

SPRAY APPLIED AIR BARRIER

1' -

4"5'

- 4"

EXP. JOINTS

VAPOR BARRIER TURN UPBEHIND EXPANSION BOARD

----

----

MA502

NA502

SEE STRUCTURAL FORBEARING HEIGHT

J TRIM

BEAM END COVERSEE 7/A107

123.5

STEEL STAIRSEE FLOOR PLAN

CONCRETE CURB SEE STRUCTURAL

ALUMINUM CURTAINWALL

CAST ALUMINUM SILLSLOPE TO DRAIN

SPRAY APPLIED AIR BARRIER

FLEXIBLE FLASHINGWEEPS @ 32" O.C.

GROUT SOLID BELOW GRADE

FLEXIBLE FLASHINGWEEPS @ 32" O.C.

ALUM. HEAD FLASHING

10" 16 GA . ALUM. STUDS@ 16" O.C.

1/2" CDX PLYWOOD

SPRAY APPLIED AIR BARRIER

PREFINISHED ALUM. WALL PANELS

BACKER ROD & SEALANT

2X BLOCKING

PREFINISHED ALUM. SOFFIT PANELS

THERMAL WALL CAVITY INSULATION

----

----D

A502

AA502

SEE STRUCTURAL FOR WALL FRAMING

P.T. 2X

GYP. BOARDJ-TRIM AT WINDOW

RUBBER BASE - SEE FINISH SCHDEULE

VAPOR BARRIER

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

MM

A203

WAL

L SE

CTI

ON

S

3/4" = 1'-0"2 WALL SECTION 6

3/4" = 1'-0"3 WALL SECTION 7

3/4" = 1'-0"4 WALL SECTION 8 3/4" = 1'-0"1 WALL SECTION 5

3/4" = 1'-0"5 WALL SECTION 9 3/4" = 1'-0"6 WALL SECTION 10

R-VALUES:BRICK WALLS - 11.3METAL PANEL WALLS - 10.3ROOF - 27.5

Page 10: COVER PS (1)

20 GA. STEEL STUDS @16" OC.

5/8' GYSUM BOARD

3" ACOUSTICAL MINERAL FIBER BATTINSULATION (SEE SPECIFCATIONS)

BASE AS INDICATED ON FINISH SCHEDULE

20 GA CONT TRACK FASTEN TO SLAB @ 16" O.C.

SUSPENDED ACOUSTICAL TILE CIELING AND GRID

3 5/8" 20 GA. STUDS BRACE @10'O.C.MIN. & ATSTRIKE SIDE OF DOORS

3" ACOUSTICAL MINERAL FIBER BATTINSULATION (SEE SPECIFCATIONS)

20 GA. STEEL STUDS @16" OC. (FOR 3 5/8" WALLSTALLER THAN 15' USE 18 GA)

GYSUM BOARD

BASE AS INDICATED ON FINISH SCHEDULE

20 GA CONT TRACK FASTEN TO SLAB @ 16"O.C.

SEE ROOM FINISH SCHEDULE FOR CEILING HEIGHTS

SEAL PENETRATIONS THROUGH WALL WITHSHEET ROCK MUD

SEAL WALL TO DECK

5/8" TYPE X GYSUM BOARD STAGGERJOINTS. FASTEN WITH 1" #8 SCREWS@8" O.C. ALONG EDGES & 12" O.C. INFEILD WHEN PANELS ARE APPLIEDVERTICALLY.

3" ACOUSTICAL MINERAL FIBERBATT INSULATION (SEESPECIFCATIONS)

20 GA CONT TRACK FASTEN TOSLAB @ 16" O.C.

SEE ROOM SCHEDULE FORCEILING HEIGHTS

SEAL PENETRATIONS THROUGHWALL WITH FIRE CAULK AND FIRESTOPPING

BASE AS INDICATED ON FINISH SCHEDULE

20 GA. STEEL STUDS @16" OC. (FORWALLS TALLER THAN 15 FEET USE 18GA. STUDS)

SEAL WALL TO DECK

20 GA. STEEL STUDS @16" OC. (FOR 3 5/8" WALLSTALLER THAN 16' USE 16 GA)

CERAMIC TILE OVER CEMENT BACKER BOARD

3" ACOUSTICAL MINERAL FIBER BATTINSULATION (SEE SPECIFCATIONS)

BED TRACK IN 2 CONT. BEADS OF SEALANT

CERAMIC COVE BASE

CERAMIC FLOOR TILE THINSET OR ON AGROUT BED

SUSPENDED ACOUSTICAL CEILING SEE ROOMSCHEDULE FOR CEILING HEIGHTS

SEAL PENETRATIONS THROUGH WALL WITHSHEET ROCK MUD

SEAL WALL TO DECK

GYPSUM BOARD CEILING

WATERPROOF MEMBRANE 6" UP WALL AND 8"ONTO FLOOR

20 GA. STEEL STUDS @16" OC. (FOR 3 5/8" WALLSTALLER THAN 16' USE 16 GA)

CERAMIC TILE OVER CEMENT BACKER BOARD

6" ACOUSTICAL MINERAL FIBER BATTINSULATION (SEE SPECIFCATIONS)

BED TRACK IN 2 CONT. BEADS OF SEALANT

CERAMIC COVE BASE

CERAMIC FLOOR TILE THINSET OR ON AGROUT BED

SEAL PENETRATIONS THROUGH WALL WITHSHEET ROCK MUD

SEAL WALL TO DECK

GYPSUM BOARD CEILING

WATERPROOF MEMBRANE 6" UP WALL AND 8"ONTO FLOOR

8" CMU

BASE AS INDICATED ON FINISH SCHEDULE

GYP. BOARD CEILING

SEAL WALL TO DECK WITH CONCRETE

1 1/2" HAT CHANNEL @ 16" O.C.

5/8" CEMENT BOARD

CERAMIC TILE

WATERPROOF MEMBRANE 6" UP WALL AND 8"ONTO FLOOR

CERAMIC FLOOR TILE THINSET OR ON AGROUT BED

8" CMU

BASE AS INDICATED ON FINISH SCHEDULE

SUSPENDED ACOUSTICAL TILE CEILING AND GRID -SEE FINISH SCHEDULE FOR CEILING HEIGHTS

SEAL WALL TO DECK WITH CONCRETE

1 1/2" HAT CHANNEL @ 16" O.C.

5/8" GYP. BOARD

8" CMU WALLTOOL ALL JOINTS

SEE STRUCTURALFOR REINFORCING

SEE FINSIH SCHEDULE FORCEILING TYPE

8'-8"

OR

9'-4"

SEE

CLG

. PLA

N FO

R HE

IGHT

S

8" CMU WALLTOOL ALL JOINTS

SEE STRUCTURAL FORFLOOR TO WALL CONNECTION

CAST IN PLACE RAKE

MOLD RESISTANT GYP. BOARD

PAINTED 1x4 TRIM SCARF JOINTS

J TRIM

5/8" GYSUM BOARD STAGGER JOINTS.FASTEN WITH 1" #8 SCREWS @8" O.C.ALONG EDGES & 12" O.C. IN FEILD WHENPANELS ARE APPLIED VERTICALLY.

3" ACOUSTICAL MINERAL FIBERBATT INSULATION (SEESPECIFCATIONS)

20 GA CONT TRACK FASTEN TOSLAB @ 16" O.C.

SEE ROOM SCHEDULE FORCEILING HEIGHTS

SEAL PENETRATIONS THROUGHWALL WITHSHEET ROCK MUD

SEAL WALL TO DECK

BASE AS INDICATED ON FINISH SCHEDULE

20 GA. STEEL STUDS @16" OC. (FORWALLS TALLER THAN 15 FEET USE 18GA. STUDS)

8" CMU WALLTOOL ALL JOINTS

MOLD RESISTANT GYP. BOARD

2X8 FRAMING @ 16" O.C.

MOLD RESISTANT GYP. BOARD

PAINTED 1X4 TRIM(SCARF JOINTS)

J TRIM

8" CMU WALLTOOL ALL JOINTS

PAINTED 1X WOOD TRIM

SEAL ALL PENTRATIONS THROUGHWALL WITH SLEEVES ANDFIRE SEALANT

SEAL WALL TO DECK WITHFIRE SEALANT

CONCRETE BOND BEAMSEE STRUCTURAL

1/2" PLYWOOD

FISH SCALE WALL PANELS

BELOW GRADEWATERPROOFING

PAINTED 6" WOOD BASE

1/2" PLYWOOD

FISH SCALE PANELS

PAINTED WOOD TRIM

ELEVATOR PIT FLOOR

SEAL WALL TO DECK WITHFIRE SEALANT

CONCRETE BOND BEAMSEE STRUCTURAL

ELEVATOR PIT FLOOR

BELOW GRADE WATERPROOFING

SUSPENDED ACOUSTICAL CEILING

SECOND FLOOR SLAB

PAINTED T&G WALL PANELINGSEE I 101

FIRST FLOOR SLAB

1/2" PLYWOOD

ROOF STRUCTURE

SEAL WAL TO DECK WITHFIRE SEALANT

PAINTED T&G WALL PANELINGSEE I 101

12" CMU WALLTOOL ALL JOINTS

PAINTED 1X WOOD TRIM

SEAL ALL PENTRATIONS THROUGH WALLWITH SLEEVES AND FIRE SEALANT

SEAL WALL TO DECK WITHFIRE SEALANT

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

MM

A204

INTE

RIO

R W

ALL

TYPE

S

1" = 1'-0"1 3 5/8" BRACED STUD WALL 1" = 1'-0"2 3 5/8" STUD PARTITION WALL

1" = 1'-0"3 6" 1 HR. RATED STUD WALL 1" = 1'-0"5 3 5/8" RESTROOM WALL

1" = 1'-0"6 6" RESTROOM PARTITION WALL 1" = 1'-0"7 8" CMU FURRED RESTROOM WALL

1" = 1'-0"8 8" CMU FURRED 1" = 1'-0"9 8" CMU PARTIAL HEIGHT WALL

1" = 1'-0"10 CMU PARTITION WALL

1" = 1'-0"4 6" STUD WALL

1" = 1'-0"11 8" CMU CAPPED PARTITION WALL 1" = 1'-0"12 8" CMU RATED PARTITION WALL

(UL DESIGN - U-419)

(UL DESIGN - U-905) 1" = 1'-0"13

CMU ELEVATOR WALL FISH SCALEPANELS

1" = 1'-0"14 CMU ELEVATOR WALL PANLEING(UL DESIGN - U-905)

1" = 1'-0"15 12" CMU RATED PARTITION WALL

Page 11: COVER PS (1)

UP

DN

DN

5A300

5' -

7 1/

4"

5' - 9 5/16"

FLOOR MOUNTEDPIPE RAILING

CAST-IN-PLACE CONC.LANDINGS

PRECAST CONC. TREADS

3A300

5A300

8' -

3"4'

- 11

3/4

"

4' - 8"

4' - 9 5/16"5' - 6"4' - 6"

CAST-IN-PLACE CONC.LANDINGS

CAST-IN-PLACE CONC.LANDINGS

PRECAST CONC. TREADS

7A300

5' - 8"

5' - 3"

3' -

9"10

' - 1

"10

' - 1

"6'

- 8

31/3

2"3'

- 7

23/3

2"

3"4"

8' -

8 3/

8"

7' - 2"

11"

3' -

9 31

/32"

8A300

6A300

1

A301

ELEVATORLADDER

13A204

14A204

24' - 0 3/4"

17' -

11

21/3

2"

8' -

8 3/

8"

7' - 2" 11"

3' -

9 31

/32"

6' -

11 2

7/32

"

4' - 4 25/32"

8A300

6A300

7/A3

00 R

AILI

NG E

LEVA

TION

#2

6/A300 RAILING ELEVATION #1

13A204

14A204

8A300

WATERPROOFINGCONT.

13' -

11

31/3

2"12

' - 1

1 1/

32"

STEEL BEAM(SEE STRUCTURAL)

3

A301

SUMP PIT

4' -

0"

ELEVATOR LADDER(SEE 1/A301)

ELEVATORDOORS

1 HR. RATED ELEVATOR CAP1" GWB SHAFT LINER & 6" METALSTUDS @ 16" O.C.FIRE CAULK PERIMETER

6A300

WATER PROOFINGCONT.

