CITY OF KIRKLAND Public Works Department 123 Fifth Avenue, Kirkland, WA 98033 425.587.3800 www.kirklandwa.gov
MEMORANDUM To: Kurt Triplett, City Manager From: Kathy Brown, Public Works Director Dave Snider, P.E., Capital Projects Manager Kari Page, Cross Kirkland Corridor Coordinator Date: April 8, 2015 Subject: Cross Kirkland Corridor Update
RECOMMENDATION: It is recommended that the City Council receives an update on all things related to the Cross Kirkland Corridor (CKC) and hears a portion of the Currently Kirkland video “What’s not to love about the CKC.” 1. Interim Trail Construction: Construction was completed (except work at 124th/Totem
Lake Blvd—see below) in March of 2015 with only warranty work items and required contractor paperwork submittals remaining. The estimated final construction contract (with reduced material quantities and removal of the 124th/TLB Intersection work) is $1,890,000, which is approximately $200,000 under the original contract amount of $2,099,175. Staff will return to City Council with an Acceptance-of-Work recommendation on the Interim Trail construction once the contractor has submitted all of the grant and other required paperwork.
2. Rail removal and overlay at 124th Avenue NE and Totem Lake Boulevard: Due to
weather and other construction related concerns during the contract work on the Interim Trail, a City and WSDOT Local Programs (grant administrators) staff decision was made to delete the rail removal/restoration work element from the trail construction contract. In order to achieve a better finished product, it was concluded that this work should be performed during the more favorable paving weather months (late spring/early summer). Staff is currently costing the work using the Job Order Contracting process and anticipates accomplishing the rail removal, road paving, and additional sidewalk construction by early to mid-summer of this year—the currently estimated cost for this work is $105,000. Once this work is complete the entire project and final project closeout for the Interim Trail Project would occur after obtaining funding agency concurrence; City Council acceptance of the work is anticipated in late summer/early fall of 2015.
3. Waddell property connection: The City is in the process of purchasing two properties
adjacent to the CKC in the Houghton neighborhood, located at 6705 and 6711 106th Avenue NE. These properties can be used to provide connectivity from the CKC to the Houghton Shopping Center while preserving the property until the community Houghton/Everest Neighborhood Business Center update process is complete.
Council Meeting: 04/21/2015 Agenda: Unfinished Business Item #: 10. c.
Memorandum to Kurt Triplett April 8, 2014
Page 2
The CKC Master Plan identified connectivity to the Houghton Shopping Center along NE 68th Street as a high priority. Knowing this, the property owner, Doug Waddell, offered these properties to the City of Kirkland prior to his placing them on the open real estate market for sale. Seizing the opportunity to use the properties to further implement its long-term vision for the CKC, the City Council recently authorized the acquisition of two parcels. The City has a signed Purchase and Sale Agreement (PSA) with Mr. Waddell. Included in the PSA, is a due diligence period, allowing the City, as the buyer, an opportunity to evaluate the property prior to closing the sale. This due diligence period is coming to an end, and the sale is scheduled to close on April 24th. Staff is in the process of creating concepts for connecting the CKC to the Houghton Shopping Center using the Waddell properties. The transaction with Mr. Waddell will include a Pedestrian Access Agreement that will provide the City with the option of making an interim connection over a portion of the property to the north. Other than construction of a connection to the CKC, there are no plans at this time to redevelop or alter the site.
4. Maintenance and Operations: The 2012 Parks Levy included $98,800/year for maintenance of the Interim Trail. Public Works is in the process of developing an ongoing maintenance plan for the Interim Trail to set standards and determine whether this funding is sufficient to meet those standards. Using the principles of maintenance management, the following steps are underway:
a) Feature Inventory: A complete inventory of all items to be maintained on the interim
trail. Examples of trail feature inventory items include: trail surface, drainage ditches, backslopes, fencing, landscape, wetland areas, crosswalks, flashing beacons, paved approaches, and drainage culverts.
b) Maintenance Tasks: A list of tasks necessary to maintain each inventory feature. For
example, tasks to be performed on the trail surface might include grading, patching, restoration, and litter cleanup.
c) Performance Standards: The standard crew, equipment and materials needed to
perform each task on a daily basis, along with an estimated standard daily work accomplishment.
d) Service Levels/Effort Levels: The annual amount of work to be performed for each
task. The effort level is usually expressed in terms of frequency. For some tasks, it makes sense to express the effort level in terms of quantities of material per amount of inventory (for example, surface patching may be expressed as “tons per mile”).
Using the information above, an annual work program is developed for each maintenance task. Projected work quantities, budget, labor, equipment, and material are established for each task. This work plan is further divided into each month.
Memorandum to Kurt Triplett April 8, 2014
Page 3
Public Works is in the process of implementing an automated Maintenance Management System (MMS). Prior to the start of a functioning MMS, a maintenance management work program is being developed manually for the interim trail a) Garbage cans: Combination garbage and recycle recepticles
were installed in March at all “at grade road crossings” including: 132nd Avenue NE; 128th Avenue NE; NE 124th Street/Totem Lake Blvd; 120th Avenue NE; NE 112th Street; NE 110th Street; NE 87th Street; Kirkland Avenue; 6th Street South; NE 52nd Street; and 108th Avenue NE. Waste Management services all locations weekly as part of the existing contract with the City of Kirkland with no additional costs.
b) Mutt mitt dispensers: Seattle Veternary Specialists will be
installing mutt mitt dispensers next to the garbage receptacles at 11 locations within the next month. Volunteers will be asked to adopt the receptacles to keep them filled with bags. Maintenance staff is ready to assist if the volume of use is higher than what the adoptees can handle.
c) Counts on the corridor: As a pilot, in January a VideoLan
Camera was purchased and placed on the trail to record images for counting users. The camera has a rechargable battery which is recharged every few days. Counts have been taken prior to the opening of the trail, the weekend of the opening and several weeks after the opening. The advantage of the camera (over infrared counters) is the ability to distinguish different types of users (bicycle, running, walking, dog walking, etc.). The video recordings will be reviewed and users tallied so an assessment can be made to determine if this is the most effective way of monitoring use of the trail over time.
