Cost Estimating Advice Manual

download Cost Estimating Advice Manual

of 287

Transcript of Cost Estimating Advice Manual

  • 8/12/2019 Cost Estimating Advice Manual

    1/287

    CREDIBLE COST ESTIMATES

    CE CLASSIFICATION

    COST ESTIMATING PROCESS

    12 STEPS

    CE CHALLENGES

  • 8/12/2019 Cost Estimating Advice Manual

    2/287

    CE UNCERTAINTY

    FUNDING PROFILES

    COST ANALYSIS CONCEPTS

    ASSESS TEAM CHECKLIST

    BASELINE ELEMENTS

    BASELINE DESCRIPTION

    COMMON ELEMENTS IN A

    WBS

    WBS CHECKLIST

  • 8/12/2019 Cost Estimating Advice Manual

    3/287

    GROUND RULES & ASSUMP.

    CHECKLIST

    DATA SOURCES

    DATA BEST PRACTICES

    CE METHODS COMPARED

    CE METHODS SAMPLES

    LEARNING CURVE

    POINT ESTIMATED CHECKLIST

    SENSITIVITY ANALYSIS

  • 8/12/2019 Cost Estimating Advice Manual

    4/287

    SENSITIVITY ANALYSIS

    SAMPLE

    UNCERTAINTY

    ELECTRICAL SERVICES

    COST, RISK & UNCERTAINTY

    POTENTIAL UNCERTAINTY

    RISK SCORING MATRIX

    ROLLING DICE PROBABILITY

    HIGH CLASS CE MAPPED

  • 8/12/2019 Cost Estimating Advice Manual

    5/287

    CE ACCURACY CHECK

    8 TYPES OF CE REVIEWS

    CE VALIDATION CHECKLIST

    COST ESTIMATING

    DOCUMENTATION

    WHAT TO INCLUDE IN CE DOC

    CE PRESENTATION

    CE INTEGRATION WITH

    SYSTEMS & RISK

    INTEGRATING EVM & RISK

    MANAGEMENT

  • 8/12/2019 Cost Estimating Advice Manual

    6/287

    TRACKING EARNED VALUE

    KEY BENEFITS OF EVM

    CONCERNS ABOUT EVM

    ANSI GUIDELINE FOR EVM

    WBS COST, SCHEDULE, TI

    INTEGRATION

    ID RESPONSIBILITY @

    CONTROL ACCOUNT

    EV METRICS

    EV & % COMPLETION METHOD

    GENESIS OF PERFORMANCE

    METRICS

  • 8/12/2019 Cost Estimating Advice Manual

    7/287

    STRUCTURED CONTRACT

    PAYMENTS

    EVM ACCEPTANCE PROCESS

    MANAGING COSTS BEST

    PRACTICE

    IBR DISCUSSION TEMPLATE

    EVM OVERALL VIEW

    CONTRACT PERFORMANCE

    REPORT ELEMENTS

    EVM PERFORMANCE INDEXES

    EXECUTION OF PROGRAMCOST

    ANSI ON CHANGES TO EVM

    SURVEILLANCE SELECTION

    MATRIX

    COMMON INDICATORS OF

    POOR PERFORMANCE

  • 8/12/2019 Cost Estimating Advice Manual

    8/287

    STEPS ASSOCIATED WITH

    OVERTARGET BUDGETS

    TAKE OFF FORM

    OVERHEAD RECAP FORM

    PAINTING CE FORM

    RESIDENTIAL COST

    ESTIMATING

    STANDARD SUBCONTRACT

    JOB SCHEDULE FORM

    WBS FORM

    MASTER COST CODE SYSTEM

    MATERIAL CONTROL

  • 8/12/2019 Cost Estimating Advice Manual

    9/287

    COMMUNICATIONS PLAN

  • 8/12/2019 Cost Estimating Advice Manual

    10/287

    Credible Cost Estimates Characteristics

    Cost Engineers Association Cost Estimates Classification

    Cost Estimating Process

    12 Steps to High Quality Cost Estimates

    Cost Estimating Challenges

    COST ESTIMATING ADVICE MANUAL

    SPREADSHEETS DESCRIPTION

  • 8/12/2019 Cost Estimating Advice Manual

    11/287

    Cost Estimate Uncertainty Cone

    Typical Acquisition Capital Funding Profiles

    Cost Analysis Concepts

    Cost Assessment Team Checklist

    Typical Technical Baseline Elements

    Technical Baseline Description Checklist

    Common Elements in a Work Breakdown Structure

    WBS Checklist Best Practice

  • 8/12/2019 Cost Estimating Advice Manual

    12/287

    Ground Rules and Assumptions Checklist Best Practice

    Data Sources

    Data Best Practices Checklist

    Cost Estimating Methods Compared

    Cost Estimating Methods Samples

    Learning Curve

    Point Estimate Checklist

    Sensitivity Analysis Checklist

  • 8/12/2019 Cost Estimating Advice Manual

    13/287

    Sensitivity Analysis Sample

    Cost Estimates Uncertainty during the Project Life Cycle

    Cumulative Probability

    Cost, Risk and Uncertainty Checklist

    Potential Sources of Cost Estimate Uncertainties

    Risk Scoring Matrix

    Rolling Dice Probability Distribution

    High Class Cost Estimates Mapped Against Characteristics

  • 8/12/2019 Cost Estimating Advice Manual

    14/287

    Cost Estimates Accuracy Check

    Eight Types of Cost Estimates Reviews

    Cost Estimate Validation Checklist

    Cost Estimating Documentation

    What is included in the Cost Estimate Documentation

    Presenting the Cost Estimate to Management

    Integrating Cost Estimates with Systems and Risk

    Integrating EVM and Risk Management

  • 8/12/2019 Cost Estimating Advice Manual

    15/287

    Tracking Earned Value

    Key Benefits of EVM

    Concerns about EVM

    ANSI Guidelines for EVM

    WBS Integration of Cost, Schedule and Technical Information

    Identifying Responsibility for Managing Work at the Control Account

    Typical Methods for Measuring EV Performance

    Earned Value Using the Percentage Completion Method

    The Genesis of Performance Measurement Baseline

  • 8/12/2019 Cost Estimating Advice Manual

    16/287

  • 8/12/2019 Cost Estimating Advice Manual

    17/287

    Steps Typically Associated with Implementing an Over target Budget

    Estimate Quantities Take off Sheet Form

    Overhead Recap Form

    Painting Cost Estimate Form

    Residential Cost Estimating Form

    Standard Subcontract Form

    Job Schedule form

    Work Breakdown Structure Form

    Master Cost Code System

    Material Requisition Control Form

  • 8/12/2019 Cost Estimating Advice Manual

    18/287

    Communication Plan Form

  • 8/12/2019 Cost Estimating Advice Manual

    19/287

    1

    2

    3

    4

    5

  • 8/12/2019 Cost Estimating Advice Manual

    20/287

    6

    7

    8

    9

    10

    11

    12

    13

  • 8/12/2019 Cost Estimating Advice Manual

    21/287

    14

    15

    16

    17

    18

    19

    20

    21

  • 8/12/2019 Cost Estimating Advice Manual

    22/287

    22

    23

    24

    25

    26

    27

    28

    29

  • 8/12/2019 Cost Estimating Advice Manual

    23/287

    30

    31

    32

    33

    34

    35

    36

    37

  • 8/12/2019 Cost Estimating Advice Manual

    24/287

    38

    39

    40

    41

    42

    43

    44

    45

    46

  • 8/12/2019 Cost Estimating Advice Manual

    25/287

    47

    48

    49

    50

    51

    52

    53

    54

    55

    56

    57

  • 8/12/2019 Cost Estimating Advice Manual

    26/287

    58

    59

    60

    61

    62

    63

    64

    65

    66

    67

  • 8/12/2019 Cost Estimating Advice Manual

    27/287

    68

  • 8/12/2019 Cost Estimating Advice Manual

    28/287

    TO GO

    TO THIS

    SPREADS

    HEET

    cred

    ceclas

    cepr

    12st

    cecha

    TO GO TO THIS

    SPREADSHEET

