Controllinnerseal #84minerales :DIN EN 12390: Testing of concrete (part 8): Permeability to water...

2
Examination report No: 220007478-2009-04 Commissioned by: Betonseal GmbH & Co. KG Commissioned on: 18.06.2009 Samples produced on: 17.08.2009 Task Test to examine permeability to water in treated and untreated concrete samples (Concrete density: C20/25, dimensions 200 x 200x 120mm) Procedure Specification Application of coating CONTROLL@INNERSEAL Test description and relevant regulations DIN EN 12390: Testing of concrete (part 8): Permeability to water under pressure (2009-07) These test results relate solely to the above specified samples. Publication of the examination report is only permitted in its original form. No alterations or condensed summary of the content may be made without prior permission from the MPA NRW. 1 Description of the examination Sample specification: Standard concrete (C20/25) submitted by the client Samples: CONTROLL@INNERSEAL Product delivered and sprayed by the client Dose The sample application was carried out by the client. According to the client 0.5l of CONTROLL@INNERSEAL was applied per m². All the samples were stored for 35 d under plastic foil. The test samples were treated on the first, second and third day after removal from the mould. CONTROL@INNERSEAL was applied to all surfaces to saturation. The tests were undertaken 35 days thereafter.

Transcript of Controllinnerseal #84minerales :DIN EN 12390: Testing of concrete (part 8): Permeability to water...

Page 1: Controllinnerseal  #84minerales :DIN EN 12390: Testing of concrete (part 8): Permeability to water under pressure

Examination report No: 220007478-2009-04 Commissioned by: Betonseal GmbH & Co. KG Commissioned on: 18.06.2009 Samples produced on: 17.08.2009 Task Test to examine permeability to water in treated and untreated concrete samples (Concrete density: C20/25, dimensions 200 x 200x 120mm) Procedure Specification Application of coating CONTROLL@INNERSEAL Test description and relevant regulations DIN EN 12390: Testing of concrete (part 8): Permeability to water under pressure (2009-07) These test results relate solely to the above specified samples. Publication of the examination report is only permitted in its original form. No alterations or condensed summary of the content may be made without prior permission from the MPA NRW.

1 Description of the examination Sample specification: Standard concrete (C20/25) submitted by the client Samples: CONTROLL@INNERSEAL Product delivered and sprayed by the client Dose The sample application was carried out by the client.

According to the client 0.5l of CONTROLL@INNERSEAL was applied per m².

All the samples were stored for 35 d under plastic foil. The test samples were treated on the first, second and third day after removal from the mould. CONTROL@INNERSEAL was applied to all surfaces to saturation. The tests were undertaken 35 days thereafter.

Page 2: Controllinnerseal  #84minerales :DIN EN 12390: Testing of concrete (part 8): Permeability to water under pressure

2 Test results

2.1 Permeability to water The permeability to water was conducted according to DIN EN 12390-8. The test was coducted under pressure of 5 bar over a period of 72 hours. The results can be found in the table below. Table: Permeability to water Specification of the sample - Maximum depth permeated [mm] – Test observations Zero samples Side surfaces moist Untreated Side and top surfaces moist CONTROLL@INNERSEAL Treated Test undertaken by. Date: