Transcript of Cooling and Heat Recovery at the Max IV Research Facility.
• The starting point was the need of energy for MAX-lab research facility.
• It was clear that MAX-lab was going to use a lot of electricity to run its equipment…
• … but what about heating, cooling and air condition?
Background
24 C 34 C 7 C 15 C
Heating Process cooling Comfort cooling
Max-lab needs both heating and cooling. The demands where divided into three groups:
Background
24 C 34 C 7 C 15 C
Heating Process cooling Comfort cooling
Can’t we just use some of our excess heat to internal heating?
Background
90 C 45 C 24 C 34 C 7 C 15 C35 C 70 C??
Can there be Equipment that can be cooled at higher temperatures?
Background
90 C 45 C 24 C 34 C 7 C 15 C
We needed a solid partner to handle our energy demands and to realize the full potential of heat recovery from our excess heat
From the perspective of the Energy Company
Background 1: Large District Heating system Background 2: Large District Cooling system
Background 3: ”Old” Max Laboratory major cooling customer
From the perspective of the Energy Company
Background 4: External heat supplier is old news Background 5: Lund NE
Preconditions Amount of energyLoad levelsTemperature levels
Investment costs District heating pipesRedundancyHeat pumps
Additional cost for pipesAdditional cost for building
Deduction for chillerDeduction for cooling towers
Variable costs Electricity for heat pumps (COP)Deduction for operation of chillerDeduction for operation of cooling towers
Revenue $$$
We treated heat recovery as a joint project
Byggnad nr: 2 A2 KlystrongalleriStorhet EnhetByggnadsklass ProcessByggnadsform Rektangulärlängd mbredd mhöjd mAntal våningar st 1 Ref: Caj Lundquist
Atemp m2 1861 Ref: Caj Lundquist
Aom.luft m2 0 Ref: Caj Lundquist
Aom.mark m2 4106 Ref: Caj Lundquist
Afönster m2 0 Ref: Caj Lundquist
Gm fönster - 0,40
Um.luft W/m2 oC 0,30
Um.mark W/m2 oC 0,30
GTfrikyla luftoC -99
Qläckluft l/s m2 Aom.ute 0,05
Qläckluft l/s 0
TinneoC 25 Ref: LG Janneson
Tinblås(TL)sommar 21,0
Tute.sommar 25,0
Tinblås(TL)vinter 25,0
Tute 25,0
Qvent l/s m2 Atemp 0,35 Ref: LG Janneson
Qvent l/s 651,35
VVXvent % 0,55 Ref: LG Janneson
SFP kW/ m3/s 2,0 Ref: LG Janneson
Verksamhetsel W/m2 0
Processel
- Modulator 100Hz kW 270 270
10% 100%
- Modulator 10Hz kW 54 54
10% 100%
- Klystron + klyst.win 100Hz kW 558 558
10% 100%
- Klystron + klyst.win 10Hz kW 55,8 55,8
Verksamhetsel kW 0 10% 100%
Fastighetsel (fläktar) kW 1Effektbehov kW 1 0 5,58 55,8 55,8 558 5,4 54 27 270
Tin oC 25 25 25 25
Tut oC 51 57 26 32
Qvent Efläckt Everksamhet Eprocess.luft Eprocess.H2O Eprocess.luft Eprocess.H2O Eprocess.luft Eprocess.H2O Eprocess.luft Eprocess.H2O