STEEL BEAM (SEESTRUCTURAL)

2

A301

13' -

11

31/3

2"

7' - 4"

12' -

11

1/32

"

1 HR. RATED ELEVATOR CAP1" GWB SHAFT LINER & 6" METALSTUDS @ 16" O.C.FIRE CAULK PERIMETER

A20414

5A300

9' -

11"

2' -

3"

FLOOR MOUNTEDPIPE RAILING SEE DTL. 11/A301

3A300

4' -

0 1/

2"4'

- 1"

5' -

10"

7"

1' - 0"

(24) 7"H RISERS &(21) 12" D TREADS

S.S. MESH (SEERAILING SECTION8/A301 FOR DETAIL)

PAINTED STL. TUBE STRINGERSW/ PRECAST CONCRETETREADS & RISERS

2' -

3"

FLOOR MOUNTEDPIPE RAILING SEE DTL. 11/A301

7A301

10' - 2" 3' - 9"

10' - 1"

7' -

0"

1' - 0"

1' - 0"

7"

1' - 0"

(24) 7"H RISERS &(22) 12"D TREADS

STL. HANDRAILEA. SIDE(SEE4/A301)

STL. PAN STAIRW/ CONC. BROOMFINISH

6A301

PRE-FINISHED ALUM.FISH SCALE PANELS

CONT CLEAT

HEM EDGE

PAINTED 1X TRIM

PAINTED SHIP LAPPED 1X6(SEE I101)

1/2" PLYWOOD

CMU WALL

PAINTED 1X TRIM1/2" PLYWOOD

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

MM

A300

ELEV

ATO

R &

STA

IRPL

ANS/

SEC

TIO

NS

1/4" = 1'-0"2 MONUMENTAL STAIR PLAN

1/4" = 1'-0"1 MONUMEMTAL SECOND FLOOR PLAN

1/4" = 1'-0"4 STAIR 156 PLAN

1/4" = 1'-0"9 FIRST FLOOR ELEVATOR PLAN

1/4" = 1'-0"10 SECOND FLOOR ELEVATOR PLAN

1/4" = 1'-0"6 ELEVATOR N-S SECTION

1/4" = 1'-0"8 ELEVATOR E-W SECTION

1/4" = 1'-0"3 STAIR 101 SECTION 1/4" = 1'-0"5 STAIR 101 SECTION N-S 1/4" = 1'-0"7 STAIR 156 SECTION

1 1/2" = 1'-0"11 ELEVATOR WALL TRIM DETAILS

T&G SIDINGSIM. TO ELEVATION2/I101

FISH SCALE WALL PANELS #2

PAINTED CMU .

Page 12: COVER PS (1)

1' -

0"3"

3/4" OR 3/8" BENT PLATE BRACKETFASTEN INTO WALL WITH 3/4" X 6"EPOXY BOLTS

.

3/4" X 2" STEEL PLATE RAILS.

CAST IN PLACE CONCRETE WALL

CMU WALL

3"

7 1/

2"

3"2' - 0"

3' -

4"4'

- 0"

2 1/

2"

VAPOR BARRIER

WATER PROOFING

TURNED DOWN SLAB EDGESEE STRUCTURAL

ALUMINUM THRESHOLD2 1/2" X 2 1/2" X 1/2" ANGLE

ELEVATOR DOOR JAMB

CMU OR CONCRETEELEVATOR SHAFT WALL

3 1/2" X 3 1/2" X 1/2" ANGLE

20.5" X 20.5" X 1" ALUM. GRATE

1X1X 1/8" ALUM. ANGLE

ELEVATOR PIT SLAB& FOUNDATION

NOTE: COORDINATE LOCATION OFSUMP PIT W/ ELEVATOR MANUFACTURER

1X1X 1/8" ALUM. ANGLE

1' -

6"

1' - 6"

1 1/2"

SATIN FINISH ALUMINUM HANDRAIL

STAINLESS STEEL STANDOFF BRACKET@ 4' O.C.

EPOXY ANCHOR INTOCMU WALL

1 1/2"

1-1/2" DIA. SATIN FINISH ALUMINUMHAND RAIL

1/2" DIA. BRACKETS @ EACHVERTICAL

2"x2" SATIN FINISH ALUMINUMTUBE POSTS

3' -

0"

3' -

6"

1-1/2" X 1/1/2" X1/8" SATIN FINISH ALUMINUMTUBE RAIL

SS TUBE FRAME BY JAKOB INOXLINE

3/4" SOLID BAR WELD TO FRAME ANDFIN POST (2 EACH SIDE OF POST)

WEBNET BY JAKOB INOX LINE 1/16"DIMATER WIRE

3/4" SOLID BAR WELD TO FRAME ANDFIN POST (2 EACH SIDE OF POST)

SS TUBE FRAME BY JAKOB INOXLINE

2"x1/4" ALUMINUM PLATE

CONTINUOUS STEEL TUBE

2"

PAINTED STAIR BRACKETS

CONCRETE FILL @EACH TREAD

PAINTED CONTINUOUS STRINGERBEYOND

VINYL TREAD AND RISER COVER

STEEL DECKING AT LANDING

PRECAST CONCRETE TREAD (ONEPIECE / CLOSED RISER) BY STEPSTONE

GALVANIZED 11 GA. WELD PLATE4"x7-1/4" BY STEPSTONE

PAINTED STEEL "L" (SEE STRUCTURAL)

CONTINUOUS TUBE STRINGERBEYOND ( PAINTED )

3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2"3' - 11 1/2" 3' - 11 1/2"

3' -

6"

23' - 9"

8

A301

3' - 7" 3' - 7" 3' - 7" 3' - 7"

17' - 11"

3' - 7"

3' -

6"

8

A301

2' -

9 1/

2"

1-1/2" x1 1/2" x1/8" ALUM. TUBETOP RAIL

SS TUBE FRAME BY JAKOB INOX LINE

3/4" SOLID BAR WELD TO FRAMEAND FIN POST (2 EA SIDE OF POST

WEBNET BY JAKOB INOX LINE 1/16"DIAMETER WIRE

3/4" SOLID BAR WELD TO FRAMEAND FIN POST (2 EA SIDE OF POST

SS TUBE FRAME BY JAKOB INOX LINE

1-1/2" DIA. x 1/8" ALUM. TUBEBOTTOM RAIL

1/8" ALUMINUM FIN POSTEDGES TO BE CHAMFERED

1 1/

2"1

1/2"

1 1/

2"

1 1/

2"

2"

3' -

6"

4"

1 1/2"

6"

BP 1/2"x4x6-3/4"x4 W/ (4)7/16" DIA. HOLES TO ACCEPT4 EA 3/8"x4 ANCHOR BOLTS

2' -

3"

1 1/2" DIA. SATIN FINISH ALUM. RAIL

1 1/2" DIA. VERTICALS@ 4' O.C.

5" DIA. X1/2" ALUM PLATE

1/4" X 3" ALL THREAD RODSET IN EPOXY

SS WASHER AND ACORN NUT

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

MM

A301

ELEV

ATO

R &

STA

IRD

ETAI

LS

3/4" = 1'-0"1 ELEVATOR LADDER DETAILS

3/4" = 1'-0"2 ELEVATOR DOOR SILL

3/4" = 1'-0"3 SUMP PIT DETAIL

3" = 1'-0"4 HANDRAIL DETAIL

1 1/2" = 1'-0"5 GUARD RAIL DETAIL

1 1/2" = 1'-0"6 MTL PAN STAIR DETAIL

1 1/2" = 1'-0"7 CAST CONC. STAIR DETAIL 1/2" = 1'-0"10 RAILING ELEVATIONS #2

1/2" = 1'-0"9 RAILING ELEVATIONS #1

1 1/2" = 1'-0"8 RAILING SECTION

1 1/2" = 1'-0"11 PROTECTIVE RAIL DETAIL

Page 13: COVER PS (1)

2

3

4

5

6

7

2.8

2.3

B D E F

1

C

STAFF144

ELECTRICAL147

OFFICE145

LARVALREARING 1

134

WALK INCOOLER

137

LARVALREARING 2

135

AQUACULTUREEQUIPMENT

126

DECAPSULATIONROOM

125

LIVE FEED(ARTEMIA)

122

AQUACULTUREEQUIPMENT

124

LIVE FEED(ROTIFERS)

123

BROODSTOCKHOLDING &

CONDITIONING2

127

AQUACULTUREEQUIPMENT

128

FREEZER130

FOOD PREP129

BROODSTOCKHOLDING &

CONDITIONING1

131

TEL.132

BROODSTOCKQ/C133

STAIR156

JAN138

STORAGE139

FISH HEALTHLAB140

SHOP/FEEDSTORAGE

148

SHOWER149 QUARANTINE

ROOM152

STORAGE150

AQ. EQUIP.RM.155

AQ. EQUIP.RM.153STORAGE

151

QUARANTINEROOM

154

LOBBY100

OFFICE106

OFFICE107

OFFICE105

OFFICE102

OFFICE103

OFFICECORRIDOR

104

OFFICE108

OFFICE109

MECHANICALROOM

120

TELECOM111

JAN112

CONFERENCE119

OFF.CORRIDOR

115

OFFICE118

OFFICE117

OFFICE116

STAIR101

10' 10'

9'9'

10' 8'-8" 8'-8" 8'-8"

8'-8"

WOMEN113 8'-8"

8'

8'

8'-8"

8'-8".

8'-8"

8'- 8" 8'- 8" 8'-8"

9'.9'9'

8'

8'

8'

9'

9'

9'

9'

WOMEN143

MEN142

MEN114

8 FT.

NO CEILING

HEIGHT VARIES

8'

8'-8"

8'-0"

QAUALITYCONTROL

136

NO CEILING

NO CEILING

10'

8'-8"

8' 8' 8'

NO CEILING

NO CEILING NO CEILING

NO CEILING NO CEILINGNO CEILING NO CEILING NO CEILING

NO CEILING

NO CEILING

NO CEILING

9'

48 SF

ELECTRICAL104A

A

A4002

A4003

A4002

A4002

NO CEILING

8'-0"

HEIGHT VARIES HEIGHT VARIESHEIGHT VARIESHEIGHT VARIES

HEIGHT VARIES

HEIGHT VARIES

8'-0"

OPEN TO ABOVE

8'

5 1/8"

VAR

IES

5/8" GYP. BOARD

3 5/8" STUDS @ 16" O.C.

5/8" GYP. BOARD

1 CEILING DROP DETAIL

3 5/8" 20 GAGE STUDS @ 16" O.C.

SUSPENDED ACOUS. CLNG.

7 5/8"

SUSPENDED ACOUSTICAL CEILING

CMU HEADERSEE STRUCTURAL

3 HEAD DETAIL

5 1/8"

1 CEILING DROP DETAIL

5/8" GYP. BOARD

2 CEILING DROP DETAIL

3 5/8" 20 GAGE STUDS @ 16" O.C.

FLOOR STRUCTURE SEE STRUCTURAL

3 5/8" STUD BRACESEE STRUCTURAL

SECOND FLOOR SLAB ON METAL DECK

1X PAINTED WOOD TRIM

CEI

LIG

N T

O F

LOO

R D

IMEN

SIO

N

FLOOR BEAM SEE STRUCTURAL

5 1/8"

1 CEILING DROP DETAIL

5/8" GYP. BOARD

4 CEILING DROP DETAIL

3 5/8" 20 GAGE STUDS @ 16" O.C.

T&G WOOD DECK

3 5/8" STUD BRACE@ 4' O.C.

1X PAINTED WOOD TRIM

SUSPENDED ACOUSTICALCEILING

SUSPENDED ACOUSTICALCEILING

3 5/8" STUD BRACE @ 4' O.C.

PERIMETER ANGLE SEE STRUCTURAL

FABRIC DUCT

1/2" MARINE PLYWOOD, PAINTEDEASE EDGES OF OPENING

1X TRIM, PAINTED.

