No Telpon Penting (Autosaved) (Autosaved) (Autosaved) (Autosaved) (Autosaved)
Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
-
Upload
gnaneswar-sambhana -
Category
Documents
-
view
226 -
download
0
Transcript of Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
1/46
kappa val
water line nuumber k1/ (aft) Nearest sta0 1 1
0.5 2 1
1 2.4 1
2 2.48 1
3 2.7 1
4 2.8 1
5 3 1
6 3.5 1
7 1.15 0.5
8 0.5 0
9 5.3/1.1 0
10 5.5/2.1 0
11 5.6/2.7 0
12 5.8/3.2 0
Upper dack 6/3.5 0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
2/46
es
tion (k1) k2 (fore) Nearest station (k2)2.4 19
1.9 20
3.5 20
4.1 20
4.3 20
3.3 20
2.2 20
1.2 20
0.6 20
0.15 20
0 20
0 20
0.3 20
0.8 20
1.2 20
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
3/46
stn >>>0 0.5 1 1.5 2 3
water line
0 0 0 0.1 0.3 0.5 1.78
0.5 0 0 0.54 1.06 1.73 3.7
1 0 0 0.7 1.6 2.45 4.62
2 0 0 0.92 2.1 3.3 5.7
3 0 0 1.25 2.64 4.17 6.7
4 0 0 1.62 3.3 4.8 7.28
5 0 0 2.02 3.86 5.47 7.84
6 0 0 2.8 4.5 6.02 8.42
7 0 1.3 3.8 5.36 6.83 8.968 0.7 3.4 5.06 6.38 7.5 9.28
9 3.2 4.6 5.94 7.02 8.04 9.58
10 4.16 5.45 6.66 7.66 8.56 9.96
11 4.76 6.08 7.24 8.2 9.12 10.28
12 5.26 6.46 7.6 8.56 9.43 10.55
upper deck 5.52 6.7 7.8 8.8 9.6 10.72
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
4/46
OFFCET TABLE
4 5 6 7 8 9 10 11 12
3.48 5.6 7.44 8.6 9.12 9.28 9.3 9.3 9.3
5.8 7.7 9.3 10.5 10.38 10.48 10.6 10.6 10.6
6.74 8.52 9.9 10.63 11.7 10.92 10.9 10.9 10.9
7.72 9.48 10.7 11.5 11.1 11.8 11.1 11.1 11.1
8.66 10.2 10.99 11.1 11.1 11.1 11.1 11.1 11.1
9.18 10.4 11.1 11.1 11.1 11.1 11.1 11.1 11.1
9.6 10.68 11.1 11.1 11.1 11.1 11.1 11.1 11.1
9.92 10.72 11.1 11.1 11.1 11.1 11.1 11.1 11.1
10.2 10.8 11.1 11.1 11.1 11.1 11.1 11.1 11.110.48 10.96 11.1 11.1 11.1 11.1 11.1 11.1 11.1
10.5 11.3 11.1 11.1 11.1 11.1 11.1 11.1 11.1
10.7 11.01 11.1 11.1 11.1 11.1 11.1 11.1 11.1
10.8 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1
11 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1
11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1
indicatins
or simsons 141 ru e
for trapiezoidal rule { 1 1 }for 141 & 11
FOR SIMSONS 14241 RULE
FOR 14241 & 141 RULE
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
5/46
13 14 15 16 17 18 18.5 19 19.5
9.3 9 8.6 7.6 5.8 3.3 2.06 0.9 0
10.6 10.5 9.9 8.9 7.4 5.1 3.7 2.3 1.44
10.9 10.9 10.5 9.6 8.1 5.7 4.3 2.9 1.93
11.1 11.1 10.9 10.3 9 6.56 5.1 3.64 2.61
11.1 11.1 11.1 10.5 9.4 7.18 5.65 4.04 2.62
11.1 11.1 11.1 10.72 9.7 7.6 6.1 4.3 2.58
11.1 11.1 11.1 10.8 10 7.82 6.3 4.5 2.52
11.1 11.1 11.1 10.9 10.1 8.04 6.5 4.6 2.5
11.1 11.1 11.1 11.06 10.3 8.2 6.7 4.8 2.5811.1 11.1 11.1 11.1 10.4 8.4 6.9 4.96 2.68
11.1 11.1 11.1 11.1 10.6 8.6 7.14 5.2 2.8
11.1 11.1 11.1 11.1 10.7 8.9 7.4 5.5 3
11.1 11.1 11.1 11.1 10.8 9.3 7.86 5.85 3.25
11.1 11.1 11.1 11.1 10.9 9.5 8.2 6.3 3.7
11.1 11.1 11.1 11.1 11 9.8 9.5 6.7 4.1
colr
colr
colr
colr
colr
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
6/46
20
0
0.7
1.1
1.5
1.5
1.3
1.95
0.6
0.20.1
0
0.1
0.3
0.7
1.1
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
7/46
Waterline=0 k1=1 k2=2.4
Station Half ord. SM fn(WP Area) Lever fn (M) Lever fn(IL) (Half ord.)2
(1) (2) (3) (4) = (2)x(3) (5) (6) = (4)x(5) (7) (8) = (7) x (6) (9)
0.5' 0 0.2083333 0 -68.4 0 -68.4 0 0
1 0.1 0.7083333 0.07083333 -64.8 -4.589999784 -64.8 297.431986 0.01
1.5 0.3 2 0.6 -61.2 -36.72 -61.2 2247.264 0.092 0.5 1.5 0.75 -57.6 -43.2 -57.6 2488.32 0.25
3 1.78 4 7.12 -50.4 -358.848 -50.4 18085.9392 3.1684
4 3.48 2 6.96 -43.2 -300.672 -43.2 12989.0304 12.1104
5 5.6 4 22.4 -36 -806.4 -36 29030.4 31.36
6 7.44 2 14.88 -28.8 -428.544 -28.8 12342.0672 55.3536
7 8.6 4 34.4 -21.6 -743.04 -21.6 16049.664 73.96
8 9.12 2 18.24 -14.4 -262.656 -14.4 3782.2464 83.1744
9 9.28 4 37.12 -7.2 -267.264 -7.2 1924.3008 86.1184
