Copy of SK501 Performance Analysis April 2012

19
1 2 3 4 5 6 7 Move/ Rig Up Drill Reaming Coring Circ. Trip Rig Serv. january, 1 24.00 24.00 january, 2 24.00 24.00 january, 3 24.00 17.50 1.00 5.50 january, 4 24.00 10.50 january, 5 24.00 18.00 january, 6 24.00 24.00 january, 7 24.00 24.00 january, 8 24.00 10.00 3.00 11.00 january, 9 24.00 4.50 4.00 7.50 january, 10 24.00 24.00 january, 11 24.00 24.00 january, 12 24.00 19.50 0.50 4.00 january, 13 24.00 0.50 13.00 january, 14 24.00 21.00 3.00 january, 15 24.00 22.50 1.50 january, 16 24.00 18.00 1.50 4.50 january, 17 24.00 21.50 january, 18 24.00 14.00 8.00 january, 19 24.00 january, 20 24.00 0.50 10.50 january, 21 24.00 2.50 20.00 january, 22 0.00 january, 23 0.00 january, 24 0.00 january, 25 0.00 january, 26 0.00 january, 27 0.00 january, 28 0.00 january, 29 0.00 january, 30 0.00 0.00 257.00 0.00 0.00 27.50 138.50 0.00 0.00% 35.69% 0.00% 0.00% 3.82% 19.24% 0.00% Total ( Hrs ) Percentage Date

description

1

Transcript of Copy of SK501 Performance Analysis April 2012

Page 1: Copy of SK501 Performance Analysis April 2012

1 2 3 4 5 6 7

Move/ Rig

UpDrill Reaming Coring Circ. Trip Rig Serv.

january, 1 24.00 24.00

january, 2 24.00 24.00

january, 3 24.00 17.50 1.00 5.50

january, 4 24.00 10.50

january, 5 24.00 18.00

january, 6 24.00 24.00

january, 7 24.00 24.00

january, 8 24.00 10.00 3.00 11.00

january, 9 24.00 4.50 4.00 7.50

january, 10 24.00 24.00

january, 11 24.00 24.00

january, 12 24.00 19.50 0.50 4.00

january, 13 24.00 0.50 13.00

january, 14 24.00 21.00 3.00

january, 15 24.00 22.50 1.50

january, 16 24.00 18.00 1.50 4.50

january, 17 24.00 21.50

january, 18 24.00 14.00 8.00

january, 19 24.00

january, 20 24.00 0.50 10.50

january, 21 24.00 2.50 20.00

january, 22 0.00

january, 23 0.00

january, 24 0.00

january, 25 0.00

january, 26 0.00

january, 27 0.00

january, 28 0.00

january, 29 0.00

january, 30 0.00

0.00 257.00 0.00 0.00 27.50 138.50 0.00

0.00% 35.69% 0.00% 0.00% 3.82% 19.24% 0.00%

Total ( Hrs )

Percentage

Monthly Operations Time AnalysisRig # SK501 - Well # SHABEEL # 01 - CANMEX

Date

Operations Time Distribution (Hrs)

Page 2: Copy of SK501 Performance Analysis April 2012

8 9 10 11 12 13 14 15 16

Repair RigSlip and

CutDev. Surv.

Wireline

logsCSG&CMT WOC N/U BOP Test BOP DST

3.00 7.00

2.00

0.50

1.50

1.00

14.00 8.00

8.25 0.50

1.50

3.50 5.00 0.00 0.00 22.25 0.00 0.00 16.50 0.00

0.49% 0.69% 0.00% 0.00% 3.09% 0.00% 0.00% 2.29% 0.00%

Monthly Operations Time AnalysisRig # SK501 - Well # SHABEEL # 01 - CANMEX

Operations Time Distribution (Hrs)