Ventilation E->Luft E->Luft E->Luft E->H2O E->Luft E->H2O E->Luft E->H2O E->Luft E->H2OStorhet l/s kW kW kW kW kW kW kW kW kW kW
651 1 0 6 56 56 558 5 54 27 270Drifttid: Måndag - Fredag från kl: 0 0 0 8 8 0 0 8 8 0 0
till kl: 24 24 24 24 24 8 8 24 24 8 8Lördag från kl: 0 0 0 8 8 0 0 8 8 0 0
till kl: 24 24 24 24 24 8 8 24 24 8 8Söndag från kl: 0 0 0 8 8 0 0 8 8 0 0
till kl: 24 24 24 24 24 8 8 24 24 8 8Översyn måndag kl 8-16 (J/N) N N N J J J J J J J J5+3 veckors semester (J/N) N N N J J J J J J J J
Input
Description of energy properties both in and out:
• Building • Process• Cooling
Air / WaterTemperature quality
•Lasting
Building properties
HVAC & comfort
Process Coolingdemand
Operating time
Output
Energibalans # IN # # UT # kWhel/m2 år
Efastighet kWh/år 566 408 1% 16
Everksamhet kWh/år 5 654 726 12% 155
Eprocess.luft kWh/år 4 005 758 8% 110
Eprocess.H2O kWh/år 33 298 659 70% 913
EVVX.vent.värme kWh/år 2 798 361 6% 77
Esol kWh/år 289 947 1% 8
Evärme.vent kWh/år 954 928 2% 26
Evärme.rum kWh/år 219 449 0% 6
Event kWh/år 5 299 003 11% 145
EVVX.vent.kyla kWh/år 1 096 0% 0
Eläckluft kWh/år 255 166 1% 7
Etrans kWh/år 2 797 082 6% 77
Efrikyla kWh/år 1 625 290 3% 45
Ekyla.vent kWh/år 45 934 0% 1
Ekyla.rum kWh/år 4 466 007 9% 122
Ekyla.H2o kWh/år 33 298 659 70% 913
Summa kWh/år 47 788 236 47 788 236 1310
Total energy balance
-800000
-600000
-400000
-200000
0
200000
400000
600000
800000
Linac tunnel Startbyggnad Lab, Verkstad SPF-Hallen Kontor
[kW
h]
Energibalans
Efastighet
Everksamhet
Eprocess.luft
Eprocess.H2O
EVVX.vent.värme
Esol
Evärme.vent
Evärme.rum
Event
EVVX.vent.kyla
Eläckage
Etrans
Efrikyla
Ekyla.vent
Ekyla.rum
Ekyla.H2O
Energy balance, building level
0,0
500,0
1000,0
1500,0
2000,0
2500,0
3000,0
3500,0
110
420
731
041
351
661
972
282
592
810
3111
3412
3713
4014
4315
4616
4917
5218
5519
5820
6121
6422
6723
7024
7325
7626
7927
82
2885
2988
3091
3194
3297
3400
3503
3606
3709
3812
3915
[kW
h]
[h]
Kylvatten
Process 35-25C
Process 80-50C
Excess energy in cooling water
Based upon output: Heat recovery / cooling loops:
• 7/12 C Comfort• 25/35 C Heatpump • 70/50 C District heating
Cooling demand: • 5 MW
Recovery potential:• 30 000 MWh/yr
• 20% high temperature direct to district heating• 80% through heat pump
0,0
500,0
1000,0
1500,0
2000,0
2500,0
3000,0
3500,0
110
420
731
041
351
661
972
282
592
810
3111
3412
3713
4014
4315
4616
4917
5218
5519
5820
6121
6422
6723
7024
7325
76
2679
2782
2885
2988
3091
3194
3297
3400
3503
3606
3709
3812
3915
[kW
h]
[h]
Kylvatten
Process 35-25C
Process 80-50C
Excess energy in cooling water
Energibalans # IN # # UT # kWhel/m2 år
Efastighet kWh/år 566 408 1% 16
Everksamhet kWh/år 5 654 726 12% 155