10 9.3 2 18.6 0 0 0 0 86.49
11 9.3 4 37.2 7.2 267.84 7.2 1928.448 86.49
12 9.3 2 18.6 14.4 267.84 14.4 3856.896 86.49
13 9.3 4 37.2 21.6 803.52 21.6 17356.032 86.49
14 9 2 18 28.8 518.4 28.8 14929.92 81
15 8.6 4 34.4 36 1238.4 36 44582.4 73.9616 7.6 2 15.2 43.2 656.64 43.2 28366.848 57.76
17 5.8 4 23.2 50.4 1169.28 50.4 58931.712 33.64
18 3.3 1.5 4.95 57.6 285.12 57.6 16422.912 10.89
18.5 2.06 2 4.12 61.2 252.144 61.2 15431.2128 4.2436
19 0.9 1 0.9 64.8 58.32 64.8 3779.136 0.81
19' 0 0.5 0 68.4 0 68.4 0 0
354.9108333
wp area 1703.572
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
8/46
SM fn(IT)
(10) (11) = (9)x(10)
3/14.4
0.2083333 -0.2083333
0.7083333 -0.6983333
2 -1.911.5 -1.25
4 -0.8316
2 10.1104
4 27.36
2 53.3536
4 69.96
2 81.1744
4 82.1184
2 84.49
4 82.49
2 84.49
4 82.49
2 79
4 69.962 55.76
4 29.64
1.5 9.39
2 2.2436
1 -0.19
0.5 -0.5
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
9/46
Waterline=0.5 k1= 2
Station Half ord. SM fn(WP Area) Lever fn (M)
(1) (2) (3) (4) = (2)x(3) (5) (6) = (4)x(5)
0.5' 0 0.4167 0 -68.4 0
1 0.54 0.9167 0.495018 -64.8 -32.07716641.5 1.06 2 2.12 -61.2 -129.744
2 1.73 1.5 2.595 -57.6 -149.472
3 3.7 4 14.8 -50.4 -745.92
4 5.8 2 11.6 -43.2 -501.12
5 7.7 4 30.8 -36 -1108.8
6 9.3 2 18.6 -28.8 -535.68
7 10.5 4 42 -21.6 -907.2
8 10.38 2 20.76 -14.4 -298.944
9 10.48 4 41.92 -7.2 -301.824
10 10.6 2 21.2 0 0
11 10.6 4 42.4 7.2 305.28
12 10.6 2 21.2 14.4 305.28
13 10.6 4 42.4 21.6 915.84
14 10.5 2 21 28.8 604.8
15 9.9 4 39.6 36 1425.6
16 8.9 2 17.8 43.2 768.96
17 7.4 4 29.6 50.4 1491.84
18 5.1 1.5 7.65 57.6 440.64
18.5 3.7 2 7.4 61.2 452.88
19 2.3 1 2.3 64.8 149.04
19.5 1.44 2 2.88 68.4 196.99220 0.7 0.895833333 0.627083333 72 45.15
20' 0 0.395833333 0 75.6 0
441.7471013
totel area 2120.386086
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
10/46
k2= 1.9
Lever fn(IL) (Half ord.)2
SM fn(IT)
(7) (8) = (7) x (6) (9) (10) (11) = (9)x(10)
-68.4 0 0 0.4167 0
-64.8 2078.600383 0.2916 0.9167 0.26730972-61.2 7940.3328 1.1236 2 2.2472
-57.6 8609.5872 2.9929 1.5 4.48935
-50.4 37594.368 13.69 4 54.76
-43.2 21648.384 33.64 2 67.28
-36 39916.8 59.29 4 237.16
-28.8 15427.584 86.49 2 172.98
-21.6 19595.52 110.25 4 441
-14.4 4304.7936 107.7444 2 215.4888
-7.2 2173.1328 109.8304 4 439.3216
0 0 112.36 2 224.72
7.2 2198.016 112.36 4 449.44
14.4 4396.032 112.36 2 224.72
21.6 19782.144 112.36 4 449.44
28.8 17418.24 110.25 2 220.5
36 51321.6 98.01 4 392.04
43.2 33219.072 79.21 2 158.42
50.4 75188.736 54.76 4 219.04
57.6 25380.864 26.01 1.5 39.015
61.2 27716.256 13.69 2 27.38
64.8 9657.792 5.29 1 5.29
68.4 13474.2528 2.0736 2 4.147272 3250.8 0.49 0.895833333 0.438958333
75.6 0 0 0.395833333 0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
11/46
0.395833
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
12/46
Waterline=1 k1=2.4
Station Half ord. SM fn(WP Area) Lever
(1) (2) (3) (4) = (2)x(3) (5)
0.5' 0 0.5 0 -68.4
1 0.7 1 0.7 -64.81.5 1.6 2 3.2 -61.2
2 2.45 1.5 3.675 -57.6
3 4.62 4 18.48 -50.4
4 6.74 2 13.48 -43.2
5 8.52 4 34.08 -36
6 9.9 2 19.8 -28.8
7 10.63 4 42.52 -21.6
8 11.7 2 23.4 -14.4
9 10.92 4 43.68 -7.2
10 10.9 2 21.8 0
11 10.9 4 43.6 7.2
12 10.9 2 21.8 14.4
13 10.9 4 43.6 21.6
14 10.9 2 21.8 28.8
15 10.5 4 42 36
16 9.6 2 19.2 43.2
17 8.1 4 32.4 50.4
18 5.7 1.5 8.55 57.6
18.5 4.3 2 8.6 61.2
19 2.9 1 2.9 64.8
19.5 1.93 2 3.86 68.420 1.1 1.229166667 1.352083333 72
20' 0 0.729166667 0 75.6
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
13/46
k2=3.5
fn (M) Lever fn(IL) (Half ord.)2
SM fn(IT)
(6) = (4)x(5) (7) (8) = (7) x (6) (9) (10) (11) = (9)x(10)
0 -68.4 0 0 0.5 0
-45.36 -64.8 2939.328 0.49 1 0.49-195.84 -61.2 11985.408 2.56 2 5.12
-211.68 -57.6 12192.768 6.0025 1.5 9.00375
-931.392 -50.4 46942.1568 21.3444 4 85.3776
