Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.
-
Upload
teodoro-valsecchi -
Category
Documents
-
view
221 -
download
4
Transcript of Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.
![Page 1: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/1.jpg)
Contratto a rendimento energetico nella Pubblica Illuminazione –
Esperienze
![Page 2: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/2.jpg)
2
1. CONTRATTO A RENDIMENTO
ENERGETICO (EPC)
2. ESEMPI APPLICATIVI
IND
ICE
- INQUADRAMENTO NORMATIVO- DEFINIZIONI- ELEMENTI IDENTIFICATIVI
![Page 3: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/3.jpg)
3
1. CONTRATTO A RENDIMENTO
ENERGETICO (EPC)
![Page 4: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/4.jpg)
raccomanda agli Stati membri di incoraggiare gli enti pubblici a ricorrere, se del caso, alle società di servizi energetici e ai contratti di rendimento energetico per finanziare le ristrutturazioni e attuare piani volti a mantenere o migliorare l'efficienza energetica a lungo termine.
le PPAA locali devono concorrere al raggiungimento degli obiettivi nazionali, senza creare conflitto con i principi generali dell’ordinamento comunitario, mediante provvedimenti atti a favorire l’introduzione di sistemi di gestione dell’energia facendo riscorso a Contratti di rendimento energetico.
INQUADRAMENTO NORMATIVO
NORMATIVA EUROPEADirettiva 2012/27/UE, art.5,
lett.c)
4
NORMATIVA NAZIONALED.Lgs.102/2014
1.
CO
NTR
AT
TO
A R
EN
DIM
EN
TO
EN
ER
GETIC
O
![Page 5: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/5.jpg)
un SERVIZIO INTEGRATO volto alla riqualificazione e al miglioramento dell’efficienza di edifici/ impianti, di proprietà della PPAA, a fronte di un corrispettivo correlato all’entità dei risparmi energetici ottenuti.
DEFINIZIONI
COS’ ÈD.Lgs.115/2008
5
1.
CO
NTR
AT
TO
A R
EN
DIM
EN
TO
EN
ER
GETIC
O
ELEMENTI MINIMI identificati nell’All.8 del D.Lgs.102/2014 che riassume l’All.II del D.Lgs.115/2008.
![Page 6: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/6.jpg)
DEFINIZIONI
6
1.
CO
NTR
AT
TO
A R
EN
DIM
EN
TO
EN
ER
GETIC
O
COMPOSIZIONE CANONE
![Page 7: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/7.jpg)
1. SERVIZIO ENERGIA2. SERVIZIO ENERGIA PLUS
DEFINIZIONI
TIPOLOGIED.Lgs.115/2008
7
1.
CO
NTR
AT
TO
A R
EN
DIM
EN
TO
EN
ER
GETIC
O
[Fonte: www.entropiazero.it]
CARATTERISTICHE
![Page 8: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/8.jpg)
• Gara di Servizi• Procedura aperta• Durata contrattuale media: 9-15 anni• Affidamento con criterio dell’offerta
economicamente più vantaggiosa
• Fornitura di Energia• Conduzione ed esercizio• Manutenzione Ordinaria• Manutenzione Straordinaria • Interventi di riqualificazione energetica• Rispetto obiettivo di consumo ridotto
PRINCIPI
8
1.
CO
NTR
AT
TO
A R
EN
DIM
EN
TO
EN
ER
GETIC
O
OGGETTO
ELEMENTI IDENTIFICATIVI DELLA GARA
![Page 9: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/9.jpg)
9
2. ESEMPI APPLICATIVI
![Page 10: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/10.jpg)
10
2.
