Countywide Recycling and Disposal Facility Weekly Progress Report
12/19/08 This Weekly Progress Report is prepared by Countywide and submitted to the OEPA weekly by the close of business on each Friday. This meets the requirement of Order No. 5 of the December 31, 2007 Findings and Orders to provide updates on progress of field activities. In addition, this report provides updated presentations of data being collected. All information presented in this report originates from the publicly-available data being gathered as part of the normal operational requirements of the facility or as part of the Director’s Findings and Orders. This report covers the period December 13, 2008 to December 19, 2008. PROGRESS ON FIELD ACTIVITIES TOWARD DECEMBER 31, 2007 ORDERS See the attached Table 1. DATA PRESENTATION Bold font in comments column means updated version included with this report. Attachment Attachment No. Comments Wellhead Temperature Graph 1 Updated Dec. 19, 2008 Downhole Temp. Graph 2 Updated Dec. 19, 2008 FBMP Max. In-Situ Temp. Graph 3 Updated Dec. 12, 2008 Leachate Sump Temperature. Graph 5 Updated Dec. 19, 2008 LCS Temperature Graph 6 Updated Dec. 19, 2008 Weekly Cumulative Sett. Graph 7 Updated Dec. 12, 2008 Quarterly Cumulative Sett. Graph 8 Updated Oct. 10, 2008 CO Graph 9 Updated Dec. 19, 2008 Leachate Volume Graph 10 Updated Dec. 12, 2008 Leachate COD Graph 11 Updated Dec. 5, 2008 Leachate TDS Graph 12 Updated Dec. 5, 2008 Odor (Nasal Ranger) Readings 13 Updated Dec. 5, 2008 Appendices (transmitted separately) Appendix No. Comments Wellhead Temperature Zone Map A Updated Nov. 14, 2008 4-Week Cumulative Sett. Front Map B Updated Nov. 21, 2008 Carbon Monoxide Zone Map C Updated Dec. 19, 2008 AMBIENT AIR SAMPLING ACTIVITIES LOG See attached Table 2. OUTSTANDING ISSUES Significant documents pending OEPA review, comment, and/or approval:
• Fire Suppression Plan submitted May 25, 2007 • Permit-to-Install (PTI) “Needs Analysis” submitted May 29, 2007 • Dewatering and EGES Enhancement Work Plan submitted on Jan. 14, 2008
TABLE 1
WEEKLY PROGRESS REPORT FOR DECEMBER 31, 2007 F&OsCOUNTYWIDE LANDFILLWEEK ENDING 12-19-08
Units Estimated Previously Completed Total Est. to beWork Item of Required Completed This Completed Completed Comments
Measure or Goal* Period to Date Next Week
Install Vertical Relief Wells ea. 4 4 0 4 0 RW-4 is currently not pumping, and is in an actively settling area; this situation is under assessment to determine if this well can be maintained.
Install Perm. Dewatering Pumps and Infrastructure ea. 44 44 0 44 0
Install 4-inch HDPE Liquid Discharge Line l.f. 3000 3000 0 3000 0
Install 2-inch HDPE Air Supply Line l.f. 10500 10500 0 10500 0
Install and Test Compressors ea. 3 3 0 3 0
Relocate Flares from Top of Landfill ea. 1 1 0 1 0
Install New Gas Wells ea.37 (original goal was
10)37 0 37 0
Replace Compromised Wells ea.23 (original goal was
12)23 0 23 0
Install Perm. Dewatering Pumps in New and Replacement Gas Wells ea. 20 18 0 18 0
Install 4-inch HDPE Liquid Discharge Line for new gas wells l.f. 2000 2500 0 2500 0 Full restoration to this system (following capping activities) has been performed.
Install 2-inch HDPE Air Supply Line for new gas wells l.f. 2000 2500 0 2500 0 Full restoration to this system (following capping activities) has been performed.
Measure Achievable Drawdown ea. 73 73 0 73 0
Establish Baseline Flow ea. 1 0 0 0 0 Countywide has completed a test assessing gas flow as a function of gas well fluid level drawdown.
* The estimate of "required" or "goal" items may change as project progresses.
Note: This table presents one-time field activities and does not address recurring activities such as liquid level measurements, downhole temperature profiles, liquid sampling, etc.
Table 2Log of Field Activities and Conditions
Per Order No. 2.B of Feb. 7, 2008 Orders
Approx.Date Time Contractor Location
12/7/08 NA NA NA12/8/08 13:30 - 17:45 BVR Cell 5/7 to 7/8A12/8/08 14:00 - 15:00 AEG Cell 712/8/08 7:00 - 17:00 AEG 88 acres12/9/08 13:00 - 17:00 AEG Cell 5/7 y-area12/9/08 7:00 - 17:30 BVR Cell 5/7 to 7/8A12/9/08 7:00 - 17:00 AEG 88 acres12/10/08 8:00 - 9:00 AEG Cell 712/10/08 12:00 - 15:00 AEG Cell 512/10/08 7:00 - 17:00 AEG 88 acres12/11/08 7:00 - 17:30 BVR Cell 5/7 to 7/8A12/11/08 8:30 - 10:00 AEG Cell 712/11/08 7:00 - 17:00 AEG 88 acres12/12/08 7:00 - 17:30 BVR Cell 5/7 to 7/8A12/12/08 7:00 - 17:00 AEG 88 acres12/13/08 7:00 - 12:30 AEG 88 acres
AEG decomissioned PW-326 as part of the Isolation Break Project
Performed waste excavation/relocation activities for the Isolation Break ProjectAEG liner crew repaired a leak in the FML East of W-30RMBlackhawk pump maintenance and O&M leachate sampling
Performed waste excavation/relocation activities for the Isolation Break ProjectBlackhawk pump maintenance and O&M leachate sampling
Blackhawk pump maintenance
Field Activity or Potentially Odor-Causing Incident.No activities monitored.