DU

CT

DIA

. + 8

"

6A400

FABRIC DUCT

1/2" MARINE PLYWOOD

2X2 TRIM, ROUT OUTTO REVEIVE PLYWOOD

GYP. BOARD SEE WALL TYPES

2X FRAMING

INSULATION

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

MM

A400

FIR

ST F

LOO

RR

EFLE

CTE

D C

EILI

NG

PLAN

& C

EILI

NG

DET

AILS

3/32" = 1'-0"1 FIRST FLOOR REFLECTED CEILING PLANN

3/4" = 1'-0"5 FABRIC DUCT WALL PENETRATION

1 1/2" = 1'-0"6

TYPICAL FABRIC DUCT PENTRATIONDETAIL

NOTE: FOR NON-RATEDWALL PENETRATIONS ONLY

Page 14: COVER PS (1)

2

3

4

5

6

7

2.8

2.3

B D E F

1

CA

ROOF EDGEBELOW

ROOF EDGEBELOW

9'

8'

9'

SLOPE DN. 3.5/12

SLOPE DN. 3.5/12

SLOPE DN. 3.5/12

BALCONY200

CLASSROOM201

VIEW CORRIDOR202

CHAIR STORAGE202A

MECHANICAL203

STAIR101

4A400

1A400

4A400

4A400

ROOF EDGE

ROOF EDGE

NO CEILING

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

MM

A401

SEC

ON

D F

LOO

RR

EFLE

CTE

D C

EILI

NG

PLAN

N

3/32" = 1'-0"1

SECOND FLOOR REFLECTED CEILINGPLAN

Page 15: COVER PS (1)

7' -

0"

3' - 0"

7' -

0"

3' - 0"

7' -

0"

VARIES 6' - 0"

8' -

0"

6"4'

- 6"

6"1'

- 6"

1' -

0"

7' -

0"

3' - 0"

7' -

0"

3' - 0"

7' -

0"

VARIES

10' -

0"

10' - 0"

ASCWHMF

TYPE:FRAME:DOOR:

BSCWHMF

DFIBERGLASSFIBERGLASS

FFIBERGLASSFIBERGLASS

C EFIBERGLASSFIBERGLASS

SCWHMF

GALUMINUMALUMINUM

GLASS:

JPOWDER COATEDSTEEL SECTIONAL

3' - 0"

6"4'

- 6"

6"1'

- 6"

1' -

0"

HALUMINUMALUMINUM

KSCWHMF

FIRELITE GLAZING

7' -

0"

3' - 0"

6' - 8"

2' -

8"

4"4" 4" 4" 4" 4" 4"

LFIBERGLASSFIBERGLASS

11' -

0"

4"

TEMPERED TEMPERED TEMPERED TEMPERED

6' - 4"2" 2"

8' -

0"

6"

3' -

0"

2" 2"

6' - 4" 3' - 4"

2" 2"

A

B

C

INSULATED IMPACTGLASSCURTAIN WALLFRAMINGDOOR FRAMEDOOR STOP

ALUMINUM DOOR

IMPACT GLASS

STOREFRONTDOOR FRAME

INSULATED IMPACTGLASS

CURTAIN WALL FRAMING

ALUMINUMSTOREFRONTDOOR

ALUMINUMTHRESHOLD SET INMASTIC (PIN TOFLOOR)

DOOR

K

I

DOOR JAMB

TEMPERED GLASS

DOUBLE RABBETEDFRAME

GLAZING STOP

VARIES

2"

L DOOR SILL

2" METAL THRESHOLDAT RATED DOORS (PIN TOFLOOR)STOP FLOORING BENEATHTHRESHOLD

SLAB ON FILLEDCMU

ACCESSIBLE SILL SETIN MASTIC. PRE-STRIPEBEFORE SETING SILL

DOOR SWEEP

P DOOR SILL

WEEPS AT CORNERS

MORTAR NET

RIGID INSULATION

FLASHING ABOVEGALV. ANGLE DAM

ENDS

BRICK

CAST IN PLACE CONCRETECROSSOVER

TURN DOWN SLABEDGE

SLAB ON FILLEDCMU

SECTIONAL DOORGASKET

DEPRESSED SLAB 1/2"

SLOPE TO DRAIN

STEELCHANNEL

WELD SECTIONAL DOORTRACK AT LEG OF CHANNEL

INSULATION

BRICK

CMU JAMB

N DOOR JAMB

M

DOOR HEAD

DOOR HEAD

DOOR HEAD

DOOR JAMB

DOOR HEAD

SEALANT

FLEXIBLE WEEPS ATCORNERS (DAM ENDS)

MORTAR NET

RIGID INSULATION

FLASHING ABOVEGALV. ANGLE

BRICK

3/8"

4"

8 3/4"

6"

RETURN BRICK TOJAMB

SEALANT

D

G

H

DOOR HEAD

DOOR JAMB

E DOOR JAMB

GYP. BOARD

DOUBLE 6" STUDS

SEALANT

GYP. BOARD

DOUBLE JAMBSTUDS

HOLLOW METALFRAME

STUD ANCHORSEE DETAILS THISSHEET

VARIES

4"2"

VARIES

J

DOOR HEAD

DOOR JAMB

HOLLOW METALOR FIBERGLASSFRAME

F DOOR SILL

TURNED DOWNSLAB EDGE

CMU LINTELSEE STRUCTURAL

CMU JAMBSEE STRUCTURAL

METAL ORFIBERGLASS FRAMESEE DOOR SCEHDULE

METAL ORFIBERGLASS FRAMESEE DOOR SCEHDULE

SECTIONAL DOOR TRACK

U-ANCHOR. SHOPWELDTO FRAMEMETAL STUDS

TYPICAL STUD ANCOR

H DOOR CLEARANCE

U-SHAPED STUD WALLANCHORWELDED TO FRAME

1' - 6" PULL SIDE

1' - 0" PUSH SIDE

FIBERGLASSFRAME

FIBERGLASSFRAME

SEALANT

SEALANTCMU JAMBANCHOR

SPRAY APPLIED AIR BARRIER

SEE A502 FOR DOOR HEADFLASHING DETAIL

SPRAY APPLIED AIR BARRIER

SPRAY APPLIED AIR BARRIER

SPRAY APPLIEDAIR BARRIER

SEALANT SEALANT

STEEL CHANNEL

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

MM

A500

DO

OR

SC

HED

ULE

Door Schedule

Mark TYPE Width Height Frame_Depth Head_Detail Jamb_Detail Sill_Detail Hardware_Set Fire Rating

100 G 6' - 0" 8' - 0" 1100A G 6' - 0" 8' - 0" 1A101 K 3' - 0" 7' - 0" 8 1/4" I J/K L 18 60 M101A H 3' - 0" 8' - 0" 1101B K 3' - 0" 7' - 0" 8 1/4" I JK L 18 60 M102 B 3' - 0" 7' - 0" 8 3/4" G H - 15102A B 3' - 0" 7' - 0" 5 3/4" I J - 15103 B 3' - 0" 7' - 0" 5 3/4" I J - 15104 B 3' - 0" 7' - 0" 5 3/4" I J - 16104A A 3' - 0" 7' - 0" 5 3/4" I J - 19105 B 3' - 0" 7' - 0" 5 3/4" I J - 15106 B 3' - 0" 7' - 0" 5 3/4" I J - 15107 B 3' - 0" 7' - 0" 5 3/4" I J - 15108 B 3' - 0" 7' - 0" 5 3/4" I J - 15109 B 3' - 0" 7' - 0" 5 3/4" I J - 15111 A 3' - 0" 7' - 0" 5 3/4" I J - 19112 A 3' - 0" 7' - 0" 5 3/4" I J - 19113 A 3' - 0" 7' - 0" 5 3/4" I J - 17114 A 3' - 0" 7' - 0" 5 3/4" I J - 17115 B 3' - 0" 7' - 0" 5 3/4" I J - 16116 B 3' - 0" 7' - 0" 5 3/4" I J - 15117 B 3' - 0" 7' - 0" 5 3/4" I J - 15118 B 3' - 0" 7' - 0" 5 3/4" I J - 15119 B 3' - 0" 7' - 0" 5 3/4" I J - 20120 F 6' - 0" 7' - 0" 8 3/4" D E F 3121 C 6' - 0" 7' - 0" 8 3/4" G H L 14 45 M122 F 6' - 0" 7' - 0" 8 3/4" G H - 11124 D 3' - 0" 7' - 0" 8 3/4" G H - 8125 E 3' - 0" 7' - 0" 8 3/4" G H - 8126 F 6' - 0" 7' - 0" 8 3/4" G H - 11126A D 3' - 0" 7' - 0" 8 3/4" G H - 8127 E 3' - 0" 7' - 0" 8 3/4" G H - 7127A F 6' - 4" 7' - 0" 8 3/4" D E F 3127B E 3' - 0" 7' - 0" 8 3/4" G H - 8128 E 3' - 0" 7' - 0" 8 3/4" G H - 8128A F 6' - 4" 7' - 0" 8 3/4" D E F 3131 D 3' - 0" 7' - 0" 8 3/4" G H - 7131A F 6' - 4" 7' - 0" 8 3/4" D E F 3131B E 3' - 0" 7' - 0" 8 3/4" G H - 8132 D 3' - 0" 7' - 0" 8 3/4" G H - 6133 E 3' - 0" 7' - 0" 8 3/4" G H - 7134 F 6' - 4" 11' - 0" 8 3/4" G H - 9135 D 3' - 0" 7' - 0" 8 3/4" G H - 7136 E 3' - 0" 7' - 0" 8 3/4" G H - 7138 D 3' - 0" 7' - 0" 8 3/4" G H - 6139 D 3' - 0" 7' - 0" 8 3/4" G H - 6140 F 6' - 0" 7' - 0" 8 3/4" M N P 10141A J 10' - 0" 11' - 0" 8 3/4" G H - 2142 D 3' - 0" 7' - 0" 8 3/4" G H - 12143 E 3' - 0" 7' - 0" 8 3/4" G H - 12144 E 3' - 0" 7' - 0" 8 3/4" G H - 13145 E 3' - 0" 7' - 0" 8 3/4" G H - 7146 E 6' - 0" 7' - 0" 8 3/4" G H - 11147 F 6' - 4" 7' - 0" 8 3/4" D E F 3148 F 6' - 4" 7' - 0" 8 3/4" D E F 3149 D 3' - 0" 7' - 0" 8 3/4" D E F 5150 F 3' - 0" 7' - 0" 8 3/4" D E F 4151 D 3' - 0" 7' - 0" 8 3/4" D E F 4152 F 6' - 4" 7' - 0" 8 3/4" D E F 3153 F 6' - 0" 7' - 0" 8 3/4" D E F 10154 F 6' - 4" 7' - 0" 8 3/4" D E F 3155 F 6' - 0" 7' - 0" 8 3/4" G H - 10156 E 3' - 0" 7' - 0" 8 3/4" D E F 4157 F 6' - 4" 7' - 0" 8 3/4" D E F 3158 E 3' - 0" 7' - 0" 8 3/4" D E F 23200A C 6' - 0" 7' - 0" 8 3/4" G H L 21 45M201 B 3' - 0" 7' - 0" 8 1/4" I J - 22201A B 3' - 0" 7' - 0" 8 1/4" I J - 22202 C 6' - 0" 7' - 0" 8 3/4" G H L 14 45M202A B 3' - 0" 7' - 0" 8 3/4" G H L 18 60M203 C 6' - 0" 7' - 0" 8 3/4" G H - 21

1/4" = 1'-0"DOOR ELEVATIONS

1 1/2" = 1'-0"1 DOOR DETAILS

Page 16: COVER PS (1)

13' -

4"

21' -

0 1

5/16

"

7' -

4"

30' - 10"

30' -

0 2

1/32

"

8" 8"

SPANDREL GLASS

SUN SCREEEN

SECOND FLOOR LEVEL

SUN SCREEEN

SPANDREL GLASS

13' - 4"

8' -

0"

22' -

0"

8"

2' -

6 1/

2"

4' -

0"

20' - 0"

7' -

4"

14' -

11

3/8"

26' - 1 5/16"

20' -

4"

12' - 8"

13' -

11

31/3

2"

3' - 6 21/32" 1' - 0" 3' - 6 21/32" 1' - 0" 3' - 6 11/16"

SECOND FLOOR ELEVATION

SPANDREL GLASS

SUN SCREEN

8"

4' - 0"

6' -

0"

1' - 4"

1' -

4"2'

- 8"

2' -

8"

4' - 0"

1' - 4"

8' -

0"

APPLIEDMULLION

2' -

8"8'

- 0"

4' - 0"

1' - 4"

2' -

8"

2' -

8"8'

- 0"

12' - 0"

2' -

8"

2' -

0"

4' - 0"

1' -

4 1/

32"

5' -

4"

8' - 0"

4' -

8"

8' - 0"

2' -

8"

1' -

4 1/

32"

5' -

4"

4' - 0"

8"20

' - 0

1/1

6"

23' -

3 1

7/32

"

11' - 3 5/16"

APPLIED MULLION

SECOND FLOOR

6' - 0"

APPLIED MULLION

28' -

7 2

3/32

"

21' -

11

13/3

2"8"

ADA OPERATOR BUTTON

22' - 10 5/32"

4' - 0"

1' - 4"

5' -

4"1'

- 4"

3' -

4"2'

- 0"

2' - 0"

14' -

0"

4' -

0"

4' -

0"

12' - 0"

11'-0

" ABO

VE 2

ND

. FL

R.

