CONTRACT DRAWINGS FOR OLD NORWICH ROAD, EVERGREEN … · middletown norwich new haven stamford...
Transcript of CONTRACT DRAWINGS FOR OLD NORWICH ROAD, EVERGREEN … · middletown norwich new haven stamford...
BID SET No.
FOR REVIEW
FOR BIDDING
WP PROJECT No. 14064A
CONNECTICUT
HARTFORD
NORWICHMIDDLETOWN
NEW HAVEN
STAMFORD
DRAWING INDEX
GENERAL
--- COVER SHEET
WATERFORD UTILITY COMMISSION
CONTRACT DRAWINGS FOR
OLD NORWICH ROAD, EVERGREEN AVENUE & BLUE HIL
PUMP STATIONS HVAC IMPROVEMENTS
JULY 2019
WATERFORD, CONNECTICUT
MECHANICAL
M-1 MECHANICAL NOTES, LEGEND, ABBREVIATIONS, DESIGN DATA, AND DETAILSM-2 MECHANICAL EQUIPMENT SCHEDULESM-3 OLD NORWICH ROAD PUMP STATION DEMOLITION PLANS AND SECTIONM-4 OLD NORWICH ROAD PUMP STATION MODIFICATIONS PLANS AND SECTIONM-5 EVERGREEN PUMP STATION DEMOLITION PLANSM-6 EVERGREEN PUMP STATION MODIFICATIONS PLANSM-7 BLUE HILLS PUMP STATION - DEMOLITION & MODIFICATIONS PLANS
WATERFORD
CHAIRMAN: PETER M. GREEN
MEMBERS: KENNETH KIRKMAN
RODNEY A. PINKHAM
STEPHEN J. NEGRI
RAYMOND L. VALENTINI
SECRETARY: AMY WINDLE
WATERFORD UTILITY COMMISSION
MODERATOR: THOMAS DEMBEK
RTM
OCTOBER 2018
JULY 2019
ELECTRICAL
E-1 ELECTRICAL LEGEND AND NEMA SCHEDULEE-2 ELECTRICAL ABBREVIATIONS, GENERAL NOTES AND DEMOLITION NOTESE-3 OLD NORWICH ROAD PUMP STATION MOTOR CONTROL CENTER "MCC" SINGLE LINE DIAGRAM - DEMOLITIONE-4 OLD NORWICH ROAD PUMP STATION FLOOR PLANS - DEMOLITIONE-5 OLD NORWICH ROAD PUMP STATION MOTOR CONTROL CENTER "MCC" SINGLE LINE DIAGRAM - MODIFICATIONSE-6 OLD NORWICH ROAD PUMP STATION FLOOR PLANS - MODIFICATIONSE-7 OLD NORWICH ROAD PUMP STATION SCHEMATIC DIAGRAMSE-8 OLD NORWICH ROAD PUMP STATION CONDUIT AND WIRE AND PANELBOARD SCHEDULEE-9 EVERGREEN PUMP STATION MOTOR CONTROL CENTER MCC-1B SINGLE LINE DIAGRAMS - DEMOLITIONE-10 EVERGREEN PUMP STATION ENTRY AND ELECTRICAL ROOM FLOOR PLANS - DEMOLITIONE-11 EVERGREEN PUMP STATION MOTOR CONTROL CENTER MCC-1B AND MCC-1A SINGLE LINE DIAGRAMS - MODIFICATIONSE-11 EVERGREEN PUMP STATION ENTRY ROOM FLOOR PLAN - MODIFICATIONSE-13 EVERGREEN PUMP STATION ELECTRICAL, PUMP CONTROL AND GRINDER ROOM FLOOR PLAN - MODIFICATIONSE-14 EVERGREEN PUMP STATION SCHEMATIC DIAGRAMSE-15 EVERGREEN PUMP STATION CONDUIT AND WIRE SCHEDULEE-16 BLUE HILLS PUMP STATION MOTOR CONTROL CENTER MCC-1 SINGLE LINE DIAGRAM - DEMOLITIONE-17 BLUE HILLS PUMP STATION ROOF AND CONTROL ROOM FLOOR PLANS - DEMOLITIONE-18 BLUE HILLS PUMP STATION MOTOR CONTROL CENTER MCC-1 SINGLE LINE DIAGRAM - MODIFICATIONSE-19 BLUE HILLS PUMP STATION ROOF AND CONTROL ROOM FLOOR PLANS - MODIFICATIONSE-20 BLUE HILLS PUMP STATION SCHEMATIC DIAGRAMSE-21 BLUE HILLS PUMP STATION CONDUIT AND WIRE SCHEDULE
FIRST SELECTMAN:DANIEL M. STEWARD
BOARD OF SELECTMAN
CHAIRMAN: RON FEDOR
BOARD OF FINANCE
BID No. 19-111
OLD NORWICH ROAD PS
BLUE HILLS PS
LOCATION PLAN
SCALE: 1"=4,000'
N
EVERGREEN AVENUE PS
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
MEC
\140
64-M
S-N
OTE
S-LE
G-A
BBRV
.DW
G |
Not
es-L
eg-A
bbrv
-Det
| 1
:10.