Beaver began waste excavation/relocation activities for the Isolation Break Project
Blackhawk pump maintenance and O&M leachate sampling
Blackhawk pump maintenance and O&M leachate samplingDecomissioned PW-332 as part of the Isolation Break Project
AEG cut through the 12" header running E to W near D2-M and capped it off on each endBlackhawk pump maintenance and O&M leachate sampling
Performed waste excavation/relocation activities for the Isolation Break ProjectDecomissioned PW-359 as part of the Isolation Break Project
ATTACHMENT 1
Initial Wellhead Temperatures
in the 88-acre Area
95.5 100.2 108.0
113.1
103.8
105.2
101.8
95.9
85.6
98.6
93.6
104.0
105.5
104.5 113.2 1
25.1
124.1
124.8
120.7
121.5
121.3
117.9
114.9 122.9
125.2 1
36.1
138.3
142.7
144.7
141.5
142.6
134.1
132.5
126.5
127.0
130.6
136.5
137.8
141.8
145.7
143.2
142.4
148.4
146.2
140
151
14815
217
515
515
214
1144
184
152
182
165
185 18
721
320
4 208
207
205
203
212
207
202
20020
221
0214
211
208
205 21
020
120
120
0202
203
201
201
202 20
4 207
203 20
5
45
5660
67 65
52
40 40
6
35
2730
40
28
67
54
65
56
3834
2114 12
20
29
58 60
6972
62
53
34
23
8
20
29
40
5358
67 69
6055
44
0.0
50.0
100.0
150.0
200.0
250.0
Aug-04 Feb-05 Sep-05 Mar-06 Oct-06 Apr-07 Nov-07 Jun-08 Dec-08 Jul-09
Month
De
gre
es
F
Monthly Average Monthly Maxiumum Monthly Minimum
All Cell 7 wells excluded except PW-315.
Anomalous readings from PW-147 excluded for June 2008.
ATTACHMENT 2
Downhole Temperatures
Monthly Maximums and Averages
180.5
7 201.8
9
197.1
8
195.2
2
186.8
6
200.1
5
189.8
8
186.5
7
185.1
1
184.0
8
179.1
6
189.6
5
187.5
3
181.8
9
192.1
4
196.7
8
192.5
2
185.9
2
179.0
9
176.8
4
0
50
100
150
200
250
300
April May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June July Aug Sept Oct Nov
Month
Deg
rees F
Monthly Maximum Monthly Average Linear (Monthly Average)
The maximum is the temperature of the highest single reading recorded during that month.
The above graph was generated using data from those wells within the 88-acre area (excluding
Cell 7) that met the March 2007 F&O criteria for performing downhole temperature
measurements, i.e. a wellhead temperature greater than 150 degrees F.
A correction has been made to the October 2007 data point.
DRAFT Attachment 5
Weekly Leachate Temperatures in Cell Sump
40
60
80
100
120
140
160
4/6/20
07
6/6/20
07
8/6/20
07
10/6/
2007
12/6/
2007
2/5/20
08
4/6/20
08
6/6/20
08
8/6/20
08
10/6/
2008
12/6/
2008
Date
Tem
pera
ture
(deg
. F)
1 2 North 2 South 3 4 5 A/B 5 C/D 7
DRAFT Attachment 6
Weekly Leachate Cleanout Riser Temperatures
60
80
100
120
140
160
180
200
5/17/2
007
7/13/2
007
9/8/20
07
11/4/
2007
12/31
/2007
2/26/2
008
4/23/2
008
6/19/2
008
8/15/2
008
10/11
/2008
12/7/
2008
Date
Tem
pera
ture
(deg
. F)
1C 1D 2C 3B Type K 3B Type T 3C 4C 4E 5 A/B 6B
ATTACHMENT 9
Carbon Monoxide Concentrations
(Excluding Invalid Sample Results)
0
1000
2000
3000
4000
5000
6000
7000
8000
April
07
May
07
June
07
July
07
Aug
07
Sept
07
Oct
07
Nov
07
Dec
07
Jan
08
Feb
08
Mar
08
Apr
08
May
08
June
08
July
08
Aug
08
Sept
08
Oct
08
Nov
08
Date
Co
nc
en
tra
tio
n (
pp
mv
)
Minimum Detected Concentration Maximum Concentration Average Concentration
Non-detects are represented by a zero concentration
in the average calculation.