-582.336 -43.2 25156.9152 45.4276 2 90.8552
-1226.88 -36 44167.68 72.5904 4 290.3616
-570.24 -28.8 16422.912 98.01 2 196.02
-918.432 -21.6 19838.1312 112.9969 4 451.9876
-336.96 -14.4 4852.224 136.89 2 273.78
-314.496 -7.2 2264.3712 119.2464 4 476.9856
0 0 0 118.81 2 237.62
313.92 7.2 2260.224 118.81 4 475.24
313.92 14.4 4520.448 118.81 2 237.62
941.76 21.6 20342.016 118.81 4 475.24
627.84 28.8 18081.792 118.81 2 237.62
1512 36 54432 110.25 4 441
829.44 43.2 35831.808 92.16 2 184.32
1632.96 50.4 82301.184 65.61 4 262.44
492.48 57.6 28366.848 32.49 1.5 48.735
526.32 61.2 32210.784 18.49 2 36.98
187.92 64.8 12177.216 8.41 1 8.41
264.024 68.4 18059.2416 3.7249 2 7.449897.35 72 7009.2 1.21 0.5 0.605
0 75.6 0 0 0 0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
14/46
0.729167
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
15/46
Waterline=2 k1=2.48
Station Half ord. SM fn(WP Area) Lever fn (M)
(1) (2) (3) (4) = (2)x(3) (5) (6) = (4)x(5)
0.5' 0 0.5166 0 -68.4 01 0.92 1.0166 0.935272 -64.8 -60.6056256
1.5 2.1 2 4.2 -61.2 -257.04
2 3.3 1.5 4.95 -57.6 -285.12
3 5.7 4 22.8 -50.4 -1149.12
4 7.72 2 15.44 -43.2 -667.008
5 9.48 4 37.92 -36 -1365.12
6 10.7 2 21.4 -28.8 -616.32
7 11.5 4 46 -21.6 -993.6
8 11.1 2 22.2 -14.4 -319.68
9 11.8 4 47.2 -7.2 -339.84
10 11.1 2 22.2 0 0
11 11.1 4 44.4 7.2 319.68
12 11.1 2 22.2 14.4 319.68
13 11.1 4 44.4 21.6 959.04
14 11.1 2 22.2 28.8 639.36
15 10.9 4 43.6 36 1569.6
16 10.3 2 20.6 43.2 889.92
17 9 4 36 50.4 1814.4
18 6.56 1.5 9.84 57.6 566.784
18.5 5.1 2 10.2 61.2 624.24
19 3.64 1 3.64 64.8 235.87219.5 2.61 2 5.22 68.4 357.048
20 1.5 1.3541666 2.0312499 72 146.2499928
20' 0 0.8541666 0 75.6 0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
16/46
k2=4.1
Lever fn(IL) (Half ord.)2
SM fn(IT)
(7) (8) = (7) x (6) (9) (10) (11) = (9)x(10)
-68.4 0 0 0.5166 0-64.8 3927.244539 0.8464 1.0166 0.86045024
-61.2 15730.848 4.41 2 8.82
-57.6 16422.912 10.89 1.5 16.335
-50.4 57915.648 32.49 4 129.96
-43.2 28814.7456 59.5984 2 119.1968
-36 49144.32 89.8704 4 359.4816
-28.8 17750.016 114.49 2 228.98
-21.6 21461.76 132.25 4 529
-14.4 4603.392 123.21 2 246.42
-7.2 2446.848 139.24 4 556.96
0 0 123.21 2 246.42
7.2 2301.696 123.21 4 492.84
14.4 4603.392 123.21 2 246.42
21.6 20715.264 123.21 4 492.84
28.8 18413.568 123.21 2 246.42
36 56505.6 118.81 4 475.24
43.2 38444.544 106.09 2 212.18
50.4 91445.76 81 4 324
57.6 32646.7584 43.0336 1.5 64.5504
61.2 38203.488 26.01 2 52.02
64.8 15284.5056 13.2496 1 13.249668.4 24422.0832 6.8121 2 13.6242
72 10529.99948 2.25 1.3541666 3.04687485
75.6 0 0 0.8541666 0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
17/46
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
18/46
k2=4.3
fn (M) Lever fn(IL) (Half ord.)2
SM fn(IT)
(6) = (4)x(5) (7) (8) = (7) x (6) (9) (10) (11) = (9)x(10)
0 -68.4 0 0 0.5625 0-86.0625 -64.8 5576.85 1.5625 1.0625 1.66015625
-323.136 -61.2 19775.9232 6.9696 2 13.9392
-360.288 -57.6 20752.5888 17.3889 1.5 26.08335
-1350.72 -50.4 68076.288 44.89 4 179.56
-748.224 -43.2 32323.2768 74.9956 2 149.9912
-1468.8 -36 52876.8 104.04 4 416.16
-633.024 -28.8 18231.0912 120.7801 2 241.5602
-959.04 -21.6 20715.264 123.21 4 492.84
-319.68 -14.4 4603.392 123.21 2 246.42
-319.68 -7.2 2301.696 123.21 4 492.84
0 0 0 123.21 2 246.42
319.68 7.2 2301.696 123.21 4 492.84
319.68 14.4 4603.392 123.21 2 246.42
959.04 21.6 20715.264 123.21 4 492.84
639.36 28.8 18413.568 123.21 2 246.42
1598.4 36 57542.4 123.21 4 492.84
907.2 43.2 39191.04 110.25 2 220.5
1895.04 50.4 95510.016 88.36 4 353.44
620.352 57.6 35732.2752 51.5524 1.5 77.3286
691.56 61.2 42323.472 31.9225 2 63.845
261.792 64.8 16964.1216 16.3216 1 16.3216358.416 68.4 24515.6544 6.8644 2 13.7288
150.75 72 10854 2.25 1.395833333 3.140625
