Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1 Douglas J. Steinmetz, AIA Addendum #1 Issued February 22, 2011 Page 1 of 5 ADDENDUM #1 ISSUED: February 22, 2011 PROJECT: Alterations to the Corning Opera House Corning IA PROJECT No.: COH 241-05 From: Douglas J. Steinmetz, AIA 4121 Timberview Drive Cedar Rapids, IA 52411 Phone 319-294-4905 To: Plan Holders This information forms part of the contract documents and modifies the original bidding documents dated January 2011 (Volume I) and February 2011 (Volume II) as noted below. Acknowledge receipt of this Addendum by placing the number (1) in the appropriate blank spaces provided on the bid form submitted as part of your sealed bid. Failure to do so may subject the Bidder to disqualification. VOLUME I PREBID CONFERENCE ITEM 1. Attached is the sign-in sheet of those attending the 18 February pre-bid conference. INTERVIEWS ITEM 1. The Owner will conduct separate interviews with the two apparent low bidders on Monday 7 March 2011. The first interview will be scheduled for 4:30 PM and the second at 5:45 PM. Each interview will last no longer than one hour during which time the presenter will be given an opportunity to describe their company and the relevant experiences they bring to the project. Fifteen minutes will be reserved at the end of each interview for questions from the Board of Directors. APPROVED SUBSTITUTIONS The following listed items include approved substitute materials, products, and equipment or systems which have been submitted and reviewed in accordance with procedures specified in Section 01635 – SUBSTITUTION REQUIREMENTS. All items allowed by this Addendum are subject to full provisions of original contract documents including all modifications thereto, and shall be warranted as substitutions conforming to the contract documents as provided by General Conditions. Approvals are based upon the opinion, knowledge, information, and belief of the Architect at time of issuance of this Addendum and reliance upon data referenced and submitted. Approvals are therefore interim in nature and subject to reconsideration as additional data, materials, workmanship, and coordination with other work are observed and reviewed. In proposing items allowed by this

Transcript of Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center...

Page 1: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz, AIA Addendum #1 Issued February 22, 2011 Page 1 of 5

ADDENDUM #1 ISSUED: February 22, 2011

PROJECT: Alterations to the Corning Opera House Corning IA PROJECT No.: COH 241-05 From: Douglas J. Steinmetz, AIA 4121 Timberview Drive Cedar Rapids, IA 52411 Phone 319-294-4905 To: Plan Holders This information forms part of the contract documents and modifies the original bidding documents dated January 2011 (Volume I) and February 2011 (Volume II) as noted below. Acknowledge receipt of this Addendum by placing the number (1) in the appropriate blank spaces provided on the bid form submitted as part of your sealed bid. Failure to do so may subject the Bidder to disqualification. VOLUME I PREBID CONFERENCE

ITEM 1. Attached is the sign-in sheet of those attending the 18 February pre-bid conference. INTERVIEWS

ITEM 1. The Owner will conduct separate interviews with the two apparent low bidders on Monday 7 March 2011. The first interview will be scheduled for 4:30 PM and the second at 5:45 PM. Each interview will last no longer than one hour during which time the presenter will be given an opportunity to describe their company and the relevant experiences they bring to the project. Fifteen minutes will be reserved at the end of each interview for questions from the Board of Directors.

APPROVED SUBSTITUTIONS The following listed items include approved substitute materials, products, and equipment or systems which have been submitted and reviewed in accordance with procedures specified in Section 01635 – SUBSTITUTION REQUIREMENTS. All items allowed by this Addendum are subject to full provisions of original contract documents including all modifications thereto, and shall be warranted as substitutions conforming to the contract documents as provided by General Conditions. Approvals are based upon the opinion, knowledge, information, and belief of the Architect at time of issuance of this Addendum and reliance upon data referenced and submitted. Approvals are therefore interim in nature and subject to reconsideration as additional data, materials, workmanship, and coordination with other work are observed and reviewed. In proposing items allowed by this

Page 2: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz, AIA Addendum #1 Issued February 22, 2011 Page 2 of 5

Addendum, bidder assumes all risk, costs, and responsibility for items final acceptance, integration into work and performance. This “prior approval” procedure has been offered and administered in a manner to fulfill the Owner’s desire for bidding competition. SCHEDULE OF APPROVED SUBSTITUTIONS