Eprocess.luft kWh/år 4 005 758 8% 110
Eprocess.H2O kWh/år 33 298 659 70% 913
EVVX.vent.värme kWh/år 2 798 361 6% 77
Esol kWh/år 289 947 1% 8
Evärme.vent kWh/år 954 928 2% 26
Evärme.rum kWh/år 219 449 0% 6
Event kWh/år 5 299 003 11% 145
EVVX.vent.kyla kWh/år 1 096 0% 0
Eläckluft kWh/år 255 166 1% 7
Etrans kWh/år 2 797 082 6% 77
Efrikyla kWh/år 1 625 290 3% 45
Ekyla.vent kWh/år 45 934 0% 1
Ekyla.rum kWh/år 4 466 007 9% 122
Ekyla.H2o kWh/år 33 298 659 70% 913
Summa kWh/år 47 788 236 47 788 236 1310
Total energy balance -800000
-600000
-400000
-200000
0
200000
400000
600000
800000
Linac tunnel Startbyggnad Lab, Verkstad SPF-Hallen Kontor
[kW
h]
Energibalans
Efastighet
Everksamhet
Eprocess.luft
Eprocess.H2O
EVVX.vent.värme
Esol
Evärme.vent
Evärme.rum
Event
EVVX.vent.kyla
Eläckage
Etrans
Efrikyla
Ekyla.vent
Ekyla.rum
Ekyla.H2O
Energy balance, building level
Energy pricesSwedish electricity cost 2014 (800 SEK/MWh):
• Price 425• Tax 300• Renewable certificates 25• Grid fee 50
Value of recovered heat: According to alternative cost to produce the heatAgreement: Will be calculated monthly according to open book principle
Prediction of energy flows
Year 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025Beamlines 7 10 13 16 18 20 22 24 26 28 30
Year 2015 7 Beamlines 33% 100HzCooling demand 9k 5,3Cooling demand 25k 12,1Cooling demand 50k 5,3
Year 2018 16 Beamlines 67% 100HzCooling demand 9k 6,5Cooling demand 25k 15,2Cooling demand 50k 7,5
Year 2025 30 Beamlines 67% 100HzCooling demand 9k 8,5Cooling demand 25k 17,9Cooling demand 50k 9,1
0
5
10
15
20
25
30
35
40
2014 2016 2018 2020 2022 2024 2026
GW
H ;
pcs
Energy
Beamlines
CalculationGrafer utveckling kalkyl 20 år Total Kalkyl 20 år
År 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Totalt Per årIntäkter 1,6 2,2 3,78 0,189Intäkter återvunnen värme 0,0 4,7 6,8 10,0 11,2 12,5 13,3 14,1 15,0 15,9 16,8 17,8 18,8 19,6 20,4 21,2 22,0 22,8 23,6 24,4 310,9 15,5Summa intäkter 0,0 4,7 6,8 10,0 12,9 12,5 13,3 16,3 15,0 15,9 16,8 17,8 18,8 19,6 20,4 21,2 22,0 22,8 23,6 24,4 314,7 15,7UtgifterAnslutningsavgift fjärrvärme 1,1 1,1 1,1 1,0 1,0 1,0 0,9 0,9 0,9 0,9 0,8 0,8 0,8 0,7 0,7 0,7 0,7 0,6 0,6 0,6 16,8 0,8Extra värmekrets 0,7 0,7 0,7 0,7 0,6 0,6 0,6 0,6 0,6 0,6 0,5 0,5 0,5 0,5 0,5 0,4 0,4 0,4 0,4 0,4 10,9 0,5Alternativkostnad kyltorn och kylmaskin -1,9 -1,8 -1,8 -1,7 -1,7 -1,6 -1,6 -1,5 -1,5 -1,4 -1,4 -1,3 -1,3 -1,2 -1,2 -1,1 -1,1 -1,0 -1,0 -0,9 -28,0 -1,4Alternativkostnad värme -0,3 -0,3 -0,3 -0,3 -0,3 -0,3 -0,3 -0,3 -0,2 -0,2 -0,2 -0,2 -0,2 -0,2 -0,2 -0,2 -0,2 -0,2 -0,2 -0,2 -4,7 -0,2Grundkostnad (amortering, ränta och byggnadshyra) 0,8 1,4 3,9 5,8 6,4 6,3 6,1 6,0 5,8 5,7 5,6 5,4 5,3 5,2 5,0 4,9 4,7 4,6 4,5 4,3 