0 75.6 0 0 0.895833333 0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
19/46
Waterline=4 k1=2.8
Station Half ord. SM fn(WP Area) Lever
(1) (2) (3) (4) = (2)x(3) (5)
0.5' 0 0.583333333 0 -68.41 1.62 1.083333333 1.755 -64.8
1.5 3.3 2 6.6 -61.2
2 4.8 1.5 7.2 -57.6
3 7.28 4 29.12 -50.4
4 9.18 2 18.36 -43.2
5 10.4 4 41.6 -36
6 11.1 2 22.2 -28.8
7 11.1 4 44.4 -21.6
8 11.1 2 22.2 -14.4
9 11.1 4 44.4 -7.2
10 11.1 2 22.2 0
11 11.1 4 44.4 7.2
12 11.1 2 22.2 14.4
13 11.1 4 44.4 21.6
14 11.1 2 22.2 28.8
15 11.1 4 44.4 36
16 10.72 2 21.44 43.2
17 9.7 4 38.8 50.4
18 7.6 1.5 11.4 57.6
18.5 6.1 2 12.2 61.2
19 4.3 1 4.3 64.819.5 2.58 2 5.16 68.4
20 1.3 1.1875 1.54375 72
20' 0 0.6875 0 75.6
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
20/46
k2=3.3
fn (M) Lever fn(IL) (Half ord.)2
SM
(6) = (4)x(5) (7) (8) = (7) x (6) (9) (10)
0 -68.4 0 0 0.583333333-113.724 -64.8 7369.3152 2.6244 1.083333333
-403.92 -61.2 24719.904 10.89 2
-414.72 -57.6 23887.872 23.04 1.5
-1467.648 -50.4 73969.4592 52.9984 4
-793.152 -43.2 34264.1664 84.2724 2
-1497.6 -36 53913.6 108.16 4
-639.36 -28.8 18413.568 123.21 2
-959.04 -21.6 20715.264 123.21 4
-319.68 -14.4 4603.392 123.21 2
-319.68 -7.2 2301.696 123.21 4
0 0 0 123.21 2
319.68 7.2 2301.696 123.21 4
319.68 14.4 4603.392 123.21 2
959.04 21.6 20715.264 123.21 4
639.36 28.8 18413.568 123.21 2
1598.4 36 57542.4 123.21 4
926.208 43.2 40012.1856 114.9184 2
1955.52 50.4 98558.208 94.09 4
656.64 57.6 37822.464 57.76 1.5
746.64 61.2 45694.368 37.21 2
278.64 64.8 18055.872 18.49 1352.944 68.4 24141.3696 6.6564 2
111.15 72 8002.8 1.69 1.1875
0 75.6 0 0 0.6875
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
21/46
fn(IT)
(11) = (9)x(10)
02.8431
21.78
34.56
211.9936
168.5448
432.64
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
229.8368
376.36
86.64
74.42
18.4913.3128
2.006875
0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
22/46
Waterline=5 k1=3
Station Half ord. SM fn(WP Area) Lever
(1) (2) (3) (4) = (2)x(3) (5)
0.5' 0 0.625 0 -68.4
1 2.02 1.125 2.2725 -64.81.5 3.86 2 7.72 -61.2
2 5.47 1.5 8.205 -57.6
3 7.84 4 31.36 -50.4
4 9.6 2 19.2 -43.2
5 10.68 4 42.72 -36
6 11.1 2 22.2 -28.8
7 11.1 4 44.4 -21.6
8 11.1 2 22.2 -14.4
9 11.1 4 44.4 -7.2
10 11.1 2 22.2 0
11 11.1 4 44.4 7.2
12 11.1 2 22.2 14.4
13 11.1 4 44.4 21.6
14 11.1 2 22.2 28.8
15 11.1 4 44.4 36
16 10.8 2 21.6 43.2
17 10 4 40 50.4
18 7.82 1.5 11.73 57.6
18.5 6.3 2 12.6 61.2
19 4.5 1 4.5 64.8
19.5 2.52 2 5.04 68.420 1.95 0.958333333 1.86875 72
20' 0 0.458333333 0 75.6
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
23/46
k2=2.2
fn (M) Lever fn(IL) (Half ord.)2
SM
(6) = (4)x(5) (7) (8) = (7) x (6) (9) (10)
0 -68.4 0 0 0.625
-147.258 -64.8 9542.3184 4.0804 1.125-472.464 -61.2 28914.7968 14.8996 2
-472.608 -57.6 27222.2208 29.9209 1.5
-1580.544 -50.4 79659.4176 61.4656 4
-829.44 -43.2 35831.808 92.16 2
-1537.92 -36 55365.12 114.0624 4
-639.36 -28.8 18413.568 123.21 2
-959.04 -21.6 20715.264 123.21 4
-319.68 -14.4 4603.392 123.21 2
-319.68 -7.2 2301.696 123.21 4
0 0 0 123.21 2
319.68 7.2 2301.696 123.21 4
319.68 14.4 4603.392 123.21 2
959.04 21.6 20715.264 123.21 4
639.36 28.8 18413.568 123.21 2
1598.4 36 57542.4 123.21 4
933.12 43.2 40310.784 116.64 2
2016 50.4 101606.4 100 4
675.648 57.6 38917.3248 61.1524 1.5
771.12 61.2 47192.544 39.69 2
291.6 64.8 18895.68 20.25 1
344.736 68.4 23579.9424 6.3504 2134.55 72 9687.6 3.8025 0.958333333
0 75.6 0 0 0.458333333
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
24/46
fn(IT)
(11) = (9)x(10)
0
4.5904529.7992
44.88135
245.8624
184.32
456.2496
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
233.28
400
91.7286
79.38
20.25
12.70083.6440625
0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
25/46
Waterline=6 k1=3.5
Station Half ord. SM fn(WP Area) Lever