Page 3: Copy of SK501 Performance Analysis April 2012

17 18 19 20 21 A B C D

Plug BackSqueeze

CMTFishing Dir. Work Others Perforating

Tubing

TripsTreating Swabbing

3.50

4.00

7.50

9.00

2.50

1.00

2.00

4.25

4.25 0.00 0.00 14.50 15.00 0.00 0.00 0.00 0.00

0.59% 0.00% 0.00% 2.01% 2.08% 0.00% 0.00% 0.00% 0.00%

Monthly Operations Time AnalysisRig # SK501 - Well # SHABEEL # 01 - CANMEX

Completion Time Distribution (Hrs)Operations Time Distribution (Hrs)

Page 4: Copy of SK501 Performance Analysis April 2012

E

Testing

0.00

0.00%

Monthly Operations Time AnalysisRig # SK501 - Well # SHABEEL # 01 - CANMEX

Completion Time Distribution (Hrs)

Page 5: Copy of SK501 Performance Analysis April 2012

Drill, 257.00

Circ., 27.50

Trip, 138.50

Repair Rig, 3.50

Slip and Cut, 5.00

CSG&CMT, 22.25

Test BOP, 16.50

Others, 15.00

Chart Title

Operations Time Distribution (Hrs)

Page 6: Copy of SK501 Performance Analysis April 2012

Drill 53%

Circ. 6%

Trip 28%

Repair Rig 1%

Slip and Cut 1%

CSG&CMT 5%

Test BOP 3%

Others 3%

Operations Time Distribution (%)

Page 7: Copy of SK501 Performance Analysis April 2012

Draw

Work Sys.

Crown

Block

Travelling

BlockHook

Swivel & Wash

PipeTop Drive

Pipe

Spinner

Pipe Handling

Sys.BOP Sys.

BOP Control

Sys.

Mud

Pumps

Mechanical

Sys.

Electrical

Sys.Engines Others Total

january, 1 0.50 0.50

january, 2 0.50 0.50

january, 3 0.50 0.50

january, 4 0.00

january, 5 0.00

january, 6 0.00

january, 7 0.00

january, 8 0.00

january, 9 0.00

january, 10 0.00

january, 11 0.00

january, 12 0.00

january, 13 0.00

january, 14 0.00

january, 15 0.00

january, 16 0.00

january, 17 0.00

january, 18 0.00

january, 19 0.00

january, 20 0.00

january, 21 0.00

january, 22 0.00

january, 23 0.00

january, 24 0.00

january, 25 0.00

january, 26 0.00

january, 27 0.00

january, 28 0.00

january, 29 0.00

january, 30 0.00

0.00 0.00 0.00 0.00 0.00 1.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.50Total

Date

Monthly Repair Time AnalysisRig # SK501 - Well # SHABEEL # 01 - CANMEX

Monthly Repair Time Analysis (Hrs)

Page 8: Copy of SK501 Performance Analysis April 2012

0.00 0.00 0.00 0.00 0.00

1.50

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1.50

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

Hrs Repair Time Analysis (Hrs)

Page 9: Copy of SK501 Performance Analysis April 2012

From To From To From To

1 3827 0 16.00 7.97

2 0 3866 18.00 7.16

3 4071 0 11.00 12.34

4 0 4060 7.00 19.33

5 2490 0 9.00 9.22

6 0 4290 11.50 12.43

7 4457 0 11.75 12.64

8 0 3240 10.50 10.29

9 3240 0 8.50 12.71

10 0 3279 4.00

11 3279 0 4.00

12 0 4457 9.00 16.51

13 3300 0 9.75 11.28

14 0 3602 6.00 20.01

15 3602 0 8.50 14.13

Average RIH 12.3

Average POOH 11.0

Average ( CSG 7'' )

As per CANMEX plan, We did CMT plugs without

running 7'' liner

Monthly Tripping&Casing PerformanceRig # SK501 - Well # SHABEEL # 01 - CANMEX

Tripping Performance Running Caing Performance

CaseSection: 8 1/2'' Hole Casing 7''

RIH (m) POOH (m) Duration

(Hrs)

Stand per

hour

RIH (m)

Page 10: Copy of SK501 Performance Analysis April 2012

0.00Average ( CSG 7'' )

