Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

33
Coop Presentation Coop Presentation WAN Compression and Optimization (W.C.O) Name: Ahmad M.J Batwa ID#: 202496 Serial: 052-202496 Company: National Commercial Bank Location: Jeddah Duration: From 25 th June, 2005 – 4 th Jan, 2006

description

Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496 Serial:052-202496 Company:National Commercial Bank Location:Jeddah Duration:From 25 th June, 2005 – 4 th Jan, 2006. Introduction Business Systems Development (BSD) Business Role - PowerPoint PPT Presentation

Transcript of Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

Page 1: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

Coop PresentationCoop Presentation

WAN Compression and Optimization

(W.C.O)

Name: Ahmad M.J BatwaID#: 202496Serial: 052-202496 Company: National Commercial BankLocation: JeddahDuration: From 25th June, 2005 – 4th Jan, 2006

Page 2: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

2

• Introduction• Business Systems Development (BSD)

– Business Role– Hierarchy– Central Customers Repository System (CCR)

• Internal User Support Department (IUSD)– Business Role– Hierarchy– NCB Network Overview– WAN Optimization and Compression (W.C.O)– Small Tasks and Assignments

• Coop Conclusions and Recommendations

Presentation Outline

Page 3: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

3

Introduction

• What is NCB ?– Establishment…1953.

– Largest in the Middle-East (Capital, SR 6 Billion).

– Development.

• How is NCB different?– We at NCB are People Oriented

– We at NCB are Customer Oriented

– We at NCB are Performance Oriented

Page 4: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

4

NCB’s Hierarchy

Board of DirectorsBoard of Directors

Chairman & Managing Director(CMD)

Chairman & Managing Director(CMD)

General ManagerGeneral Manager

Audit Committee

Head, Audit Division

Head, Compliance Dept.

Executive Committee

Secretary of Board

Head, Finance andAccounting Division

Head, Public RelationsDept.

Real EstateCommittee

Senior HRCommittee

ALCO

Credit PolicyCommittee

Sponsorship and Donation

Committee Chief Financial OfficerChief Financial Officer

Senior Relationship Officer

Senior Relationship OfficerDeputy General Manager

Deputy General Manager

Head, Islamic RetailBanking Division

Head, Private BankingDivision

Head, Finance ServicesGroup

Head, Marketing Division

Head, Real Estate Dept.

Head, Legal Dept.

Sector Head, CorporateSector Head, Corporate

Head, International BankingRelations Division

Head, Corporate BankingDivision

Head, Commercial BusinessBanking Division

Head, Remedial Dept.

Head, Trade Services Dept.

Corporate Quality Officer

Sector Head, IndividualSector Head, Individual DGM & Sector Head

Support and Central

DGM & Sector HeadSupport and Central

Head, Information Technology Division

Head, Operations Division

Head, General SupportServices Division

Head, Islamic FinanceGroup

Head, Insurance Business

Sector Head, Asset Mgmt.Sector Head, Asset Mgmt.

Head, Treasury Division

Head, Investment ServicesDivision

Head, Brokerage Group

Head, Economics Dept.

Head, Human ResourcesDivision

Head, Risk Mgmt. Division

Page 5: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

5

Coop PlanTasks Start Date Due Date Duration Status

CCR overview 3-July 6-July 4 days Done

Studying CCR architecture

9-July 13-July 5 days Done

Overview on BANCS

18-July 20-July 3 days Done

Overview on other

systems

23-July 1-Aug 10 days Done

Introduction to NCB

Network

20-Aug 24-Aug 5 Days Done

Solving al-Khobar branch

problem

29-Aug 31-Aug 3 Days Done

Domain consolidatio

n

30-Aug 30-Sept 1 month Done

RAM Upgrade 4-Sept 5-Sept 2 Days Done

Phase I of main project

10- Sept 18- Sept 9 Days Done

Subnet mask modification

24-Sept 12-Oct 18 days Done

Design discussion

and modification

1-Oct 3-Oct 3 days Done

Arrange a deployment

plan

4-Oct 5-Oct 1 day Done

Preparation for deployment

14-Oct 26-Oct 5 days Done

Install and configuratio

n of the device

20-Oct 30-Oct 10 days Done

Preparing the rollout plan

8- Nov 9- Nov 1 day Done

Rollout Phase 12- Nov 21- Dec 3 days Done

Writing a weekly

progress report

- - - Done

Preparing a brief "after- installation

report"

26-Nov 28-Nov 2 days Done

Page 6: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

6

Part 1 Business Systems Development

Page 7: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

7

• What is BSD.?– Role and Responsibilities

•Develop New Systems•Upgrade existing systems according to NCB needs

•Electronic Banking Issues

Business Systems Development (BSD)

Page 8: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

8

BSD’s Devisions

BSD

Electronic Banking

Core System

(BANCS)

Phone Banking

)IVR(

Data Warehous

e

Invesment System

Trade Finance System

Credit Card

System

Base24(ATM)

CCRMIDDLE WARE BEAM10

Page 9: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

9

• Project features- Unified system that contain customer info across

all Bank systems.- Covers Prospect and other parties that have

relationship with the Bank.- Enhance customer data quality and customer

synchronization across different bank legacy systems.