ES
EM
PI
AP
PLIC
ATIV
I
• N.25 Comuni coinvolti• N.100.000 punti luce riqualificati• 20 M€ di investimenti nella riqualificazione
energetica
• Area Nord (Mirandola, San Possidonio, Concordia s/S)• Carpi• Castelnuovo Rangone• Castelvetro• Fanano• Fiumalbo• Lama Mocogno• Pavullo n/F• Riolunato• Sassuolo• Vignola
• GEOVEST (5 Comuni BO)• Ravenna (RA)• Collecchio (PR)• Felino (PR)• Parma (PR)
ALCUNI NUMERI
ELENCO COMUNIIN PROV.MO
(sviluppati in ambito del progetto ELENA Modena)
ELENCO COMUNIFUORI PROV.MO
![Page 11: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/11.jpg)
Improving energy efficiency in public lighting by replacing obsolete lamps and not up to standard for light pollution, as well as integration of remote management systems in the Municipality of LAMA MOCOGNO.
372.863,23 €
N. lighting system (switchboard): 57N. lamps: 834
Annual energy savings: 34,0 TEPEnvironmental savings: 96,0 ton CO2
SL.01
CALL:
AMOUNT:
TECHNICALDATA:
ENERGY AND ENVIRONMENTAL
BENEFITS:
2)P
roje
ct
pro
gre
ss a
nd
its
im
ple
men
tati
on
•Te
nders
& invest
ment
alr
eady im
ple
mente
d
11
AGREEMENT CONSIP ( )
WORKS CONTRACT ( )
SERVICE CONTRACT ( x )
CONCESSION OF ROOF SURFACE USE ( )
PROJECT FINANCING ( )
![Page 12: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/12.jpg)
Improving energy efficiency in public lighting by replacing obsolete lamps and not up to standard for light pollution, as well as integration of remote management systems in the Municipality of VIGNOLA.
1.443.111,36 €
N. lighting system (switchboard): 60N. lamps: 3.261
Annual energy savings: 101,4 TEPEnvironmental savings: 334,4 ton CO2
SL.02
CALL:
AMOUNT:
TECHNICALDATA:
ENERGY AND ENVIRONMENTAL
BENEFITS:
2)P
roje
ct
pro
gre
ss a
nd
its
im
ple
men
tati
on
•Te
nders
& invest
ment
alr
eady im
ple
mente
d
12
AGREEMENT CONSIP ( )
WORKS CONTRACT ( )
SERVICE CONTRACT ( )
CONCESSION OF ROOF SURFACE USE ( )
PROJECT FINANCING ( x )
![Page 13: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/13.jpg)
Improving energy efficiency in public lighting by replacing obsolete lamps and not up to standard for light pollution, as well as integration of remote management systems in the Municipality of RIOLUNATO.
127.787,44 €
N. lighting system (switchboard): 44N. lamps: 381
Annual energy savings: 12,3 TEPEnvironmental savings: 35,0 ton CO2
SL.03
CALL:
AMOUNT:
TECHNICALDATA:
ENERGY AND ENVIRONMENTAL
BENEFITS:
2)P
roje
ct
pro
gre
ss a
nd
its
im
ple
men
tati
on
•Te
nders
& invest
ment
alr
eady im
ple
mente
d
13
AGREEMENT CONSIP ( )
WORKS CONTRACT ( )
SERVICE CONTRACT ( x )
CONCESSION OF ROOF SURFACE USE ( )
PROJECT FINANCING ( )
![Page 14: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/14.jpg)
Improving energy efficiency in public lighting by replacing obsolete lamps and not up to standard for light pollution, as well as integration of remote management systems in the Municipality of FIUMALBO.
128.479,18 €
N. lighting system (switchboard): 50N. lamps: 458
Annual energy savings: 16,9 TEPEnvironmental savings: 48,0 ton CO2
SL.04
CALL:
AMOUNT:
TECHNICALDATA:
ENERGY AND ENVIRONMENTAL
BENEFITS:
2)P
roje
ct
pro
gre
ss a
nd
its
im
ple
men
tati
on
•Te
nders
& invest
ment
alr
eady im
ple
mente
d
14
AGREEMENT CONSIP ( )
WORKS CONTRACT ( )
SERVICE CONTRACT ( x )
CONCESSION OF ROOF SURFACE USE ( )
PROJECT FINANCING ( )
![Page 15: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/15.jpg)
Improving energy efficiency in public lighting by replacing obsolete lamps and not up to standard for light pollution, as well as integration of remote management systems in the Municipality of PAVULLO n/F.
