The Agnico‐Eagle Exploration Show and Tell
145 King Street East, Suite 400January 6th and 7th
Featuring core and geologists from key projects: Suuri‐Roura Deep (Kittila),
Tiriganiaq‐F Zone (Meliadine), Westwood (Ellison), D Zone (Goldex), Zone 5 (Bousquet),
Cubiro (Pinos Altos)
CORE IN THE CORNER OFFICE
![Page 2: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/2.jpg)
![Page 3: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/3.jpg)
Pinos Altos – Mexico
2011 Estimated production of 168,000oz Au at cash costs of $400/oz Mascota: 31,000oz Au at cash costs of $439/oz
2012-2015 Estimated average annual production of 175,000oz Au at cash
costs of $345/oz Underground to account for majority of production Mascota: 55,000oz Au at cash costs of $299/oz
Exploration Focus Potential to develop satellite deposits (Cubiro, Sinter, San Eligio) Focus on resource conversion, expansion of
Pinos Altos zones, Reyna de Plata, Creston Mascota
Gold reserves (m oz) 3.4
Average reserve grade (g/t) 2.5
Measured & Indicated resource (m oz) 0.5
Inferred resource (m oz) 0.7
Est. LOM (years) 18
Estimated average production (k oz/yr) 170
2011 exploration budget $2M
Exploration Success Adding to Growth Opportunities
![Page 4: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/4.jpg)
Mexico
![Page 5: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/5.jpg)
Cubiro & Colorada Areas
![Page 6: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/6.jpg)
Cubiro Vein – Geology Map
![Page 7: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/7.jpg)
View Looking north-northeast (+/- 1.0 g/Au t grade shell over 2m width)
Cubiro Vein – Mineralization 3D Model
![Page 8: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/8.jpg)
Cubiro Vein LongsectionContoured Au Intercepts (Approx. >2m @ + 0.3 g Au/t)
View Looking Northeast
![Page 9: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/9.jpg)
Looking NortheastDecember, 2010
Cubiro Vein – Mineralization 3D Model Longsection View
![Page 10: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/10.jpg)
Drillhole CB-09-015 Assay Summary
Cross Section-16(Showing Loc. of CB-09-015)200 meter Grid View Looking northeast December, 2010
Cubiro Vein – Mineralization 3D ModelCross Section View
![Page 11: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/11.jpg)
![Page 12: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/12.jpg)
Kittila Mine
2011 Estimated production of 150,000oz Au at cash costs
of $548/oz Expansion study to be reviewed Q3 2011
2012-2015 Estimated average annual production of 173,000oz
Au at cash costs of $501/oz
Exploration Focus Resource conversion, expansion below Suuri and
Roura, and along strike
Optimization Phase Bearing Significant Results
Gold reserves (m oz) 4.0
Average reserve grade (g/t) 4.8
Measured & Indicated resource (m oz) 1.4
Inferred resource (m oz) 0.6
Est. LOM (years) 22
Estimated average production (k oz/yr) 150
2011 exploration budget $16M
![Page 13: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/13.jpg)
Kittila Mine - Longitudinal Section
ROU-100292.68 g/t / 2.3 m
ROU-10-024B3.85 g/t Au / 10.1 m
ROU-10-0246.42 g/t Au / 4.9 m
ROU-10-0263.98 g/t Au / 17.2 m
ROU-10-026B7.25 g/t Au / 10.0 m6.46 g/t Au / 12.8 m
ROU-100291.76 g/t Au / 2.1 m
Sect
ion
3787
0 m
N
![Page 14: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/14.jpg)
Kittila Mine
N
Tonnes, Mt Au, g/t Au, Moz.