- Removes customer Info duplication. - Can be used by all other Systems.- Each customers will be identified by 8-digits ECN

number- can be used to enter new customer information or

retrieve and change an existing customer record

Customers Central Repository (CCR)

Page 10: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

10

CCR Before and After

Current Practice – Before CCR After CCR

BankCustomer

Systems

CCR

Page 11: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

11

CCR System Logical architecture

Data management layer

ETLlayer

Front-end layer

middleware layer

Page 12: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

12

CCR System Logical architecture

•Front-End Layer-User interface.-Language management.-Data validation-Communicating Application Directly without passing middle ware.

•Middleware layer:-Middleware functions.-Authenticating. -message transformation and code translation

Page 13: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

13

• Data management layer– provide the data model – checks data validity – mapping

• ETL layer

– first time migration – feeding the CCR with data – Feeding other systems back– transform other system format to CCR format

CCR System Logical architecture

Page 14: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

14

CCR System Physical architecture

Page 15: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

15

CCR System Physical architecture

• CCR Client• Branch application server

– Holds client screens .– Store copy of database lookup values .– Installed at branches (hence the name).

• Back-end application server– Take requests from branch servers route them to DB

server and responds back to them.– When the bank middleware server needs an interface

with CCR application take its request and use the wrapper files (DLL files) to transform the Message and send the request to DB server. Respond back to the middleware server.

Page 16: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

16

• ETL Server

– Extract all customer information from all other systems' databases and transform them to CCR DB format then it will load it to the CCR at first time migration. (15 hours).

– Take all new and changed customer information from other systems and transform them to CCR DB format then load it to the CCR database in the database server. (from 2 AM to 8 AM)

• Database server:– Contain database and all procedure implementing the

logic.

CCR System Physical architecture

Page 17: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

17

Part 2Internal User Support

Department

Page 18: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

18

ISUD’ Hierarchy

The National Commercial Bank

Information Technology Division

Service Disk Agent (Layer)

Service Disk (Layer 2)

The Thicnical Specialist Group (Layer 3)

Internal User Support Department

Technical Desktop Technical Security Technical Server

Page 19: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

19

–Role and Responsibilities•Application related - Escalated Calls. •Desktops (Nortel, Network technologies, Router, OSPF, X.25, TCP/IP, Links, Link utilization, disaster recovery) related escalated call. •Problem Management (RCA, Trend Analysis & reduction of calls on Servers). •Implementation of Change Calls (Major Impact Changes).•Project Management.

•Communication Maintenance.

Page 20: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

20

NCB Network Overview

NCB Backbone Topology with Passport

Jeddah H.O.