97,8 4,9Drift och underhåll 0 0 0,1 0,1 0,1 0,1 0,1 0,5 0,5 0,5 0,5 0,5 0,5 0,5 0,5 0,5 0,5 0,5 0,5 0,5 7 0,4Elkostnad 0 2,1 4,8 6,5 7,4 8,3 8,8 9,4 9,9 10,5 11,1 11,6 12,3 12,6 13,1 13,6 14,1 14,6 15,1 15,6 201,6 10,1Drift av kyltorn 0,0 -0,1 -0,3 -0,3 -0,4 -0,4 -0,4 -0,4 -0,5 -0,5 -0,5 -0,5 -0,6 -0,6 -0,6 -0,6 -0,6 -0,6 -0,6 -0,6 -9,0 -0,4Drift av kylmaskin 0,0 -0,4 -0,8 -0,9 -1,0 -1,2 -1,3 -1,4 -1,4 -1,5 -1,6 -1,7 -1,8 -1,9 -1,9 -1,9 -1,9 -1,9 -1,9 -1,9 -28,4 -1,4Summa kostnader 0,5 2,8 7,3 10,9 12,2 12,8 13,1 13,8 14,1 14,4 14,7 15,1 15,4 15,6 16,0 16,3 16,7 17,1 17,5 17,8 264,0 13,2 MarginalMarginal per år -0,5 1,9 -0,5 -0,8 0,7 -0,3 0,2 2,5 0,9 1,5 2,1 2,7 3,4 4,0 4,4 4,9 5,3 5,7 6,2 6,6 50,7 2,5 19,2%Acc marginal -0,5 1,4 0,9 0,1 0,7 0,4 0,6 3,1 4,0 5,4 7,5 10,2 13,6 17,6 22,1 27,0 32,3 38,0 44,1 50,7 50,7Nuvärdesberäknad marginal per år -0,5 1,7 -0,4 -0,6 0,5 -0,2 0,1 1,4 0,5 0,7 1,0 1,2 1,4 1,5 1,5 1,6 1,6 1,6 1,6 1,6 17,7 0,9 6,7%
LEKAB kalkyl 20 årÅr 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Totalt Per år
IntäkterAnslutningsavgift fjärrvärmeledningen 10,8 10,8 0,7Grundavgift 0,8 1,4 3,9 5,8 6,4 6,3 6,1 6,0 5,8 5,7 5,6 5,4 5,3 5,2 5,0 4,9 4,7 4,6 4,5 4,3 97,8 4,9Ersättning kyla 0 1,0 2,3 2,6 3,0 3,3 3,5 3,8 4,0 4,2 4,4 4,7 4,9 5,0 5,3 5,6 5,9 6,2 6,5 6,8 83,0 4,2Ersättning fjärrvärme 0,3 0,4 0,2 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 3,2 0,2Värde återvunnen värme 0 2,4 3,4 5,0 5,6 6,2 6,6 7,1 7,5 7,9 8,4 8,9 9,4 9,8 10,2 10,6 11,0 11,4 11,8 12,2 155,5 7,8Summa intäkter + värde återvunnen värme 11,9 5,2 9,8 13,6 15,1 16,0 16,4 16,9 17,4 18,0 18,5 19,1 19,7 20,1 20,7 21,2 21,8 22,4 22,9 23,5 350,3 17,7UtgifterUtbyggnad av Fjvledning 10,8 10,8 0,7
Amortering (utgår fr nuv kapitalbas) 0,0 0,3 1,5 2,4 3,0 3,0 3,0 3,0 3,0 3,0 3,0 3,0 3,0 3,0 3,0 3,0 3,0 3,0 3,0 3,0 51,9 2,6Ränta (STIBOR 3 mån + 3 %) 0,0 0,3 1,5 2,5 2,5 2,4 2,2 2,0 1,9 1,7 1,6 1,4 1,3 1,1 0,9 0,8 0,6 0,5 0,3 0,2 25,8 1,3Byggnadshyra (bedömd hyreskostnad) 0,8 0,8 0,9 0,9 0,9 0,9 0,9 0,9 1,0 1,0 1,0 1,0 1,0 1,1 1,1 1,1 1,1 1,2 1,2 1,2 20,0 1,0Summa Grundkostnad/-avgift 0,8 1,4 3,9 5,8 6,4 6,3 6,1 6,0 5,8 5,7 5,6 5,4 5,3 5,2 5,0 4,9 4,7 4,6 4,5 4,3 97,8 4,9
Drift och underhåll (bedömd) 0,1 0,1 0,1 0,1 0,1 0,5 0,5 0,5 0,5 0,5 0,5 0,5 0,5 0,5 0,5 0,5 0,5 0,5 7 0,4Elkostnad 0 2,1 4,8 6,5 7,4 8,3 8,8 9,4 9,9 10,5 11,1 11,6 12,3 12,6 13,1 13,6 14,1 14,6 15,1 15,6 201,6 10,1Summa rörliga kostnader 0 2,1 4,9 6,6 7,5 8,4 8,9 9,9 10,4 11,0 11,6 12,1 12,8 13,1 13,6 14,1 14,6 15,1 15,6 16,1 208,6 10,4