ITEM 1. Section 10 155 – TOILET COMPARTMENTS Item: Stainless Steel Units Manufacturer: Hadrian DRAWINGS ITEM 1. Insert the following drawings which serve to modify and supplement information on

previously issued drawings: AD1-A1 (Revision to A1.9) AD1-A2 (Revisions to A1.2 and A1.9) AD1-A3 (Revisions to A2.2) AD1-A4 (Revisions to A2.7 and 2.8) AD1-A5 (Revisions to A3.1) AD1-A6 (Revisions to A3.2) AD1-A7 (Revisions to A3.3) AD1-A8 (Revisions to A3.3) AD1-A9 (Revisions to A3.4) AD1-A10 (Revisions to A3.5) AD1-A11 (Revisions to A3.5) AD1-A12 (Revisions to A5.6 and 5.13) AD1-A13 (Revisions to A5.13) AD1-A14 (Revisions to A7.2) AD1-A15 (Revisions to A7.6) AD1-A16 (Revisions to A7.6)

ITEM 2. Replace drawing sheets S2, S5, S13, S15, S17, and S18 with attached drawings sheets AD1-S2, AD1-S5, AD1-S13, AD1-S15, AD1-S17, and AD1-S18.

SPECIFICATIONS – PROJECT MANUAL VOLUME 1

ITEM 3. SECTION 00 001 – TABLE OF CONTENTS A. Insert section 000910 WORK PACKAGES in Division 00-PROCUREMENT AND

CONTRACTING REQUIREMENTS. B. Insert section 01230 ALTERNATES in Division 01-GENERAL REQUIREMENTS.

Page 3: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz, AIA Addendum #1 Issued February 22, 2011 Page 3 of 5

ITEM 4. SECTION 00 020 – INVITATION TO BID

A. Examination of Procurement Documents: Bidding documents are available at the following Plan Rooms: a. Construction Update Plan Room

645 32nd Ave SW Cedar Rapids, IA 52404 (319)369-4848

b. Construction Update Plan Room 612 Mulberry Waterloo, IA 50703 (319) 232-3621

c. Master Builders of Iowa 21 Park St., PO Box 695 Des Moines, IA 50309 (515) 288-8904

d. McGraw Hill Dodge Construction 3875 Elmore Ave. Ste C Davenport, IA 52807 (563) 445-3081

e. North Iowa Builders Exchange 25 W State St., Ste B PO Box 1154 Mason City, IA 50401 (641) 423-5334

f. Omaha Builders Exchange 4255 S94th St Omaha, NE 67127 (402) 593-6908

ITEM 5. SECTION 00 210 – SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

A. Delete 3.3.2.1 as written and insert the following: 3.3.2.1 Make request for approval of substitute products on "Substitution Request Form" included at the end of this section 01 635. Submit a separate Substitution Request Form for each proposed substitution; verbal or written requests without completed Substitution Request Form will not be considered.

The bidder is advised that vagueness of submittal, inadequate warranty, insufficient data and failure to meet project requirements may be cause for rejection of request. Approval is subject to later reconsideration at any time during the life of the contract.

If the Architect approves a proposed substitution prior to receipt of bids, such approval will be set forth in an addendum. Bidders shall not rely upon approvals made in any other manner.

B. Delete modification to subparagraph 3.4.3 as written and insert the following: No addenda will be issued later than 7 calendar days 48 hours prior to the date for receipt of bids except: (1) an addendum withdrawing the request for bids; (2) an addendum which includes postponement of the date for receipt of bids; or (3) an addendum issued after receipt of bids and prior to execution of the contract.

C. Change §6.1 to read as follows: §6.1 Bidders to whom award of a Contract is under consideration shall submit to the Architect, upon request, with their bid a properly executed AIA Document A305, Contractor's Qualification Statement, unless such a Statement has been previously required and submitted as a prerequisite to the issuance of Bidding Documents.

D. Add §6.1.1 as follows: §6.1.1 Provide up to five specific project examples completed by your firm in the last five years that required compliance with the Secretary of the Interior’s Standards for Rehabilitation and up to five specific project examples completed by your firm that required compliance Iowa Green Streets Criteria (the same projects may appear on both lists if appropriate). For each project listed provide the project name, location, approximate cost, and brief description of the scope of the project and which requirements applied to the project.

E. Delete §6.3.1.4 as written and insert the following:

Page 4: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz, AIA Addendum #1 Issued February 22, 2011 Page 4 of 5

§6.3.1.4 The bidder at the time of submitting proposal shall include a list of all subcontractors including their Company Name, City and State where headquartered, and shall include a list of all suppliers of principal items or systems of materials and equipment for the work intended to be used by the Contractor. List shall be reviewed by the Owner prior to awarding of contract.

