Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf ·...

16
Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy INDONESIA M. Achyar Karim UNU Fellow 2005

Transcript of Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf ·...

Page 1: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy INDONESIA

M. Achyar KarimUNU Fellow 2005

Page 2: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

Page 2

OUTLINE

1. INTRODUCTION

2. THE UNU-GTP

3. PGE FELLOW ACHIEVEMENT

4. CONCLUSION

Page 3: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

Page 3

INTRODUCTION

PGE is a SUBSIDIARY OF PERTAMINA

ESTABLISHED IN 2006

37 YEARS EXPERIENCE

HAS 15 WORKING AREA (OWN OPERATION & JOINT OPERATING CONTRACT)

INSTALLED CAPACITY : OWN OPERATION 252 JOINT OPERATING CONTRATCT 780 MW

Page 4: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

Page 4

PERTAMINA’S WORKING AREA

Page 5: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

Page 5

OWN OPERATIONS JOINT OPERATION

BODYJOINT VENTURE

Kamojang

200 MW

Lahendong

40 MW

Sibayak

12 MW

Ulubelu

(Exploration Drilling)

Lumut Balai

(Exploration Drilling)

Kotamobagu

(Scientific Study)

Hululais

(Scientific Study)

Sungaipenuh

(Scientific Study)

Iyang Argopuro

(Scientific Study)

Salak field (ChevronTexaco)

375 MW

Darajat (ChevronTexaco)

255 MW

Wayang Windu (MNL)

110 MW

Bedugul (Bali Energy)

Sarulla (MEDCO ENERGY)

Karaha-Bodas

Patuha (PT GDE)

Dieng (PT GDE)

60 MW

Page 6: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

Page 6

THE UNU-GTP

ESTABLISHED IN 1979

NUMBER OF FELLOWS SINCE 1982 ;

• TWENTY FOUR (22 PGE, 1 PLN, 1 VOLCANOLOGY DEPT.)

ACADEMIC BACKGROUND ;

• GEOLOGIST, 6• PETROLEUM ENGINEER, 6• MINING ENGINEER, 3• CHEMICAL ENGINEER, 3• ELECTRICAL ENGINEER, 1• MECHANICAL ENGINEER, 1• CIVIL ENGINEER, 1• ENVIRONMENTAL ENGINEER, 1

Page 7: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

Page 7

The ROLE of THE UNU/GTP ;

EDUCATING PGE’s PEOPLE

TRANSFER ;o KNOWLEDGE, KNOW HOW, EXPERIENCE & BEST PRACTICE

BUILDING INTERPERSONAL, and INTERNATIONAL RELATIONSHIPS

AREAS OF TRAINING ;

BOREHOLE GEOLOGY, 5

RESERVOIR ENGINEERING, 5

GEOTHERMAL UTILIZATION, 4

GEOPHYSICAL EKSPLORATION, 2

BOREHOLE GEOPHYSICS, 2

CHEMISTRY OF THERMAL FLUIDS, 1

ENVIRONMENTAL STUDIES, 2

DRILLING TECHNOLOGY, 1

Page 8: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

Page 8

DISTRIBUTION OF ACTIVE UNU FELLOWS

HEAD OFFICE, 3

KAMOJANG FIELD, 6

LAHENDONG FIELD, 3

SIBAYAK FIELD, 2

KARAHA PROJECT, 1

KOTAMOBAGU PROJECT, 1

GEODIPA ENERGY, 1

Page 9: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

Page 9

FELLOW ACHIEVEMENT

OPERATION DIRECTOR , 1

GENERAL MANAGER, 1

PROJECT MANAGER, 2

MANAGER, 4

SUPERINTENDENT, 3

ENGINEER and GEOLOGIST, 4

Page 10: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

Page 10

FELLOW ACHIEVEMENT

OPERATION DIRECTOR , 1

Soeroso, UNU fellow 1986

GENERAL MANAGER, 1 (Lahendong Area)

M. Irhas, UNU fellow 1996

PROJECT MANAGER, 2

- Tafif Azimudin, UNU fellow 1995 (Kotamobagu Project)

- Doddy Sasradipoera, UNU fellow 1995 (Karaha)

Page 11: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

Page 11

FELLOW ACHIEVEMENT

MANAGER, 4

- M. Yustin Kamah, UNU fellow 1996 (Resourse Development)

- Agus A Zuhro, UNU fellow 2004 (Engineering, Kamojang)

- Hendrick Siregar, UNU fellow 2004 (Engineering, Sibayak)

- Roy Bandoro, UNU fellow 2006 – MSc studies 2007-8

(Utilization, Sibayak)

SUPERINTENDENT, 3

- M. Achyar Karim, UNU fellow 2005

- Dradjat B Hartanto, UNU fellow 2005

Page 12: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

Page 12

FELLOW ACHIEVEMENT

- Moeljanto, UNU fellow 2004 (Lahendong)

ENGINEER and GEOLOGIST, 6

- Ahmad Yani, 2006 (Kamojang)

- Thesa, 2006 – MSc studies 2007-8 (Kamojang)

- Andi Joko, 2007 (Kamojang)

- Harry Koestono, 2007 (Lahendong)

- Fahmi H Dereinda, 2008 (Kamojang)

- I Made Budi Kesuma, 2008 (Kamojang)

Page 13: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

Page 13

CONCLUCIONS

UNU/GTP HAS BEEN VERY USEFUL IN UP-GRADING;

SKILLS

COMPETENCIES

THE FELLOWS HAS DONE A FANTASTIC JOB

MORE FELLOWS STILL NEEDED TO BE TRAINED

TO ACHIEVE 1,035 MW IN YEAR 2,014

Page 14: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

Page 14

Lahendong Field

Kamojang Field

Kamojang Field

Page 15: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

Page 15

SIBAYAK FIELD

Page 16: Contribution of UNU/GTP Training to Geothermal Development ... 2008/PPT/09MAchyarKarim.pdf · Contribution of UNU/GTP Training to Geothermal Development in Pertamina Geothermal Energy

THANK YOU