(1) (2) (3) (4) = (2)x(3) (5)
0.5' 0 0.729166667 0 -68.4
1 2.8 1.229166667 3.441666667 -64.81.5 4.5 2 9 -61.2
2 6.02 1.5 9.03 -57.6
3 8.42 4 33.68 -50.4
4 9.92 2 19.84 -43.2
5 10.72 4 42.88 -36
6 11.1 2 22.2 -28.8
7 11.1 4 44.4 -21.6
8 11.1 2 22.2 -14.4
9 11.1 4 44.4 -7.2
10 11.1 2 22.2 0
11 11.1 4 44.4 7.2
12 11.1 2 22.2 14.4
13 11.1 4 44.4 21.6
14 11.1 2 22.2 28.8
15 11.1 4 44.4 36
16 10.9 2 21.8 43.2
17 10.1 4 40.4 50.4
18 8.04 1.5 12.06 57.6
18.5 6.5 2 13 61.2
19 4.6 1 4.6 64.8
19.5 2.5 2 5 68.420 0.6 0.75 0.45 72
20' 0 0.25 0 75.6
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
26/46
k2=1.2
fn (M) Lever fn(IL) (Half ord.)2
SM
(6) = (4)x(5) (7) (8) = (7) x (6) (9) (10)
0 -68.4 0 0 0.729166667
-223.02 -64.8 14451.696 7.84 1.229166667-550.8 -61.2 33708.96 20.25 2
-520.128 -57.6 29959.3728 36.2404 1.5
-1697.472 -50.4 85552.5888 70.8964 4
-857.088 -43.2 37026.2016 98.4064 2
-1543.68 -36 55572.48 114.9184 4
-639.36 -28.8 18413.568 123.21 2
-959.04 -21.6 20715.264 123.21 4
-319.68 -14.4 4603.392 123.21 2
-319.68 -7.2 2301.696 123.21 4
0 0 0 123.21 2
319.68 7.2 2301.696 123.21 4
319.68 14.4 4603.392 123.21 2
959.04 21.6 20715.264 123.21 4
639.36 28.8 18413.568 123.21 2
1598.4 36 57542.4 123.21 4
941.76 43.2 40684.032 118.81 2
2036.16 50.4 102622.464 102.01 4
694.656 57.6 40012.1856 64.6416 1.5
795.6 61.2 48690.72 42.25 2
298.08 64.8 19315.584 21.16 1
342 68.4 23392.8 6.25 232.4 72 2332.8 0.36 0.75
0 75.6 0 0 0.25
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
27/46
fn(IT)
(11) = (9)x(10)
0
9.63666666740.5
54.3606
283.5856
196.8128
459.6736
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
237.62
408.04
96.9624
84.5
21.16
12.50.27
0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
28/46
Waterline=7 k1=1.15
Station Half ord. SM fn(WP Area) Lever
(1) (2) (3) (4) = (2)x(3) (5)
0' 0 0.239583333 0 -720.5 1.3 0.989583333 1.286458333 -68.4
1 3.8 1.25 4.75 -64.8
1.5 5.36 2 10.72 -61.2
2 6.83 1.5 10.245 -57.6
3 8.96 4 35.84 -50.4
4 10.2 2 20.4 -43.2
5 10.8 4 43.2 -36
6 11.1 2 22.2 -28.8
7 11.1 4 44.4 -21.6
8 11.1 2 22.2 -14.4
9 11.1 4 44.4 -7.2
10 11.1 2 22.2 0
11 11.1 4 44.4 7.2
12 11.1 2 22.2 14.4
13 11.1 4 44.4 21.6
14 11.1 2 22.2 28.8
15 11.1 4 44.4 36
16 11.06 2 22.12 43.2
17 10.3 4 41.2 50.4
18 8.2 1.5 12.3 57.6
18.5 6.7 2 13.4 61.219 4.8 1 4.8 64.8
19.5 2.58 2 5.16 68.4
20 0.2 0.625 0.125 72
20' 0 0.125 0 75.6
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
29/46
k2=0.6
fn (M) Lever fn(IL) (Half ord.)2
SM
(6) = (4)x(5) (7) (8) = (7) x (6) (9) (10)
0 -72 0 0-87.99375 -68.4 6018.7725 1.69
-307.8 -64.8 19945.44 14.44 1
-656.064 -61.2 40151.1168 28.7296 2
-590.112 -57.6 33990.4512 46.6489 1.5
-1806.336 -50.4 91039.3344 80.2816 4
-881.28 -43.2 38071.296 104.04 2
-1555.2 -36 55987.2 116.64 4
-639.36 -28.8 18413.568 123.21 2
-959.04 -21.6 20715.264 123.21 4
-319.68 -14.4 4603.392 123.21 2
-319.68 -7.2 2301.696 123.21 4
0 0 0 123.21 2
319.68 7.2 2301.696 123.21 4
319.68 14.4 4603.392 123.21 2
959.04 21.6 20715.264 123.21 4
639.36 28.8 18413.568 123.21 2
1598.4 36 57542.4 123.21 4
955.584 43.2 41281.2288 122.3236 2
2076.48 50.4 104654.592 106.09 4
708.48 57.6 40808.448 67.24 1.5
820.08 61.2 50188.896 44.89 2311.04 64.8 20155.392 23.04 1
352.944 68.4 24141.3696 6.6564 2
9 72 648 0.04 0.5
0 75.6 0 0 0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
30/46
fn(IT)
(11) = (9)x(10)
00
14.44
57.4592
69.97335
321.1264
208.08
466.56
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
244.6472
424.36
100.86
89.7823.04
13.3128
0.02
0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
31/46
Waterline=8 k1=0.5
Station Half ord. SM fn(WP Area) Lever
(1) (2) (3) (4) = (2)x(3) (5)
0' 0 0.104166667 0 -75.60 0.7 0.604166667 0.422916667 -72
511500 3.4 2 6.8 -68.4