F. Add §6.3.5. The Owner may at their discretion conduct interviews of up to two of the lowest apparent bidders to assist them in awarding the contract. Bidders will be notified of the request for an interview within two days of the bid opening. The interviews are expected to be completed no later than 11 March. Each interviewee shall be prepared to present additional evidence of applicable experience, qualifications, and financial responsibility to carry out the terms of the contract.

ITEM 6. SECTION 00 410 - BID FORM A. Replace SECTION 00 410 - BID FORM with the document of the same name provided

with this addendum.

ITEM 7. Insert attached new SECTION 00910 – WORK PACKAGES.

ITEM 8. Insert attached new SECTION 01230 – ALTERNATES.

ITEM 9. SECTION 01 635 – SUBSTITUTION PROCEDURES Delete the Substitution Request Form found at the end of the section and replace it with the SUBSTITUTION REQUEST FORM page 01 635-3 attached to this addendum.

ITEM 10. SECTION 07315 COMPOSITE SLATE ROOF A. Delete 1.03 B. a. as written and insert: Class A Fire Resistance - UL 790 Test Standard. B. Delete 1.06 A. as written and insert the following in its place:

Warranties: Manufacturer's standard form or customized, without monetary limitation, signed by roofing manufacturer agreeing to repair leaks due to defects in materials or workmanship for period of 50 years equal to EcoStar Gold Star.

C. Delete 2.01 C. as written and insert the following in its place: Color selection shall be made by architect from available standard colors in the standard grey family or other colors that may be available without a cost premium.

ITEM 11. SECTION 08 7100 – DOOR HARDWARE

Delete article 3.6 DOOR HARDWARE SCHEDULE in its entirety and replace it with the attached article 3.6 DOOR HARDWARE SCHEDULE, pages 08 7100 - 15 thru 08 7100-22.

VOLUME II

ITEM 1. Refer to Attached Addendum #1, Issued February 21, 2011 for APPROVED SUBSTITUTIONS, SCHEDULE OF APPROVED SUBSTITUTIONS, SPECIFICATIONS, and DRAWINGS including all attachments referenced in that document.

ITEM 2. THEATRICAL LIGHTING A. Base bid shall include providing only the work identified on drawings inserted in

paragraph B. as being done by Electrical Contractor (EC). Where the term “done” or other similar terms are used their meaning shall be synonymous with the meaning of the

Page 5: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz, AIA Addendum #1 Issued February 22, 2011 Page 5 of 5

word “provide” as defined in section 01420 REFERENCES. All other work shown is being bid separately and should not be included in the bid amount.

B. Insert the following drawings (drawings are 24x36 unless otherwise noted): L0-1 LIGHTING SYSTEM SCHEMATIC L0-2 LIGHTING SYSTEM WIRING SCHEMATIC L1-1 PLAN VIEW, STAGE LIGHTING FIXTURES L1-2 PLAN VIEW, ATTIC LIGHTING FIXTURES L2-1 CENTERLINE VIEW, STAGE LIGHTING FIXTURES L2-2 LATERAL SECTION, VIEW THROUGH BOX BOOMS L2-3 LATERAL SECTION, VIEW THROUGH STAGE HOUSE L3-1 PLAN VIEW, STAGE DMX, BOX BOOM, & LOAD CIRCUITS L3-2 PLAN VIEW, ATTIC DMX & LOAD CIRCUITS L3-3 PLAN VIEW, LIGHT BOOTH L4-1 ELEVATION VIEW, STAGE LIGHTING RACEWAYS & DMX PANELS L4-2 ELEVATION VIEW, HOUSE LIGHTING RACEWAYS, STAGE CONNECTORS &

DMX PANELS

ITEM 3. THEATRICAL SOUND A. Base bid shall include providing only the work identified on drawings and specifications

inserted in paragraph B and C. as being done by Electrical Contractor (EC). Where the term “done” or other similar terms are used their meaning shall be synonymous with the meaning of the word “provide” as defined in section 01420 REFERENCES. All other work shown is being bid separately and should not be included in the bid amount.