1.187.060,00 €
N. lighting system (switchboard): 218N. lamps: 3.184
Annual energy savings: 140,3 TEPEnvironmental savings: 398,0 ton CO2
SL.05
CALL:
AMOUNT:
TECHNICALDATA:
ENERGY AND ENVIRONMENTAL
BENEFITS:
2)P
roje
ct
pro
gre
ss a
nd
its
im
ple
men
tati
on
•Te
nders
& invest
ment
alr
eady im
ple
mente
d
15
AGREEMENT CONSIP ( )
WORKS CONTRACT ( )
SERVICE CONTRACT ( x )
CONCESSION OF ROOF SURFACE USE ( )
PROJECT FINANCING ( )
![Page 16: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/16.jpg)
Improving energy efficiency in public lighting by replacing obsolete lamps and not up to standard for light pollution, as well as integration of remote management systems in the Municipality of SAN POSSIDONIO.
355.495,80 €
N. lighting system (switchboard): 19N. lamps: 1.100
Annual energy savings: 42,8 TEPEnvironmental savings: 128,3 ton CO2
SL.06
CALL:
AMOUNT:
TECHNICALDATA:
ENERGY AND ENVIRONMENTAL
BENEFITS:
2)P
roje
ct
pro
gre
ss a
nd
its
im
ple
men
tati
on
•Te
nders
& invest
ment
alr
eady im
ple
mente
d
16
AGREEMENT CONSIP ( )
WORKS CONTRACT ( )
SERVICE CONTRACT ( x )
CONCESSION OF ROOF SURFACE USE ( )
PROJECT FINANCING ( )
![Page 17: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/17.jpg)
Improving energy efficiency in public lighting by replacing obsolete lamps and not up to standard for light pollution, as well as integration of remote management systems in the Municipality of MIRANDOLA.
1.246.295,88 €
N. lighting system (switchboard): 93N. lamps: 5.690
Annual energy savings: 167,0 TEPEnvironmental savings: 378,0 ton CO2
SL.17
CALL:
AMOUNT:
TECHNICALDATA:
ENERGY AND ENVIRONMENTAL
BENEFITS:
2)P
roje
ct
pro
gre
ss a
nd
its
im
ple
men
tati
on
•Te
nders
& invest
ment
alr
eady im
ple
mente
d
17
AGREEMENT CONSIP ( )
WORKS CONTRACT ( )
SERVICE CONTRACT ( x )
CONCESSION OF ROOF SURFACE USE ( )
PROJECT FINANCING ( )
![Page 18: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/18.jpg)
Improving energy efficiency in public lighting by replacing obsolete lamps and not up to standard for light pollution, as well as integration of remote management systems in the Municipality of CONCORDIA s/S.
292.434,00 €
N. lighting system (switchboard): 21N. lamps: 2.027
Annual energy savings: 69,6 TEPEnvironmental savings: 209,6 ton CO2
SL.18
CALL:
AMOUNT:
TECHNICALDATA:
ENERGY AND ENVIRONMENTAL
BENEFITS:
2)P
roje
ct
pro
gre
ss a
nd
its
im
ple
men
tati
on
•Te
nders
& invest
ment
alr
eady im
ple
mente
d
18
AGREEMENT CONSIP ( )
WORKS CONTRACT ( )
SERVICE CONTRACT ( x )
CONCESSION OF ROOF SURFACE USE ( )
PROJECT FINANCING ( )
![Page 19: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/19.jpg)
Improving energy efficiency in public lighting by replacing obsolete lamps and not up to standard for light pollution, as well as integration of remote management systems in the Municipality of CASTELVETRO.