  • 8/12/2019 Cost Estimating Advice Manual

    29/287

    unctru

    funpro

    coanc

    catcl

    ttble

    tbldc

    cewbs

    wbscpb

  • 8/12/2019 Cost Estimating Advice Manual

    30/287

    graclbp

    dsour

    dbpc

    cemc

    cems

    learcur

    pechl

    ssacl

  • 8/12/2019 Cost Estimating Advice Manual

    31/287

    ssasam

    ceunlc

    cumpro

    crucl

    psceu

    rsmat

    rdpd

    hcemach

  • 8/12/2019 Cost Estimating Advice Manual

    32/287

  • 8/12/2019 Cost Estimating Advice Manual

    33/287

    tev

    kbevm

    caevm

    ansi

    wbsicsti

    irmwca

    evmetr

    ev%cm

    gopm

  • 8/12/2019 Cost Estimating Advice Manual

    34/287

    scpay

    evmap

    mcbp

    ibramdt

    evmov

    cprdele

    evmpind

    epcclbp

    ansichgev

    m

    pssm

    cippp

  • 8/12/2019 Cost Estimating Advice Manual

    35/287

    stpaiob

    tkoff

    ohrec

    pcef

    rcef

    sscf

    jsf

    wbsf

    mccs

    mrcf

  • 8/12/2019 Cost Estimating Advice Manual

    36/287

    cpf

  • 8/12/2019 Cost Estimating Advice Manual

    37/287

    BASIC CHARACTERISTICS OF CREDIBLE COST ESTIMATES

  • 8/12/2019 Cost Estimating Advice Manual

    38/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    39/287

  • 8/12/2019 Cost Estimating Advice Manual

    40/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    41/287

  • 8/12/2019 Cost Estimating Advice Manual

    42/287

  • 8/12/2019 Cost Estimating Advice Manual

    43/287

  • 8/12/2019 Cost Estimating Advice Manual

    44/287

    TWELVE STEPS OF A HIGH-QUALITY COST ESTIMATING

  • 8/12/2019 Cost Estimating Advice Manual

    45/287

  • 8/12/2019 Cost Estimating Advice Manual

    46/287

  • 8/12/2019 Cost Estimating Advice Manual

    47/287

    PROCESSRETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    48/287

  • 8/12/2019 Cost Estimating Advice Manual

    49/287

  • 8/12/2019 Cost Estimating Advice Manual

    50/287

  • 8/12/2019 Cost Estimating Advice Manual

    51/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    52/287

  • 8/12/2019 Cost Estimating Advice Manual

    53/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    54/287

  • 8/12/2019 Cost Estimating Advice Manual

    55/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    56/287

  • 8/12/2019 Cost Estimating Advice Manual

    57/287

  • 8/12/2019 Cost Estimating Advice Manual

    58/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    59/287

    COST ASSESSMENT TEAM BEST PRACTICE

  • 8/12/2019 Cost Estimating Advice Manual

    60/287

    CHECKLIST RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    61/287

  • 8/12/2019 Cost Estimating Advice Manual

    62/287

  • 8/12/2019 Cost Estimating Advice Manual

    63/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    64/287

  • 8/12/2019 Cost Estimating Advice Manual

    65/287

    TECHNICAL BASELINE DESCRIPTION CHECKLIS

  • 8/12/2019 Cost Estimating Advice Manual

    66/287

    T BEST PRACTICE RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    67/287

  • 8/12/2019 Cost Estimating Advice Manual

    68/287

  • 8/12/2019 Cost Estimating Advice Manual

    69/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    70/287

  • 8/12/2019 Cost Estimating Advice Manual

    71/287

    WBS CHECKLIST BEST PRACTICE

  • 8/12/2019 Cost Estimating Advice Manual

    72/287

  • 8/12/2019 Cost Estimating Advice Manual

    73/287

    GROUND RULES AND ASSUMPTIONS BEST PRACT

  • 8/12/2019 Cost Estimating Advice Manual

    74/287

  • 8/12/2019 Cost Estimating Advice Manual

    75/287

    CES CHECKLIST RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    76/287

  • 8/12/2019 Cost Estimating Advice Manual

    77/287

  • 8/12/2019 Cost Estimating Advice Manual

    78/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    79/287

    DATA BEST PRACTICE CHECKLIST

  • 8/12/2019 Cost Estimating Advice Manual

    80/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    81/287

  • 8/12/2019 Cost Estimating Advice Manual

    82/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    83/287

  • 8/12/2019 Cost Estimating Advice Manual

    84/287

  • 8/12/2019 Cost Estimating Advice Manual

    85/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    86/287

  • 8/12/2019 Cost Estimating Advice Manual

    87/287

  • 8/12/2019 Cost Estimating Advice Manual

    88/287

  • 8/12/2019 Cost Estimating Advice Manual

    89/287

  • 8/12/2019 Cost Estimating Advice Manual

    90/287

  • 8/12/2019 Cost Estimating Advice Manual

    91/287

  • 8/12/2019 Cost Estimating Advice Manual

    92/287

  • 8/12/2019 Cost Estimating Advice Manual

    93/287

  • 8/12/2019 Cost Estimating Advice Manual

    94/287

  • 8/12/2019 Cost Estimating Advice Manual

    95/287

    LEARNING CURVE

  • 8/12/2019 Cost Estimating Advice Manual

    96/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    97/287

    DEVELOPING A POINT ESTIMATE CHECKLI

  • 8/12/2019 Cost Estimating Advice Manual

    98/287

  • 8/12/2019 Cost Estimating Advice Manual

    99/287

    STRETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    100/287

  • 8/12/2019 Cost Estimating Advice Manual

    101/287

    SENSITIVITY ANALYSIS CHECKLIST BEST P

  • 8/12/2019 Cost Estimating Advice Manual

    102/287

    ACTICE RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    103/287

  • 8/12/2019 Cost Estimating Advice Manual

    104/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    105/287

  • 8/12/2019 Cost Estimating Advice Manual

    106/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    107/287

  • 8/12/2019 Cost Estimating Advice Manual

    108/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    109/287

    COST RISK AND UNCERTAINTY CHECKLIS

  • 8/12/2019 Cost Estimating Advice Manual

    110/287

  • 8/12/2019 Cost Estimating Advice Manual

    111/287

  • 8/12/2019 Cost Estimating Advice Manual

    112/287

    BEST PRACTICE RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    113/287

  • 8/12/2019 Cost Estimating Advice Manual

    114/287

  • 8/12/2019 Cost Estimating Advice Manual

    115/287

  • 8/12/2019 Cost Estimating Advice Manual

    116/287

  • 8/12/2019 Cost Estimating Advice Manual

    117/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    118/287

  • 8/12/2019 Cost Estimating Advice Manual

    119/287

  • 8/12/2019 Cost Estimating Advice Manual

    120/287

  • 8/12/2019 Cost Estimating Advice Manual

    121/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    122/287

  • 8/12/2019 Cost Estimating Advice Manual

    123/287

