Control Hormigon 19.04

8
Fecha Mes Semana N° Guía Factura CODIGO PROVEED. TIPO DE HORMIGON M3 GUIA H.S.P H.LL.O H.I.D H.S.O HGON LABOR TIPO AREA EJES ELEMENTO EDIFICIO SECCION

Transcript of Control Hormigon 19.04

Page 1: Control Hormigon 19.04

Fecha Mes Semana N° Guía Factura CODIGO PROVEED. TIPO DE HORMIGON H.S.P H.LL.O H.I.D H.S.O HGON LABOR TIPO AREA EJES ELEMENTO EDIFICIO SECCION M3 GUIA

Page 2: Control Hormigon 19.04

Fecha Mes Semana N° Guía Factura CODIGO PROVEED. TIPO DE HORMIGON H.S.P H.LL.O H.I.D H.S.O HGON LABOR TIPO AREA EJES ELEMENTO EDIFICIO SECCION M3 GUIA

Page 3: Control Hormigon 19.04

ESTABLECIMIENTO PENITENCIARIO PUERTO MONTT

I.- RESUMEN SEMANAL DE HORMIGONES

DESDE 4/10/2006HASTA 4/16/2006Semana (Todas)

Suma de M3 GUIA HGON TIPO

H005 H015 H020 H025

DESTINO EMPLANTILLADO RADIER FUNDACION ESTRUCTURAL

CERRO VERDE 9.50 37.50 176.00

CERRO VERDE ADI-ASA-TUNEL 14.00 1.00

FLA (ZONA EXTERNAS) 27.50 137.00

ORLANDO HIDALGO 25.00

VCGP 13.50 32.50 192.50

VCGP (ESC-VIS-GAV) 1.50 3.00

VCGP (PREFA PANELES) 43.00

VCGP UNIONES 260.50

W. SANTANA 14.00 2.50 37.50

Total general 9.50 70.50 72.50 875.50

II.- RESUMEN DE HORMIGON BOMBEADOS

Semana 4/17/2006

Suma de M3 GUIA LABORPROVEED. B N Total generalREADY MIX 98.50 92.50 191.00Total general 98.50 92.50 191.00

Page 4: Control Hormigon 19.04

CARG Total general

CARGA INCOMPLETA

3.50 226.50

15.00

164.50

25.00

238.50

4.50

43.00

118.00 378.50

7.00 61.00

128.50 1,156.50

Page 5: Control Hormigon 19.04

VINCI - VCGP

DETALLE DE HORMIGONES - DIARIOS

Suma de M3 GUIA

Semana Fecha Total

4/3/2006 4/3/2006 91.0

4/4/2006 95.5

4/5/2006 67.0

4/6/2006 141.0

4/7/2006 125.5

4/8/2006 107.5

Total 03-04-2006 627.5

4/10/2006 4/10/2006 74.0

4/11/2006 44.5

4/12/2006 107.5

4/13/2006 112.0

Total 10-04-2006 338.0

4/17/2006 4/17/2006 110.5

4/18/2006 46.5

4/19/2006 34.0

Total 17-04-2006 191.0

Total general 1,156.5

Page 6: Control Hormigon 19.04

VINCI - VCGP

DETALLE Y REPORTE VALORIZADO DE HORMIGONES

FECHA DE CONTROL 4/9/2023VALOR DE UF

PROVEED. READY MIXM3 / U.F. SEMANALES Semanas

TIPO DE HORMIGON Datos 03-04-06 10-04-06 17-04-06CARGA INCOMPLETA M3 Totales (Instalados) 72.00 46.50 10.00 128.50

Suma de TOTAL M3 + Bombeo EN UF 28.80 18.60 4.00 51.40 H025-90-10-18-12-03-N-P06 M3 Totales (Instalados) 142.50 61.50 33.50 237.50

Suma de TOTAL M3 + Bombeo EN UF 484.50 209.10 113.90 807.50 H025-90-20-10-11-28-B-C11 M3 Totales (Instalados) 260.00 116.00 81.50 457.50