1236
4677
| --
-- |
7/12
/201
9 3:
31:1
7 PM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
RO
DNEY
.GRE
ENE
7/12
/201
9 2:
45 P
M
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
MEC
HAN
ICAL
NO
TES,
LEG
END,
ABB
REVI
ATIO
NS,
DESI
GN
DAT
A, A
ND
DETA
ILS
M-1
ISSU
ED F
OR
BIDD
ING
BBB
NSB
OCT
OBE
R 20
18N
SBO
CTO
BER
2018
1406
4
DAD
07-1
9BB
BRT
G
MITERED ELBOW WITH TURNING VANES
PIPE TURNING DOWN
UNION
CHECK VALVE
RECTANGULAR SUPPLY AIR DUCT UP
MOTOR OPERATED DAMPER (MOD)
THERMOSTAT
M
PRESSURE GAUGE WITH SHUT OFF
DIRECTION OF AIR FLOW (S/OA)
LEGEND
RECTANGULAR RETURN OR EXHAUST AIR DUCT UP
VOLUME DAMPERVD
DIRECTION OF AIR FLOW (R/E)
RECTANGULAR SUPPLY AIR DUCT DOWN
T
RECTANGULAR RETURN OR EXHAUST AIR DUCT DOWN
PIPE TURNING UP
SHUT OFF VALVE
UNIT HEATER (UH)
DIFFCFM
DIFFUSER DESIGNATION PER SCHEDULEAIRFLOW IN CFM
EQ#
EQUIPMENT DESIGNATION PER SCHEDULEEQUIPMENT SEQUENCE NUMBER
BALL VALVE
FLEXIBLE DUCT CONNECTION
SPIRAL AIR DUCT UP
SPIRAL AIR DUCT DOWN
RECTANGULAR-TO-SPIRAL DUCT TRANSITION
PIPE TEE DOWN
EXISTING NEW
WYE STRAINER
SIDEWALL REGISTER
ABBREVIATIONS
ATC-#
POINT OF CONNECTION BETWEENEXISTING AND NEW
AUTOMATIC TEMPERATURECONTROL PANEL
APPROX. EXTENTS OF DEMOLITION
CONTROL VALVE (2 WAY)
A AMPEREABV ABOVEACH AIR CHANGES PER HOURAD ACCESS DOORAFF ABOVE FINISH FLOORAFG ABOVE FINISH GRADEAHU AIR HANDLING UNITAPD AIR PRESSURE DROPAS AIR SEPARATORATC AUTOMATIC TEMPERATURE CONTROLB BOILERBHP BRAKE HORSEPOWERBOD BOTTOM OF DUCTBOE BOTTOM OF EQUIPMENTBTU BRITISH THERMAL UNITBTUH BRITISH THERMAL UNITS PER HOUR℄ CENTERLINECFM CUBIC FEET PER MINUTECG COMBUSTIBLE GASD DAMPERDB DRY BULBDIA, Ø DIAMETERDN DOWNDX DIRECT EXPANSIONE EXHAUSTEAT ENTERING AIR TEMPERATUREEER ENERGY EFFICIENCY RATIOEF EXHAUST FANEFF EFFICIENCYEL ELEVATIONESP EXTERNAL STATIC PRESSUREET EXPANSION TANKEWT ENTERING WATER TEMPERATURE°F DEGREES FAHRENHEITFAT FINAL AIR TEMPERATUREFC FLEXIBLE CONNECTIONFLA FULL-LOAD AMPSFPF FINS PER FOOTHP HORSEPOWER (SCHEDULES)HWR HOT WATER RETURNHWS HOT WATER SUPPLYIN INCHES
L LOUVERLAT LEAVING AIR TEMPERATURELRA LOCKED ROTOR AMPSLWT LEAVING WATER TEMPERATUREMAU MAKE-UP AIR UNITMAX MAXIMUMMBH BTUH x 1000MFR MANUFACTURERMIN MINIMUMMOCP MAXIMUM OVERCURRENT PROTECTIONMOD MOTOR OPERATED DAMPERN/A NOT APPLICABLENTS NOT TO SCALEOA OUTSIDE AIROAT OUTSIDE AIR TEMPERATUREOED OPEN END DRAIN, OPEN END DUCTPD PRESSURE DROPR RETURNRAD RADIUSRLA RUNNING LOAD AMPSRPM REVOLUTIONS PER MINUTES SUPPLYSC SENSIBLE COOLINGSCH SCHEDULESF SUPPLY FANSMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATIONSS STAINLESS STEELTC TOTAL COOLINGTOD TOP OF DUCTTOE TOP OF EQUIPMENTTSTAT THERMOSTATTV TURNING VANESTYP TYPICALUH UNIT HEATERV VOLTSVD VOLUME DAMPERVFD VARIABLE FREQUENCY DRIVEW/ WITHWB WET BULBWC WATER COLUMN
CIRCULATING PUMP
THERMOMETER
BALANCING VALVE OR BALLVALVE W/MEMORY STOPGAS COCK
PROPANE OR NATURAL GAS PIPEPROPANE OR NATURAL GAS PIPEG G
GX GX BELOW SLAB OR GRADE