1' -

4"2' - 8"

10' -

0"

1' -

4"

1' - 4"

10' -

0"

2' -

0"

2' - 0"10

' - 0

"

8"

1' - 4"

8"10

' - 0

"

2' - 0"

10' -

0"

10' -

0"

2' -

0"

4' - 0"

14' -

0"

1' -

4"

2' - 0"

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

MM

A501

WIN

DO

W S

CH

EDU

LE

D

10 13/16" ALUM CURTAINWALLINSUL. IMPACT

E

10 13/16" ALUM CURTAINWALL

INSUL. IMPACT

10 13/16" ALUM CURTAINWALLINSUL. IMPACT

F

7 13/16" ALUM CURTAINWALL

INSUL. IMPACT

G

7 13/16" ALUM CURTAINWALL

H

ALUM STOREFRONTINSUL. IMPACT

K

INTERIOR ALUM STOREFRONT

TEMPERED

I

N P Q

ALUM STOREFRONTINSUL. IMPACT

A

ALUM STOREFRONTINSUL. IMPACT

B

ALUM STOREFRONTINSUL. IMPACT

B2

ALUM STOREFRONTINSUL. IMPACT

B3

ALUM STOREFRONTINSUL. IMPACT

C

HOLLOW METAL FRAMEINSULATED

J

HOLLOW METAL FRAME (60M RATED)DOUBLE FIRELITE GLAZING

L

10'-8

"

HOLLOW METAL FRAMEINSULATED

TEMPERED GLAZING

M

E

F

G

E

F

G

E

F

G

E

F

G

E

F

G

J

K

L

L

J

K

J

L

K

B

A

C

D

C

A

D

C

C

A

C

D

C

D

A

B

A

BC

D

I

H

M

N

APPLIED MULLLION

ALUM STOREFRONTINSUL. IMPACT

A1

E

F

G

PASS-THRU WINDOWTEMPERED GLAZING

T

R S T U

NOTE: SEE MECHANICAL FOR LOUVERPLANS & SPECIFICATIONS

V W

PRE-FINISHED ALUM. LOUVERS

P

Page 17: COVER PS (1)

A WINDOW HEAD

FLEXIBLEFLASHING WEEPS

AT CORNERS

MORTAR NET

RIGIDINSULATION

FLASHINGABOVE

GALV. ANGLE

STANDARDBRICK

CMU CROSSOVER -SEE STRUCTURALFOR SUPPORT

1/2" PLYWOOD

RETURN GWB TOWINDOW

J- TRIM AT ALL OPENINGS

BACKER ROD ANDSEALANT

5/8" GYP BPARDOVER FURRING

5"

2 1/

2"

3/4" MARBLE SILL& SKIRT

P.T. 1/2" PLYWD.

TURN UP SILL FLASHING BEHINDWINDOW @ JAMBS

GYPSUM BOARD OVERFURRING

CAST ALUMINUM SILLFLASHING SLOPE TO

DRAIN

BACKER ROD & SEALANT

FLEXIBLE FLASHINGWEEPS @ CORNERS

GYP. BOARD

DOUBLE 6" STUDS

SHIM

TEMPEREDGLASS

ALUMINUMSTOREFRONTFRAME

GYP. BOARD

DOUBLE 6" JAMB STUDS

SHIM

TEMPERED GLASS

ALUMINUMSTOREFRONT FRAME

STEEL BEAM

2 - 1/2" 16 GA STUDS

J TRIM AT ALLOPENINGS

GYP. BOARD

8" BATTINSULATION

METAL FASCIAPANELS

BOTTOM CLOSUREFLASHING

SHEATHINGBOARD

SPRAY APPLIEDAIR BARRIER

BACKER ROD ANDSEALANT

ALUMINUMSTOREFRONT

PREFINISHED ALUMINUMFLASHING SLOPE TO DRAIN

BACKER ROD & SEALANT

VARIES

CMU WALL

BRICK

8" 16 GA. STUDS

SPRAY APPLIEDAIR BARRIER

SHEATHINGBOARD

BACKER ROD& SEALANT

CMU WALL

METAL WALL PANEL

DOUBLED 8" 16 GA. STUDS

PEEL & STICKMEMBRANE

SHEATHINGBOARD

BACKER ROD& SEALANT

FLASHING

B WINDOW JAMB

C WINDOW JAMB

D WINDOW SILL

E WINDOW HEAD

J BEAD STOP

REINFORCED CMUJAMB - SEESTRUCTURAL

RETURNBRICK TO

JAMB

SEALANT

BLOCKING

BACKER ROD ANDSEALANT

BYP. BOARD OVERFURRING

F WINDOW JAMB

G WINDOW SILL

H WINDOW HEAD

I WINDOW JAMB

INSULATION BOARD

8 1/4"

J WINDOW HEAD

K WINDOW JAMB

L WINDOW SILL

CMU LINTEL

BASEFLASHING

1/2" CDXPLYWOOD

RIGIDINSULATION

P.T. 2X

METAL WALLPANELS

CMU CROSSOVER - SEESTRUCTURAL

5"

2 1/

2"

M WINDOW HEAD

3/4" MARBLE SILL& SKIRT

P.T. 1/2" PLYWD.

TURN UP SILL FLASHING BEHINDWINDOW @ JAMBS

CAST ALUMINUM SILLFLASHING SLOPE TO DRAIN

BACKER ROD & SEALANT

P.T. 2X BLOCKING

CMU LINTELSEE STRUCTURAL

1/2" CDX PLYWOOD

METAL WALL PANELS

INSULATION BOARD

N SILL

FLEXIBLE FLASHING

SPRAY APPLIEDAIR BARRIER

WEEPS @ 32" O.C.

CAST IN PLACE CONCRETE CURBRUB FINISH SMOOTH

ALUMINUM CURTAIN WALL

8 1/4"

8 1/4"

INSULATED GLAZING

CMU CROSSOVERSEE STRUCTURAL

CMU JAMBSEE STRUCTURAL

HOLLOW METAL FRAME

INSULATED GLAZING

HOLLOW METAL FRAME

INSULATED GLAZING

CMU SILLSEE STRUCTURAL

SPRAY APPLIEDD AIR BARRIER

SPRAY APPLIED AIR BARRIER

SPRAY APPLIED AIR BARRIER

SPRAY APPLIED AIR BARRIER

PAINTED 1XWOOD TRIM

PAINTED 1X TRIM

SEALANT

SEALANT

TYPICAL EXTERIOR CROSSOVER DTL.O

P WINDOW SILL

ALUMINUM STOREFRONT

1X OAK TRIM

1X BLOCKINGFASTEN TO FLOOR SLAB

BACKER ROD & SEALANT

SEALANT

HOLLOW METAL FRAME

SEALANT

SEALANT

SEALANT

TERMINATION BARCAULK TOP EDGE

FLEXIBLE FLASHING

CMU OR CONCRETECROSSOVERGALVANIZED ANGLE(SEE STRUCTURAL)DAM ENDS OF FLASHING(SEAL INSIDE CORNER)ANGLE TERMINATES @OPENING RETRUN BRICK TO CMU

RETRURN AIR BARRIERINTO CMU OPENING

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

JJZ

A502

WIN

DO

W D

ETAI

LS

Page 18: COVER PS (1)

9' - 4"

2' -

1"

2' -

1"

9' - 4"

OPEN

OPEN SHELVING

3' -

0"2'

- 0"

2' -

6"

3' -

6"

3' -

0"

3"1

1/2"

SOLID SURFACE TRANSACTION TOPON METAL / NICKEL FINISH SUPPORTSW/ SHARK NOSE PROFILE

SOLID SURFACE COUNTERSW/ SHARK NOSE PROFILE

BACK PAINTED TEMPEREDGLASS PANELS W/ S.S. STANDOFF POSTS AND CAPS

TOESPACE, TYP.

2' - 6" 3" 2' - 6" 3" 2' - 6"

2' -

5 3/

4"

6"

2' -

6"

3' -

0"

3' -

6"

2' -

6"

SOLID SURFACE TRANSACTIONTOP ON METAL / NICKEL FINISHSUPPORTS

PLASTIC LAMINATE ATVERTICAL SURFACES

(SOLID SURFACE TOPS W/SHARK NOSE EDGE PROFILES)

2' -

0"2'

- 0"

2' - 5"

2' - 4 23/32"

2' -

0"1'

- 0"

OPEN

3' -

0"

2' - 8 1/2"

2' -

0"2'

- 0"

1' -

0"

OPENSHELVING

1' -

0"2'

- 0"

2' -

0"2'

- 0"

3' -

0"

REFRIGERATOR(N.I.C.)

OPEN SHELVING2' -

0"2'

- 0"

OPEN

3' -

0"2'

- 0"

2' -

0"

3' -

0"2'

- 0"

1' -

11 1

/4"

OPEN SHELVING

FREE STANDING SINK

1' -

0"

OPEN SHELVING

2' -

0"2'

- 0"

2' -

0"

REFRIGERATOR (N.I.C.)

3' -

0"2'

- 0"

2' -

0"

OPEN SHELVING

1' -

0"2'

- 0"

2' -

0"2'

- 0"

3' -

0"

OPEN

OPEN SHELVING

3' -

0"

OPEN SHELVING

2' -

0"2'

- 0"

OPEN

3' -

0"

PASS THRU WINDOW T

FUME HOODSEE MECHANICAL

5' - 3"

CHEST FREEZER(N.I.C.)

PASS THRU WINDOW T

2' -

0"1'

- 0"

2' -

0"2'

- 0"

OPEN SHELVING

3' -

0"

OPEN SHELVING

MICROWAVESHELF

1' -

7"2'

- 5"

2' -

0"

REFRIGERATOR(N.I.C.)

3' -

0"

3' -

0"

TEMPERED GLASS FRONTEDUPPER SHELVING

LOCKS ON DOORS & DRAWERS.

11' - 1 15/16"

2' -

1"

2' - 9 3/8" 2' - 10 9/16" 5' - 6"

7' -

11"

2' - 1"

10' - 4"

2' -

11"

2' -

1"

14' - 0"

11' -

11

9/32

"

2' - 1"

2' - 3 1/2"

2' -

11 2

1/32

"4'

- 10

"2'

- 5"

4' - 8 1/2" 2' - 6" 2' - 5"

7' -

2 15

/32"

2' - 1"

5' -

0 29

/32"

2' -

1 9/

16"

2' - 4" 2' - 4" 2' - 4"

9' - 2"

2' -

3"

7' - 11"

2' - 3"

2' - 10" 3' - 1" 2' - 0"

2' -

8 3/

8"2'

- 7"

2' -

7"

9' -

11 3

/8"

2' - 3"

13' - 11 15/32"

2' -

3"

2' - 1"2' - 9"2' - 9"

2' -

10 1

/2"

6' - 0"

1' -

8"

8' - 4 19/32"

2' -

1"

13' - 3 13/16"

2' -

3"

2' - 3"

2' -

10 1

/2"

3' -

0"

8' -

0 13

/32"

10' - 10 1/4"

25' - 4 3/8"

2' -

6"

2' - 6"

6' -

5"

5' - 2 15/16"5' - 2 1/2" 7' - 7"

5' -

3 7/

8"

2' - 4 1/2" 2' - 5"

FUME HOOD

CHEST FREEZER(N.I.C.)

