CAS/CAIS User Group Meeting
October 18, 2018
Cost Estimating Module -
RPV Model Customization
Prepared by Adam Pugh & Mark Gordy
2
CAIS
-Condition Assessment Survey
-Functional Assessment
Projects Module
Estimating Module
CAS/CAIS User Group Meeting – October 16-18, 2018
CAIS Functionality
3
CAIS is DOE’s cost estimating system for calculating and recording:
Repair Needs and Deferred Maintenance cost based on physical
deficiencies identified during a condition assessment survey
Modernization Costs based on mission deficiencies identified during
functional assessment
In 2012, CAIS was expanded to include the Projects Module, which
allows a Site to compile both physical deficiencies and/or mission
deficiencies into a single project
Example: How much does it cost to replace all the roofs at my Site?
CAS/CAIS User Group Meeting – October 16-18, 2018
CAIS Functionality (Cont’d)
4
In October 2016, CAIS expanded to include the Estimating Module to
give Sites and Programs the ability to develop independent cost
estimates to include Replacement Plant Value (RPV) Estimates
CAS/CAIS User Group Meeting – October 16-18, 2018
Taking Advantage of the DOE Models
5
Users can build a RPV model in the CAIS Estimating Module
Upside: Site have a very detailed RPV for the building
Downside: Very time-consuming and resource intensive
Solution: Take advantage of the CAIS Estimating Module cost data by
adding the RPV modeling capability from the DOE Costworks CD. This
new RPV Module will allow Sites and Programs to develop building RPV
estimates that will automatically update each year with new cost data.
CAS/CAIS User Group Meeting – October 16-18, 2018
The Value of a Good RPV Estimate
6
Provides a better estimate of Department’s total liability for real
property
The RPV provides the basis for the analysis of many real property
data metrics. Examples:
Maintenance Investment Index = 𝐴𝑛𝑛𝑢𝑎𝑙 𝐴𝑐𝑡𝑢𝑟𝑎𝑙𝑀𝑎𝑖𝑛𝑡𝑒𝑛𝑎𝑛𝑐𝑒
𝑅𝑃𝑉× 100
Condition Index = 1 −𝑅𝑒𝑝𝑎𝑖𝑟 𝑁𝑒𝑒𝑑𝑠
𝑅𝑃𝑉× 100
Deferred Maintenance Index = 𝐷𝑒𝑓𝑒𝑟𝑟𝑒𝑑 𝑀𝑎𝑖𝑛𝑡𝑒𝑛𝑎𝑛𝑐𝑒
𝑅𝑃𝑉× 100
Hot topic during the standing up of the Laboratory Operation Board (LOB)
CAS/CAIS User Group Meeting – October 16-18, 2018
7
CAIS
-Condition Assessment Survey
-Functional Assessment
Projects Module
Estimating Module
RPV Module
Aug 2018
CAS/CAIS User Group Meeting – October 16-18, 2018
8
What is a FIMS RPV Model?
CAS/CAIS User Group Meeting – October 16-18, 2018
FIMS RPV Model Example – Office, Large
9
Large 8 story office building model of
150,000 GSF. The structure is steel
framed, with precast concrete exterior,
single-ply membrane roof, and roof top
HVAC units and central air system
GSF = 150,000
Perimeter (LF) = 520
Location = National Average
Wall/Framing Type = Precast Concrete / Steel Frame
No of Floors = 8
Floor Height (LF) = 12
Includes Basement = No
CAS/CAIS User Group Meeting – October 16-18, 2018
FIMS RPV Model Composition
10
Model includes complete Assembly list that rolls up to provide
Cost/Sqft and Total Building Cost
Uniformat Classification Cost / Sqft Total Cost
A10 Foundations $2.74 $410,998
A20 Basement Construction $0.04 $6,188
B10 Superstructure $23.08 $3,462,206
B20 Exterior Enclosure $23.35 3,052,854
B30 Roofing $0.67 $99,939
[Remaining Levels] “ “
Total $124.03 $18,604,616
Used by FIMS to calculate building/trailer RPV values
CAS/CAIS User Group Meeting – October 16-18, 2018
Ex. of using the RPV Models
11
FIMS default, $125/gsf
5000gsf * $125/gsf = $625,000
Using just the information already available in FIMS
Only using GSF:
5000gsf * $195.50/gsf = $977,500
GSF & Number of Floors: 2
5000gsf * 224.11/gsf = $1,120,550
E15 Office Small
Actually GSF 5,000GSF
Wall/Framing Type Glass curtain wall / Steel Frame system
Perimeter 380LF
Number of Floors 2
Floor Height 14LF
Basement (Yes/No) No
CAS/CAIS User Group Meeting – October 16-18, 2018
12
Using a few readily available details
GSF, Wall/Framing Type, Perimeter,
Number of Floors, Basement (Y/N)
5000gsf * $250.95/gsf = $1,254,750
FIMS default = $625,000
E15 Office Small
Actually GSF 5,000GSF
Wall/Framing Type Glass curtain wall / Steel Frame system
Perimeter 380LF
Number of Floors 2
Floor Height 14LF
Basement (Yes/No) No
$977,500
$1,120,550
Ex. of using the RPV Models
CAS/CAIS User Group Meeting – October 16-18, 2018
Enhanced Cost Estimating Module
13
Capability to customize the FIMS
building models to generate a more
accurate RPV value
Supports the need for better quality
RPV data
Estimates can be stored and automatically escalated annually
Ability to develop line item estimates still exists
CAS/CAIS User Group Meeting – October 16-18, 2018
Enhanced Cost Estimating Module (cont’d)
14
Improved organization with the ability to
develop folders for storing estimates
Estimates can be linked to a FIMS asset
CAS/CAIS User Group Meeting – October 16-18, 2018
FIMSEstimating
Module
How does this work?
15
Cost Estimating Module now has access to 101 building/trailer models
76 DOE
25 NNSA
Once a model is selected, the Total Building Cost (RPV) will be displayed
CAS/CAIS User Group Meeting – October 16-18, 2018
Users have the opportunity to modify the
RS Means model parameter defaults to
generate a new Total Building Cost
Model Parameters
16
RS Means model parameter default values that can be customized
Location (Geographic Adjuster)
Gross Square Feet
Perimeter (LF)
Wall/Framing Type
No of Floors
Floor Height (LF)
Basement (Y/N)
CAS/CAIS User Group Meeting – October 16-18, 2018
Custom Model Screen Sample
17
CAS/CAIS User Group Meeting – October 16-18, 2018
Advanced Estimating Options
18
CAS/CAIS User Group Meeting – October 16-18, 2018
Modify Assembly quantities for
each model
New Assemblys or Master Format
components can be added to a
model
Assembly items can be removed from a model
Cost Adders can be applied to Assembly or Master Format items
Additional cost can be included as part of the estimate
19
Advanced Estimating Options (cont’d)
Modify the Assembly quantity
Add a new Assembly or delete an existing Assembly
CAS/CAIS User Group Meeting – October 16-18, 2018
Assembly Example
20
Assembly: C30302105800
Acoustic ceilings 5/8” fiberglass board, 24” x 48” tile, tee grid,
suspended support
Suspended acoustic ceiling tiles,
fiberglass boards, film faced,
2’x2’ or 2’x4’ x 5/8” thick
Ceiling suspension system, class
A, 15/16” T bar, 2’x4’ grid
Ceiling suspension system,
metal pan, snap-on 1’x1’
CAS/CAIS User Group Meeting – October 16-18, 2018
Questions?