  • 8/12/2019 Cost Estimating Advice Manual

    124/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    125/287

  • 8/12/2019 Cost Estimating Advice Manual

    126/287

  • 8/12/2019 Cost Estimating Advice Manual

    127/287

  • 8/12/2019 Cost Estimating Advice Manual

    128/287

  • 8/12/2019 Cost Estimating Advice Manual

    129/287

  • 8/12/2019 Cost Estimating Advice Manual

    130/287

  • 8/12/2019 Cost Estimating Advice Manual

    131/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    132/287

  • 8/12/2019 Cost Estimating Advice Manual

    133/287

  • 8/12/2019 Cost Estimating Advice Manual

    134/287

  • 8/12/2019 Cost Estimating Advice Manual

    135/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    136/287

  • 8/12/2019 Cost Estimating Advice Manual

    137/287

    VALIDATE COST ESTIMATE CHECKLIST BEST PRACTICE

  • 8/12/2019 Cost Estimating Advice Manual

    138/287

  • 8/12/2019 Cost Estimating Advice Manual

    139/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    140/287

  • 8/12/2019 Cost Estimating Advice Manual

    141/287

    COST ESTIMATE DOCUMENTATION

  • 8/12/2019 Cost Estimating Advice Manual

    142/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    143/287

  • 8/12/2019 Cost Estimating Advice Manual

    144/287

  • 8/12/2019 Cost Estimating Advice Manual

    145/287

  • 8/12/2019 Cost Estimating Advice Manual

    146/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    147/287

  • 8/12/2019 Cost Estimating Advice Manual

    148/287

  • 8/12/2019 Cost Estimating Advice Manual

    149/287

    PRESENTING A COST ESTIMATE TO M

  • 8/12/2019 Cost Estimating Advice Manual

    150/287

    NAGEMENT - BEST PRACTICE

  • 8/12/2019 Cost Estimating Advice Manual

    151/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    152/287

  • 8/12/2019 Cost Estimating Advice Manual

    153/287

  • 8/12/2019 Cost Estimating Advice Manual

    154/287

  • 8/12/2019 Cost Estimating Advice Manual

    155/287

  • 8/12/2019 Cost Estimating Advice Manual

    156/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    157/287

  • 8/12/2019 Cost Estimating Advice Manual

    158/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    159/287

  • 8/12/2019 Cost Estimating Advice Manual

    160/287

  • 8/12/2019 Cost Estimating Advice Manual

    161/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    162/287

  • 8/12/2019 Cost Estimating Advice Manual

    163/287

  • 8/12/2019 Cost Estimating Advice Manual

    164/287

  • 8/12/2019 Cost Estimating Advice Manual

    165/287

  • 8/12/2019 Cost Estimating Advice Manual

    166/287

  • 8/12/2019 Cost Estimating Advice Manual

    167/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    168/287

  • 8/12/2019 Cost Estimating Advice Manual

    169/287

  • 8/12/2019 Cost Estimating Advice Manual

    170/287

  • 8/12/2019 Cost Estimating Advice Manual

    171/287

  • 8/12/2019 Cost Estimating Advice Manual

    172/287

  • 8/12/2019 Cost Estimating Advice Manual

    173/287

  • 8/12/2019 Cost Estimating Advice Manual

    174/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    175/287

  • 8/12/2019 Cost Estimating Advice Manual

    176/287

  • 8/12/2019 Cost Estimating Advice Manual

    177/287

  • 8/12/2019 Cost Estimating Advice Manual

    178/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    179/287

  • 8/12/2019 Cost Estimating Advice Manual

    180/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    181/287

  • 8/12/2019 Cost Estimating Advice Manual

    182/287

  • 8/12/2019 Cost Estimating Advice Manual

    183/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    184/287

  • 8/12/2019 Cost Estimating Advice Manual

    185/287

  • 8/12/2019 Cost Estimating Advice Manual

    186/287

  • 8/12/2019 Cost Estimating Advice Manual

    187/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    188/287

  • 8/12/2019 Cost Estimating Advice Manual

    189/287

  • 8/12/2019 Cost Estimating Advice Manual

    190/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    191/287

  • 8/12/2019 Cost Estimating Advice Manual

    192/287

  • 8/12/2019 Cost Estimating Advice Manual

    193/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    194/287

  • 8/12/2019 Cost Estimating Advice Manual

    195/287

  • 8/12/2019 Cost Estimating Advice Manual

    196/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    197/287

  • 8/12/2019 Cost Estimating Advice Manual

    198/287

  • 8/12/2019 Cost Estimating Advice Manual

    199/287

  • 8/12/2019 Cost Estimating Advice Manual

    200/287

    ICE RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    201/287

  • 8/12/2019 Cost Estimating Advice Manual

    202/287

  • 8/12/2019 Cost Estimating Advice Manual

    203/287

  • 8/12/2019 Cost Estimating Advice Manual

    204/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    205/287

  • 8/12/2019 Cost Estimating Advice Manual

    206/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    207/287

  • 8/12/2019 Cost Estimating Advice Manual

    208/287

  • 8/12/2019 Cost Estimating Advice Manual

    209/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    210/287

  • 8/12/2019 Cost Estimating Advice Manual

    211/287

  • 8/12/2019 Cost Estimating Advice Manual

    212/287

  • 8/12/2019 Cost Estimating Advice Manual

    213/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    214/287

    EXECUTION OF PROGRAM COSTS C

  • 8/12/2019 Cost Estimating Advice Manual

    215/287

  • 8/12/2019 Cost Estimating Advice Manual

    216/287

    ECKLIST BEST PRACTICE

  • 8/12/2019 Cost Estimating Advice Manual

    217/287

  • 8/12/2019 Cost Estimating Advice Manual

    218/287

  • 8/12/2019 Cost Estimating Advice Manual

    219/287

  • 8/12/2019 Cost Estimating Advice Manual

    220/287

  • 8/12/2019 Cost Estimating Advice Manual

    221/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    222/287

  • 8/12/2019 Cost Estimating Advice Manual

    223/287

  • 8/12/2019 Cost Estimating Advice Manual

    224/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    225/287

  • 8/12/2019 Cost Estimating Advice Manual

    226/287

  • 8/12/2019 Cost Estimating Advice Manual

    227/287

  • 8/12/2019 Cost Estimating Advice Manual

    228/287

  • 8/12/2019 Cost Estimating Advice Manual

    229/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    230/287

  • 8/12/2019 Cost Estimating Advice Manual

    231/287

    RETURN

    Info!A1

  • 8/12/2019 Cost Estimating Advice Manual

    232/287

    Tak

    Customer: Job #:

    Dimension

    L H W Qty.

    Totals

    Description Qty. Unit

  • 8/12/2019 Cost Estimating Advice Manual

    233/287

    RETURN

    Info!A1

    -off Sheet

    Date:

    Total Labor Man- Total Equip. Total

    matl. rate hours labor cost equip.SUBCost Total

  • 8/12/2019 Cost Estimating Advice Manual

    234/287

  • 8/12/2019 Cost Estimating Advice Manual

    235/287

    RETURN

    Info!A1

    p Form

    Last Chg

    Description 12 mo. + or - ProjectedOffice expenses

    Building maintenance

    Equipment repairs

    Postage

    Printing

    Rent

    Security Supplies

    Telephone

    Utilities

    Personnel (indirect)

    Payroll

    Pensions

    Profit sharing

    Union dues

    Taxes

    Payroll (indirect) Property

    Travel

    Vehicles

    Fuel

    Insurance

    Registration

    Repair and maintenance

    Totals

  • 8/12/2019 Cost Estimating Advice Manual

    236/287

    DateCustomer

    AddressCity/State/Zip

    PhoneEstimated by

    Operation Material

    1

    2

    3

    4

    5

    67

    8

    9

    10

    11

    12

    13

    14

    15

    1617

    18

  • 8/12/2019 Cost Estimating Advice Manual

    237/287

    Operation Material

    1

    2

    3

    4

    56

    7

    8

    9

    10

    11

    12

    13

    14

    1516

    17

    18

    Operation1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    Operation Descriptio

  • 8/12/2019 Cost Estimating Advice Manual

    238/287

    SetUp

    Remove/Replace

    Protection

    TouchUp is applied as a percentage of the total costs.

    CleanUp

    Equipment

    Equipment Rental

    description days

    Subcontractor Costs

    TradePavement marking $

    Sandblasting $

    Scaffolding $

    Wallcovering $

    Waterblasting $

    Other -- $

    Other -- $

    Other -- $

    Total Subcontractor Costs $

  • 8/12/2019 Cost Estimating Advice Manual

    239/287

  • 8/12/2019 Cost Estimating Advice Manual

    240/287

    Application Dimensions Quantity

    method SF/LF/Each

    x

    x

    x

    x

    xx

    x

    x

    x

    x

    x

    x

    x

    x

    xx

    x

    x

    Total Exterior Costs (includes overhe

    Preparation CostsQuantity

    Dimensions SF/LF/Eachx

    x

    x

    x

    x

    x

    x

    x

    x

    x

    Total Preparation Costs (includes overhe

    SURRPTUCU Costs

    Labor Labor cost

    n hours (AT $_____)

  • 8/12/2019 Cost Estimating Advice Manual

    241/287

    osts

    Daily Total Supervisi

    cost cost Setup

    $ Remove/

    $ Protectio

    $ Cleanup $ Equipme

    $ Subcontr

    $ Commiss

    Total Equipment Costs $ Other co

    Overhea

    Profit (__

    Preparati

    Bid amount Interior toExterior t

    Touchup

    Continge

    Total bas

    Adjustme

    Final bid

    Price per

    Price per

  • 8/12/2019 Cost Estimating Advice Manual

    242/287

    RETURN

    Info!A1

    Unit cost Total

    cost

    = $

    = $

    = $

    = $

    = $

    = $= $

    = $

    = $

    = $

    = $

    = $

    = $

    = $

    = $

    = $= $

    = $

    d and profit) = $

  • 8/12/2019 Cost Estimating Advice Manual

    243/287

    Unit cost Total

    cost

    = $

    = $

    = $

    = $

    = $= $

    = $

    = $

    = $

    = $

    = $

    = $

    = $

    = $

    = $= $

    = $

    = $

    d and profit) = $

    Unit Total

    cost cost= $

    = $

    = $

    = $

    = $

    = $

    = $

    = $

    = $

    = $

    d and profit) = $

    Material

    cost Totals

  • 8/12/2019 Cost Estimating Advice Manual

    244/287

    = $

    = $

    = $

    = $

    Extensions

    on ____

    eplace

    t

    ats

    ions

    ts

    Subtotal

    (__%)

    %)

    Subtotal

    on

    tal tal

    Subtotal

    (__%)

    cy (__%)

    e bid

    nt (__%)

    otal

    SF

    room

  • 8/12/2019 Cost Estimating Advice Manual

    245/287

    Residential Estimat

    Owner Contractor

    Property address Address

    Estimate by Telephone num

    Legal description Net Bldg. Fund

    No. Item Qty Unit Material1 Excavation

    2 Trenching

    3 Concrete rough4 Concrete finish

    5 Asphalt paving

    6 Rough lumber

    7 Finish lumber

    8 Door frames

    9 Windows and glass

    10 Fireplace

    11 Masonry

    12 Roof

    13 Plumbing14 Heating

    15 Electric wiring

    16 Electric fixtures

    17 Rough carpentry

    18 Finish carpentry

    19 Lath and plaster

    20 Drywall

    21 Garage door

    22 Doors

    23 Painting24 Cabinets

    25 Hardwood floors

    26 Ceramic tile

    27 Formica

    28 Hardware

    29 Linoleum

    30 Asphalt tile

    31 Range and oven

  • 8/12/2019 Cost Estimating Advice Manual

    246/287

    32 Insulation

    33 Shower door

    34 Temperature facilities

    35 Miscellaneous

    36 Cleanup

    37 Carpet

    38 Gutters and downspouts39 Septic tank

    40 Sewer connection

    41 Overhead

    42 Supervision

    43 Water meter

    44 Building permit

    45 Plan and specifications

    4647 Total cost

  • 8/12/2019 Cost Estimating Advice Manual

    247/287

    RETURN

    Info!A1

    Summary

    er

    Loan Number

    Labor Subcontract Total Actual cost

  • 8/12/2019 Cost Estimating Advice Manual

    248/287

  • 8/12/2019 Cost Estimating Advice Manual

    249/287

    Standard Form Subcontract

    Subcontract No. _____

    This Agreement, made and entered into at ___________ this __________ day of ______

    ___________________________ hereinafter called Contractor, with principal office at __

    ___________________ and ____________________________________________ herei

    Recitals

    On or about the ________________ day of _______________, 19 _____, Contractor ente