B. Insert the following specifications: Specification cover including Schedule, Special Conditions, Receipt of Bid Documents Section 1062 – SOUND AND VIDEO SYSTEMS SPECIFICATIONS

C. Insert the following drawings (drawings are 24x36 unless otherwise noted): S1-1 Speaker Layout, Plan View (11x17) S1-2 Speaker Layout, Under Balcony Plan View (11x17) S2-1 Speaker Layout, Centerline Section View (11x17) S0-1 Sound System Schematic S0-2 Wiring Schematic S0-3 Paging System Schematic S1-1 Main Floor Speaker Layout, Plan View S1-2 Dressing Room Speaker Layout, Plan View S1-3 Auditor Main Floor Speaker Layout, Plan View S1-4 Balcony Speaker Layout, Plan View S1-5 Attic Connector Panels, Plan View S2-1 Speaker Layout, Centerline Section View S3-1 Sound System Equipment Racks Elevation S3-2 Patch Panels Elevation S3-3 Sound System Connector Panels Elevation

END OF ADDENDUM #1

Page 6: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House PREBID MEETING Project No. 241-05 SIGN IN SHEET

Name Phone * FAX/email

A I I I t~lc... 1 ~ft~~~~ j~~~~~~~ ~n (/~~~ ~ Q ~__________~_____=-~~~~-=~_______________________________________________________~~ ,

Company

eo..... .. ,. " ....

Denht?'!<\9€Cc,!\..~tc.; ~~It ,c;.o.....