d) Americans with Disabilities Act (ADA) plan and access: ADA
access to the corridor is a high priority. Staff has been working on both a long range plan and opportunities for quick wins. Seven or eight sites have been identified along the corridor to provide parking and ADA access. Those locations include 128th Avenue NE, 120th Avenue NE, NE 112th Street, NE 110th Street, NE 87th Street, Kirkland Avenue, 5th Place S, and possibly the Waddell property connection. The topographical and access challenges on the southern quadrant of the corridor emphasizes the importance of the South Kirkland TOD CKC Multi-Modal bridge. Each parking and ADA location is estimated to cost roughly $2-3,000. Staff will return to Council with a recommended plan and funding strategy for these quick ADA wins.
e) Adjacent property owners letter: There have been a handful of tree
trimming/vegetation removal violations on the CKC since the Interim Trail has been
Signs for donated Mutt Mitt Dispenser
Garbage/recycle receptacle
Memorandum to Kurt Triplett April 8, 2014
Page 4
opened. In most cases, the perpetrator was not aware of the City’s rules to obtain a permit to remove vegetation on City property. As the growing season approaches, this problem may worsen. Therefore, the City will be sending a mailing to all of the property owners along the CKC to explain the permiting process. In addition, frequently asked questions and contact information of key staff will be included to foster communications between the CKC operational staff and our new neighbors.
5. Outreach
a) Kudos: The City is receiving “fan mail” about the CKC almost daily. Staff would be remiss not to reflect this overwhelmingly positive feedback as part of the CKC update. Here are just a few comments:
“I never expected the day would arrive when the BNR corridor would become a multi-use trail for the people. I've lived in Kirkland 31 years. My family is already using the trail regularly. We intend to enjoy the honeymoon period to the max, i.e. before it's paved.” “The CKC is such a wonderful addition to the regional trail system in the Greenway—many thanks to all of you at the City of Kirkland for championing this through.” Mountain to Sound Greenway “It's the fastest way to get to work by bike vs sitting on 405 in a car. Thank you for all your hard work on this project!” “Greetings -- yesterday I walked part of the cross Kirkland corridor for the first time---I LOVE it” “I've been using the CKC to commute by bike from my house in North Bellevue to my office on NE 122ND Way in Kirkland. It is a joy to take the CKC. What a wonderful way to start and end the work day.” “Please extend my thanks and gratitude to any and all who responsible for having the foresight, motivation and persistence to see this project from concept through to completion. CKC is a superb resource. So well envisioned and so well executed.” “A big thanks goes to the City of Kirkland planners, the 520 highway planners, the voters, and of course me (since I voted for these projects and the funding). I recently had the most excellent commute. I live near 116th & 405 in Kirkland and I commute downtown Seattle most week days.” “This is so much better than commuting by car, or waiting for the chronically overflowing 255 bus.” “I had a wonderful commute that was nearly all on separated bike/walk paths. In 6 miles, I had about 4 intersections – 3 with user activated flashing yellow crosswalks. The car free trails almost felt like I was in Amsterdam!”
Memorandum to Kurt Triplett April 8, 2014
Page 5
“I can hardly wait for summer and longer days – this commute will be truly incredible. Oh wait, don’t tell anyone. Keep it a secret.”
b) Road show: CKC is being recognized and applauded on the regional level including presentations for Cascadia Eastside Branch Collaborative on February 17; Washington Bike Summit on March 16; and Feet First Walkable Washington Symposium on April 2. In addition, two important tours have been scheduled: the American Planning Association (APA) National Conference on April 20, and the International City/County Management Association (ICMA) Annual Conference on September 28.
c) Police Utility Terrain Vehicles (UTVs): Police Officers
are being trained and the vehicles are being licensed for street use. By later this spring these vehicles will be on the Cross Kirkland Corridor. The City is turning to 5th grade classes within the Lake Washington School District (LWSD) to name the vehicles. Fifth grade classes (including 4th/5th Grade combination classes) have been invited to submit suggested names for the UTVs by May 1, 2015. Participating LWSD elementary schools to date include: Peter Kirk, A.G. Bell, Ben Franklin, David Thoreau, Carl Sandburg and Juanita. A community online vote will occur from May 2 through May 15 with the winning name to be announced at a future City Council meeting and in City materials. Contest details can be found at www.kirklandwa.gov/crosskirklandcorridor.
Officers will be visiting participating schools as a way to display the UTVs and interact with students.” On April 21, KPD Neighborhood Resource Officer Audra Weber will be at Sandburg, Thoreau and Juanita schools and on April 23, she will be at Franklin, Kirk and Bell schools.
d) Draft Map: A user map of the CKC is in progress and
is anticipated to be printed and online by summer. The map includes trail connections, parking opportunities (possibly including ADA), restrooms, park amenities, nearby business/shopping/restaurant districts, and other landmarks.
e) Photo competition: CKC users are often sending in photos and videos of their
favorite features of the trail. Instead of hiring a professional to take photos of the trail for the web site and other publications, staff is considering a photo competition.
Photo by CKC user and neighbor Bea Stollnitz
City Manager Kurt Triplett and Chief Olsen with one of the UTVs
Memorandum to Kurt Triplett April 8, 2014
Page 6
6. Projects a) South Kirkland TOD CKC Multi-Modal Bridge/Elevator: The South Kirkland Pedestrian
Bridge project will provide a needed ADA-accessible pedestrian route between the Cross Kirkland Corridor (CKC) trail and King County Metro’s South Kirkland Park & Ride facility and the nearby Transit-Oriented Development (TOD). There is approximately 50 vertical feet between the level of the parking lot and the level of the CKC trail where it intersections 108th Avenue NE. Current pedestrian access between the South Kirkland facility and the CKC trail is limited to a long and strenuous sidewalk along 108th Avenue NE. The connection will incorporate an elevator and stair tower with access to the parking lot and the bottom level of the adjacent parking garage with an elevated pedestrian bridge that will connect to the trail. The 60-foot tower will enclose a passenger elevator and staircase within a steel-framed structure wrapped in a combination of glazing, architectural steel mesh, and perforated metal panels. The architecture of the project will be important, as this connection is located at the south terminus of the City of Kirkland’s CKC trail, and so may be considered a “gateway” to the trail north. The project is currently being designed and is approaching a 60-percent design and engineer’s estimate stage. As much of the project represents an addition to an existing and fully-utilized Park & Ride facility, and the structure will be maintained by the City of Kirkland after construction, several aspects of the project require careful coordination with King County that is still underway. The “gateway” aspect of the project also has a significant influence on the 60-percent design and estimate. Initial project funds for the project came from a Washington State Capital Appropriations grant, with supplemental funds committed to the project by King County. Additional funding necessary to the complete construction of the project will be evaluated based on the 60-percent design and engineer’s estimate. Staff is evaluating options to balance the desire to make the structure an iconic feature with project affordability.
b) SRM Development: The public improvements between
Google Phase I and Phase II on the CKC are under construction and anticipated to be complete one month later than originally planned. The trail is expected to be open August 1st and a joint SRM Development, Google, and City of Kirkland opening celebration is being discussed for mid-August. More information will follow on this event.
c) Kalakala Art: Roughly 30 pieces of the Kalakala have come home to rest in Kirkland after nearly 80 years (totaling $59,000).