Jeddah K-10

CENTRAL

REGION

EASTERN REGION

WESTERN REGION

SOUTHERN

REGION

19.2 kbs leased line

64 kbs DDN circuit

Passport 6440 CFP1

E-1 2 MBps circuit

E3 34 Meg local

BAHA 6440

Passport 6480

128 kbs DDN circuit

PBX

PBX

PBX

PBX

PBX

PBX

PBX

PJed46480K-10

Baljoraishi

PP6440

CFP1

Thalia

PP6440 CFP1

4 MBps circuit on ATM

E1

E1

E1

E1

E1

128k

128k

128k

64k64k

2 x E1

192 kbs DDN circuit

64k

64k

64k

64k

Jizan PP6440

CFP1

64k

128k

128k

128k

128k

2 x E1

E1

E1

6 x E1

Makkah Siteen PP6440 CFP1

Makkah Main PP6440 CFP1

E1

Khamis PP6440 CFP1

4Meg

192k

192k RJed1CSRM

RJed2CSRM

192k

192k

E1

Al Hasa PP6440 CFP1

128k

128k

128k

3 x128k

DAM6480

E1

128k

128k

Arar PP6440 CFP1

128k Tabuk PP6440 CFP1

Al Zikri PP6440 CFP1

3 x128k

E1 E1

E1

Batha PP6440 CFP1

E1

128k

RIY16480

Unaizah PP6440 CFP1

E1

2 x E1

Madinah PP6440 CFP1

128k

Abha6480128k

Baha PP6440 CFP1

Taif 2

old Main PP6440 CFP1

2x34Meg

2x34Meg

University

6480

E1

6480

Naseriah

E1

128k

19.2

E1

Buraidah PP6440 CFP1

19.2

PBX

E1

Taif 1 Main PP6440 CFP1

128k

PBX

PBX

Hafr Al Baten

CFP1 PP6440

128k

Khobar6480

E1

Pales-tine6480Balad

6480

6 x E1

4Meg

RIY26480

E1

E1

PJHO16480HO

PJCC16480K-10

133M133M

PJCC26480K-10

PJHO26480HO

133 MEg

Page 21: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

21

NCB Network Overview

•Branch Setup

Page 22: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

22

• What is PERIBIT

• How Does It Work– MSR– PFA– QoS

Project W.C.O Background

Page 23: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

23

Project W.C.O Peribit V.S. LL

Upgrade

$ $168,666168,666

Inst. Charge

$25,920

Single Site

Backbone Sites LL Upgrade Cost / Year

(64K 512K)

$ $544,320544,320

All Sites (21)

$ $1,172,7601,172,760

All Br. (232)

$ $584,261584,261 $5,055

Single Br. NTUs

Branches LL Upgrade Cost / Year

(128K 512K)

One Time Payment (for all sites : 253 Sites)

Main Backbone Sites Cost

(6 Sites)

Other Backbone Sites Cost(21 Sites)

Branches Cost(232 Branches)

Single Site All SitesSingle

BranchAll

Branches

$ $380,000380,000 $3,400 $ $71,40071,400 $2,950 $ $685,000685,000

Page 24: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

24

Project W.C.O Peribit V.S. LL

Upgrade

Page 25: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

25

Project W.C.O Pilot branch

Results

Daily SummaryFrom JCC to Br103

Peak Data Reduction

96.34 %

Total Data Reduction

91.98 %

Effective WAN Capacity

12.4 X

Total Bytes Into Reduction

221 MB

Total Bytes Out of Reduction

17 MB

Total Bytes Passed Through

0.4 MB

Daily SummaryFrom Br103 to JCC

Peak Data Reduction

65.5 %

Total Data Reduction

53 %

Effective WAN Capacity

2.1 X

Total Bytes Into Reduction

50.5 MB

Total Bytes Out of Reduction

23.7 MB

Total Bytes Passed Through

0.26 MB

Page 26: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

26

Project W.C.O Deployment

Page 27: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

27

Project W.C.O IPsec Solution

NCB WAN

Passport 6480Passport 6480

Power

Fault

Passthrough

Remote Interface

Vlan X

Power

Fault

Passthrough

Power

Fault

Passthrough

Vlan A

Vlan B

Vlan C

Local Interface

WX-100

WX-60

WX-60

IP AIP BIP C

Vlan YVlan D

Vlan E

Vlan F

Power

Fault

Passthrough

Power

Fault

Passthrough

Power

Fault

Passthrough

Remote Interface Local Interface

IP DIP EIP F

Acceler LAN SwitchAcceler LAN Switch

LAN

•In-Line Option

Page 28: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

28

Project W.C.O IPsec Solution

•Off-Path Option

NCB WAN

Passport 6480Passport 6480

Power

Fault

Passthrough

Power

Fault

Passthrough

Power

Fault

Passthrough

Vlan A

Vlan B

Vlan C

Local Interface

WX-100

WX-60

WX-60

Vlan D

Vlan E

Vlan F

Power

Fault

Passthrough

Power

Fault

Passthrough

Power

Fault

Passthrough

Local Interface

Acceler LAN SwitchAcceler LAN Switch

LAN

Page 29: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

29

Project W.C.O Pre-Production

phase

•Changing Subnet mask

•From 255.255.255.252 to 255.255.255.248 (6 devices)

•241 branches + main sites

•Each CONTIVITY , ARN, passport

•BUILDING Backbone sites

•5 main sites in the 5 regions

Page 30: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

30

• Rollout– Rollout plan– 22 main sites– 241 branches

• 200 tunnels problem– Memory low– Solution: wait for extra WX-60

Project W.C.O Production

Phase (Rollout)

Page 31: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

31

• Monitoring– Performance reports– Weekly report

Project W.C.O Monitoring

Page 32: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

32

• Conclusion

• Recommendation

Project W.C.O Conclusion & Recommendatin

Page 33: Coop Presentation WAN Compression and Optimization (W.C.O) Name:Ahmad M.J Batwa ID#:202496

33

Q & A

Thank You