7' - 9 1/2"

2' -

1"

2' -

6"

3' -

0"6" METAL BRACE

SOLID SURFACEGLASS PANELS

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

MM

A600

MIL

LWO

RK

PLAN

S AN

DEL

EVAT

ION

S

1/4" = 1'-0"11 MW 11 PLAN 1/4" = 1'-0"12 MW 12 PLAN

1/4" = 1'-0"13 MW1 ELEVATION

1/4" = 1'-0"14 MW 2 ELEVATION A

1/4" = 1'-0"15 MW 2 ELEVATION B

1/4" = 1'-0"16 MW 3 ELEVATION A

1/4" = 1'-0"17 MW 3 ELEVATION B

1/4" = 1'-0"18 MW 4 ELEVATION A

1/4" = 1'-0"19 MW 4 ELEVATION B

1/4" = 1'-0"20 MW 5 ELEVATION A

1/4" = 1'-0"21 MW 5 ELEVATION B

1/4" = 1'-0"22 MW 6 ELEVATION A

1/4" = 1'-0"23 MW 6 ELEVATION B

1/4" = 1'-0"24 MW 7 ELEVATION

1/4" = 1'-0"25 MW 8 ELEVATION A

1/4" = 1'-0"26 MW 8 ELEVATION B

1/4" = 1'-0"27 MW 9 ELEVATION A

1/4" = 1'-0"28 MW 9 ELEVATION B 1/4" = 1'-0"29 MW 10 ELEVATION

1/4" = 1'-0"30 MW 11 ELEVATION 1/4" = 1'-0"31 MW 12 ELEVATION

OPEN

RM. 102 RM. 100 RM. 123 RM. 125 RM. 136 RM. 129

RM. 131 RM. 140 RM. 144 RM. 201 RM. 201

TEMPERED GLASS FRONTEDUPPER SHELVING

RM. 133

1

64

3

3 9

3 2

4

12 5 5

43

1/4" = 1'-0"1 MW 1 PLAN 1/4" = 1'-0"2 MW 2 PLAN

1/4" = 1'-0"3 MW 3 PLAN 1/4" = 1'-0"4 MW 4 PLAN

1/4" = 1'-0"5 MW 5 PLAN 1/4" = 1'-0"6 MW 6 PLAN

1/4" = 1'-0"7 MW 7 PLAN 1/4" = 1'-0"8 MW 8 PLAN

1/4" = 1'-0"9 MW 9 PLAN 1/4" = 1'-0"10 MW 10 PLAN

B

A

AB BA BA BA

AB AB

1/4" = 1'-0"32 MW 2 ELEVATION C

C

LOCKS ON ALL DOORS

LOCKS ON ALL DRAWERS

LOCKS ON DOORS & DRAWERS.

6

LOCATE AVEQUIMENTHERE. SEEAV DRAWINGS

8

NOTE: RESIDENTIAL APPLIANCES (REFIGERATORS, MICROWAVES ETC..)TO BE SUPPLIED BY THE OWNER. COORDINATE WITH ARCHITECT FOR UNIT SIZES.

Page 19: COVER PS (1)

THERMALLY FUSEDMELAMINE OVER 1/4" MDFBACKING

DRAWERS ON FULLEXTENSION GLIDESSEE DETAIL

RUBBER BASE

3/4" MARINE PLYWOODBASE

2X BLOCKING IN STUDWALLS

2' -

0"3'

- 0"

2' -

0"

1/4" MDF BACK

3/4" MDFBACKSPLASH

PVC EDGING

P/L OVER 3/4" MDF

THERMALLY FUSEDMELAMINE OVER 3/4"MDF INTERIORS

THERMALLY FUSEDMELAMINE OVER 1/4" MDFBACKING

RUBBER BASE

3/4" MARINE PLYWOODBASE

2X BLOCKING IN STUDWALLS

2' -

0"3'

- 0"

2' -

0"THERALLY FUSEDMELAMINE OVER 1/4"MDF BACK

P/L OVER 3/4" MARINEPLYWOODBACKSPLASH

PVC EDGING

THERMALLY FUSEDMELAMINE OVER 3/4" MDF

SINK - SEE PLUMBINGDRAWINGS

P/L OVER 3/4" MARINEPLYWOOD

THERMALLY FUSEDMELAMINE OVER 3/4"MDF

PVC EDGING

P/L ON 3/4" MDF

WIRE PULL

1/2" SOLID WOODBACKING

1/2" SIDING

1/2" SIDES ANDBACK

1/2" BOTTOM

1/4" MDF BACK

3/4" MDF DIVIDER

3/4" MDF DIVIDER

THERMALLY FUSDMELAMINE INTERIOR

EDGING

1/4" MDF BACK

P/L OVER 3/4" MDF

WIRE PULL

2X BLOCKING IN STUD WALLS

5/8" 3/4"

BASE & UPPER CABINETSCALE: 1"=1' 0"1 BASE & UPPER SINK CABINET

SCALE: 1"=1' 0"2

TYPICAL DRAWERSCALE: 1"=1' 0"10

TYPICAL DOORSCALE: 1"=1' 0"11

P/L OVER 3/4" MARINEPLYWOOD

PVC EDGING

HDPE DOORS WITH 5KNUCKLE HINGES

3/4" HDPE BACK

3/4" HDPEBACKSPLASH

BASE CABINETSCALE: 1"=1' 0"3

3/4" HDPE TOP

EDGING

1' -

0"2'

- 0"

VARIES

3/4" HDPE BACK

3/4" HDPEBACKSPLASH

BASE CABINETSCALE: 1"=1' 0"4

3/4" HPDE TOP

EDGING

1' -

0"2'

- 0"

VARIES

3/4" HDPE BOTTOM

3/4" HDPE SHELVES

ATTACH TO CMU WALLWITH EXPANSION ANCHORS

THERMALLY FUSEDMELAMINE OVER 1/4" MDFBACKING

THERMALLY FUSEDMELAMINE OVER 3/4"MDF INTERIORS

2' -

0"2'

- 0"

OAK VENEEROVER 1/4"MDF BACKING

OAK VENEER OVERDRAWERS ON FULLETENSION GLIDES SEEDETAIL

RUBBER BASE

3/4" MARINE PLYWOODBASE

2' -

0"3'

- 0"

2' -

0"

1/4" MDF BACK

BLACK EPOXYBACKSPLASH

OAK VENEER OVER 3/4"MDF

OAK VENEER OVER 3/4"MDF INTERIORS

BASE & UPPER CABINETSCALE: 1"=1' 0"5

1" BLACK SOLID EPOXYTOP

EPOXY EDGING

OAK VENEER OVER3/4" MDF

TEMPERD GLAZING

4"

2' -

6"6"

RECEPTION COUNTERSCALE: 1"=1' 0"6

2' -

6"3"

SOLID SURFACE TOPOVER PLYWOOD ON METALSUPPORTS

SOLID SURFACE TOPOVER PLYWOOD

P/L OVER 3/4" PLYWOODOR MDF

3/4" STAINLESS STEELSTANDOFF BRACKETS

PAINTED TEMPERED GLASS PANELS

2X FRAMING ROUT OUTHOLES FOR CONDUIT

P/L OVER PLYWOOD OR MDF BASE

SOLID SURFACE TOP OVER3/4" PLYWOODMETAL BRACE @ 3' O.C.

SOLID SURFACE OVER3/4" PLYWOOD BACK SPLASH

PRE-FINISHED METAL BRACE @ 3' O.C.

SOLID SURFACE OVER 3/4"PLYWOOD TOP

TYPICAL DRAWERSCALE: 1"=1' 0"7

1' - 0" 1' - 0"1' - 0"

2" DIA. SS COUNTERTOP SUPPORTS

2' - 3"

CLEANING COUNTERSCALE: 1"=1' 0"8

EDGING

2' -

0"

3/4" HDPE BOTTOM

2' - 3"

2' -

0"

CLEANING COUNTERSCALE: 1"=1' 0"9

3/4" HDPE TOP

FREE STANDING SSSINK UNIT

HDPE TOPHDPE EDGING

ATTACH TO CMU WALLWITH EXPANSION ANCHORS

OPEN SHELVINGSEE PLAN FOR LOCATIONS

SS SHELF

THERMALLLY FUSED MELAMINEOVER 3/4" MDF

6"3/

4"

3' -

0"

BASE & UPPER CABINETSCALE: 1"=1' 0"12

PVC EDGING

1' -

7"1'

- 5"

1' -

0"

1' - 0"

1' - 6"

P/L OVER 1/4" MDFBACKING

2X BLOCKING IN STUDWALLS

P/L OVER 3/4"MDF

P/L OVER 3/4" MDFINTERIORS

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

110

, 24,

201

7M

MBI

D D

OC

UM

ENTS

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

MM

MM

A601

MIL

LWO

RK

DET

AILS

SEE ELEVATIONS FOR UNITSWITHOUT DOORS OR SHELVES

SEE ELEVATIONS FOR UNITSWITHOUT DOORS OR SHELVES

SEE ELEVATIONS FOR UNITSWITHOUT DOORS OR SHELVES

Page 20: COVER PS (1)

LVT6

PCT1

LVT6

PCT1

CPT 1

PCT1

CPT1

PCON

CONCLVT7

LVT7

LVT7

LVT6

LVT5

LVT5

LVT3

LVT4

LVT3

LVT4

LVT4

LVT4

CPT1

LVT6

LVT5

LVT5

STR 1

PCT1

PCT1

LVT 2

PCON

PCON

LVT 1, 2

PCON

PCON

CONC

PCON

PCON

PCON PCON PCON PCON PCON

CONC

PCON

PCT1

PCON

PCON

SHIP-1

CT 1,3,4

CT 1,2,4

CT 1,3,4

CT 1,2,4

PCON

SHIP-1

MWP 1-3

PT 1,5,6

PT-3

CPT 1

SDT1

LOBBY

CORR

110

OFFICE

106

OFFICE

107

OFFICE

108

OFFICE

109

OFFICE

CORRIDOR

104OFFICE

105

OFFICE

102

OFFICE

103

OFFICE

116

OFFICE

117

OFFICE

118

CONFERENCE

119

MEN

114

WOMEN

113

OFF.

CORRIDOR

115

TELECOM

111MECHANICAL

ROOM

120

WALK

IN

COOLER

137

LARVAL

REARING

2

135

FREEZER

130

AQ.

EQUIP.

RM.

155

FISH

HEALTH

LAB

140

AQ.

EQUIP.

RM.

153

QUARANTINE

ROOM

152

BROODSTOCK

HOLDING &

CONDITIONING

1

131

AQUACULTURE

EQUIPMENT

128

BROODSTOCK

HOLDING &

CONDITIONING

2

127

AQUACULTURE

EQUIPMENT

126

ELEC

147

OFFICE

145

WOMEN

143

MEN

142

TRUCK

TRANSFER

141

LOBBY

100

STAIR

156

STAFF

144

SHOP/FEED

STORAGE

148

LIVE

FEED

(ARTEMIA)

122

LIVE FEED

(ROTIFERS)

123

HATCHERY

CORRIDOR

121

SHOWER

149

AQUACULTURE

EQUIPMENT

124

DECAPSULATION

ROOM

125

JAN

112

BROODSTOCK

Q/C

133

STORAGE

139

JAN

138

QUARANTINE

ROOM

154

TEL.