,L! /.L.' • v1 ~ ~ON "II 11111\"" v~1.. 'nt.;. ,,,01

:rf,~'1l1w~ej.....,,/J

0. C)/, f.. 'Ie " .J.t.. ro.,.! 111,)]

~~~~:-

Page 7: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz, AIA BID FORM © January 2011 00410-1

SECTION 00410 - BID FORM GENERAL CONSTRUCTION CONTRACT -STIPULATED SUM THE PROJECT AND THE PARTIES TO (OWNER): Corning Opera House Cultural Center FOR (PROJECT): Alterations to the Historic Corning Opera House DATE: , 2011 (Bidder to enter date) SUBMITTED BY: (Bidder to enter firm name and address below) BIDDER'S ACKNOWLEDGEMENT: In submitting this bid, BIDDER acknowledges and represents that:

This bid is genuine and not made in the interest of or on behalf of an undisclosed person, firm or corporation; BIDDER has examined copies of all the Bidding Documents; BIDDER has visited the Place of Work and become familiar with the general, local, and site conditions;

BIDDER is familiar with federal, State, and local laws, ordinances and regulations, including those associated with grants awarded to the project;

BIDDER has correlated the information known to BIDDER, observations obtained from examination of the site, reports and drawings identified in the Bidding Documents and additional investigations, explorations, tests and data with the Bidding Documents; BIDDER has not sought by collusion to obtain an advantage over the OWNER; BIDDER has the financial capability to project the entire Project without delay. BIDDER is aware that additional work packages that have been let separately by the Owner are being assigned to the BIDDER as prime contract.

Page 8: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz, AIA BID FORM © January 2011 00410-2

BIDDER has received the Addenda indicated below, and all costs resulting from modifications to the Bidding Documents have been considered and included in the Bid Price.

Addendum No, , Dated

Addendum No, , Dated

Addendum No, , Dated In response to your request for bids and in compliance with the Bidding and Contract Requirements, the undersigned proposes to furnish all labor, materials and equipment, all supervision, coordination, all related incidentals necessary to perform the work to complete the alterations the historic Corning Opera House in strict accordance with the Project manual and the Drawings dated January and February 2011, including Addenda numbered ____ through ____, inclusive, prepared by Douglas J. Steinmetz Architect, for the Base Bid Lump Sum of:

dollars ($ ) ALTERNATES (Refer to Section 01230)

Alternate A-1: Should the Owner decide to accept that portion of the work identified as Alternate A-1: Main Entry Stair, ADD to the base bid the amount stated above the sum of:

dollars

Alternate M-1: Should the Owner decide to accept that portion of the work identified as Alternate M-1: Fire Pump, ADD to the base bid the amount stated above the sum of:

dollars ALLOWANCES (Refer to Section 01210)

BIDDER has included the following UNIT COST allowances in the Base Bid as specified in section 01210 ALLOWANCES:

A. Allowance No. 1: Unit-Cost Allowance: Include the sum of $10/SF for wood flooring

material as specified in 09640 WOOD FLOORING. 1. This allowance includes material cost.

B. Allowance No. 2: Unit-Cost Allowance: Include the sum of $27/SY for floor covering material as specified in 09652 SHEET VINYL FLOOR COVERINGS. 1. This allowance includes material cost.

Page 9: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz, AIA BID FORM © January 2011 00410-3

WORK PACKAGE MARK-UP (Refer to Section 00 910) The following markup shall be stated as a percent of the total value of the assigned contracts such that multiplying the total sum of the assigned contracts by the percentage amount provided by the bidder yields the total dollar amount including the value of the assigned contracts and the associated costs to the prime bidder include that assigned work package. The total value of assigned contracts for which this markup applies is not to exceed $520,000. Work Package Markup In words: One hundred percent CONTRACT TIME If this Bid is accepted, Bidder will:

Achieve Substantial Completion of the entire Work before February 9, 2012.

ATTACHMENTS The following Supplements are attached to this Bid Form and are considered an integral part of this Bid Form:

Bid security in the form of a __________________ as required by the Instructions to Bidders is attached to and made a condition of this Bid. A fully completed AIA Document A305 Contractor Qualification Statement.

ACCEPTANCE This offer shall be open to acceptance and is irrevocable for forty five days from the bid closing date. If this bid is accepted by the Owner within the time period stated above, we will:

Execute the Agreement within seven days of receipt of Notice of Award. Furnish the required bonds within three days of date of execution of the contract. Commence work within seven days of receipt of the Owner's written Notice to Proceed.

If this bid is accepted within the time stated, and we fail to commence the Work or we fail to provide the required Bond(s), the security deposit shall be forfeited as damages to the Owner by reason of our failure. In the event our bid is not accepted within the time stated above the required security deposit shall be returned to the undersigned, in accordance with the provisions of the Instructions to Bidders; unless a mutually satisfactory arrangement is made for its retention and validity for an extended period of time.

Page 10: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz, AIA BID FORM © January 2011 00410-4

BID FORM SIGNATURE(S) Firm Name:

Telephone:

, Fax:

Type of Business Entity

(corporation, partnership, sole proprietor)

By

(Authorized signing officer and title) END OF SECTION

Page 11: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz AIA WORK-PACKAGES © January 2011 00 0910 - 1

SECTION 00 0910 WORK-PACKAGES PART 1 GENERAL 1.01. WORK-PACKAGES

A. The project is being bid in separate Work-Packages as described below. a. Access to bid documents including drawings and specifications for each of the additional Work

Packages will be made available for viewing at the project website (www.shk3.com/corning ) as each is released for bid. No further notice regarding the status of these documents at the website will be made; it is each bidder’s responsibility to investigate the status/availability of the work package bid documents at the website.

B. It is the Owner’s intent to assign to the successful bidder the additional work packages described below establishing the successful General Construction Work-Package bidder as the single prime contract on the project.

C. The additional work packages are being bid by the Owner concurrently with the bidding period for the General Construction Work-Package (which includes General Construction / Mechanical / Electrical / Plumbing). a. Following the Owner’s selection of the subcontractors for each of the additional work packages

a post bid addendum will be issued to the apparent low bidder of the General Construction Package notifying them of the successful bidders’ name and bid amount.

D. Each BIDDER shall provide a percent markup on their bid form which will be used to calculate their total base bid including all additional work packages assigned from the list below. a. The percentage markup shall include all additional costs to the Prime contract holder including

costs for compliance with all Division 00 and Division 01 requirements and including but not limited to all associated overhead, profit, bonding costs and supervisory and coordination costs associated with each assigned contract.

b. The markup shall be stated as a percent of the total value of the assigned contracts such that multiplying the total sum of the assigned contracts by the percentage amount provided by the bidder yields the total dollar amount including the value of the assigned contracts and the associated costs to the prime bidder include that assigned work package.

c. The total value of assigned contracts for which this markup applies is not to exceed $520,000. 1.02. THEATRICAL LIGHTING WORK-PACKAGE

A. The contractor agrees to comply with project requirements and provide all Work for this Work-Package described in the bid documents (Plans and Specifications) for this work provided at www.shk3.com/corning.

B. Comply with project requirements in Volume 1, DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS, and DIVISION 01 – GENERAL REQUIREMENTS.

1.03. THEATRICAL SOUND SYSTEMS WORK-PACKAGE A. The contractor agrees to comply with project requirements and provide all Work for this Work-

Package described in the bid documents (Plans and Specifications) for this work provided at www.shk3.com/corning.

B. Comply with project requirements in Volume 1, DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS, and DIVISION 01 – GENERAL REQUIREMENTS.

1.04. THEATRICAL RIGGING WORK-PACKAGE A. The contractor agrees to comply with project requirements and provide all Work for this Work-

Package described in the bid documents (Plans and Specifications) for this work provided at www.shk3.com/corning.

B. Comply with project requirements in Volume 1, DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS, and DIVISION 01 – GENERAL REQUIREMENTS.

PART 2 - PRODUCTS (Not USED) PART 3 - EXECUTION (Not USED) END OF SECTION 00 0910

Page 12: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz, AIA ALTERNATES © January 2011 01230 - 1

SECTION 01230 - ALTERNATES PART 1 - GENERAL 1.1 SUMMARY

A. Section includes administrative and procedural requirements for alternates. 1.2 DEFINITIONS

A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents. 1. Alternates described in this Section are part of the Work only if enumerated in the

Agreement. 2. The cost or credit for each alternate is the net addition to or deduction from the

Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.

1.3 PROCEDURES A. Coordination: Revise or adjust affected adjacent work as necessary to completely

integrate work of the alternate into Project. 1. Include as part of each alternate, miscellaneous devices, accessory objects, and

similar items incidental to or required for a complete installation whether or not indicated as part of alternate.

B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated revisions to alternates.

C. Execute accepted alternates under the same conditions as other work of the Contract. D. Schedule: A schedule of alternates is included at the end of this Section.

PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 SCHEDULE OF ALTERNATES

A. Alternate No. A-1: Main Entry Stair. 1. Base Bid: Paint existing handrails. 2. Alternate: Replace stair with new as shown on drawings, salvage and install

existing handrails and provide additional ADA compliant handrails rails as shown on drawings.

B. Alternate No. M-1: Fire Pump. 1. Alternate: Provide the fire pump, jockey pump, piping, controls power, fire alarm

interfaces, control system interfaces, fire pump electrical and jockey pump electrical connections and incidental general construction work associated with the fire pump as specified and indicated on the drawings.