    ____________________________________________________________ hereinafter ca

    _______________________________________________________________________

    the following construction work: _____________________________________________

    . Said work t

    be performed in accordance with the prime contract and the plans and specifications. Said

    have been prepared by or on behalf of ________________________________________

    Section 1 - Entire Contract

    Subcontractor certifies and agrees that he is fully familiar with all of the terms, conditions a

    tract Documents, as hereinafter defined, the location of the job site, and the conditions un

    performed, and that he enters into this Agreement based upon his investigation of all such

    lying upon any opinions or representations of Contractor. It is agreed that this Agreement r

    ment. It is further agreed that the Contract Documents are incorporated in this Agreementsame force and effect as if the same were set forth at length therein, and that Subcontract

    be and are bound by any and all of said Contract Documents insofar as they relate in any

    directly to the work covered by this Agreement. Subcontractor agrees to be bound to Cont

    and to the same extent as Contractor is bound to Owner under the Contract Documents, t

    vided for this Agreement, and that where, in the Contract Documents, reference is made t

    or specification therein pertains to Subcontractor's trade, craft, type of work, then such wor

    interpreted to apply to Subcontractor instead of Contractor. The phrase "Contract Docume

    mean and include:

    Section 2 - Scope

    Subcontractor agrees to furnish all labor, services, materials, installation, cartage, hoisting

    equipment, scaffolding, tools and other facilities of every kind and description required for

    execution of the work described herein and to perform the work necessary or incidental to

    for the project in strict accordance with the Contract Documents and as more particularly, t

    specified in:

  • 8/12/2019 Cost Estimating Advice Manual

    250/287

    Section 3 - Contract Price

    Contractor agrees to pay Subcontractor for the strict performance of his work, the sum of:

    _____________________________________________________________ ( _________

    additions and deductions for changes in the work as may be agreed upon, and to make paPayment Schedule, Section 4.

    Section 4 - Payment Schedule

    Contractor agrees to pay Subcontractor in monthly payments of ________________ % of

    been placed in position and for which payment has been made by Owner to Contractor. T

    shall be retained by Contractor until he receives final payment from Owner, but not less th

    entire work required by the prime contract has been fully completed in conformity with the

    been delivered and accepted by the Owner, Architect and Contractor. Subject to the provi

    Page 1 of 2

    the retained percentage shall be paid Subcontractor promptly after Contractor receives his

    from Owner. Subcontractor agrees to furnish, if and when required by Contractor, payroll a

    release of claims for labor, material and subcontractors performing work or furnishing mat

    all in form satisfactory to Contractor, and it is agreed that no payment hereunder shall be

    option, until and unless such payroll affidavits, receipts, vouchers or releases; or any or all

    And payment made hereunder prior to completion and acceptance of the work, as referred

    construed as evidence of acceptance of any part of Subcontractor's work.

    Section 5 - General Provisions

    1. Subcontractor agrees to begin work as soon as instructed by the Contractor, and shall c

    efficiently and at a speed that will not cause delay in the progress of the Contractor's work

    tractors. If, in the opinion of the Contractor, the Subcontractor falls behind in the progress

    may direct the Subcontractor to take such steps as the Contractor deems necessary to im

    including, without limitation, requiring the Subcontractor to increase the number of shifts, p

    days of work, equipment, or other remedies and to submit to Contractor for Contractor's a

    demonstrating the manner in which the required rate of progress will be regained, without

    Contractor may require Subcontractor to prosecute, in preference to other parts of the wor

    such part or parts of the work as Contractor may specify.

    The Subcontractor shall complete the work as required by the progress schedule prepared

    be amended from time to time. The progress schedule may be reviewed in the office of the

    construction will be as directed by the Contractor.

    The Subcontractor agrees to have an acceptable representative (an officer of Subcontract

    Contractor) present at all job meetings and to submit weekly progress reports in writing if r

    Any job progress schedules are hereby made part of and incorporated herein by reference

    2. Reserved Gate Usage

  • 8/12/2019 Cost Estimating Advice Manual

    251/287

    Subcontractor shall notify in writing, and assign its employees, material men and suppliers

    as may be established for their use by Contractor and in accordance with such conditions

    posed by Contractor. Strict compliance with Contractor's gate usage procedures shall be r

    who shall be responsible for such gate usage by its employees, material men, suppliers, s

    men and suppliers.

    3. Staggered Days and Hours of Work and for Deliveries

    Subcontractor shall schedule the work and the presence of its employees at the jobsite an

    materials by its material men and suppliers to the jobsite on such days, and at such times

    directed by Contractor. Subcontractor shall assume responsibility for such schedule compl

    but for all its material men, suppliers and subcontractors, and their material men and suppl

    Section 6 - Special Provisions

    Contractors are required by law to be licensed and regulated by the Contractors' State Lic

    concerning a contractor may be referred to the registrar of the board.

    In Witness Whereof: The parties hereto have executed this Agreement fo

    cessors, administrators, and assignees on the day and year first above written.

    Subcontractor Contractor

    By ByName Title Name

    Corporation Partnership Proprietorship

    Contractor's State License No._________ Contractor's State Lice

    Page 2 of 2

  • 8/12/2019 Cost Estimating Advice Manual

    252/287

    RETURN

    Info!A1

    _______

    __ 19 ______ by and between

    _______________________,

    nafter called a Subcontractor.

    red into a prime contract with

    lled Owner, whose address is

    ____________to perform

    ___________________

    o

    plans and specifications

    ______________, Architect.

    nd obligations of the Con-

    er which the work is to be

    matters and is in no way re-

    epresents the entire agree-

    by this reference, with theor and his subcontractors will

    part or in any way, directly or in-

    actor in the same manner

    the extent of the work pro-

    Contractor and the work

    k or specification shall be

    nts" is defined to

    , supplies, insurance,

    he prompt and efficient

    complete

    hough not exclusively,

  • 8/12/2019 Cost Estimating Advice Manual

    253/287

    _______________), subject to

    yment in accordance with the

    labor and materials which have

    e remaining __________ %

    n thirty-five days after the

    Contract Documents and has

    ions of the next sentence,

    final payment

    ffidavits, receipts, vouchers,

    rials under this Agreement,

    ade, except at Contractor's

    of them, have been furnished.

    to above, shall not be

    arry on said work promptly,

    or work of other subcon-

    of the work, the Contractor

    prove the rate of progress,

    ersonnel, overtime operations,

    proval an outline schedule

    additional cost to the Contractor.

    k,

    by the Contractor, which may

    Contractor and sequence of

    or if requested by the

    equested by the Contractor.

    .