Wheel room (excluding the front section) Two large doors – where cars entered Valve wheels (4)
One of the ten art deco railing (with brass hand rail)
Memorandum to Kurt Triplett April 8, 2014
Page 7
Hand railing (approximately 60 feet) Top silver section of the front of the boat with 6
port holes Window section of exterior with 3 port holes Rudder trim lever/wheel
Rectangle brass window frames (5) Round top brass window frames (2) Small hatch with door Mooring line access hole
In July of 1935, the ship made its maiden voyage into Elliot Bay from the Kirkland Shipyard at Carillon Point. Within six years, the ship had carried over six million passengers and was later incorporated into the State’s ferry system (1951). At the Worlds Fair in 1962, the Kalakala was voted the second biggest attraction after the Space Needle. The relevance of the iconic art deco ship to the history of the Pacific Northwest was reflected by the interest in seeing and acquiring pieces of the ship when Rhine Demolition began dismantling it in February of this year. Salty’s Restaurant and the City of Kirkland preceded hundreds of people and organizations who inquired and flocked to the salvage “garage sale” during the demolition. The vision is to place the art in a way that will connect them visually to Carillon Point from the Cross Kirkland Corridor. A committee comprised of members from the Cultural Arts Commission, Parks Board, Transportation Commission, and interested contributors has been formed to develop an art concept for reuse of the salvaged Kalakala pieces. The first committing meeting is scheduled for April 20th and will include a visit to the storage area where the salvaged parts are located and an afternoon session for brainstorming ideas for the art. A Request for Qualifications will be developed later this spring to procure a renovation and installation consultant/artist.
d) CKC Connections: Connections to the CKC are a high priority in the draft Transportation Master Plan. The interim trail on the CKC provides an important new corridor for pedestrians and bicycles, and City staff are making every effort to complete connections to the CKC, and to complete non-motorized networks that include the CKC. There are four general categories of connections underway:
• Neighborhood Safety Program: This year’s Neighborhood Safety Program (NSP) project list includes important connections to the CKC. Details are
Kalakala Pieces being transported to Kirkland
Inside the Kalakala Wheel House
Memorandum to Kurt Triplett April 8, 2014
Page 8
included in the Neighborhood Safety Program memo for the April 21 City Council meeting.
• Capital Improvement Program (CIP): In preparing the 2015-2016 CIP,
considerable effort has been put into creating a comprehensive approach to implementing the policies set forth in the draft Transportation Master Plan (TMP). The draft TMP places a high priority on CKC connections, which will be reflected in the proposed CIP budget for 2015-2016.
• Maintenance Work Program: In addition to the CIP, some CKC connection
projects are small enough in scope to be completed by in-house Public Works crews.
• Volunteer Work: Some connections are being built by volunteer groups, under
the oversight of Public Works and Parks staff. Attachment A is a draft map indicating existing connections, as well as those planned through the NSP. Attachment B is a draft listing of each trail connection. The map will be updated once the CIP is finalized.
7. Planning a) Regional Advisory Council: The Regional Advisory Council April 22 meeting will be
held at Kirkland City Hall Council Chambers from 2:00 p.m. to 4:00 p.m. The agenda includes the 2015 Work Plan, Collaborative Funding, Branding, and an update on concepts and funding of the gap in the Eastside Rail Corridor at Wilburton created by the construction of I-405. Kirkland staff continues to participate on the Staff Team to coordinate efforts with the regional entities.
b) Sound Transit and City of Belleuve Memorandum of Understanding (MOU): On
Monday, April 6, Sound Transit and the City of Bellevue reached an agreement for an amended memorandum of understanding that will allow East Link light rail construction to begin in Bellevue. The City of Bellevue will hold a public hearing on April 13 and the Sound Transit board will consider approving the MOU on April 23. If the maintenance facility is sited in Bel-Red, the MOU also calls for the construction of an interim trail within a one-mile stretch of the Eastside Rail Corridor to connect to a station at 120th Avenue Northeast.
c) Special Events: The first special event is planned for the CKC on Mother’s Day. For
more than 10 years, the Mother’s Day Marathon has been known for being one of the hilliest and most challenging half marathons in the Northwest. By using the CKC and turning the event into a point-to-point route, the marathan will be one of the flatest and event organizers anticipate having the fastest times in the region. The event will be the first of several that have been scheduled on the CKC. Attachment C is a listing of currently scheduled special events on the CKC.
The CKC will be a wonderful place to hold events, with the views, flat terrain and separation from the automobile. Anticipating a surge in special event requests, staff has developed a plan that will keep the trail safe and open to the community during events. Event guidelines include:
Memorandum to Kurt Triplett April 8, 2014
Page 9
No more than two events can be held on the CKC in one month (no matter how much of the CKC the event will use).
No races will be “out and back” to enable the public to continue to use the trail during races.
Off-duty Kirkland police officers are required for traffic control at each street crossing.
Motorized vehicles are prohibited. Event staff shall lead participants and monitor course by mountain bike or other nonmotorized means.
Timed events may not cross NE 124th Street in Totem Lake. Public notification signage is required at major access points with no less
than 1 week prior notice. Larger events will not start on the CKC to allow time and spacing of
participants before coming onto stretches of the CKC that are limited to 8-10 feet.
Staff may limit the number of participants if over time there becomes a clear “carrying capacity” issue with the trail.
d) Eco Charrette: The “Eco-Charrette” is scheduled for May 28, 2015 9:00 a.m. to 1:45
p.m. at the Kirkland Justice Center Totem Lake Room. The purpose is to build upon on the Cross Kirkland Corridor (CKC) Master Plan, further defining the Plan’s goal to “Foster a Greener Kirkland.” The interactive workshop will:
• Engage experts from a variety of disciplines to explore opportunities towards the “greenest” corridor.