132

LARVAL

REARING

1

134

FOOD

PREP

129

STORAGE

150

STORAGE

151

MECHANICAL

157

COVERED

WATER

STORAGE

158

COVERED

PRE

QUARANTINE

AREA

159

QAUALITY

CONTROL

136

PCON

SDT1

LVT1

**TREADS & RISERS TO BE PRECAST CONCRETE (PCC)

STAIR

101

LVT1

LVT1

LVT1

LVT1

UP

UP

I101

FIR

ST

F

LO

OR

FIN

IS

H P

LA

N

3/32" = 1'-0"

1

FIRST FLOOR FINISH PLAN

N

1/8" = 1'-0"

SHIPLAP WALL1

I101

___

4"

OPEN

PT-1

RB-1

8"

SHIPLAP

PT-1

10

'-0

"

ABBREVIATIONS

ACT ACOUSTICAL CEILING TILE

CONC CONCRETE FLOOR

CPT CARPET TILE

CT CERAMIC TILE

EM ENGINEERED MARBLE

GB/PT GYP BOARD-PAINTED

GLS GLASS

GRT GROUT

LVT LUXURY VINYL TILE

MWP METAL WALL PANELS

PC PLASTIC CABINETRY

PCC PRECAST CONCRETE

RB RUBBER BASE

SDT STATIC DISSIPATIVE TILE

SHIP SHIPLAP WALL BOARDS

SS SOLID SURFACE

STR STAIR TREADS & RISERS

TO TOILET PARTITIONS

WD WOOD STAIN

WT WINDOW TREATMENT

PCON PAINTED CONCRETE

PCT PORCELAIN TILE

PCTB PORCELAIN TILE BASE

PL PLASTIC LAMINATE

PT PAINT

Pensacola - P

anam

a C

ity B

each - T

allahassee - M

obile - B

revard C

ounty - T

am

pa

Page 21: COVER PS (1)

STAIR

101

BALCONY

200

OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOW OPEN TO BELOW

OPEN TO BELOW

CLASSROOM

201

OPEN TO BELOW

OPEN TO BELOW

CHAIR

STORAGE

200A

MECH.

203

VEW

CORRIDOR

202

LVT1-2

LVT1

LVT1-2

LVT1-2

CPT1

LVT2

CPT1

LVT-1

LVT-2

LVT-1

LVT-2

LVT-1

LVT-2

PT 1, 5, 6GRAPHIC

PT-2

PT-2

14 12" = 2 PLANKS OF LVT-1 FROMWALL - TYPICAL

14 12" = 2 PLANKS OF LVT-1 FROMWALL - TYPICAL

14 12" = 2 PLANKS OF LVT-1 FROMWALL - TYPICAL

14 12" = 2 PLANKS OF LVT-1 FROMWALL - TYPICAL

14 12" = 2 PLANKS OF LVT-1 FROMWALL - TYPICAL

14 12" = 2 PLANKS OF LVT-1 FROMWALL - TYPICAL

ALIGN LVT-2 WITH DOOR OPENING

PT 1, 5, 6GRAPHIC

STR1

5'-10"APPROX

CONC

LVT1

**TREADS & RISERS TO BE PRECAST CONCRETE (PCC)

STAIR

156

LVT1

LVT1

LANDINGS TO BE LVT-1

LANDINGS TO BE LVT-1

DN

DN

I102

SE

CO

ND

F

LO

OR

FIN

IS

H P

LA

N

3/32" = 1'-0"

1

SECOND FLOOR FINISH PLAN

N

SYMBOL LEGEND

LVT-1

LVT-2

PT-5

PT-6

1/8" = 1'-0"

CERAMIC TILE PATTERN - TYPICAL WET WALL2

I102

___

8"

60

"

PCTB-1

1 ROW CT-2 (MEN)

1 ROW CT-3 (WOMEN)

1 ROW CT-2 (MEN)

1 ROW CT-3 (WOMEN)

1 ROW CT-4 WAVE TILE ACCENT

CT-1

CT-1

Pensacola - P

anam

a C

ity B

each - T

allahassee - M

obile - B

revard C

ounty - T

am

pa

ABBREVIATIONS

ACT ACOUSTICAL CEILING TILE

CONC CONCRETE FLOOR

CPT CARPET TILE

CT CERAMIC TILE

EM ENGINEERED MARBLE

GB/PT GYP BOARD-PAINTED

GLS GLASS

GRT GROUT

LVT LUXURY VINYL TILE

MWP METAL WALL PANELS

PC PLASTIC CABINETRY

PCC PRECAST CONCRETE

RB RUBBER BASE

SDT STATIC DISSIPATIVE TILE

SHIP SHIPLAP WALL BOARDS

SS SOLID SURFACE

STR STAIR TREADS & RISERS

TO TOILET PARTITIONS

WD WOOD STAIN

WT WINDOW TREATMENT

PCON PAINTED CONCRETE

PCT PORCELAIN TILE

PCTB PORCELAIN TILE BASE

PL PLASTIC LAMINATE

PT PAINT

Page 22: COVER PS (1)

WALK

IN

COOLER

137

LARVAL

REARING

2

135

FREEZER

130

AQ.

EQUIP.

RM.

155

FISH HEALTH

LAB

140

AQ.

EQUIP.

RM.

153

QUARANTINE

ROOM

152

BROODSTOCK

HOLDING &

CONDITIONING

1

131

AQUACULTURE

EQUIPMENT

128

BROODSTOCK

HOLDING &

CONDITIONING

2

127

AQUACULTURE

EQUIPMENT

126

ELECTRICAL

147

OFFICE

145

WOMEN

143

MEN

142

TRUCK

TRANSFER

141

STAIR

156

STAFF

144

SHOP/FEED

STORAGE

148

LIVE FEED

(ROTIFERS)

123

HATCHERY

CORRIDOR

121

SHOWER

149

AQUACULTURE

EQUIPMENT

124

DECAPSULATION

ROOM

125

BROODSTOCK

Q/C

133

STORAGE

139

JAN

138

QUARANTINE

ROOM

154

TEL.

132

LARVAL

REARING

1

134

FOOD

PREP

129

STORAGE

150

STORAGE

151

MECHANICAL

157

QAUALITY

CONTROL

136

C1A

C1A

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1A

C1A

C1A

C1A

C1A

C3

(TYP)

T1

S1

D1L

D1R

D1L

D1L

D3

S2

S2

S2

T2

A2

A1

C4A

C5

C1A

C6

C6

C6

C6

T3

T3

T3

T4

T4

T5

T5

T5

T5

T5

S3 S3

E1

E2

C1B C1B

D4

ELECTRICAL

104A

OFFICE

106

OFFICE

107

OFFICE

108

OFFICE

109

OFFICE

CORRIDOR

104

OFFICE

105

OFFICE

102

OFFICE

103

OFFICE

116

OFFICE

117

OFFICE

118

CONFERENCE

119

MEN

114

WOMEN

113

OFF.

CORRIDOR

115

TELECOM

111

MECHANICAL

ROOM

120

LOBBY

100

JAN

112

STAIR

101

LOBBY

CORRIDOR

110

LIVE

FEED

(ARTEMIA)

122

WALK

IN

COOLER

137

LARVAL

REARING

2

135

FREEZER

130

AQ.

EQUIP.

RM.

155

FISH HEALTH

LAB

140

AQ.

EQUIP.

RM.

153

QUARANTINE

ROOM

152

BROODSTOCK

HOLDING &

CONDITIONING

1

131

AQUACULTURE

EQUIPMENT

128

BROODSTOCK

HOLDING &

CONDITIONING

2

127

AQUACULTURE

EQUIPMENT

126

ELECTRICAL

147

OFFICE

145

WOMEN

143

MEN

142

TRUCK

TRANSFER

141

STAIR

156

STAFF

144

SHOP/FEED

STORAGE

148

LIVE FEED

(ROTIFERS)

123

HATCHERY

CORRIDOR

121

SHOWER

149

AQUACULTURE

EQUIPMENT

124

DECAPSULATION

ROOM

125

BROODSTOCK

Q/C

133

STORAGE

139

JAN

138

QUARANTINE

ROOM

154

TEL.

132

LARVAL

REARING

1

134

FOOD

PREP

129

STORAGE

150

STORAGE

151

MECHANICAL

157

QAUALITY

CONTROL

136

C1A

C1A

C2

C2

C2

C2C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1A

C1A

C1A

C1A

C1A

C1A

C1A

C3

(TYP)

T1

S1

D1R

D2

D1L

S2

S2

S2

T2

A2

A1

C5

C4A

C6

C6

C6

C6

T3

T3

T3

C1B

T4

T4

T5

T5

T5

T5

T5

S3 S3

E1

E2

D4

ELECTRICAL

104A

OFFICE

106

OFFICE

107

OFFICE

108

OFFICE

109

OFFICE

CORRIDOR

104

OFFICE

105

OFFICE

102

OFFICE

103

OFFICE

116

OFFICE

117

CONFERENCE

119

MEN

114

WOMEN

113

OFF.

CORRIDOR

115

TELECOM

111

MECHANICAL

ROOM

120

LOBBY

100

JAN

112

STAIR

101

LOBBY

CORRIDOR

110

LIVE

FEED

(ARTEMIA)

122

A2

A2

A2

S2

D1L

S2S2

C7A

C7B

C7A

C7B

C7A

C7B

C7A

C7B

C7A

C7A

C7A

C7A

C7A

C7B

C7B

C7B

C7B

C7B

UP

UP

I103

FIR

ST

F

LO

OR

FU

RN

IT

UR

E P

LA

N

3/32" = 1'-0"

1

FIRST FLOOR FURNITURE PLAN

N

FURNITURE LEGEND

Pensacola - P

anam

a C

ity B

each - T

allahassee - M

obile - B

revard C

ounty - T

am

pa

Page 23: COVER PS (1)

C4B C4A

C4A

C4B C4A

T6 QTY 25

(TYP)

C8A

STAIR

101

BALCONY

200

OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOW OPEN TO BELOW

OPEN TO BELOW

CLASSROOM

201

OPEN TO BELOW

OPEN TO BELOW

CHAIR

STORAGE

200A

MECH.

203

F

VEW

CORRIDOR

202

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

C8A

C8B

DN

DN

I104

SE

CO

ND

F

LO

OR

FU

RN

IT

UR

E P

LA

N

3/32" = 1'-0"

1

SECOND FLOOR FURNITURE PLAN

N

FURNITURE LEGEND

Pensacola - P

anam

a C

ity B

each - T

allahassee - M

obile - B

revard C

ounty - T

am

pa

Page 24: COVER PS (1)

I600

FIN

IS

H S

CH

ED

UL

E

AN

D M

AT

ER

IA

L C

OL

OR

LE

GE

ND

MATERIAL COLOR LEGEND

LVT LUXURY VINYL TILE

LVT-1 MANNINGTON COMMERCIAL

SPACIA WOOD

COLOR: SS5W2333 - CELLAR OAK

SIZE: 7.25" X 48" PLANKS

LVT-2 MANNINGTON COMMERCIAL

SPACIA WOOD

COLOR: SS5W2524 - WEATHERED OAK

SIZE: 7.25" X 48" PLANKS

LVT-3 JOHNSONITE IQ OPTIMA

COLOR: 833 JUNIPER

SIZE: 12' WIDE SHEET GOODS

CPT CARPET TILE

CPT-1 INTERFACE

PATTERN: MAIN LINE

COLOR: STRATOSPHERE 104245

SIZE: 50 X 50 cm TILES

PCT PORCELAIN FLOOR TILE

PCT-1 DAL TILE "PLAZA NOVA"

COLOR: GRAY FOG PN98

SIZE: 12" X 24" TILES

INSTALLED IN ASHLAR

BRICK PATTERN

CEILING

ACT ACOUSTICAL CEILING TILE

ACT-1 AMRSTRONG

DUNE BEVELED TEGULAR

COLOR: WHITE - 1775 SIZE: 24" X 24" X

5

8

"

GRID:

9

16

" SUPRAFINE

GYB/PT PAINTED GYPSUM BOARD

PT-7 SHERWIN WILLIAMS

SW7007 CEILING BRIGHT WHITE

SHEEN: FLAT

DOORS

PT-8 HOLLOW METAL FRAMES - PAINTED

SW0023 PEWTER TANKARD

SHEEN: ENAMEL LOW LUSTER

MILLWORK

SS SOLID SURFACE MATERIAL

SS-1 LIVINGSTONE

COLOR: L716 ROCK SALT

COUNTERTOPS

BASE

RB RUBBER WALL BASE

RB-1 JOHNSONITE

COLOR: 55 SILVER GREY

SIZE: 4" TRADITIONAL

PCTB PORCELAIN TILE BASE

PCTB-1 DAL TILE "PLAZA NOVA"

COLOR: BLACK SHADOW PN99

SIZE: 3" X 12" #S-43C9

PT PAINT

PT-1 SHERWIN WILLIAMS

COLOR: SW0055 LIGHT FRENCH GRAY

SHEEN: SATIN

PT-2 SHERWIN WILLIAMS

COLOR: SWOO31 DUTCH TILE BLUE

SHEEN: SATIN

PT-3 BENJAMIN MOORE

COLOR:2135-40 PROVINCE BLUE

SHEEN: SATIN

PT-5 SHERWIN WILLIAMS

COLOR: SW6711 PARAKEET

SHEEN: SATIN

PT-6 BENJAMIN MOORE

COLOR: 2049-40 PEACOCK BLUE

SHEEN: SATIN

PL PLASTIC LAMINATE

PL-1 FORMICA

COLOR: 8841-WR WHITE ASH

WALL CABINETS

PL-2 FORMICA

COLOR: 5876-58 FOSSIL WEFT

BASE CABINETS

PL-3 FORMICA

COLOR: 5349-58 FOSSIL

SHELVING/BASECABINETS/FACE OF

RECEPTION DESK

WT WINDOW TREATMENT

WT-1 LEVELOR 1" RIVIERA METAL BLINDS

COLOR: 860 MERCURY

ALL EXTERIOR OFFICE WINDOWS

CT CERAMIC TILE

CT-1 DAL TILE "SEMI-GLOSS"

COLOR: ICE GREY K176

SIZE: 6" X 6"

CT-2 DAL TILE "SEMI-GLOSS"

COLOR: WATERFALL 0169

SIZE: 6" X 6"

CT-3 DAL TILE "SEMI-GLOSS"

COLOR: SPA 0148

SIZE: 6" X 6"

CT-4 DAL TILE "MODERN DIMENSIONS"

COLOR: ARCTIC WHITE 0190

SIZE: 4" X 12" WAVE TILE

WD-1 WOOD STAIN

TO MATCH LVT -1

MANNINGTON SPACIA WOOD

COLOR: SS5W2333 - CELLAR OAK

SPECIES: WHITE BIRCH

LVT-4 JOHNSONITE IQ OPTIMA

COLOR: 838 SEA SPRAY

SIZE: 12' WIDE SHEET GOODS

LVT-5 JOHNSONITE IQ OPTIMA

COLOR: 841 DRAGON SCALE

SIZE: 12' WIDE SHEET GOODS

LVT-6 JOHNSONITE IQ OPTIMA

COLOR: 839 SUBMERGED

SIZE: 12' WIDE SHEET GOODS

LVT-7 JOHNSONITE IQ OPTIMA

COLOR: 861 CLOVER LEAF

SIZE: 12' WIDE SHEET GOODS

WD-2 WOOD STAIN

TO MATCH LVT -2

MANNINGTON SPACIA WOOD

COLOR: SS5W2524 -

WEATHERED OAK

SPECIES: WHITE BIRCH

NOTES

FINISH NOTES:

1. FLOOR PATTERN IN THIS AREA. SEE FINISH PLANS I-101 & I-102 FOR DETAILS & EXTENTS.

2. WALL PATTERN TO BE ADDITIVE ALTERNATE.

3. WOOD LAMINATE BEAMS TO MATCH LVT-1. WOOD CEILING TO MATCH LVT-2.

4. ACCENT WALL. SEE FINISH PLANS I-101 & I-102 FOR DETAILS & EXTENTS.

5. TILE WALL - FLOOR TO CEILING. SEE FINISH PLANS FOR ELEVATION & DETAILS.

6. PAINTED MOISTURE RESISTANT GYPSUM BOARD CEILING. SEE MATERIAL LEGEND FOR COLOR.

7. SHIPLAP WOOD WALL. BOARDS TO BE MOUNTED HORIZONTALLY. PAINTED PT-1. SEE ELEVATION 1/I-101.

8. ELEVATOR SHAFT TO HAVE BLEND OF MWP 1-3 (33% EACH COLOR) ON NORTH & WEST WALLS;

9. SHIP-1 ON EAST & SOUTH WALLS.

10. BACK PAINTED GLASS PANELS AT RECEPTION DESK. SEE ARCHITECTURAL FOR ELEVATIONS & DETAILS.

GENERAL NOTE:

ALL "A" & "C" WINDOWS ON 1ST & 2ND FLOORS AND "G" & "H" WINDOWS ON 2ND FLOOR TO RECEIVE

WINDOW TREATMENT (WT-1). SEE WINDOW SCHEDULE ON ARCHITECTURAL SHEET A501.

Pensacola - P

anam

a C

ity B

each - T

allahassee - M

obile - B

revard C

ounty - T

am

pa

GRT GROUT

GRT-1 TO MATCH MAPAI

COLOR: 93 WARM GRAY

ALL WALL TILE

GRT-2 TO MATCH MAPAI

COLOR: 09 GRAY

ALL FLOOR TILE

TP TOILET PARTITIONS

TP-1 AMPCO

COLOR: FOSSIL 5349

HIGH PRESSURE LAMINATE

SHIP-1 SHIPLAP WOOD

COLOR: PT-1 ON PINE OR EQUAL

SIZE: 8" WIDE BOARDS

SHIP SHIPLAP WOOD WALL

MWP-1 ATLAS INTERNATIONAL

METAL WALL PANELS

COLOR: PATINA GREEN

MWP METAL WALLPANELS

PC PLASTIC CABINETRY

PT-4 BENJAMIN MOORE

COLOR: 1640 DUSKY BLUE

SHEEN: SATIN

PC-1 SIMONA HDPE BOAT BOARD

UPPER CABINETS: POLAR WHITE

WD-2 WOOD STAIN

TO MATCH LVT -2

MANNINGTON SPACIA WOOD

SPECIES: WHITE BIRCH

PC-2 SIMONA HDPE

BASE CABINETS: DOLPHIN GRAY

PC-3 SIMONA HDPE

COUNTERTOPS: BLACK

SS-2 CORIAN

COLOR: SILT

COUNTERTOPS IN CLASSROOM (MILLWORK 11 & 12)

EM-1 ENGINEERED MARBLE WINDOW SILLS

COLOR: WHITE

MWP-2 ATLAS INTERNATIONAL

METAL WALL PANELS

COLOR: HEMLOCK GREEN

MWP-3 ATLAS INTERNATIONAL

METAL WALL PANELS

COLOR: HARTFORD GREEN (EMBOSSED)

ACT-2 AMRSTRONG

CERAMAGARD SQUARE EDGE

COLOR: WHITE -#607 SIZE: 24" X 24" X

5

8

"

GRID:

15

16

" PRELUDE PLUS XL FIREGUARD

PCON PAINTED CONCRETE

PCON-1 TO MATCH SHERWIN WILLIAMS

AS SPECIFIED IN SECTION 099123

#SW0023 PEWTER TANKARD

SDT STATIC DISSIPATIVE TILE

SDT-1 ROPPE

COLOR: STORM BEIGE #754

ABBREVIATIONS

ACT ACOUSTICAL CEILING TILE

CONC CONCRETE FLOOR

CPT CARPET TILE

CT CERAMIC TILE

EM ENGINEERED MARBLE

GB/PT GYP BOARD-PAINTED

GLS GLASS

GRT GROUT

LVT LUXURY VINYL TILE

MWP METAL WALL PANELS

PC PLASTIC CABINETRY

PCC PRECAST CONCRETE

RB RUBBER BASE

SDT STATIC DISSIPATIVE TILE

SHIP SHIPLAP WALL BOARDS

SS SOLID SURFACE

STR STAIR TREADS & RISERS

TO TOILET PARTITIONS

WD WOOD STAIN

WT WINDOW TREATMENT

PCON PAINTED CONCRETE

PCT PORCELAIN TILE

PCTB PORCELAIN TILE BASE

PL PLASTIC LAMINATE

PT PAINT

STR STAIR TREADS & RISERS

STR-1 JOHNSONITE

COLOR: 55 SILVER GREY

Page 25: COVER PS (1)

WATER HAMMER ARRESTOR SCHEDULE

P.D.I.SIZE FIXTURE UNITS SIZE

TYPE/MODELNUMBER (WROUGHT

COPPER SHELL) NOTES

A 1-11 1/2" 75001-S 1,2

B 12-32 3/4" 75002-S 1,2

C 33-60 1" 75003-S 1,2

NOTES:

1. REPRESENTS PLUMBING AND DRAINAGE INSTITUTE "STANDARD P.D.I.-WH201".

2. REPRESENTS ARRESTOR TYPE AND ASSOCIATED MODEL NUMBER DERIVED FROM JOSAM CO.

(SHOCK ABSORBERS, WROUGHT COPPER SHELL) AND IS USED AS A STANDARD FOR HELPING

DETERMINE PROPER SELECTION FROM OTHER MANUFACTURERS EQUALLY COMPETENT IN THE

FABRICATION OF AND USING THE SIZING METHOD ESTABLISHED IN ACCORDANCE WITH

PLUMBING DRAINAGE INSTITUTE (P.D.I.).

SHEET NOTE

HOT WATER RETURN PIPING

HOSE BIBB (HB) OR FREEZEPROFFWALL HYDRANT (WH)

FLOOR CLEANOUT

FLOOR DRAIN

GRADE LEVEL CLEANOUT

VENT THRU ROOF

FD

GCO

VTR

UNION

FCO

SANITARY PIPING

COLD WATER SUPPLY PIPING

HOT WATER SUPPLY PIPING

VENT PIPING

LEGEND

1

ABBREVIATIONS GENERAL NOTES

AAVADAAFF

BFP

CACFHCFMCFUCOCONCCW

DFDFUDIADN

ELEVEWCEWH

FCOFDFDAGFSFTFV

GGALVGCOGIGPFGPMGWH

HBHDHFUHWHWR

INV

MECH

NCNGNO

PSI

SSHSKSS

TLTTYP

U

VVTR

WW/WCWCOWHWHA

AIR ADMITTANCE VALVEAMERICANS WITH DISABILITIES ACTABOVE FINISH FLOOR

BACKFLOW PREVENTER

COMPRESSED AIRCUBIC FEET PER HOURCUBIC FEET PER MINUTECOLD WATER FIXTURE UNITSCLEANOUTCONCRETECOLD WATER

DRINKING FOUNTAINDRAINAGE FIXTURE UNITSDIAMETERDOWN

ELEVATIONELECTRICAL WATER COOLERELECTRIC WATER HEATER

FLOOR CLEANOUTFLOOR DRAINFLOOR DRAIN WITH AIR GAPFLOW SWITCHFOOT OR FEETFLUSH VALVE

NATURAL GASGALVANIZEDGRADE LEVEL CLEANOUTGREASE INTERCEPTORGALLONS PER FLUSHGALLONS PER MINUTEGAS WATER HEATER

HOSE BIBBHUB DRAINHOT WATER FIXTURE UNITSHOT WATERHOT WATER RETURN

INVERT

MECHANICAL

NORMALLY CLOSEDNATURAL GASNORMALLY OPEN

POUNDS PER SQUARE INCH

SANITARYSHOWERSINKSTAINLESS STEEL

TOILETTYPICAL

URINAL

VENTVENT THROUGH ROOF

WASTEWITHWATER CLOSET (TOILET)WALL CLEANOUTWALL HYDRANTWATER HAMMER ARRESTOR

1. PLUMBING CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, SIZES, AND CONNECTION LOCATIONS BEFORE ANY PIPE CUTTING ISCOMMENCED.