  • 8/12/2019 Cost Estimating Advice Manual

    254/287

    , to such gates or entrances

    and at such times as may be im-

    equired by the Subcontractor

    ubcontractors, and their material

    d any deliveries of supplies or

    and during such hours, as may be

    liance not only for its employees

    liers.

    nse Board. Any questions

    r themselves, their heirs, executors, suc-

    Title

    se No._________

  • 8/12/2019 Cost Estimating Advice Manual

    255/287

    Job Sche

    Contract number:

    Event 1 2 3 4 5 6

  • 8/12/2019 Cost Estimating Advice Manual

    256/287

    RETURN

    Info!A1

    ule

    Job foreman:

    Production date (Elapsed time by w

    7 8 9 10 11 12 13 14 15

  • 8/12/2019 Cost Estimating Advice Manual

    257/287

    Customer name:

    ek)

    16 17 18 19 20 21 22 23 24

  • 8/12/2019 Cost Estimating Advice Manual

    258/287

    25 26 27 28 29 30

  • 8/12/2019 Cost Estimating Advice Manual

    259/287

    ID Task

    Dependencies

    StatusEffort

    HoursCost

    1

    ID # oftask

    23

    4

    5

    6

    7

    8

    9

    10

    11

    1213

    14

    15

    Project artifacts

    Work BreakdoProject

    Project manager

  • 8/12/2019 Cost Estimating Advice Manual

    260/287

    Project # RETURN

    Sponsor

    Updated Info!A1

    Start DatePlanned

    Completion

    Estimate to

    Completion

    Actual

    CompletionResource

    n Structure

  • 8/12/2019 Cost Estimating Advice Manual

    261/287

    CLASS LIST STATUS

    100 Land/Property Acquisition None

    110 Acquisition Expenses None150 Development Costs None160 Lot Mowing/Maintenance None170 Carrying Costs - Loan Interest None180 Carrying Costs - Property Taxes None190 Carrying Costs - HOA Fees None

    CLASS LIST STATUS200 Site Surveys L-M-S-R201 Property Inspections L-M-S-R202 Soils Exploration L-M-S-R205 Design Costs L-M-S-R206 Engineering Fees L-M-S-R207 Estimating Costs L-M-S-R210 Construction Financing None220 Project Insurance None221 Builders Risk Insurance None230 Building Permits/Fees None231 Radon Gas Fee None232 Arborist Fee None233 Inspector Training Fee None238 Other Permit Fees None

    239 Reinspections None240 Utility Deposits None241 Water Connection Fee None242 Sewer Connection Fee None245 Utility Service Fee None250 Impact Fees None251 City Impact Fee None252 Road Impact Fee None253 Sewer Impact Fee None

    DIVISION 200 PRE-CONSTRUCTION

    MASTERCODE COST CODEGENERAL NOTES

    1. L-M-S-R Labor - Material - Subcontract - Rental. (Category II)

    2. Labor = Payroll Labor and Subcontract Labor (optional). (Category I)

    3. Materials = Material only, including delivery and taxes. (Category I)

    4. Subcontract = Labor & Material Subcontracts and Subcontract Labor (optional). (Category I)

    5. Rental = Rental only, including delivery and taxes. (Category I)

    6. None = Not Classified / Unclassified / No Class Assigned

    7. N/A = Not Applicable

    8. List Status = Account status in the Template File when 1st installed. (may be changed by user)

    DIVISION 100 LAND & PROPERTY

  • 8/12/2019 Cost Estimating Advice Manual

    262/287

  • 8/12/2019 Cost Estimating Advice Manual

    263/287

    316 Concrete Reinforcing Materials* Material317 Concrete Reinforcing Labor* Labor 320 Concrete Work Contract321 Concrete TruckMix Material322 Concrete Labor* Labor 323 Concrete Equip Rental* Rental

    324 Concrete Crane Rental L-M-S-R325 Concrete Pumping L-M-S-R326 Concrete Precast L-M-S-R327 Concrete Special Finishes L-M-S-R329 Concrete Testing L-M-S-R330 Concrete Structures L-M-S-R331 Concrete Footers L-M-S-R332 Concrete Foundations L-M-S-R333 Concrete Columns334 Concrete Decks L-M-S-R335 Concrete Monolithic Slabs L-M-S-R

    336 Concrete Floor Slabs L-M-S-R337 Concrete Walls L-M-S-R338 Concrete Tilt Up L-M-S-R340 Masonry Contract341 Masonry Materials* Material342 Masonry Labor* Labor 343 Masonry Equip Rental* Rental344 Masonry Scaffolding L-M-S-R345 Parging L-M-S-R348 Foundation Waterproofing L-M-S-R

    349 Foundation Drainage/Sump L-M-S-R350 Masonry Structures L-M-S-R351 Masonry Foundation Walls L-M-S-R352 Masonry Retaining Walls L-M-S-R353 Masonry Walls L-M-S-R354 Masonry Columns L-M-S-R355 Masonry Chimney L-M-S-R356 Masonry Modifications L-M-S-R360 Structural Steel L-M-S-R361 Structural Steel Materials* Material362 Structural Steel Labor* Labor

    364 Structural Steel Crane L-M-S-R365 Steel - Shop Fabrications L-M-S-R366 Steel - Field Welding L-M-S-R370 Steel Structures L-M-S-R377 Steel/Metal Stairs L-M-S-R380 Rough Carpentry Contract381 Rough Carpentry Materials* Material382 Rough Carpentry Labor* Labor 383 Rough Carpentry Tool Rental* Rental

  • 8/12/2019 Cost Estimating Advice Manual

    264/287

    384 Rough Carpentry Crane L-M-S-R385 Special Wood Beams Material386 Structural Hardware Material387 Floor Trusses Material388 Roof Trusses Material390 Rough Carpentry Structures L-M-S-R

    391 Wood Beams & Girders L-M-S-R392 Floor Framing L-M-S-R393 Exterior Wall Framing L-M-S-R394 Roof Framing L-M-S-R395 Interior Partitions & Blocking L-M-S-R396 Wall Furring L-M-S-R397 Stair/Landing Framing L-M-S-R

    CLASS LIST STATUS400 Roofing L-M-S-R401 Roofing Materials* Material402 Roofing Labor* Labor

    403 Roofing Equip Rental* Rental404 Asphalt Shingle Roofing L-M-S-R405 Concrete/Clay Tile L-M-S-R406 Slate Roofing L-M-S-R407 Cedar Shake Roofing L-M-S-R408 Metal Roofing L-M-S-R409 Membrane/Built-up Roofing L-M-S-R410 Exterior Swing Doors L-M-S-R411 Sliding Glass Doors L-M-S-R413 Basement Doors L-M-S-R

    414 Special Doors L-M-S-R415 Garage Doors L-M-S-R416 Garage Door Opener L-M-S-R419 Access Panels L-M-S-R420 Windows L-M-S-R421 Greenhouse Windows L-M-S-R422 Glazing L-M-S-R423 Stained/Etched Glass L-M-S-R424 Entrances/Storefront L-M-S-R425 Glass Block Windows L-M-S-R429 Skylights/Roof Windows L-M-S-R

    430 Building Wrap L-M-S-R431 Exterior Millwork L-M-S-R432 Molded Foam Trim L-M-S-R435 Wood Siding & Trim L-M-S-R436 Wood Siding & Trim Materials* Material437 Wood Siding & Trim Labor* Labor 440 Face Brick L-M-S-R441 Face Brick Materials* Material442 Face Brick Labor* Labor