Suma de TOTAL M3 + Bombeo EN UF 765.60 339.93 233.95 1,339.48 H025-90-40-05-11-28-N-C11 M3 Totales (Instalados) 44.50 4.50 49.00

Suma de TOTAL M3 + Bombeo EN UF 102.80 10.40 113.19 H020-90-40-06-11-28-N-C11 M3 Totales (Instalados) 41.00 22.50 9.00 72.50

Suma de TOTAL M3 + Bombeo EN UF 90.20 49.50 19.80 159.50 H025-90-20-08-12-07-N-000 M3 Totales (Instalados) 47.00 38.00 4.00 89.00

Suma de TOTAL M3 + Bombeo EN UF 126.90 102.60 10.80 240.30 H015-90-40-05-11-28-N-C11 M3 Totales (Instalados) 15.50 34.50 20.50 70.50

Suma de TOTAL M3 + Bombeo EN UF 32.86 73.14 43.46 149.46 H025-90-20-10-11-28-B-C11 SIKA1 M3 Totales (Instalados) 5.00 5.00

Suma de TOTAL M3 + Bombeo EN UF 15.25 15.25 H025-90-10-12-11-28-B M3 Totales (Instalados) 9.00 28.50 37.50

Suma de TOTAL M3 + Bombeo EN UF 28.53 90.35 118.88 H005-90-40-06-11-28-N-000 M3 Totales (Instalados) 5.50 4.00 9.50

Suma de TOTAL M3 + Bombeo EN UF 10.29 7.48 17.77 Total M3 Totales (Instalados) 627.50 338.00 191.00 1,156.50 Total Suma de TOTAL M3 + Bombeo EN UF 1,646.91 842.08 523.74 3,012.71

Total general en M3 / U.F.

Page 7: Control Hormigon 19.04

04/09/2023 Página 7

VINCI - VCGP

DETALLE DE PAGO FACTURAS DE HORMIGONPROVEEDOR : PREMIX

FECHA 4/9/2023M3 BBA (Todas)Factura (Todas)

M3 GUIA TIPO DE HORMIGONFecha N° Guía CARGA INCOMPLETA H025-90-10-18-12-03-N-P06 H025-90-20-10-11-28-B-C11 H025-90-40-05-11-28-N-C11 H020-90-40-06-11-28-N-C11 H025-90-20-08-12-07-N-000 H015-90-40-05-11-28-N-C11 H025-90-20-10-11-28-B-C11 SIKA1

4/10/2006 2040479 2.5 3.52040482 5.02040483 3.0 3.02040487 3.0 3.02040491 1.02040492 3.02040493 7.02040494 3.52040495 3.0 3.02040498 3.5 2.52069001 7.02069003 5.02069004 7.02069008 5.5

Total 10-04-2006 15.0 15.0 6.5 22.5 1.0 14.0

4/8/2006 2040447 3.02040448 6.02040451 7.52040455 7.02040457 3.0 3.02040458 7.52040459 7.02040461 7.02040462 3.0 3.02040463 7.02040465 5.02040466 2.5 3.52040467 4.52040468 4.02040469 2.0 4.02040470 1.5 4.52040471 2.5 3.52040473 2.5 3.5

Total 08-04-2006 17.0 46.0 27.0 4.0 13.5

4/7/2006 2040403 3.0 3.02040404 3.5 2.52040408 3.5 2.52040409 3.0 3.02040412 4.02040414 4.52040415 3.0 3.02040417 7.02040418 3.02040419 3.5 2.52040420 3.0 3.02040421 3.5 2.52040426 7.02040427 6.52040434 7.02040439 3.5 2.52040441 3.0 3.02040442 7.02040443 7.02040444 7.02040445 5.5

Total 07-04-2006 32.5 27.5 61.5 4.0

4/6/2006 2040355 1.52040357 4.52040363 1.02040364 5.02040365 7.02040368 4.52040370 7.02040374 4.02040375 6.02040376 7.02040379 7.02040380 1.0 5.02040381 3.02040382 7.02040383 7.52040386 7.02040392 4.02040394 7.02040395 7.02040396 7.02040397 7.02040399 7.02040400 7.02040401 5.02040402 5.0