• Identify green strategies and environmental themes for specific corridor segments.
• Develop concepts to inform future design guidelines, projects and potential eco-certifications. Regional experts, regional partners and City staff will be invited to provide input on four geographic-based sections of the CKC. Opportunities and recommendations will be reported to the City Council later this summer.
Despite being open for only a few months, the CKC Interim Trail has quickly become a connector and creator of community as the Council envisioned. The residents and businesses of Kirkland have embraced the CKC with passion and excitement. New ideas and suggestions for enhancing and improving the Interim Trail are constantly being proposed by citizens, businesses and employees. Staff will continue to provide the Council periodic updates throughout the year as the Interim Trail continues to evolve and CKC Master Plan implementation efforts commence.
nr
nr
nr
nr
nr
nr
nr
nr
nr
!F
!F
!F
!F
!F
!F
!F
!F
!F!F
!F
!F
!F!F
!F
!F
!F
!F
!F !F
!F!F
!F
!F
!F
!F
!F
!F
!F
!F!F
!F !F
!F
!F
!F
!F
!F
!F
!F
!F
!
!
!
!
!
!
!
!
!
!
LAKE WASHINGTO
N
FORBESLAKE
TOTEMLAKE
12
3
4
6
8
910
1112
13
14
15
16
17
1918
!
20
2223
2425
26
2728
29
30
31
21
3233
7
5
37
36
35
34
38
39
A
B
C
D
E
F
G
H
I
S I 4
05N
I 40
5
132N
D A
VE
NE
NE 124TH ST
NE 132ND ST
3RD
ST
CR
OSS
KIR
KLAN
D C
OR
RID
OR
124T
H A
VE
NE
4TH
ST
84TH
AV
E N
E
NE 116TH ST
116T
H A
VE
NE
JUAN
ITA
DR
NE
NE 85TH ST
2ND
ST
108T
H A
VE
NE
MA
RKE
T ST
7TH AVE
8TH AVE
9TH AVE
NE 60TH ST
10TH AVE
NE 128TH ST
NE 80TH ST
NE JUANITA DR
90TH
AV
E N
E
98TH
AV
E N
E
15TH AVE
5TH
ST
6TH
ST
S
120TH AVE NE
NE 68TH ST
19TH AVE
18TH AVE
RED
MO
ND
SPU
R
LAKE
ST
S
NE 100TH ST
FORBES CREEK DR
72ND
AVE NE
NE 70TH ST
NE 75TH ST
LAKE
WA
SH
ING
TON
BLVD N
E
130T
H A
VE
NE
5TH AVE W
STAT
E S
T S
121S
T A
VE N
E
NE 126TH PL
87TH
AV
E N
E
WAVER
LY WAY
LAKE
VIE
W D
R
8TH
ST
S
91S
T PL
NE
NE 95TH ST
NE 144TH ST
SLAT
ER AVE N
E
6TH AVE
TOTEM
LAKE BLVD
136T
H A
VE
NE
CENTRAL WAY
S I 4
05O
NR
AMP
KIRK
LAND
WAY
119T
H A
VE
NE
EAST
SID
E R
AIL
CO
RR
IDO
R
6TH S
T W
13TH AVE
NE 104TH ST
4TH AVE
8TH
ST
6TH
ST
75TH
AV
E N
E
93R
D A
VE
NE
82N
D A
VE
NE
LAKE AVE W
2ND AVE S
7TH AVE S
5TH S
T W
SIMONDS RD NE
122N
D A
VE
NE
8TH AVE W
111T
H A
VE
NE
86TH
AV
E N
E
HOLMES POINT DR NE
NE 52ND ST
JUAN
ITA
WOODIN
VILL
E W
AY N
E
16TH AVE W
10TH AVE W
94TH
AV
E N
E
3RD AVE S
4TH S
T W
N I 405ON
RAM
P
76TH
PL
NE
141S
T AV
E N
E
10TH
ST
W
95TH
PL
NE
7TH AVE W
18TH AVE W
14TH AVE W
101S
T P
L N
E
NE 113TH PL
NE POINTS DR
NE 140TH PL
116TH W
AY NE
NE 107TH PL
77TH
AV
E N
E
NE 137TH PL
106T
H A
VE
NE
113T
H A
VE N
E
73RD PL NE
3RD S
T W
7TH
ST
S
NE 139TH ST
NE 110TH ST
NE 137TH ST
NE 112TH ST
NE 138TH ST
NE 38TH PL
68TH AVE N
E
13TH AVE W
115TH A
VE N
E
NE 92ND ST
NE 117TH PL
117T
H A
VE
NE
NE 55TH ST
N I
405R
AM
PLA
NE
5TH
PL
S
NE 110TH PL
10TH
ST
S
NE 90TH ST
9TH AVE S
20TH AVE W
S I 4
05R
AMPL
AN
E
NE 118TH ST
112T
H A
VE
NE
114T
H A
VE
NE
NE 70TH PL
NE 129TH ST
17TH AVE W
KIRKLAND AVE
NE 116TH PL
NE 141ST ST
119T
H P
L N
E
125T
H A
VE
NE
S I 405OFFR
AMP
NE 53RD ST
102ND
LN N
E
9TH S
T W
NE 140TH ST
N I
405O
FFR
AMP
103R
D P
L N
E
NE 136TH ST
NE 113TH ST
5TH P
L
5TH AVE
SLAT
ER S
T S
NE 131S
T WAY
NE 65TH ST
NE 97TH ST
10TH AVE S
NE 123RD ST
NE 102ND PL
NE 142ND ST
NE 62ND ST
128T
H A
VE
NE
89TH
PL
NE
129T
H P
L N
E
103R
D A
VE
NE
88TH
PL
NE
80TH
AV
E N
E
104T
H A
VE
NE
NE 109TH PL
PARK LN
8TH S
T W
NE 123RD LN
S I 405HO
VON
RAM
P
NE 103RD PL
NE 120TH ST
11TH PL
89TH
AV
E N
E
NE 130TH PL