Proven + Probable Proven + Probable Mineral Reserve*Mineral Reserve* 26.0 4.8 4.0
Indicated Mineral Indicated Mineral ResourceResource 20.5 2.2 1.4
Inferred Mineral Inferred Mineral ResourceResource 5.2 3.4 0.6
* Reserve and Resource calculation as of December 31, 2009
![Page 15: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/15.jpg)
Kittila Mine – Underground Operation
![Page 16: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/16.jpg)
Kittila – Geology Map
![Page 17: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/17.jpg)
Kittila - Cross Section 37870 mN
North Roura Zone
Central Roura Zone
ROU-10-026B7.25 g/t Au / 10.0 m6.46 g/t Au / 12.8 m
![Page 18: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/18.jpg)
![Page 19: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/19.jpg)
Increasing Gold Output in 2012
LaRonde – Canada
2011 Estimated production of 157,000oz Au at cash costs of
$54/oz
2012-2015 Estimated average annual production of 290,000oz Au
at cash costs of $381/oz
Exploration Focus Additional potential at depth, to the East and to the
West Tracing and potentially defining a gold resource at
Ellison (appr. 2km west of LaRonde)
Gold reserves (m oz) 4.8
Average reserve grade (g/t) 4.4
Measured & Indicated resource (m oz) 0.4
Inferred resource (m oz) 1.4
Est. LOM (years) 13
Estimated average production (k oz/yr) 324
2011 exploration budget $4M
![Page 20: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/20.jpg)
Abitibi Regional Map
![Page 21: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/21.jpg)
Ellison-Bousquet- LaRonde – Exploration Targets 2011
![Page 22: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/22.jpg)
Building from Strength
Aerial Photo Looking West
LaRonde Puits 2
Laronde PENNA
LaRonde Puits 1
Bousquet 2Bousquet 1
DoyonMouska
Doyon-Bousquet-LaRonde Mining Camp
![Page 23: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/23.jpg)
Bousquet Zone 5 - Surface View
Bousquet 1 shaft
Zone 5
Zone 3 (mined)
2500meters
Zone 4Bousquet 2
![Page 24: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/24.jpg)
Bousquet Zone 5 Longsection - 2011 Program
-450m
-250m
Mineral inventory (0- 500 metres)20.1 Mt @ 1.90 g/t =>1.2 M ounces (Zone 5 only)9.1 Mt @ 1.70 g/t =>0.5 M ounces (Other parallel zones incl. Zone 4)
Re-sampling program±1500 samples (assays pending)
Drilling Program 2011 (0-500m)20 000m – 2 000 000 $
Drilling 2010 (started Nov 30th 2010)2 082 m
S10-022.0 g/t Au over 49.7m (42 tw)Incl. Zone 4 @ 2.9 g/t over 4.5m (3.8 tw)And Zone 5 @ 2.2 g/t over 39.4m (33.5 tw)
S10-01
S10-03
S10-04
S10-05
S10-06
S10-07 In progress
In progress
6 90
0EHistorical Pit Production (80’s) by Long Lac Mineral1.9 M tonnes @ 2.20 g/t Au => 124 000 ounces
Surface
![Page 25: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/25.jpg)
S10-01Assays pending
Approx. Open Pit
S10-04Logging in progress
S10-02S10-022.0 g/t Au over 49.7m (42 tw)Incl. Zone 4 @ 2.9 g/t over 4.5m (3.8 tw)and Zone 5 @ 2.2 g/t over 39.4m (33.5 tw)
Zone
3 (m
ined
out
)
Zone
4Zo
ne 5
S10-03Assays pending
Cross Section 6900E
-250m
-450m
Surface
Bousquet Zone 5
![Page 26: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/26.jpg)
Puits PennaPuits IPuits Bousquet IIPuits Bousquet I Puits II
1.8 / 4.1
3.0 / 14.3
3.8 / 5.4
In progress
In progress
In progress5 500m
863 500$
2 800m532 000$
4 250m484 500$
TOTAL BUDGET 201112 550m
TOTAL : 2 157 773 $2010 Results2011 Targets
LaRonde Exploration Targets – Budget 2011
![Page 27: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/27.jpg)
![Page 28: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/28.jpg)
Abitibi Regional Map
![Page 29: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/29.jpg)
Ellison Project - Longitudinale Section
![Page 30: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/30.jpg)
Ellison Project - Longitudinal Section
![Page 31: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/31.jpg)
Ellison Project
Drill Site
Camping Resort
![Page 32: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/32.jpg)
![Page 33: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/33.jpg)
Goldex – Canada
2011 Estimated production of 185,000oz Au at cash costs of
$349/oz
2012-2015 Estimated average annual production of 179,000oz Au
at cash costs of $344/oz
Exploration Focus Resource definition and expansion at D zone at depth,
exploration to west, east and at depth
Gold reserves (m oz) 1.6
Average reserve grade (g/t) 2.1Measured & Indicated resource (m oz) 0.0
Inferred resource (m oz) 0.8
Est. LOM (years) 7Estimated average production (k oz/yr) 168
2011 exploration budget $6M
Strong Free Cash Flow Generator
![Page 34: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/34.jpg)
Goldex - 2011 Exploration Budget
R-Zone9 000m / 1M$
38 level
View Looking North
D-Zone27 300m / 2.8M$(spacing 60x60m)
D-Zone13 200m / 1.3M$(spacing 90x90m)
1900 elev.