1 5.06 1 5.06 -64.8
1.5 6.38 2 12.76 -61.2
2 7.5 1.5 11.25 -57.6
3 9.28 4 37.12 -50.4
4 10.48 2 20.96 -43.2
5 10.96 4 43.84 -36
6 11.1 2 22.2 -28.8
7 11.1 4 44.4 -21.6
8 11.1 2 22.2 -14.4
9 11.1 4 44.4 -7.2
10 11.1 2 22.2 0
11 11.1 4 44.4 7.2
12 11.1 2 22.2 14.4
13 11.1 4 44.4 21.6
14 11.1 2 22.2 28.8
15 11.1 4 44.4 36
16 11.1 2 22.2 43.2
17 10.4 4 41.6 50.4
18 8.4 1.5 12.6 57.618.5 6.9 2 13.8 61.2
19 4.96 0.5 2.48 64.8
19.5 2.68 2 5.36 68.4
20 0.1 0.53125 0.053125 72
20' 0 0.025 0 75.6
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
32/46
k2=0.15
fn (M) Lever fn(IL) (Half ord.)2
SM fn(IT)
(6) = (4)x(5) (7) (8) = (7) x (6) (9) (10) (11) = (9)x(10)
0 -75.6 0 0 0.104166667 0-30.45 -72 2192.4 0.49 0.604166667 0.296041667
-465.12 -68.4 31814.208 11.56 2 23.12
-327.888 -64.8 21247.1424 25.6036 1 25.6036
-780.912 -61.2 47791.8144 40.7044 2 81.4088
-648 -57.6 37324.8 56.25 1.5 84.375
-1870.848 -50.4 94290.7392 86.1184 4 344.4736
-905.472 -43.2 39116.3904 109.8304 2 219.6608
-1578.24 -36 56816.64 120.1216 4 480.4864
-639.36 -28.8 18413.568 123.21 2 246.42
-959.04 -21.6 20715.264 123.21 4 492.84
-319.68 -14.4 4603.392 123.21 2 246.42
-319.68 -7.2 2301.696 123.21 4 492.84
0 0 0 123.21 2 246.42
319.68 7.2 2301.696 123.21 4 492.84
319.68 14.4 4603.392 123.21 2 246.42
959.04 21.6 20715.264 123.21 4 492.84
639.36 28.8 18413.568 123.21 2 246.42
1598.4 36 57542.4 123.21 4 492.84
959.04 43.2 41430.528 123.21 2 246.42
2096.64 50.4 105670.656 108.16 4 432.64
725.76 57.6 41803.776 70.56 1.5 105.84844.56 61.2 51687.072 47.61 2 95.22
160.704 64.8 10413.6192 24.6016 0.5 12.3008
366.624 68.4 25077.0816 7.1824 2 14.3648
3.825 72 275.4 0.01 0.53125 0.0053125
0 75.6 0 0 0.025 0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
33/46
Waterline=9 k1=5.3
1.1
Station Half ord. SM fn(WP Area) Lever
(1) (2) (3) (4) = (2)x(3) (5)
0' 0 1.104166667 0 -75.6
0 3.2 1.604166667 5.133333333 -720.5 4.6 2 9.2 -68.4
1 5.94 1 5.94 -64.8
1.5 7.02 2 14.04 -61.2
2 8.04 1.5 12.06 -57.6
3 9.58 4 38.32 -50.4
4 10.5 2 21 -43.2
5 11.3 4 45.2 -36
6 11.1 2 22.2 -28.8
7 11.1 4 44.4 -21.6
8 11.1 2 22.2 -14.4
9 11.1 4 44.4 -7.2
10 11.1 2 22.2 0
11 11.1 4 44.4 7.2
12 11.1 2 22.2 14.4
13 11.1 4 44.4 21.6
14 11.1 2 22.2 28.8
15 11.1 4 44.4 36
16 11.1 2 22.2 43.2
17 10.6 4 42.4 50.4
18 8.6 1.5 12.9 57.6
18.5 7.14 2 14.28 61.219 5.2 0.5 2.6 64.8
19.5 2.8 0 68.4
19.5' 0 0 72
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
34/46
k2=0
fn (M) Lever fn(IL) (Half ord.)2
SM
(6) = (4)x(5) (7) (8) = (7) x (6) (9) (10)
0 -75.6 0 0 1.104166667
-369.6 -72 26611.2 10.24 1.604166667-629.28 -68.4 43042.752 21.16 2
-384.912 -64.8 24942.2976 35.2836 1
-859.248 -61.2 52585.9776 49.2804 2
-694.656 -57.6 40012.1856 64.6416 1.5
-1931.328 -50.4 97338.9312 91.7764 4
-907.2 -43.2 39191.04 110.25 2
-1627.2 -36 58579.2 127.69 4
-639.36 -28.8 18413.568 123.21 2
-959.04 -21.6 20715.264 123.21 4
-319.68 -14.4 4603.392 123.21 2
-319.68 -7.2 2301.696 123.21 4
0 0 0 123.21 2
319.68 7.2 2301.696 123.21 4
319.68 14.4 4603.392 123.21 2
959.04 21.6 20715.264 123.21 4
639.36 28.8 18413.568 123.21 2
1598.4 36 57542.4 123.21 4
959.04 43.2 41430.528 123.21 2
2136.96 50.4 107702.784 112.36 4
743.04 57.6 42799.104 73.96 1.5
873.936 61.2 53484.8832 50.9796 2168.48 64.8 10917.504 27.04 0.5
0 68.4 0 7.84
0 72 0 0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
35/46
fn(IT)
(11) = (9)x(10)
0
16.4266666742.32
35.2836
98.5608
96.9624
367.1056
220.5
510.76
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
246.42
449.44
110.94
101.959213.52
0
0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
36/46
Waterline= 10 k1=5.5
2.1
Station Half ord. SM fn(WP Area) Lever fn (M)
(1) (2) (3) (4) = (2)x(3) (5) (6) = (4)x(5)