NE 87TH ST
109T
H A
VE
NE
12TH AVE
100T
H A
VE
NE
NE 143RD PL
NE 134TH PL
NE 145TH ST
4TH
PL
104T
H PL
NE
10TH
ST
86TH
PL
NE
NE 55TH LN
NE 68TH PL
NE 125TH ST2N
D ST W
133R
D P
L N
E
123R
D A
VE
NE
1ST
ST
NE 48TH PL
3RD AVE
14TH AVE
16TH AVE
NE 67TH
ST
NE 133RD PL
88TH AVE N
E
4TH AVE S
11TH AVE
6TH AVE S
NE 73RD ST
128T
H L
N N
E
NE 101ST PL
135TH AVE NE
NE 135TH ST
110T
H W
AY
NE
NE 88TH ST
111T
H P
L N
E
116T
H P
L N
E
NE
37T
H C
IR
NE 83RD ST
NE 141ST WAY
NE 133RD ST
127T
H D
R N
E
NE 47TH PL
110T
H A
VE
NE
102N
D P
L N
E
NE 155TH ST
72ND PL NE
NE 145TH PL
NE 58TH ST
83R
D P
L N
E
113T
H P
L N
E
129T
H A
VE
NE
5TH AVE S
70TH
AVE
NE
126T
H A
VE
NE
14TH PL
NE 149TH ST
NE 143RD ST
107T
H P
L N
E
131ST PL NE
124T
H P
L N
E
82N
D P
L N
E
S I 405WESTONRAMP
2ND AVE
CAR
ILLON
PT
NE 71ST ST
NE 120TH PL
118T
H A
VE
NE
74TH
PL
NE
125T
H D
R N
E
NE 141ST PL
NE 128TH PL
97TH
LN
NE
81S
T AV
E N
E
OHDE AVE
NE 72ND PL
NE 41ST ST
19TH PL
127T
H P
L N
E
70TH LN NE
NE 124TH LN
NE 46TH ST
NE 142ND PL
102ND
CT N
E
NE 111TH PL115TH CT NE
NE 122ND PL
NE 148TH ST
17TH AVE
NE 150TH PL
94TH
PL
NE
NE 138TH PL
NE 105TH LN
NE 148TH PL
3RD
ST
S
NE 136TH PL
2ND
ST
S
NE 45TH ST
NE 112TH PL
RAILROAD AVE
131S
T A
VE N
E
10TH P
L W
8TH LN
74TH
AV
E N
E
NE 125TH WAY
127T
H A
VE
NE
NE 122ND ST
79TH
AV
E N
E
NE 132ND PL
99TH PL NE
78TH
PL
NE
NE 41ST DR
117T
H P
L N
E
87TH PL N
E
97TH
AVE
NE
103R
D C
T N
E
NE 118TH PL
79TH
PL
NE
NE 121ST ST
NE TOTEM LAKE WAY
NE 109TH LN
NE 64TH ST
NE 59TH ST
NE 134TH LN
NE 84TH ST
6TH PL S
NE 47TH ST
91ST
AVE
NE
NE 70TH DR
NE 91ST ST
ACC
ES
S RD
1
CENTRAL AVE
NE 72ND ST
128T
H P
L N
E
NE 48TH ST
NE 135TH LN
1ST
ST
S
118TH PL N
E
101ST LN
NE
114T
H P
L N
E
111T
H L
N N
E
NE JUANITA LN
NE 66TH ST
NE 121ST PL
NE 61ST ST
NE 108TH ST
16TH LN
9TH S
T
122N
D P
L N
E
CH
AM
PAG
NE
PO
INT
RD
NE
ROSE
PO
INT
LN
73RD
AVE NE
96TH
AV
E N
E
83RD
AVE NE
NE 130TH WAY
14TH PL W
NE 119TH ST80TH
PL
NE
LAKE ST
7TH S
T W
109TH CT NE
120TH PL N
E
NE 117TH ST
NE 125TH PL
NE 144TH PL
93R
D L
N N
E
NE 63RD ST
NE 61ST PL
102N
D A
VE
NE
91S
T LN
NE
NE 94TH ST
NE 126TH ST
101S
T A
VE N
E
123R
D L
N N
E
NE 125TH LN
NE 76TH ST
NE 144TH CT
107T
H A
VE
NE
NE 106TH PL
NE 122ND WAY
NE 49TH ST
NE 109TH ST
126T
H C
T N
E
NE 125TH DR
93RD PL NE
NE 65TH LN
NE 130TH LN92
ND
PL
NE
105T
H A
VE
NE
112T
H P
L N
E
106T
H P
L N
E
130T
H P
L N
E
127T
H L
N N
E
105T
H P
L N
E
NE 74TH ST
7TH
ST
NE 116TH LN
5TH
LN
NE 105TH ST
126T
H P
L N
E
NE 108TH PL
115T
H P
L N
E
NE 105TH PL
100T
H P
L N
E
98TH PL N
E
125T
H L
N N
E
NE 124TH PL
18TH PL
8TH AVE S
NE 130TH ST
133RD
AVE
NE
110T
H P
L N
E
78TH LN
NE
NE 119TH PL
NE 134TH ST
NE 129TH PL
NE 67TH PL
108T
H P
L N
E
90TH
PL
NE
NE 102ND ST
NE 115TH PL
128T
H W
AY
NE
NE 131ST ST
97TH
PL
NE
137T
H P
L N
E
NE 75TH PL
96TH
PL
NE
NE 107TH ST
69TH
AV
E N
E
20TH AVE
NE 123RD PL
LAKESHORE PLZ
NE 133RD LN
85TH
PL
NE
NE 127TH PL
NE 70TH CT
NE 144TH LN
102N
D W
AY
NE
NE 97TH PL
NE 98TH PL
NE 110TH LN
87TH
CT
NE
NE 43RD PL
NE 135TH PL
NE 129TH CT
NE 142ND LN
NE 86TH ST
19TH LN W
76TH
AV
E N
E
21ST PL
103RD
LN N
E
81ST
PL
NE
NE 88TH LN
68TH
PL
NE
3RD
PL
S
NE 106TH LN
NE 131ST PL
NE 41ST LN
NE 137TH CT
NE 131ST CT
109T
H P
L N
E
NE 119TH CT
1ST AVE S
NE 94TH CT
106T
H L
N N
E
113T
H L
N N
E
NE 83RD CT
NE 140TH CT
85TH
AV
E N
E
NE 139TH PL
130T
H L
N N
E
NE 127TH ST
124TH C
T NE
NE 87TH PL
136T
H P
L N
E
NE 134TH CT
NE 121ST LN
NE 81ST PL
NE 80TH LN
NE 73RD PL
2ND
PL
NE 114TH PL
NE 77TH CT
NE 101ST ST
NE 80TH PL
81S
T C
T N
E
NE 100TH PL
NE 96TH ST
124T
H L
N N
E
NE 84TH LN
66TH PL N
E
10TH