    DIVISION 400 EXTERIOR FINISHES

  • 8/12/2019 Cost Estimating Advice Manual

    265/287

    444 Brick Tuckpointing L-M-S-R445 Stonework L-M-S-R446 Stonework Materials* Material447 Stonework Labor* Labor 449 Precast Ornamental Concrete L-M-S-R450 Stucco L-M-S-R

    451 Stucco Materials* Material452 Stucco Labor* Labor 455 Textured Coatings L-M-S-R456 Water & Damproofing L-M-S-R457 Special Caulking L-M-S-R460 Exterior Painting L-M-S-R461 Exterior Painting Materials* Material462 Exterior Painting Labor* Labor 465 Spraytech Coatings L-M-S-R470 Aluminum Siding L-M-S-R471 Alum Soffit & Fascia L-M-S-R

    475 Aluminum Railings L-M-S-R476 Aluminum Screen Doors L-M-S-R479 Gutters & Downspouts L-M-S-R480 Vinyl Siding L-M-S-R481 Vinyl Soffit & Fascia L-M-S-R485 Shutters L-M-S-R489 Awnings L-M-S-R490 Ornamental Iron L-M-S-R491 Chimney Cap L-M-S-R

    CLASS LIST STATUS

    500 Insulation L-M-S-R504 Fireproofing L-M-S-R505 Metal Stud L-M-S-R506 Metal Stud Materials* Material507 Metal Stud Labor* Labor 509 Soundproofing L-M-S-R510 Drywall L-M-S-R511 Drywall Materials* Material512 Drywall Labor* Labor 515 Fiberglass Panels L-M-S-R516 Lath & Plastering L-M-S-R

    517 Ornamental Plaster L-M-S-R520 Finish Carpentry L-M-S-R521 Finish Carpentry Materials* Material522 Finish Carpentry Labor* Labor 525 Interior Doors L-M-S-R526 Fire Doors L-M-S-R530 Wood Mouldings L-M-S-R531 Wood Shelving L-M-S-R535 Wood Stairs & Rails L-M-S-R

    DIVISION 500 INTERIOR FINISHES

  • 8/12/2019 Cost Estimating Advice Manual

    266/287

    536 Attic Stairs L-M-S-R537 Paneling/Planking L-M-S-R539 Fireplace Mantle/Trim L-M-S-R540 Cabinets & Vanities L-M-S-R541 Cabinetry Materials* L-M-S-R542 Cabinetry Labor* L-M-S-R

    544 Special Millwork L-M-S-R545 Formica Countertops L-M-S-R546 Solid Surface Countertops L-M-S-R547 Stone Countertops L-M-S-R548 Cultured Marble Tops L-M-S-R549 Cultured Marble Work L-M-S-R550 Painting L-M-S-R551 Painting Materials* Material552 Painting Labor* Labor 554 Faux Finishes L-M-S-R555 Wallpaper L-M-S-R

    556 Wallpaper Materials* Material557 Wallpaper Labor* Labor 560 Suspended Ceilings L-M-S-R561 Suspended Ceiling Materials* Material562 Suspended Ceiling Labor* Labor 565 Acoustical Ceilings L-M-S-R566 Metal Ceilings L-M-S-R569 Illuminated Ceilings L-M-S-R570 Ceramic Tile L-M-S-R571 Ceramic Tile Materials* Material

    572 Ceramic Tile Labor* Labor 574 Tile Counters L-M-S-R575 Glass Block L-M-S-R578 Tile/Marble Window Sills L-M-S-R579 Ceramic Fireplace Finishes L-M-S-R580 Tile Flooring L-M-S-R581 Vinyl Flooring L-M-S-R582 Wood Flooring L-M-S-R583 Wood Floor Refinishing L-M-S-R584 Marble Flooring L-M-S-R585 Stone/Slate Flooring L-M-S-R

    586 Terrazzo Flooring L-M-S-R587 Brick/Paver Flooring L-M-S-R588 Concrete Floor Refinishing L-M-S-R589 Carpeting L-M-S-R590 Door Hardware L-M-S-R591 Mirrors L-M-S-R592 Medicine Cabinets L-M-S-R593 Shower Enclosures L-M-S-R594 Bath Accessories L-M-S-R

  • 8/12/2019 Cost Estimating Advice Manual

    267/287

    595 Wire Shelving L-M-S-R596 Metal Shelving L-M-S-R597 Closet Systems L-M-S-R598 Fabricated Plastics L-M-S-R599 Finish Metals L-M-S-R

    CLASS LIST STATUS

    600 Plumbing System L-M-S-R601 Plumbing Fixtures Material602 Special Tubs Material603 Water Heater Material604 Plumbing Utility Connections Material605 Solar Water Heating Sys L-M-S-R606 Gas Transmission System L-M-S-R607 Boiler/HW Heating System L-M-S-R610 HVAC System L-M-S-R611 Oven/Dryer/Bath Venting L-M-S-R612 Attic/Whole House Fans L-M-S-R

    614 Electrostatic Filter System L-M-S-R615 Sheet Metal Work L-M-S-R616 Duct Cleaning L-M-S-R619 Prefab Fireplaces L-M-S-R620 Electrical System L-M-S-R621 Lighting Fixtures Material622 Ceiling Fans Material624 Electrical Utility Connections Material625 Door Chime System Material626 CATV/Antenna System L-M-S-R

    627 Telephone/PBX System L-M-S-R628 Computer Wiring L-M-S-R629 Low Voltage Lighting L-M-S-R630 Security System L-M-S-R631 Safes & Vaults L-M-S-R632 Intercom/Sound System L-M-S-R634 Lightning Protection System L-M-S-R635 Smoke Detection System L-M-S-R636 Fire Extinguishers L-M-S-R637 Fire Alarm System L-M-S-R638 Fire Sprinkler System L-M-S-R

    639 Central Vacuum System L-M-S-R640 Appliances L-M-S-R641 Refrigerator/Freezer L-M-S-R642 Stove/Range L-M-S-R643 Range Hood L-M-S-R644 Garbage Disposal L-M-S-R645 Dishwasher L-M-S-R646 Microwave Oven L-M-S-R648 Clothes Washer L-M-S-R

    DIVISION 600 MECHANICAL & CSI

  • 8/12/2019 Cost Estimating Advice Manual

    268/287

    649 Clothes Dryer L-M-S-R650 SPECIALTIES (Div 10) L-M-S-R660 EQUIPMENT (Div 11) L-M-S-R670 FURNISHINGS (Div 12) L-M-S-R671 Window Treatments L-M-S-R672 Manufactured Casework L-M-S-R

    673 Rugs & Mats L-M-S-R680 SPECIAL CONST (Div 13) L-M-S-R681 Greenhouses L-M-S-R682 Gazebos L-M-S-R690 CONVEYING SYSTEMS (Div 14) L-M-S-R691 Residential Elevator L-M-S-R692 Dumb Waiter L-M-S-R693 Wheelchair Lifts L-M-S-R