Summa kostnader 11,6 3,6 8,7 12,4 13,9 14,7 15,0 15,9 16,3 16,7 17,1 17,6 18,0 18,3 18,6 19,0 19,4 19,7 20,1 20,5 317,2 16,0 MarginalMarginal per år 0,3 1,6 1,1 1,1 1,2 1,3 1,4 1,1 1,2 1,3 1,4 1,5 1,7 1,8 2,0 2,2 2,4 2,6 2,8 3,0 33,1 1,7 10,3%Acc marginal 0,3 1,9 2,9 4,1 5,3 6,6 8,0 9,0 10,2 11,5 12,9 14,4 16,1 17,9 19,9 22,2 24,6 27,2 30,1 33,1Nuvärdesberäknad marginal per år 0,3 1,4 0,9 0,9 0,9 0,9 0,8 0,6 0,6 0,6 0,6 0,7 0,7 0,7 0,7 0,7 0,7 0,7 0,7 0,7 14,8 0,7 4,2%
MAX Kalkyl 20 årÅr 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Totalt Per år
IntäkterIntäkt återvunnen värme 0 2,4 3,4 5,0 5,6 6,2 6,6 7,1 7,5 7,9 8,4 8,9 9,4 9,8 10,2 10,6 11,0 11,4 11,8 12,2 155,5 7,8Kickback anslutningsavgift fjärrvärme 1,6 2,2 3,78 0,189Summa intäkter 0,0 2,4 3,4 5,0 7,2 6,2 6,6 9,2 7,5 7,9 8,4 8,9 9,4 9,8 10,2 10,6 11,0 11,4 11,8 12,2 159,3 8,0UtgifterAnslutningsavgift fjärrvärme 1,1 1,1 1,1 1,0 1,0 1,0 0,9 0,9 0,9 0,9 0,8 0,8 0,8 0,7 0,7 0,7 0,7 0,6 0,6 0,6 16,8 0,8Extra värmekrets 0,7 0,7 0,7 0,7 0,6 0,6 0,6 0,6 0,6 0,6 0,5 0,5 0,5 0,5 0,5 0,4 0,4 0,4 0,4 0,4 10,9 0,5Alternativkostnad kyltorn och kylmaskin -1,9 -1,8 -1,8 -1,7 -1,7 -1,6 -1,6 -1,5 -1,5 -1,4 -1,4 -1,3 -1,3 -1,2 -1,2 -1,1 -1,1 -1,0 -1,0 -0,9 -28,0 -1,4Alternativkostnad värme -0,3 -0,3 -0,3 -0,3 -0,3 -0,3 -0,3 -0,3 -0,2 -0,2 -0,2 -0,2 -0,2 -0,2 -0,2 -0,2 -0,2 -0,2 -0,2 -0,2 -4,7 -0,2Grundavgift 0,8 1,4 3,9 5,8 6,4 6,3 6,1 6,0 5,8 5,7 5,6 5,4 5,3 5,2 5,0 4,9 4,7 4,6 4,5 4,3 97,8 4,9Ersättning kyla 0,0 1,0 2,3 2,6 3,0 3,3 3,5 3,8 4,0 4,2 4,4 4,7 4,9 5,0 5,3 5,6 5,9 6,2 6,5 6,8 83,0 4,2Intäkt återvunnen värme 0,3 0,4 0,2 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1 3,2 0,2Drift av kyltorn 0,0 -0,1 -0,3 -0,3 -0,4 -0,4 -0,4 -0,4 -0,5 -0,5 -0,5 -0,5 -0,6 -0,6 -0,6 -0,6 -0,6 -0,6 -0,6 -0,6 -9,0 -0,4Drift av kylmaskin 0,0 -0,4 -0,8 -0,9 -1,0 -1,2 -1,3 -1,4 -1,4 -1,5 -1,6 -1,7 -1,8 -1,9 -1,9 -1,9 -1,9 -1,9 -1,9 -1,9 -28,4 -1,4Summa kostnader 0,8 2,0 5,0 7,0 7,8 7,9 7,8 7,8 7,8 7,7 7,7 7,7 7,7 7,6 7,8 8,0 8,1 8,3 8,5 8,7 141,7 7,1 MarginalMarginal per år -0,8 0,4 -1,6 -2,0 -0,5 -1,6 -1,2 1,4 -0,3 0,2 0,7 1,2 1,7 2,2 2,4 2,6 2,9 3,1 3,3 3,5 17,6 0,9 12,4%Acc marginal -0,8 -0,5 -2,1 -4,0 -4,6 -6,2 -7,4 -5,9 -6,2 -6,0 -5,4 -4,2 -2,5 -0,3 2,1 4,8 7,6 10,7 14,1 17,6Nuvärdesberäknad marginal per år -0,8 0,3 -1,3 -1,5 -0,4 -1,1 -0,7 0,8 -0,2 0,1 0,3 0,5 0,7 0,8 0,8 0,9 0,9 0,9 0,9 0,9 2,9 0,1 1,8%
0,0
5,0
10,0
15,0
20,0
25,0
30,0
1 2 3 4 5 6 7 8 9 1011121314151617181920
Summa intäkter
Summa kostnader
0,0
5,0
10,0
15,0
20,0
25,0
1 2 3 4 5 6 7 8 9 1011121314151617181920
Summa intäkter +värde återvunnenvärme
Summa kostnader
0,0
2,0
4,0
6,0
8,0
10,0
12,0
14,0
1 2 3 4 5 6 7 8 9 1011121314151617181920
Summa intäkter
Summa kostnader
Calculation MAX-labDistrict cooling Heat recovery only
Cooling towers Heat recovery and no cooling towers