PL
S
125T
H P
L N
E
NE 80TH WAY
92N
D A
VE
NE
70TH
PL
NE
122ND
LN N
E
17TH PL
74TH
CT
NE
NE 151ST PL
NE 153RD PL
6TH CT
NE 38TH ST
118T
H C
T N
E
NE 150TH ST
NE 117TH CT
NE 132ND LN
NE 96TH PL
NE 117TH LN
114T
H C
T N
E
131S
T LN
NE
NE 104TH PL
NE 71ST LN
NE 118TH LN
NE 88TH PL
90TH
CT
NE
121S
T LN
NE
NE 128TH WAY
NE 69TH PL
NE 50TH PL
NE 86TH WAY
NE 97TH LN15TH PL
NE 111TH ST
NE 131ST LN
NE 66TH PL
130T
H C
T N
E
MAI
N S
T S
NE 111TH LN
113T
H A
VE
NE
NE 144TH PL
115T
H P
L N
E
101S
T P
L N
E
NE 94TH ST
NE 108TH ST
128T
H A
VE
NE
118TH AVE N
E
82N
D A
VE
NE
128T
H P
L N
E
NE 111TH PL
131S
T P
L N
E
NE 132ND PL
88TH PL N
E
NE 91ST ST
NE 143RD ST
NE 70TH PL
131S
T P
L N
E
115TH PL N
E
NE 137TH ST
NE 122ND PL
112T
H A
VE
NE
130T
H A
VE
NE
111T
H A
VE
NE
NE 140TH ST
NE 92ND ST
130T
H A
VE
NE
109T
H A
VE
NE
108T
H A
VE
NE
KIRKLAND AVE
5TH AVE S
NE 100TH ST
NE 138TH ST
NE 124TH ST
131S
T A
VE N
E
NE 120TH PL
110T
H A
VE
NE
NE 119TH ST
106T
H A
VE
NE
NE 126TH ST
NE 136TH PL
NE 118TH ST
NE 97TH ST
NE 141ST ST
126T
H A
VE
NE
NE 131ST ST
NE 134TH PL
116T
H P
L N
E
1ST AVE S
101S
T P
L N
E
NE 141ST ST
135T
H A
VE
NE
111T
H A
VE
NE
NE 138TH ST
NE 94TH ST
NE 134TH ST
125T
H P
L N
E
92ND PL NE
NE 116TH ST
104T
H A
VE
NE
NE 88TH ST
NE 145TH ST
102ND
AVE
NE
106T
H A
VE
NE
109T
H AV
E NE
112T
H P
L N
E
NE 138TH PL
127T
H P
L N
E
126T
H A
VE
NE
NE 45TH ST
127T
H P
L N
E
NE 143RD PL
NE 134TH PL
NE 104TH ST
123R
D A
VE
NE
NE 61ST PL
NE 145TH PL
NE 138TH PL
NE 144TH ST
NE 117TH ST
83R
D P
L N
E
120T
H A
VE
NE
130T
H A
VE
NE
105TH AVE N
E
NE 127TH PL
NE 144TH ST
NE 133RD ST
NE 139TH ST
123R
D A
VE N
E
128T
H A
VE
NE
NE 141ST PL
NE 122ND ST
NE 115TH PL
NE 65TH LN
120T
H A
VE
NE
117T
H P
L N
E
NE 130TH PL
121S
T A
VE N
E
94TH
AV
E N
E
NE 136TH ST
87TH
AV
E N
E
109T
H A
VE
NE
NE 65TH ST
NE 126TH PL
111T
H A
VE
NE
6TH AVE
113T
H A
VE
NE
NE 139TH PL
NE 84TH ST
73R
D P
L N
E
NE 143RD PL
NE 132ND ST
S I 4
05O
NR
AMP
2ND AVE
NE 61ST ST
NE 135TH ST
122N
D A
VE
NE
NE 118TH ST
93RD
LN N
E
NE 140TH ST
NE 114TH PL
NE 141ST PL
NE 126TH PL
116T
H A
VE
NE
NE 137TH ST
NE 100TH PL
128T
H A
VE
NE
NE 116TH PL
NE 143RD ST
80TH AV
E N
E
NE 126TH ST
NE 58TH ST
101S
T A
VE N
E
NE 102ND PL
NE 67TH ST
89TH
PL
NE
N I
405O
FFR
AMP
NE 101ST PL
NE 123RD ST
132N
D A
VE
NE
NE 138TH PL
NE 136TH ST
114T
H A
VE
NE
NE 120TH PL
11TH PL
NE 120TH ST
120T
H A
VE
NE
NE 142ND ST
NE 123RD PL
105T
H P
L N
E
NE 112TH PL
N I
405O
NR
AM
P
NE 121ST ST
20TH AVE
102N
D A
VE
NE
82N
D A
VE
NE
106T
H P
L N
E
5TH
PL
S
124T
H A
VE
NE
5TH AVE
NE 119TH ST
NE 137TH PL
NE 60TH ST
NE 64TH ST
SLAT
ER A
VE N
E
125T
H A
VE
NE
NE 132ND PL
95TH
PL
NE
NE 75TH ST
NE 109TH ST
1ST
ST
S
125T
H A
VE
NE
83R
D P
L N
E
NE 140TH PL
104T
H A
VE N
E
116TH AVE N
E
105T
H A
VE
NE
NE 129TH ST
103R
D A
VE
NE
NE 138TH PL
NE 68TH PL
NE 138TH PL
111T
H P
L N
E
137T
H P
L N
E
NE 74TH ST
NE 141ST ST
6TH
ST
NE 94TH ST
NE 142ND PL
KIRKLAND AVE
119T
H A
VE
NE
102N
D A
VE
NE
NE 124TH PL
110T
H A
VE
NE
NE 112TH ST
89TH
PL
NE
NE 141ST PL
NE 120TH ST
116T
H P
L N
E
NE 120TH ST
NE 131ST PL
NE 137TH ST
NE 138TH ST
NE 124TH ST
93RD AVE NE
NE 140TH PL
NE 143RD ST
NE 68TH PL
NE 141ST PLNE 141ST ST
131S
T A
VE N
E
85TH AV
E N
E
81S
T PL
NE
102N
D P
L N
E
NE 137TH PL
117T
H A
VE
NE
102ND
CT N
E
NE 131ST CT
NE 136TH PL
NE 140TH ST
NE 53RD ST
127T
H A
VE
NE
NE 123RD ST
98TH
AV
E N
E88TH
PL
NENE 136TH ST
NE 129TH ST
129TH P
L NE
NE 131ST PL
NE 141ST ST
NE 127TH PL
108T
H A
VE
NE
NE 73RD ST
NE 135TH ST NE 136TH ST
129TH PL NE
NE 90TH ST
NE 132ND PL
92N
D P
L N
E
104T
H A
VE
NE
106T
H P
L N