Total 06-04-2006 1.0 29.5 84.5 11.5 4.0 9.0 1.5

4/5/2006 2040323 5.02040328 7.02040329 5.02040331 1.02040332 5.02040336 5.02040337 2.52040338 5.52040339 2.5 3.52040340 3.5 2.52040341 7.02040342 7.02040345 5.0

Total 05-04-2006 6.0 6.0 12.0 5.0 2.5 16.5 14.0 5.0

4/4/2006 2040267 5.52040268 2.5 3.52040270 6.0 3.02040274 3.02040275 7.52040280 1.02040284 3.5 2.52040285 7.52040286 3.02040297 6.52040298 7.02040301 5.02040304 6.52040305 7.02040310 5.02040311 3.02040313 7.0

Total 04-04-2006 12.0 25.0 44.5 3.0 11.0

4/3/2006 2040230 6.02040233 1.02040235 2.52040236 4.02040237 7.02040238 7.02040241 7.02040243 6.52040246 2.5 3.52040247 4.02040248 6.52040249 5.52040250 4.02040256 7.02040259 7.02040261 1.0 5.02040262 4.0

Total 03-04-2006 3.5 8.5 30.5 21.0 21.0 6.5

4/11/2006 2069011 3.0 3.02069017 1.02069020 6.02069024 2.52069027 5.02069030 3.02069037 6.52069038 7.5

Page 8: Control Hormigon 19.04

VINCI - VCGPLISTADO DE HORMIGONES

SUMINISTRO DE HORMIGONES

OBRA CONSTRUCCIÓN RECINTO PENITENCIARIO GRUPO 3MANDANTE MOP

CONSTRUYE VINCI - VCGP

Listado Hormigones

CODIGO TIPO DE HORMIGON UF + IVA Proveedor BBO UF1 H005-90-40-06-11-28-N-000 1.87 READY MIX2 H020-90-40-06-11-28-N-C11 2.20 READY MIX3 H015-90-40-05-11-28-N-C11 2.12 READY MIX4 H25-90-40-8 2.39 READY MIX5 H025-90-40-05-11-28-N-C11 2.31 READY MIX6 H025-90-20-08-11-28-N-C11 2.46 READY MIX7 H25-90-20-08 PIGMENTADO 3.72 READY MIX8 H025-90-20-10-11-28-B-C11 2.60 READY MIX 0.359 H025-90-20-10-11-28-B-C11 SIKA1 2.70 READY MIX 0.35

10 H25-90-13-10 2.66 READY MIX11 H025-90-20-08-R3 2.91 READY MIX12 H025-90-20-08-R3-B 2.99 READY MIX 0.3513 H025-90-20-08-12-07-N-000 2.70 READY MIX14 H025-90-20-08-12-07-B-000 2.77 READY MIX 0.3515 H025-90-10-18-12-03-N-P06 3.40 READY MIX16 H025-90-10-12-11-28-B 2.82 READY MIX 0.3517 H30-90-40-8 2.57 READY MIX18 H30-90-40-5 2.48 READY MIX19 H30-90-20-8 2.62 READY MIX20 H30-90-20-8 PIGMENTADO 4.06 READY MIX21 H30-90-20-10 2.66 READY MIX22 H30-90-13-10 2.72 READY MIX23 CARGA INCOMPLETA 0.40 READY MIX24 BOMBA ESTACIONARIA 0.35 READY MIX25 BOMBA PLUMA 0.35 READY MIX26 CINTA ESTACIONARIA 0.23 READY MIX27 CINTA MOVIL 0.28 READY MIX28 H015-90-40-05-11-28-N-C11 2.20 PETREOS293031323334353637383940

H005 EMPLANTILLADOH015 RADIERH020 FUNDACIONH025 ESTRUCTURALCARG CARGA INCOMPLETA