38 Level
73 Level
84 Level
105 Level
125 Level
East ofGEZ
8 500 m / 0.9M$
Total 2011
58,200m / 6M$
E-Zone
M-Zone
S-Zone
GEZ
![Page 35: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/35.jpg)
Goldex
73-4062.07 g/t Au / 105.0 m
76-0031.27 g/t Au / 60.0 m
73-4031.23 g/t Au / 151.5 mincl. 3.30 g/t Au / 31.5 m
76-0081.88 g/t Au / 181.5 mIncl. 2.04 g/t Au / 165.0 m
73-4021.34 g/t Au / 96.0 mincl. 2.28 g/t Au / 51.0 m
76-0070.92 g/t Au / 159.0 mincl. 2.13 g/t Au / 16.5 mincl. 2.21 g/t Au / 19.5 m
76-0061.69 g/t Au / 216.0 mincl.2.04 g/t Au / 70.5 mincl. 2.06 g/t Au / 90.0 m
84-0501.51 g/t Au / 121.5 mincl. 2.10 g/t Au / 30.0 mincl. 2.68 g/t Au / 12.0 mincl. 2.16 g/t Au / 27.0 m
![Page 36: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/36.jpg)
Goldex - Cross Section 6190E
![Page 37: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/37.jpg)
Section 6040
![Page 38: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/38.jpg)
![Page 39: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/39.jpg)
Meliadine Project, Rankin Inlet, Nunavut
Tonnes Grade (g/t) Contained gold ounces
Measured Resource 0.3 million 10.6 101,000 oz Au*
Indicated Resource 13 million 7.9 3,191,000 oz Au*
Inferred Resource 8 million 6.4 1,731,000 oz Au*
* As per Jan 12, 2010 technical report by Snowden Mineral Industry Consultants
$129M – Three year exploration & development program underway
![Page 40: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/40.jpg)
Meliadine – Regional Geology Plan Map
![Page 41: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/41.jpg)
Meliadine – Tiriganiaq Schematic Cross Section
![Page 42: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/42.jpg)
Western Meliadine Property - Local Geology
![Page 43: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/43.jpg)
Meliadine - 2010 Drilling
![Page 44: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/44.jpg)
Meliadine Project Total Magnetic FieldSurface rock samples with assay results > 10g/t Au
Surface rock sample locations
10 km
![Page 45: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/45.jpg)
Meliadine Project - Tiriganiaq Longitudinal Section
M10-94010.94 g/t Au / 7.0 m
M10-10018.62 g/t Au / 19.3 mincl.15.01 g/t Au / 8.2 m
![Page 46: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/46.jpg)
![Page 47: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/47.jpg)
Meliadine - 2010 Drilling
![Page 48: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/48.jpg)
![Page 49: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/49.jpg)
Meadowbank – Canada
2011 Estimated production of 362,000oz Au at cash costs of
$597/oz
2012-2015 Estimated average annual production of 399,000oz Au
at cash costs of $511/oz
Exploration Focus Focus on resource conversion and expansion of Vault,
Goose South and Portage
Gold reserves (m oz) 3.7
Average reserve grade (g/t) 3.5
Measured & Indicated resource (m oz) 3.3
Inferred resource (m oz) 0.8
Est. LOM (years) 10
Estimated average production (k oz/yr) 350
2011 exploration budget $7M
Newest Mine - Largest Gold Producer Already
![Page 50: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/50.jpg)
Meadowbank Regional Geology Map
Program Metres 2011 Budget (‘000’s)Minesite Exploration 19,000 $7,373Regional Exploration 13,000 $4,029Total 32,000 $11,402
Vault
Portage
Goose Island
Goose South
![Page 51: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/51.jpg)
Meadowbank Exploration Budget 2011
Vault – Resource Conversion
Goose South Extension
Far West Iron Formation
Tern Lake Porphyry
Vault Pit
Vault South
Vault East
Exploration
MinesiteProgram Metres 2011 Budget
(‘000’s)Conversion 10,500 $3,814Exploration 8,500 $3,559Total 19,000 $7,373
![Page 52: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/52.jpg)
Vault Cross Section 4675N
![Page 53: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/53.jpg)
Goose South Cross Section 4300N
5
![Page 54: Coreinthe corner presentation](https://reader034.fdocuments.net/reader034/viewer/2022052619/55576905d8b42ace7f8b4ccf/html5/thumbnails/54.jpg)
Meadowbank – Aerial View