E
NE 138TH PL
108T
H A
VE
NE
129T
H P
L N
E
102N
D P
L N
E
NE 132ND PL
NE 74TH ST
117T
H P
L N
E
NE 138TH PL
12TH AVE
NE 140TH PL
NE 133RD ST
NE 109TH PL
115T
H P
L N
E
NE 142ND ST
104TH AVE NE
NE 143RD ST
2ND
ST
NE 105TH PL
NE 120TH ST
108TH P
L NE
110T
H A
VE
NE
NE 64TH ST
113T
H A
VE
NE
127T
H A
VE
NE
NE 126TH PL
NE 145TH ST
116T
H A
VE
NE
NE 83RD ST
NE 142ND ST
NE 129TH PL
5TH S
T
127T
H P
L N
E
98TH
AV
E N
E
NE 139TH PL
120T
H P
L N
E
NE 59TH ST
81ST PL N
E
11TH AVE
80TH
AV
E N
E
N I
405O
NR
AM
P
NE 62ND ST
88TH
AV
E N
E
NE 142ND ST
S I 4
05O
FFR
AMP
111T
H A
VE
NE
126T
H A
VE
NE
111TH A
VE N
E
2ND
ST
S
123R
D A
VE
NE
115TH AVE N
E
NE 143RD ST
NE 124TH PL
122N
D A
VE
NE
111T
H A
VE
NE
112T
H A
VE
NE
NE 128TH PL
110T
H A
VE
NE
NE 142ND PL
4TH AVE
NE 142ND ST
NE 121ST ST
NE 61ST ST
NE 129TH PL
93R
D A
VE
NE
NE 140TH ST
117T
H A
VE N
E
NE 65TH ST
13TH AVE
SLAT
ER A
VE N
E
136T
H A
VE
NE
86TH
PL
NE
NE 130TH PL
123R
D A
VE
NE
NE 123RD ST
120T
H A
VE
NE
NE 103RD PL
NE 86TH ST
113TH P
L NE
100T
H A
VE
NE
NE 72ND ST
106T
H A
VE
NE
NE 133RD PL
NE 138TH ST
NE 140TH ST
113T
H A
VE
NE
NE 87TH ST
79TH
PL
NE
83R
D A
VE
NE
NE 108TH ST
NE 144TH ST
NE 97TH ST
NE 140TH PL
135T
H A
VE
NE
85TH AVE N
E
90TH
AV
E N
E
1ST
ST
NE 122ND ST
131S
T A
VE N
E
NE 142ND ST
NE 136TH PL
NE 72ND ST
125T
H L
N N
E
114T
H A
VE
NE
NE 144TH ST
NE 145TH ST
112TH A
VE N
ENE 95TH
ST
NE 137TH PL
102N
D A
VE
NE
NE 128TH ST
NE 48TH PL
80TH
PL
NE
NE 130TH ST
NE 138TH PL
80TH
AV
E N
E
5TH
ST
NE 143RD PL
20TH AVE
N I 405O
FFRAM
P
NE 141S
T PL
110T
H A
VE
NE
NE 121ST ST
117TH PL NE
126T
H A
VE
NE
81S
T AV
E N
E
106T
H P
L N
E
NE 120TH ST
128TH A
VE N
E
5TH AVE S
NE 118TH PL
106T
H A
VE
NE
NE 134TH PL
NE 84TH LN
NE 128TH ST
124T
H A
VE
NE
NE 143RD ST
NE 81ST PL
105T
H AV
E NE
NE 129TH ST
79TH
PL
NE
81ST AVE NE
113T
H P
L N
E
102N
D P
L N
E
NE 132ND ST
NE 108TH PL
105TH P
L NE
NE 138TH ST
126T
H A
VE
NE
103R
D A
VE
NE
90TH
PL
NE
NE 65TH ST
97TH
PL
NE
NE 132ND PL
131S
T P
L N
E
81S
T AV
E N
E
107TH P
L NE
NE 61ST ST
NE 138TH PL
NE 137TH PL
118T
H A
VE
NE
79TH PL N
E
NE 136TH ST
126T
H A
VE
NE
NE 73RD ST
NE 128TH ST
NE 119TH ST
NE 144TH PL
125T
H L
N N
E
NE 73RD ST
107T
H A
VE
NE
NE 53RD ST
NE 62ND ST
NE 141ST ST
NE 141ST ST
NE 123RD ST
NE 139TH ST
NE 1
45TH
ST
4TH A
VE
110TH P
L NE
NE 87TH ST
NE 141ST PL
120T
H P
L N
E
NE 90TH ST
NE 140TH PL
NE 130TH ST
76TH
PL
NE
105T
H A
VE
NE
NE 139TH ST
NE 142ND ST
NE 130TH PL
NE 126TH PL
117TH PL NE
118T
H P
L N
E
Juanita High
School
Northwest University
Lake Washington
Institute of Technology
Finn Hill
Middle School
Kamiakin Middle School
Lake Washington
High School
Kirkland Middle School
Holy Family School
Emerson High
School
Carl Sandberg Elementary
International Community
School
John Muir
Elementary
Juanita Elementary
School
Henry David
Thoreau Elementary
Robert Frost
Elementary School
Rose Hill
Elementary School
Helen Keller
Elementary School
Alexander Graham
Bell Elementary School
Lakeview Elementary
School
Benjamin Franklin
Elementary School
Mark Twain
Elementary School
Peter Kirk
Elementary School
Kirkland Seventh
Day Adventist School
Northwest University
- 6710 Building
Big Finn Hill Park
Yarrow Bay
Wetlands
Saint Edward State Park
Watershed Park
Juanita Bay Park
O O
Denny Park
Edith Moulton
Park
Heronfield Wetlands
Totem Lake Park
Peter Kirk Park
East Norway
Hill Park
Juanita Beach Park
Everest Park
Crestwoods Park
132nd Square
Park
Juanita Woodlands
Park
Carillon Woods
Mark Twain Park
Houghton Beach Park
South Norway
Hill Park
Marina Park
McAuliffe Park
David E.