    CLASS LIST STATUS700 Septic System L-M-S-R701 Well & Pump L-M-S-R

    702 Water Meter L-M-S-R705 Drainage System L-M-S-R710 Concrete Curb/Gutter L-M-S-R715 Asphalt Paving L-M-S-R716 Pavement Marking L-M-S-R720 Final Grading L-M-S-R730 Concrete Flatwork L-M-S-R731 Concrete Flatwork Materials* L-M-S-R732 Concrete Flatwork Labor* L-M-S-R735 Driveways/Aprons L-M-S-R

    736 Patios/Sidewalks L-M-S-R737 Special Concrete Finishes L-M-S-R738 Brick Pavers L-M-S-R739 Flagstone L-M-S-R740 Exterior Wood Structures L-M-S-R741 Ext. Wood Structure Materials* L-M-S-R742 Ext. Wood Structure Labor* L-M-S-R750 Exterior Sundeck L-M-S-R751 Exterior Wood Stairs L-M-S-R752 Exterior Wood Railings L-M-S-R753 Wood Patios/Walkways L-M-S-R

    759 Dune Crossovers L-M-S-R760 Fencing L-M-S-R765 Mailboxes L-M-S-R766 Signage / House Numbers L-M-S-R770 Landscaping L-M-S-R771 Landscaping Materials* L-M-S-R772 Landscaping Labor* L-M-S-R775 Irrigation System L-M-S-R776 Landscape Plantings L-M-S-R

    DIVISION 700 SITE IMPROVEMENTS

  • 8/12/2019 Cost Estimating Advice Manual

    269/287

    777 Sod & Seeding L-M-S-R779 Landscape Lighting L-M-S-R780 Pool/Spa Construction L-M-S-R783 Pool/Spa Re-Decking L-M-S-R784 Pool/Sap Re-Marcite L-M-S-R785 Pool/Spa Deck Coatings L-M-S-R

    786 Chattahoochee/River Rock L-M-S-R790 Screening / Screen Rooms L-M-S-R

    CLASS LIST STATUS800 Site Supervision L-M-S-R801 Supervision Bonus L-M-S-R802 Associate Bonus L-M-S-R805 Project Management L-M-S-R810 Rough Cleanup L-M-S-R811 Trash Removal/Dumpster L-M-S-R812 Dump Fees L-M-S-R815 Final Cleaning L-M-S-R

    816 Material Protection L-M-S-R817 Special Testing L-M-S-R819 General Purpose Scaffolding L-M-S-R820 Builders Risk Insurance None821 Liability Insurance Impact None822 Worker's Comp Impact None823 Licensing Cost Impact None830 Bonding Costs None831 Warranty Program None832 Legal Expenses (project only) None

    833 Accounting Costs (project only) None834 Administration & Clerical None835 Blueprints / Copies None836 Photography None840 Travel Expenses None845 Vehicle Expenses None850 Materials Acquisition & Dist. L-M-S-R855 Off Site Storage (project only) L-M-S-R860 Minor Medical None865 Refreshments / Ice None870 Consumable Tools None

    880 Final Punchout L-M-S-R885 Final Move-in & Set-up L-M-S-R890 Warranty Service L-M-S-R891 Warranty-Materials* Material892 Warranty-Labor* Labor 893 Warranty-Rental* Rental

    CLASS LIST STATUS900 Marketing / Advertising L-M-S-R901 Promotional Signage L-M-S-R

    DIVISION 900 SALES & MARKETING

    DIVISION 800 PROJECT OVERHEAD

  • 8/12/2019 Cost Estimating Advice Manual

    270/287

    902 Decorating L-M-S-R905 Buyers Incentives None906 Permanent Utilities (for buyer) None910 Closing Costs None911 Title Insurance None912 Final Appraisal None

    913 Foundation Check L-M-S-R914 Final Inspections L-M-S-R915 Final Surveys L-M-S-R916 Bank Inspections None918 Permanent Loan Points None919 Other Closing Costs None920 Sales Commissions - In House None921 Sales Commissions - Outside None930 Construction Loan Points None931 Construction Loan Interest None932 Post Construction Interest None

    935 Investor Profit Share None940 Maintenance L-M-S-R950 Late Completion Costs None960 General Stock Materials None970 Small Job Costs L-M-S-R971 Small Jobs - Materials* Material972 Small Jobs - Labor* Labor 973 Small Jobs - Rentals* Rental974 Small Jobs - Overhead None980 Miscellaneous Job Cost L-M-S-R

    981 Miscellaneous Materials* Material982 Miscellaneous Labor* Labor 983 Miscellaneous Rental* Rental984 Miscellaneous Job Overhead None990 Perm Uncategorized Costs L-M-S-R991 Perm Uncategorized Materials* Material992 Perm Uncategorized Labor* Labor 993 Perm Uncategorized Rentals* Rental994 Perm Uncategorized Job Overhead None999 Temp Unidentified Job Costs L-M-S-R

  • 8/12/2019 Cost Estimating Advice Manual

    271/287

    RETURN

    Info!A1

    NOTES

    NOTES

    YSTEM

  • 8/12/2019 Cost Estimating Advice Manual

    272/287

    NOTES

  • 8/12/2019 Cost Estimating Advice Manual

    273/287

  • 8/12/2019 Cost Estimating Advice Manual

    274/287

    NOTES

  • 8/12/2019 Cost Estimating Advice Manual

    275/287

    NOTES

  • 8/12/2019 Cost Estimating Advice Manual

    276/287

  • 8/12/2019 Cost Estimating Advice Manual

    277/287

    NOTES

  • 8/12/2019 Cost Estimating Advice Manual

    278/287

    NOTES

  • 8/12/2019 Cost Estimating Advice Manual

    279/287

    NOTES

    NOTES

  • 8/12/2019 Cost Estimating Advice Manual

    280/287

  • 8/12/2019 Cost Estimating Advice Manual

    281/287

    Material Requisitio

    Proj

    Project

    Unit Qty.

    Date Description price ordered

  • 8/12/2019 Cost Estimating Advice Manual

    282/287

  • 8/12/2019 Cost Estimating Advice Manual

    283/287

    n Control

    Date: RETURN

    ct name:

    number: Info!A1

    Cost Supplier Date Back

    ($) contact order received

  • 8/12/2019 Cost Estimating Advice Manual

    284/287

  • 8/12/2019 Cost Estimating Advice Manual

    285/287

    Project #

    Sponsor

    Updated

    ID Communication Description Frequency

    1 What type of communication is this?What is the description

    of the contents/purpose

    of this communication?

    2

    34

    56

    7891011

    1213

    1415

    1617

    Communication PlProject

    Project manager

    Project artifacts

  • 8/12/2019 Cost Estimating Advice Manual

    286/287

    TO GET BACK TO MAI

    Info!A1

    Format Owner Recipient/

    Attendees

    Who sends? Who gets?

    n

  • 8/12/2019 Cost Estimating Advice Manual

    287/287