662.701,56 €
N. lighting system (switchboard): 47N. lamps: 1.689
Annual energy savings: 39,6 TEPEnvironmental savings: 130,8 ton CO2
SL.07
CALL:
AMOUNT:
TECHNICALDATA:
ENERGY AND ENVIRONMENTAL
BENEFITS:
2)P
roje
ct
pro
gre
ss a
nd
its
im
ple
men
tati
on
•Te
nders
& invest
ment
alr
eady im
ple
mente
d
19
AGREEMENT CONSIP ( )
WORKS CONTRACT ( )
SERVICE CONTRACT ( x )
CONCESSION OF ROOF SURFACE USE ( )
PROJECT FINANCING ( )
![Page 20: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/20.jpg)
Improving energy efficiency in public lighting by replacing obsolete lamps and not up to standard for light pollution, as well as integration of remote management systems in the Municipality of SASSUOLO.
1.689.093,72 €
N. lighting system (switchboard): 240N. lamps: 7.786
Annual energy savings: 184,4 TEPEnvironmental savings: 553,2 ton CO2
SL.09
CALL:
AMOUNT:
TECHNICALDATA:
ENERGY AND ENVIRONMENTAL
BENEFITS:
2)P
roje
ct
pro
gre
ss a
nd
its
im
ple
men
tati
on
•Te
nders
& invest
ment
alr
eady im
ple
mente
d
20
AGREEMENT CONSIP ( )
WORKS CONTRACT ( )
SERVICE CONTRACT ( x )
CONCESSION OF ROOF SURFACE USE ( )
PROJECT FINANCING ( )
![Page 21: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/21.jpg)
Improving energy efficiency in public lighting by replacing obsolete lamps and not up to standard for light pollution, as well as integration of remote management systems in the Municipality of CASTELNUOVO RANGONE.
1.338.658,43 €
N. lighting system (switchboard): 78N. lamps: 4.071
Annual energy savings: 175,4 TEPEnvironmental savings: 578,6 ton CO2
SL.10
CALL:
AMOUNT:
TECHNICALDATA:
ENERGY AND ENVIRONMENTAL
BENEFITS:
2)P
roje
ct
pro
gre
ss a
nd
its
im
ple
men
tati
on
•Te
nders
& invest
ment
alr
eady im
ple
mente
d
21
AGREEMENT CONSIP ( )
WORKS CONTRACT ( )
SERVICE CONTRACT ( x )
CONCESSION OF ROOF SURFACE USE ( )
PROJECT FINANCING ( )
![Page 22: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/22.jpg)
Improving energy efficiency in public lighting by replacing obsolete lamps and not up to standard for light pollution, as well as integration of remote management systems in the Municipality of FANANO.
313.099,58 €
N. lighting system (switchboard): 42N. lamps: 812
Annual energy savings: 27,2 TEPEnvironmental savings: 81,6 ton CO2
SL.13
CALL:
AMOUNT:
TECHNICALDATA:
ENERGY AND ENVIRONMENTAL
BENEFITS:
2)P
roje
ct
pro
gre
ss a
nd
its
im
ple
men
tati
on
•Te
nders
& invest
ment
alr
eady im
ple
mente
d
22
AGREEMENT CONSIP ( )
WORKS CONTRACT ( )
SERVICE CONTRACT ( x )
CONCESSION OF ROOF SURFACE USE ( )
PROJECT FINANCING ( )
![Page 23: Contratto a rendimento energetico nella Pubblica Illuminazione – Esperienze.](https://reader036.fdocuments.net/reader036/viewer/2022070313/5542eb76497959361e8e03c8/html5/thumbnails/23.jpg)
Improving energy efficiency in public lighting by replacing obsolete lamps and not up to standard for light pollution, as well as integration of remote management systems in the Municipality of CARPI.
3.500.000,00 €
N. lighting system (switchboard): 170N. lamps: 6.400
Annual energy savings: 372,8 TEPEnvironmental savings: 1.229,9 ton CO2
SL.20
CALL:
AMOUNT:
TECHNICALDATA:
ENERGY AND ENVIRONMENTAL
BENEFITS:
2)P
roje
ct
pro
gre
ss a
nd
its
im
ple
men
tati
on
•Te
nders
& invest
ment
alr
eady im
ple
mente
d
23
AGREEMENT CONSIP ( )
WORKS CONTRACT ( x )
SERVICE CONTRACT ( )
CONCESSION OF ROOF SURFACE USE ( )
PROJECT FINANCING ( )