0' 0 1.145833333 0 -75.6 00 4.16 1.645833333 6.846666667 -72 -492.96
0.5 5.45 2 10.9 -68.4 -745.56
1 6.66 1 6.66 -64.8 -431.568
1.5 7.66 2 15.32 -61.2 -937.584
2 8.56 1.5 12.84 -57.6 -739.584
3 9.96 4 39.84 -50.4 -2007.936
4 10.7 2 21.4 -43.2 -924.48
5 11.01 4 44.04 -36 -1585.44
6 11.1 2 22.2 -28.8 -639.36
7 11.1 4 44.4 -21.6 -959.04
8 11.1 2 22.2 -14.4 -319.68
9 11.1 4 44.4 -7.2 -319.68
10 11.1 2 22.2 0 0
11 11.1 4 44.4 7.2 319.68
12 11.1 2 22.2 14.4 319.68
13 11.1 4 44.4 21.6 959.04
14 11.1 2 22.2 28.8 639.36
15 11.1 4 44.4 36 1598.4
16 11.1 2 22.2 43.2 959.04
17 10.7 4 42.8 50.4 2157.12
18 8.9 1.5 13.35 57.6 768.9618.5 7.4 2 14.8 61.2 905.76
19 5.5 1 5.5 64.8 356.4
19.5 3 2 6 68.4 410.4
20 0.1 0.5 0.05 72 3.6
20' 0 0 0 75.6 0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
37/46
k2=0
Lever fn(IL) (Half ord.)2
SM fn(IT)
(7) (8) = (7) x (6) (9) (10) (11) = (9)x(10)
-75.6 0 0 1.145833333 0-72 35493.12 17.3056 1.645833333 28.48213333
-68.4 50996.304 29.7025 2 59.405
-64.8 27965.6064 44.3556 1 44.3556
-61.2 57380.1408 58.6756 2 117.3512
-57.6 42600.0384 73.2736 1.5 109.9104
-50.4 101199.9744 99.2016 4 396.8064
-43.2 39937.536 114.49 2 228.98
-36 57075.84 121.2201 4 484.8804
-28.8 18413.568 123.21 2 246.42
-21.6 20715.264 123.21 4 492.84
-14.4 4603.392 123.21 2 246.42
-7.2 2301.696 123.21 4 492.84
0 0 123.21 2 246.42
7.2 2301.696 123.21 4 492.84
14.4 4603.392 123.21 2 246.42
21.6 20715.264 123.21 4 492.84
28.8 18413.568 123.21 2 246.42
36 57542.4 123.21 4 492.84
43.2 41430.528 123.21 2 246.42
50.4 108718.848 114.49 4 457.96
57.6 44292.096 79.21 1.5 118.81561.2 55432.512 54.76 2 109.52
64.8 23094.72 30.25 1 30.25
68.4 28071.36 9 2 18
72 259.2 0.01 0.5 0.005
75.6 0 0 0 0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
38/46
Waterline=11 k1=5.6
2.7
Station Half ord. SM fn(WP Area) Lever
(1) (2) (3) (4) = (2)x(3) (5)
0' 0 1.166666667 0 -720 4.76 1.666666667 7.933333333 -68.4
0.5 6.08 2 12.16 -64.8
1 7.24 1 7.24 -61.2
1.5 8.2 2 16.4 -57.6
2 9.12 1.5 13.68 -54
3 10.28 4 41.12 -50.4
4 10.8 2 21.6 -43.2
5 11.1 4 44.4 -36
6 11.1 2 22.2 -28.8
7 11.1 4 44.4 -21.6
8 11.1 2 22.2 -14.4
9 11.1 4 44.4 -7.2
10 11.1 2 22.2 0
11 11.1 4 44.4 7.2
12 11.1 2 22.2 14.4
13 11.1 4 44.4 21.6
14 11.1 2 22.2 28.8
15 11.1 4 44.4 36
16 11.1 2 22.2 43.2
17 10.8 4 43.2 50.4
18 9.3 1.5 13.95 57.618.5 7.86 2 15.72 61.2
19 5.85 1 5.85 64.8
19.5 3.25 2 6.5 68.4
20 0.3 0.5625 0.16875 72
20' 0 0.0625 0 75.6
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
39/46
k2=0.3
fn (M) Lever fn(IL) (Half ord.)2
SM
(6) = (4)x(5) (7) (8) = (7) x (6) (9) (10)
0 -72 0 0 1.166666667-542.64 -68.4 37116.576 22.6576 1.666666667
-787.968 -64.8 51060.3264 36.9664 2
-443.088 -61.2 27116.9856 52.4176 1
-944.64 -57.6 54411.264 67.24 2
-738.72 -54 39890.88 83.1744 1.5
-2072.448 -50.4 104451.3792 105.6784 4
-933.12 -43.2 40310.784 116.64 2
-1598.4 -36 57542.4 123.21 4
-639.36 -28.8 18413.568 123.21 2
-959.04 -21.6 20715.264 123.21 4
-319.68 -14.4 4603.392 123.21 2
-319.68 -7.2 2301.696 123.21 4
0 0 0 123.21 2
319.68 7.2 2301.696 123.21 4
319.68 14.4 4603.392 123.21 2
959.04 21.6 20715.264 123.21 4
639.36 28.8 18413.568 123.21 2
1598.4 36 57542.4 123.21 4
959.04 43.2 41430.528 123.21 2
2177.28 50.4 109734.912 116.64 4
803.52 57.6 46282.752 86.49 1.5962.064 61.2 58878.3168 61.7796 2
379.08 64.8 24564.384 34.2225 1
444.6 68.4 30410.64 10.5625 2
12.15 72 874.8 0.09 0.5625
0 75.6 0 0 0.0625
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
40/46
fn(IT)
(11) = (9)x(10)
037.76266667
73.9328
52.4176
134.48
124.7616
422.7136
233.28
492.84
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
246.42
466.56
129.735123.5592
34.2225
21.125
0.050625
0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
41/46
Waterline=12 k1=5.8
3.2
Station Half ord. SM fn(WP Area) Lever