As per CANMEX plan, We did CMT plugs without

running 7'' liner

Monthly Tripping&Casing PerformanceRig # SK501 - Well # SHABEEL # 01 - CANMEX

Running Caing Performance

Casing 7''

Duration

(Hrs)

Joint per

hour

Page 11: Copy of SK501 Performance Analysis April 2012

7.16

19.33

12.43

10.29

16.51

20.01

12.3

0.00

5.00

10.00

15.00

20.00

25.00

2 4 6 8 10 12 14 Average RIH

Stand/Hr Section 8 1/2'' ( RIH Performance )

Page 12: Copy of SK501 Performance Analysis April 2012

7.97

12.34

9.22

12.64 12.71

11.28

14.13

11.0

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

1 3 5 7 9 11 13 15 Average POOH

Series1

Stand/Hr Section 8 1/2'' ( POOH Performance )

Page 13: Copy of SK501 Performance Analysis April 2012

Depth (m) Time (Days) Depth (m)

0 0

227 1.17

670 2.17

1015 3.17

1233 4.17

1233 5.17

1233 5.17

1233 6.17

1233 7.17

1233 8.17

1373 9.17

1807 10.17

2002 11.17

2048 12.17

2298 13.17

2501 14.17

2763 15.17

2833 16.17

2833 17.17

2833 18.17

2833 19.17

2833 20.17

2883 21.17

3000 22.17

3084 23.17

3171 24.17

3246 25.17

3342 26.17

3418 27.17

3468 28.17

3468 29.17

3468 30.17 Drilling 12 1/4'' Hole

3542 31.17

3625 32.17

3704 33.17

3778 34.17

3827 35.17

3827 36.17

3866 37.17

3983 38.17

4048 39.17

4071 40.17

Openning 12 1/4'' Hole To

17 1/2'' Hole

Running 13 3/8'' CSG & CMT

Job & N/U 13 5/8'' BOP &

Pressure Test

Section 12 1/4'' & 9 5/8''

CSG

Drilling 12 1/4'' Pilot Hole

Section 17 1/2'' & 13 3/8''

CSG

Rig # SK501 - Well # SHABEEL # 01 - CANMEXWell Progress Actual Vs. Planned

ActualActual Operations

Planned

Drillinh 17.5'' Hole

Section 26'' & 20'' CSG

Running 13 3/8'' CSG &

CMT Job '' Diverter System

Page 14: Copy of SK501 Performance Analysis April 2012

4096 41.17

4185 42.17

4248 43.17

4290 44.17

4290 45.17

4381 46.17

4439 47.17

4457 48.17

4457 49.17

4457 50.17

4457 51.17

4457 52.17

4457 53.17

4457 54.17

4457 55.17

4457 56.17

4457 57.17

4457 58.17

4457 59.17

4457 60.17

4457 61.17

4457 62.17

4457 63.17 rig release

Section 8 1/2'' & 7'' CSG

Section 12 1/4'' & 9 5/8''

CSG

Page 15: Copy of SK501 Performance Analysis April 2012

Section 8 1/2'' & 7'' CSG

Page 16: Copy of SK501 Performance Analysis April 2012

Time (Days)

Rig # SK501 - Well # SHABEEL # 01 - CANMEXWell Progress Actual Vs. Planned

PlannedPlanned Operations

Page 17: Copy of SK501 Performance Analysis April 2012
Page 18: Copy of SK501 Performance Analysis April 2012
Page 19: Copy of SK501 Performance Analysis April 2012

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

0 10 20 30 40 50 60 70

Time (Days)

Depth

Well Progress Actual Vs. Planned

17 1/2'' Section

12 1/4'' Section

8 1/2'' Section

completion

- palned time 84 dayes including 15 days rig move - actual drillign dayes (63 +4hrs ) days and 13 day rig move - we finneshed earlier with 7.3 dayes

RIG ACCEPTANCE 29-11-2013 @ 08:00 PM.

rig released RIG RELEASED ON 01-Feb-2014