END OF SECTION

Page 13: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz, AIA SUBSTITUTION PROCEDURES © January 2011 01635 - 3

SUBSTITUTION REQUEST FORM

Specification Volume1 Substations (Drawings Prefix A and S): SEND TO: Douglas J. Steinmetz AIA

4121 Timberview Drive Cedar Rapids, IA 52411 Specification Volume II Substitutions (Drawings Prefix M, and E):

SEND TO: A & J Associates 365 Beaver Kreek Center Suite B North Liberty, IA 52317 We hereby submit for your consideration the following product instead of the specified item: Drawing No. ___________ Drawing Name_________________________ Spec Section Spec Name Paragraph Specified Item ____________ _________________ ________ _____________________ Proposed Substittion________________________________________________________ Attach complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation.

Submit with request necessary samples and substantiating date to prove equal quality and performance to that which is specified. Clearly mark manufacturer’s literature to indicate equality in performance.

The undersigned certifies that the function, appearance and quality are of equal performance and assumes liability for equal performance, equal design and compatibility with adjacent materials.

Submitted by: _______________________________________________ __________________ Signature (Bidder) Title ______________________________________________ Name ______________________________________________ Firm ____________________________________________ Address ______________________________________________ __________________ Telephone Date Signature shall be by person having authority to legally bind the Bidder to above terms. Failure to provide legally binding signature will result in retraction of approval.

For use by the Architect/Engineer ____ Recommended _____ Recommended as Noted ____ Not Recommended ____ Insufficient Data Received By ___________________________ Date ___________ END OF SECTION

Page 14: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz Architect DOOR HARDWARE © January 2011 08 7100 - 15

3.6 DOOR HARDWARE SCHEDULE A. The following schedule of door hardware groups is intended to describe opening

function.

Hardware Group No. C01 Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA CLASSROOM LOCK ND70 SCH 1 EA WALL STOP WS407CCV IVE Hardware Group No. C01B Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA CLASSROOM LOCK ND70 SCH 1 EA WALL STOP & HOLDER WS45 IVE Hardware Group No. C01S Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA CLASSROOM LOCK ND70 SCH 1 EA OVERHEAD STOP 900S 630 GLY Hardware Group No. C02 Provide each SGL door(s) with the following: | Quantity Description Model Number FinishMfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA CLASSROOM LOCK ND70 SCH 1 EA SURFACE CLOSER 4041 LCN 1 EA KICK PLATE 8400 10" X 2" LDW IVE 1 EA WALL STOP WS407CCV IVE

Page 15: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz Architect DOOR HARDWARE © January 2011 08 7100 - 16

Hardware Group No. C03 Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA CLASSROOM LOCK ND70 SCH 1 EA SURFACE CLOSER 4041 EDA LCN 1 EA KICK PLATE 8400 10" X 2" LDW IVE 1 EA WALL STOP WS407CCV IVE 1 EA MAGNETIC HOLD- SEM 7850 LCN 1 SET SEALS 5050B NGP 1 COORDINATE WITH FIRE Hardware Group No. C03S Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA CLASSROOM LOCK ND70 SCH 1 EA OVERHEAD STOP 900S 630 GLY Hardware Group No. E01 Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA ENTRANCE LOCK ND53 SCH 1 EA WALL STOP WS407CCV IVE Hardware Group No. EX Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

EXISTING DOOR, FRAME AND HARDWARE TO REMAIN

Hardware Group No. K02 Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA OFFSET DOOR PULL 8190-0 IVE 1 EA PUSH PLATE 8200 4" X 16" IVE 1 EA SURFACE CLOSER 4041 LCN 1 EA KICK PLATE 8400 10" X 2" LDW IVE 1 EA WALL STOP WS407CCV IVE

Page 16: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz Architect DOOR HARDWARE © January 2011 08 7100 - 17

Hardware Group No. K02S Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA OFFSET DOOR PULL 8190-0 IVE 1 EA PUSH PLATE 8200 4" X 16" IVE 1 EA SURFACE CLOSER 4041 LCN 1 EA OVERHEAD STOP 900S 630 GLY 1 EA KICK PLATE 8400 10" X 2" LDW IVE Hardware Group No. K03S door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA PULL/PUSHBAR 9190-0 IVE 1 EA SURFACE CLOSER 4041 LCN 1 EA OVERHEAD STOP 900S 630 GLY 1 EA KICK PLATE 8400 10" X 2" LDW IVE Hardware Group No. K04 Provide each PR door(s) with the following: | Quantity Description Model Number Finish Mfr

6 EA HINGE 5BB1 4.5 X 4.5 IVE 2 EA OFFSET DOOR PULL 8190-0 IVE 2 EA PUSH PLATE 8200 4" X 16" IVE 2 EA SURFACE CLOSER 4041 LCN 2 EA KICK PLATE 8400 10" X 2" LDW IVE 2 EA WALL STOP & HOLDER WS45 IVE 1 SET SEALS 5050B NGP Hardware Group No. P01 Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA PASSAGE SET ND10S SCH 1 EA WALL STOP WS407CVX IVE

Page 17: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz Architect DOOR HARDWARE © January 2011 08 7100 - 18

Hardware Group No. P02 Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA PASSAGE SET ND10S SCH 1 EA SURFACE CLOSER 4041 LCN 1 EA KICK PLATE 8400 10" X 2" LDW IVE 1 EA WALL STOP WS407CVX IVE 1 SET SEALS 5050B NGP Hardware Group No. P03 Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA PASSAGE SET ND10S SCH 1 EA SURFACE CLOSER 4041 EDA LCN 1 EA KICK PLATE 8400 10" X 2" LDW IVE 1 EA WALL STOP WS407CVX IVE 1 SET SEALS 5050B NGP Hardware Group No. R01 Provide each PR door(s) with the following: | Quantity Description Model Number Finish Mfr