Brink Park
Kingsgate Park
Kiwanis Park
Waverly Beach Park
Marsh Park Snyders
Corner Park
North Rose Hill
Woodlands Park
Rose Hill
Meadows
Heritage Park
Forbes Lake Park
Juanita Heights
Park
Windsor Vista Park
Cotton Hill Park
Spinney Homestead
Park
Beach Property
Forbes Creek Park
Van Aalst Park
North Kirkland
Com Ctr & Park
South Rose Hill Park
Terrace Park
Highlands Park
Street End Park
Tot Lot Park
Lake Ave W
Street End Park
Ohde Avenue
Pea Patch
Brookhaven Park
Juanita Triangle
Park
Reservoir Park
Settler's Landing
Cedar View Park
Phyllis A
Needy - Houghton Nbr
MAP LEGEND
Cross Kirkland CorridorCross Kirkland CorridorTrail ConnectionsTrail Connections
Parks / Open Spaces
Schools
Cross Kirkland Corridor
Kirkland City Limits
!F Identified Unimproved Connection
!F Improved Trail Access
! Identified Private Unimproved Connection
nr Potential ADA Parking
5
CITY OF KIRKLAND, WASHINGTON
0 0.50.25Miles
0 1,000 2,000 3,000 4,000 5,000500Feet
Produced by the City of Kirkland. © 2013, the City of Kirkland, all rights reserved.No warranties of any sort, including but not limited to accuracy,
fitness or merchantability, accompany this product.
Path: H:\Pw\CIP group\Community Outreach\CROSS KIRKLAND CORRIDOR - COORDINATOR\CROSS KIRKLAND CORRIDOR - COORDINATOR
sde_vector.ARCADMIN.ANNO_18056
132nd Avenue NE
128th Avenue NE
NE 124th Street
120th Avenue NE
110th Avenue NE
NE 87th Street
March 24, 2015
Kirkland Avenue
6th Street S
NE 52nd Street
108th Avenue NE
NE 112th Street
ATTACHMENT A
DRAFT Cross Kirkland Corridor Connections Data Unimproved trail/access points (not including single family connections) Public Private NSP Large CIP
1. Evergreen Hill/Kingsgate – Development connection to ERC (west) 12. Totem Lake – Astronics (east) 13. Totem Lake – Willows Road (east/west) 1 14. Totem Lake – along NE 124th Street (south) 15. Totem Lake – 132nd Avenue NE to ERC (east) 16. Totem Lake – King County Water District property adjacent to Toyota (south) 17. Totem Lake – Master Plan Aerial Bridge (north/south) 1 18. Totem Lake - Forbes Creek Drive ROW at 116th Ave alignment (east/west) 19. Highlands - 116th Avenue NE (south) NSP 1 1 110. Juanita - Forbes Creek KC easement connection (north) NSP 1 1 111. Highlands - 111th Avenue NE (south) * 112. Norkirk - North Crestwoods (west) 113. Highlands/Norkirk - South Crestwoods/Cotton Hill Park (east/west) 1 114. Highlands – 110th Pl NE (east) 115. Moss Bay – south side of NE 85th (Cobra or Garter) 1 116. Moss Bay – Kirkland Way and 9th Street (west) 117. Everest – Everest Park and 8th Street S (south) 1 118. Everest – Nytec (east) 1
19. Everest/Moss Bay – 6th Street grade separation (north/south) 1 120. Everest – 7th Avenue S and Google (east/west) 1 121. Everest – 6th Street (east) 122. Moss Bay – Lakeview Elementary School (west) 123. Moss Bay/Everest – PCC Shopping Center (east) 1 124. Moss Bay/CHNA/EV/LK - NE 68th Street (east/west) NSP 1 1 125. Lakeview/CHNA - Houghton Shopping Center (east) 1 126. Lakeview - Terrace Park (west) 127. Lakeview – Private road approximately NE 65th Street (west)* 128. Lakeview - NE 64th Street (west) 129. Lakeview – NE 62nd Street (west) 1
30. Lakeview/CHNA - NE 60th Street (east/west) NSP 1 1 131. NE 58th Street (west side) from CKC to NE 58th Street ROW 132. Lakeview - NE 55th Street 133. Lakeview – NE 54th Street (west) 134. CHNA – NE 53rd Street (east) 135. CHNA – NE 44th Street (east) 136. Lakeview – NE43rd Street (west) 137. Lakeview - 4030 Lake Washington Blvd (west) 138. Lakeview/CHNA/Keg – Watershed Park (east/west)* 139. Lakeview/CHNA – South Kirkland Park and Ride (west) 1 1
30 10 4 13LEGEND:Does not include all connections identified in the CKC Master PlanGreen: from public property including parks or trail easements showing on our trails map. Blue: from private property. Bold: Recognized in Interim Trail PlansBold: Large CIP Project (green or black)NSP – Neighborhood Safety Program proposals*Received “complaint” about fencing blocking connection.
Attachment B
Special Events
EVENT Estimated Participants
Date Comments
American Planning Association Tour
30 Monday, April 20 Walking and Golf CartsSKPR to Google
Mother’s Day Half Marathon
2000 Sunday, May 10 Between SKP&R and NE 112th Street
KITH Crop Walk 50+ Saturday, May 16
Green Charrette 12+ Thursday, May 28 Golf CartsFBINAA 200 Sunday, July 12 FBI National Academy
AssociatesSeattle Sounders FC 9K with 5K “Rave Green Run”
2000 Sunday, August 9
SRM/Google Celebration 200+ Mid August Combined with City celebration?
ICMA 50 Monday, September 28, 9:45am - 12:15pm
Tour – SKPR to SRM/Google probably
12K’s of Christmas with 5K
2000 Sunday, December 20
ATTACHMENT C