(1) (2) (3) (4) = (2)x(3) (5)
0' 0 1.208333333 0 -75.60 5.26 1.708333333 8.985833333 -72
0.5 6.46 2 12.92 -68.4
1 7.6 1 7.6 -64.8
1.5 8.56 2 17.12 -61.2
2 9.43 1.5 14.145 -57.6
3 10.55 4 42.2 -50.4
4 11 2 22 -43.2
5 11.1 4 44.4 -36
6 11.1 2 22.2 -28.8
7 11.1 4 44.4 -21.6
8 11.1 2 22.2 -14.4
9 11.1 4 44.4 -7.2
10 11.1 2 22.2 0
11 11.1 4 44.4 7.2
12 11.1 2 22.2 14.4
13 11.1 4 44.4 21.6
14 11.1 2 22.2 28.8
15 11.1 4 44.4 36
16 11.1 2 22.2 43.2
17 10.9 4 43.6 50.4
18 9.5 1.5 14.25 57.618.5 8.2 2 16.4 61.2
19 6.3 1 6.3 64.8
19.5 3.7 2 7.4 68.4
20 0.7 1.708333333 1.195833333 72
20' 0 1.208333333 0 75.6
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
42/46
k2=0.8
fn (M) Lever fn(IL) (Half ord.)2
SM
(6) = (4)x(5) (7) (8) = (7) x (6) (9) (10)
0 -75.6 0 0 1.208333333-646.98 -72 46582.56 27.6676 1.708333333
-883.728 -68.4 60446.9952 41.7316 2
-492.48 -64.8 31912.704 57.76 1
-1047.744 -61.2 64121.9328 73.2736 2
-814.752 -57.6 46929.7152 88.9249 1.5
-2126.88 -50.4 107194.752 111.3025 4
-950.4 -43.2 41057.28 121 2
-1598.4 -36 57542.4 123.21 4
-639.36 -28.8 18413.568 123.21 2
-959.04 -21.6 20715.264 123.21 4
-319.68 -14.4 4603.392 123.21 2
-319.68 -7.2 2301.696 123.21 4
0 0 0 123.21 2
319.68 7.2 2301.696 123.21 4
319.68 14.4 4603.392 123.21 2
959.04 21.6 20715.264 123.21 4
639.36 28.8 18413.568 123.21 2
1598.4 36 57542.4 123.21 4
959.04 43.2 41430.528 123.21 2
2197.44 50.4 110750.976 118.81 4
820.8 57.6 47278.08 90.25 1.51003.68 61.2 61425.216 67.24 2
408.24 64.8 26453.952 39.69 1
506.16 68.4 34621.344 13.69 2
86.1 72 6199.2 0.49 1.708333333
0 75.6 0 0 1.208333333
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
43/46
fn(IT)
(11) = (9)x(10)
047.26548333
83.4632
57.76
146.5472
133.38735
445.21
242
492.84
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
246.42
475.24
135.375134.48
39.69
27.38
0.837083333
0
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
44/46
upper deck k1=6
3.5
Station Half ord. SM fn(WP Area) Lever
(1) (2) (3) (4) = (2)x(3) (5)
0' 0 1.25 0 -75.60 5.52 1.75 9.66 -72
0.5 6.7 2 13.4 -68.4
1 7.8 1 7.8 -64.8
1.5 8.8 2 17.6 -61.2
2 9.6 1.5 14.4 -57.6
3 10.72 4 42.88 -50.4
4 11.1 2 22.2 -43.2
5 11.1 4 44.4 -36
6 11.1 2 22.2 -28.8
7 11.1 4 44.4 -21.6
8 11.1 2 22.2 -14.4
9 11.1 4 44.4 -7.2
10 11.1 2 22.2 0
11 11.1 4 44.4 7.2
12 11.1 2 22.2 14.4
13 11.1 4 44.4 21.6
14 11.1 2 22.2 28.8
15 11.1 4 44.4 36
16 11.1 2 22.2 43.2
17 11 4 44 50.4
18 9.8 1.5 14.7 57.618.5 9.5 2 19 61.2
19 6.7 1 6.7 64.8
19.5 4.1 2 8.2 68.4
20 1.1 0.75 0.825 72
20' 0 0.25 0 75.6
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
45/46
k2=1.2
fn (M) Lever fn(IL) (Half ord.)2
SM
(6) = (4)x(5) (7) (8) = (7) x (6) (9) (10)
0 -75.6 0 0 1.25-695.52 -72 50077.44 30.4704 1.75
-916.56 -68.4 62692.704 44.89 2
-505.44 -64.8 32752.512 60.84 1
-1077.12 -61.2 65919.744 77.44 2
-829.44 -57.6 47775.744 92.16 1.5
-2161.152 -50.4 108922.0608 114.9184 4
-959.04 -43.2 41430.528 123.21 2
-1598.4 -36 57542.4 123.21 4
-639.36 -28.8 18413.568 123.21 2
-959.04 -21.6 20715.264 123.21 4
-319.68 -14.4 4603.392 123.21 2
-319.68 -7.2 2301.696 123.21 4
0 0 0 123.21 2
319.68 7.2 2301.696 123.21 4
319.68 14.4 4603.392 123.21 2
959.04 21.6 20715.264 123.21 4
639.36 28.8 18413.568 123.21 2
1598.4 36 57542.4 123.21 4
959.04 43.2 41430.528 123.21 2
2217.6 50.4 111767.04 121 4
846.72 57.6 48771.072 96.04 1.51162.8 61.2 71163.36 90.25 2
434.16 64.8 28133.568 44.89 1
560.88 68.4 38364.192 16.81 2
59.4 72 4276.8 1.21 0.75
0 75.6 0 0 0.25
-
8/11/2019 Copy of hydrostatic calculations KKproject (Autosaved)_1411234414361.xls
46/46
fn(IT)
(11) = (9)x(10)
053.3232
89.78
60.84
154.88
138.24
459.6736
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
246.42
492.84
246.42
484
144.06180.5
44.89
33.62
0.9075
0