6 EA HINGE 5BB1 4.5 X 4.5 IVE 2 EA ROLLER LATCH RL30-A (TOP MOUNT) 626 IVE Hardware Group No. S01 Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA STORE LOCK ND80 SCH 1 EA WALL STOP WS407CCV IVE Hardware Group No. S01S Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA STORE LOCK ND80 SCH 1 EA OVERHEAD STOP 900S 630 GLY

Page 18: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz Architect DOOR HARDWARE © January 2011 08 7100 - 19

Hardware Group No. S02B Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1HW 4.5 X 4.5 IVE 1 EA STORE LOCK ND80 SCH 1 EA SURFACE CLOSER 4041 LCN 1 EA KICK PLATE 8400 10" X 2" LDW IVE 1 EA WALL STOP WS443 IVE Hardware Group No. S03 Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA STORE LOCK ND80 SCH 1 EA SURFACE CLOSER 4041 EDA LCN 1 EA KICK PLATE 8400 10" X 2" LDW IVE 1 EA WALL STOP WS407CCV IVE 1 SET SEALS 5050B NGP Hardware Group No. S03S Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA STORE LOCK ND80 SCH 1 EA SURFACE CLOSER 4041 EDA LCN 1 EA OVERHEAD STOP 900S 630 GLY 1 EA KICK PLATE 8400 10" X 2" LDW IVE Hardware Group No. T01 Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA PRIVACY SET ND40S SCH 1 EA WALL STOP WS407CCV IVE Hardware Group No. T01S Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA PRIVACY SET ND40S SCH 1 EA OVERHEAD STOP 900S 630 GLY

Page 19: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz Architect DOOR HARDWARE © January 2011 08 7100 - 20

Hardware Group No. XR03 Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1HW 4.5 X 4.5 IVE 1 EA FIRE EXIT HARDWARE 88L-F VON 1 EA CYLINDER CYLINDER-KEYING 1 EA SURFACE CLOSER 4041 EDA LCN 1 EA KICK PLATE 8400 10" X 2" LDW IVE 1 EA WALL STOP WS407CCV IVE 1 SET SEALS 5050B BRN NGP Hardware Group No. XR03L Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

1 EA CONTINUOUS HINGE 224HD IVE 1 EA PANIC HARDWARE 88L VON 1 EA CYLINDER CYLINDER-KEYING 1 EA SURFACE CLOSER 4041 EDA LCN 1 EA OVERHEAD STOP 900S 630 GLY 1 EA KICK PLATE 8400 10" X 2" LDW IVE 1 SET SEALS 700ES NGP 1 EA DRIP CAP 16A - DOPOR WIDTH + 4" NGP 1 EA DOOR SWEEP C627A NGP 1 EA THRESHOLD 425 NGP Hardware Group No. XR03N Provide each SGL door(s) with the following: | Quantity Description Model Number FinishMfr

1 EA CONTINUOUS HINGE 224HD IVE 1 EA PANIC HARDWARE 88NL VON 1 EA CYLINDER CYLINDER-KEYING 1 EA SURFACE CLOSER 4041 EDA LCN 1 EA OVERHEAD STOP 900S 630 GLY 1 EA KICK PLATE 8400 10" X 2" LDW IVE 1 SET SEALS 700ES NGP 1 EA DRIP CAP 16A - DOPOR WIDTH + 4" NGP 1 EA DOOR SWEEP C627A NGP 1 EA THRESHOLD 425 NGP

Page 20: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz Architect DOOR HARDWARE © January 2011 08 7100 - 21

Hardware Group No. XS04S Provide each PR door(s) with the following: | Quantity Description Model Number Finish Mfr

2 EA CONTINUOUS HINGE 224HD IVE 1 EA PANIC HARDWARE 8827EO VON 1 EA PANIC HARDWARE 8827NL VON 1 EA CYLINDER CYLINDER-KEYING 1 SET ASTRAGAL 137NA NGP 2 EA SURFACE CLOSER 4041 EDA LCN 2 EA KICK PLATE 8400 10" X 2" LDW IVE 2 EA WALL STOP WS407CCV IVE 1 SET SEALS 700ES NGP 2 SET SWEEP C627A NGP 1 EA THRESHOLD 425 NGP Hardware Group No. Z01 Provide each SGL door(s) with the following: | Quantity Description Model Number FinishMfr

HARDWARE BY DOOR MANUFACTURER 1 CYLINDER Cylinder & keying Hardware Group No. S01S Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 IVE 1 EA STORE LOCK ND80 SCH 1 EA OVERHEAD STOP 900S GLY 1 SET SOUND SEAL 700ES NGP 1 EA AUTO DOOR Bottom 200NA NGP 1 EA THRESHOLD 513 NGP Hardware Group No. S03A Provide each SGL door(s) with the following: | Quantity Description Model Number Finish Mfr

1 EA CONT HINGE 224HD IVE 1 EA STORE LOCK ND80 SCH 1 EA SURFACE CLOSER 4041-HCUSH LCN 1 EA SWEEP C627A NGP 1 SET WEATHER SEAL 700ES NGP 1 EA THRESHOLD 425 NGP

Page 21: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION

Corning Opera House Cultural Center Corning, Iowa Phase III ADDENDUM#1

Douglas J. Steinmetz Architect DOOR HARDWARE © January 2011 08 7100 - 22

Hardware Group No. Z02 | Quantity Description Model Number Finish Mfr

1 EA CONT HINGE 224HD NGP Hardware Group No. Z03 | Quantity Description Model Number Finish Mfr

3 EA HINGE 5BB1 4.5X4.5 IVE 1 EA DEADBOLT B661P SCH 1 EA FINGER PULL 100 BURNS END OF SECTION

Page 22: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 23: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 24: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 25: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 26: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 27: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 28: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 29: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 30: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 31: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 32: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 33: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 34: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 35: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 36: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 37: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 38: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 39: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 40: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 41: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 42: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION
Page 43: Corning Opera House Cultural Center Corning, Iowa Phase ... · Corning Opera House Cultural Center Corning, Iowa ... AD1-S18. SPECIFICATIONS – PROJECT MANUAL VOLUME 1 ITEM 3. SECTION