2. THE PIPING SHOWN ON THESE DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR SHALL ARRANGE WORK IN A NEAT AND ORDERLYMANNER. THE PLUMBING CONTRACTOR SHALL MAKE ANY OFFSETS, TRANSITIONS, AND OTHER MINOR ADJUSTMENTS ASREQUIRED FOR A COMPLETE AND WORKING SYSTEM INSTALLATION. COORDINATE ALL PIPING WITH DUCTWORK SHOPDRAWINGS. ROUTE PIPING AS REQUIRED TO AVOID CONFLICTS.

3. PRIOR TO START OF ANY WORK, COORDINATE SANITARY SEWER AND POTABLE WATER PIPING WITH CIVIL DRAWINGS. FIELDVERIFY PIPE INVERTS PRIOR TO LAYING OUT SANITARY SEWER PIPING.

4. CONTRACTOR SHALL PROVIDE ALL TEMPORARY AND PERMANENT CAPS FOR PIPING. CONTRACTOR SHALL NOT LEAVE PIPINGOPEN ENDED.

5. DRAWINGS SHOW GENERAL SIZE AND APPROXIMATE LOCATIONS. THE DRAWINGS ARE INTENDED TO SHOW THE GENERALARRANGEMENT OF THE UTILITY SYSTEM. THE CONTRACTOR SHALL FIELD VERIFY ALL UTILITY CONNECTIONS SIZE, LOCATION,AND DEPTH. THE CONTRACTOR SHALL INSTALL ALL SYSTEMS ACCORDING TO THE ACTUAL FIELD CONDITIONS FOUND. ANYPLUMBING SYSTEM COMPONENT INSTALLED INCORRECTLY DUE TO FIELD CONDITIONS SHALL BE REMOVED AND INSTALLEDCORRECTLY AT THE EXPENSE OF THE CONTRACTOR.

6. REFER TO RISERS FOR SIZES NOT INDICATED ON PLAN VIEWS. RISERS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO INDICATEALL OFFSETS, BENDS, FITTINGS, ETC.

7. INSTALL ALL EQUIPMENT AND PIPING PER MANUFACTURERS REQUIREMENTS AND TO MANUFACTURERS RECOMMENDEDCLEARANCES.

8. ALL TRAP PRIMERS AND DOMESTIC WATER ISOLATION VALVES SHALL BE ACCESSIBLE. ISOLATION VALVES SHALL BE OF THEQUARTER TURN BALL TYPE.

9. PROVIDE ACCESS DOORS/PANELS IN NON ACCESSIBLE WALLS AND CEILINGS FOR ALL VALVES, SHOCK ABSORBERS, AND ALLOTHER ITEMS THAT REQUIRE ACCESS FOR PROPER MAINTENANCE. COORDINATE COLOR AND INSTALLATION OF ACCESS DOORSWITH ARCHITECTURAL.

10. BALL VALVES SHALL BE PROVIDED ON ALL WATER BRANCH LINES TO ALL EQUIPMENT, HOSE BIBBS, AND RISER TAKE-OFFS.11. THE CONTRACTOR SHALL NOT CUT ANY STRUCTURAL MEMBERS OF BUILDING WITHOUT PRIOR WRITTEN CONSENT OF

ARCHITECT AND STRUCTURAL ENGINEER.12. DO NOT MOUNT DISCONNECT SWITCHES ON PLUMBING EQUIPMENT EXCEPT AS RECOMMENDED BY MANUFACTURER.13. PLUMBING CONTRACTOR TO COORDINATE WITH OTHER TRADES AS REQUIRED FOR INSTALLATION OF EQUIPMENT AND ANY

OTHER PLUMBING ITEMS.14. ALL PENETRATIONS OF FIREWALLS, CEILINGS, FLOORS, ETC. FOR PIPING SHALL BE UL LISTED FIRESTOPS AND SHALL BE

INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. CONTRACTOR SHALL KEEP MANUFACTURER SHOP DRAWINGS ATJOBSITE FOR ALL PENETRATIONS.

15. ALL (VTR'S) VENT THROUGH ROOF PENETRATIONS INDICATED ON PLANS ARE PRELIMINARY. FINAL LOCATIONS SHALL BECOORDINATED WITH ALL TRADES. ALL VTR'S SHALL BE A MINIMUM OF 10'-0" FROM ALL FRESH AIR INTAKE OPENINGS

16. CONTRACTOR SHALL PROVIDE GENERAL WARRANTY FOR WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF FINALCOMPLETION.

17. PROVIDE ALL EQUIPMENT AND VALVES WITH 2 1/2"x4" ENGRAVED, LAMINATED PLASTIC EQUIPMENT MARKER FORIDENTIFICATION PURPOSES.

18. PROVIDE ESCUTCHEON PLATES FOR ALL WALL PIPING PENETRATIONS.19. CONTRACTOR SHALL PROVIDE ALL CONNECTIONS, FITTINGS, APPURTENANCES, ETC. AS NECESSARY FOR INSTALLATION AND

OPERATION OF OWNER FURNISHED EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS.20. COMPLY WITH SPECIFICATIONS FOR PIPE TYPE, SLEEVES, HANGER SELECTIONS, AND APPLICATIONS.21. FOR EXPOSED COLD WATER PIPING, PROVIDE ALUMINUM VANDAL-PROOF JACKET. FOR EXPOSED COLD WATER PIPING EXPOSED

TO AMBIENT FREEZING CONDITIONS, PROVIDE HEAT TRACE FOR PIPING. COORDINATE WITH ELECTRICAL.22. REFER TO SPECIFICATIONS FOR PIPING INSULATION AND JACKETING REQUIREMENTS.23. ENGAGE A FACTORY AUTHORIZED SERVICE REPRESENTATIVE TO PERFORM START-UP SERVICES AND TO TRAIN OWNER'S

MAINTENANCE PERSONNEL TO ADJUST, OPERATE AND MAINTAIN EQUIPMENT.24. ALL ITEMS PROJECTING THROUGH ROOF SHALL BE FLASHED AND COUNTER-FLASHED A MINIMUM OF 12" AND SHALL BE

PAINTED TO MATCH ROOF COLOR. PROVIDE APPROVED SEALS AT ALL ROOF PENETRATIONS.25. PROVIDE PREFABRICATED WATER HAMMER ARRESTOR AT EACH NEW BATHROOM GROUP ON HOT AND COLD WATER PIPING.26. PROVIDE VACUUM BREAKERS AT FIXTURES WITH HOSE THREAD CONNECTIONS.27. PROVIDE DIELECTRIC UNIONS AT ALL DISSIMILAR METAL PIPE CONNECTIONS.28. UNDER SLAB SOIL, WASTE AND VENT PIPING PASSING TO UNDERSIDE OR THROUGH FOUNDATION FOOTING, WALL OR GRADE

BEAM SHALL BE PROVIDED WITH A RELIEVING ARCH OR PIPE SLEEVE 2 (TWO) PIPE SIZES GREATER THAN PIPE SIZE INDICATEDON PLANS. COORDINATE FINAL PIPE ROUTING AND LAYOUT WITH STRUCTURAL DRAWINGS.

29. SEE TOILET ROOM ELEVATIONS ON ARCHITECTURAL DRAWINGS FOR PLUMBING FIXTURE MOUNTING HEIGHT.30. COORDINATE EXACT LOCATION OF ALL EXTERIOR WALL HYDRANTS WITH ARCHITECT DRAWINGS.31. PRIOR TO SUBSTANTIAL COMPLETION OF NEW WORK AREAS, CONTRACTOR SHALL HAVE SANITARY PLUMBING SYSTEM

CLEARED OF DEBRIS OR ANY MATTER THAT WOULD INTERFERE OR PREVENT ADEQUATE CONVEYANCE OF MATERIALS FROMMOVING THROUGH AND TERMINATING INTO BUILDING OR PUBLIC DISPOSAL FACILITIES.

32. COORDINATE FINAL FLOOR DRAIN LOCATIONS WITH ARCHITECTURAL PLANS.33. PROVIDE BASE CLEANOUT AT LOWEST FLOOR LEVEL ON ALL SANITARY STACKS, STORM STACKS & WASTE STACKS. EXACT

LOCATION OF ALL CLEANOUTS MUST BE COORDINATED AND APPROVED PRIOR TO INSTALLATION.34. ALL COMPONENTS OF PLUMBING SYSTEMS ARE TO BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.35. WATER LINES FOR ICE MAKERS AND REFRIGERATORS SHALL BE BRAIDED STAINLESS STEEL.36. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OR RELOCATION OF ANY EXISTING MATERIALS WHICH MAY

INTERFERE WITH THE INSTALLATION OF NEW SYSTEMS OR UTILITIES.37. CONTRACTOR SHALL DEVELOP AND SUBMIT COORDINATION DRAWINGS WHICH IDENTIFY AND RESOLVE POTENTIAL CONFLICTS

BETWEEN PLUMBING WORK, STRUCTURAL, FIRE SPRINKLER, HVAC, AND ELECTRICAL SYSTEMS.38. MOUNT ALL HOSE BIBBS AT 42" A.F.F.39. ALL WORK SHALL COMPLY WITH THE FOLLOWING AGENCIES:• 2014 FLORIDA BUILDING CODE• 2014 FLORIDA MECHANICAL CODE• 2014 FLORIDA FUEL GAS CODE• 2014 FLORIDA PLUMBING CODE• NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)• AMERICAN SOCIETY OF HEATING AND REFRIGERATION ENGINEERS (ASHRAE)• AMERICAN SOCIETY OF PLUMBING ENGINEERS (ASPE)• ALL APPLICABLE LOCAL CODES, ORDINANCES, AND THE AUTHORITY HAVING JURISDICTION

1 NOT TO SCALEDETAIL

WATER HAMMER ARRESTOR

EQUIPMENT TAG

DRAWING DESCRIPTION

GATE VALVE

BALL VALVE

BUTTERFLY VALVE

SWING CHECK VALVE

SPRING CHECK VALVE

PRESSURE REDUCING VALVE

PRESSURE RELIEF VALVE. PIPEFULL SIZE DISCHARGE TO FLOOR DRAIN.

UNION

GLOBE VALVE

THERMAL EXPANSION VALVE

ANGLE VALVE

SOLENOID VALVE

FLEXIBLE PIPE CONNECTOR

STRAINER WITH BLOW DOWN GATE VALVE FULLSIZE OF STRAINER AND 3/4" HOSE ENDCONNECTION WITH CAP

ELBOW TURN UP

ELBOW TURN DOWN

CONNECTION, BOTTOM

CONNECTION, TOP

PRV

EWH1

CLEANOUT ABOVE CEILINGCOAC

NATURAL GAS PIPINGG

CONSULTING GROUP,INC.

WILLIAM JOSEPH JONES P.E.FLORIDA LICENSE NUMBER 58080

901 W. Garden St. Pensacola, FL 32502P: 850-438-0050 F: 850-432-8631

FLORIDA LICENSE NUMBER 05371

MECHANICAL ELECTRICAL STRUCTURALCOMMUNICATIONS INDUSTRIAL

S C H M I D T.

SCG PROJECT: 2016-121

Z:\P

roje

cts\

A-H

|BD

I-Fis

h H

atch

ery|

Dra

win

gs|a

nsi-D

-New

Log

o.dw

g Ju

l 01,

201

6

1 2 3 4 5

C

B

A

C

B

A

D D

PRO

JEC

T N

O:

DES

IGN

ED B

Y:

DR

AWN

BY:

CH

EK'D

BY:

PRO

J. M

GR

:

DKH

PRO

JEC

T N

O:

FDEP

GU

LF S

TATE

SM

ARIN

E FI

SHER

IES

HAT

CH

ERY

REL

EASE

D F

OR

CO

NST

RU

CTI

ON

NO

.D

ATE

APPR

.R

EVIS

ION

/AC

TIO

N T

AKEN

3770

1.01

1 3 4 52

1O

ct. 2

4, 1

7W

JJBI

D D

OC

UM

ENTS

CAD

CAD

P001

PLU

MBI

NG

LEG

END

AND

NO

TES

WJJ