3-WAY MIXING VALVE
COMBUSTIBLE GAS DETECTORCG
HOT WATER SUPPLY
HOT WATER RETURN
PROOF-OF-AIRFLOW SWITCHF
PSVPSV
PSVPSV
PRV PRV
TEMPERATURE & PRESSURE
PRESSURE REDUCING VALVE
SAFETY (RELIEF VALVE)
DESIGN CRITERIA
OUTSIDE DESIGN TEMPERATUREWINTER (ASHRAE 99.6%) 11.4°FSUMMER (ASHRAE 0.4%) 87.9°F DB/73.1°F WB
INSIDE DESIGN TEMPERATURE WINTER/SUMMERPROCESS AREAS 55°F/AMBIENTELECTRICAL ROOMS 55°F/85°F
VENTILATION RATES - REFER TO DRAWINGS
RELATIVE HUMIDITY - REFER TO DRAWINGS
MECHANICAL GENERAL NOTES
1. ALL EQUIPMENT AND PIPING LAYOUT DIMENSIONS SHALL BE FIELD VERIFIED AND COORDINATED WITH EQUIPMENT SUPPLIED, AND/OREXISTING CONDITIONS. SOME INFORMATION ASSOCIATED WITH EXISTING STRUCTURES, PIPING AND EQUIPMENT LOCATIONS,ELEVATIONS AND SIZES, WERE TAKEN FROM THE CONTRACT DRAWINGS FOR WATER AND SEWER COMMISSION, WATERFORD,CONNECTICUT, SEWAGE WORKS CONSTRUCTION PROGRAM, CONTRACT 7 - OLD NORWICH ROAD PUMPING STATION (HAYDEN &HARDING 1972), RECORD DRAWINGS FOR WATERFORD UTILITY COMMISSION, RECORD DRAWINGS FOR WATERFORD UTILITYCOMMISSION, EVERGREEN PUMP STATION COMPREHENSIVE UPGRADE (WRIGHT-PIERCE, 2008), AND WATERFORD UTILITY COMMISSION,BLUE HILLS PUMP STATION (WRIGHT-PIERCE, 2006), WHICH ARE AVAILABLE FOR REVIEW AT THE ENGINEER'S OFFICE. CONTRACTOR SHALLVERIFY ALL DIMENSIONS IN THE FIELD AS REQUIRED PRIOR TO BEGINNING CONSTRUCTION OF NEW FACILITIES, EQUIPMENT OR PIPINGTHAT MAY BE AFFECTED. IN SOME SPECIFIC INSTANCES, WHERE SPECIAL ATTENTION MAY BE REQUIRED BY THE CONTRACTOR, SOMEDIMENSIONS, ELEVATIONS, ETC. HAVE BEEN NOTED WITH AN " * ". THIS DOES NOT HOWEVER, LIMIT THE CONTRACTOR'S RESPONSIBILITYTO VERIFY AND COORDINATE ALL NECESSARY INFORMATION FOR CONSTRUCTION.
2. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DIMENSIONS, LAYOUT OR ELEVATION CHANGES REQUIRED TO SUIT THE SPECIFICEQUIPMENT BEING PROVIDED UNDER THIS CONTRACT. WHEN SUCH EQUIPMENT REQUIRES PADS, PIERS, CURBING, ETC., THAT DIFFERSFROM THAT SHOWN ON THE CONSTRUCTION DRAWINGS, THE CONTRACTOR SHALL COORDINATE THE STEEL REINFORCING SHOPDRAWINGS ACCORDINGLY.
3. CONTRACTOR TO NOTE THAT ALL EXISTING INFORMATION ON THE DRAWINGS IS SHOWN WITH A LIGHTER LINE WEIGHT AND INDICATEDWITH A SLANTED TYPE TEXT. THE EXCEPTION IS WHEN SCANNED IMAGES ARE UTILIZED FROM THE PREVIOUS CONSTRUCTION PROJECTSNOTED IN GENERAL NOTE No.1 ABOVE. WHEN REVIEWING DRAWINGS NOTED AS "SCANNED" UNDER DRAWING TITLE, THE CONTRACTORSHALL IGNORE ANY REFERENCE TO PREVIOUS CONTRACT WORK. SCANNED IMAGES ARE NOT TO SCALE, HOWEVER AN APPROXIMATESCALE MAY BE GIVEN FOR CONVENIENCE.
4. ALL COMPONENTS OF THE AUTOMATIC TEMPERATURE CONTROL SYSTEM SHALL MEET THE ELECTRICAL CLASSIFICATION OF THE SPACE INWHICH THEY ARE INSTALLED UNLESS NOTED OTHERWISE IN THE SPECIFICATIONS.
5. ALL DUCTWORK AND DEVICES SHALL BE FABRICATED, REINFORCED AND INSTALLED IN ACCORDANCE WITH SMACNA (SHEET METAL ANDAIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION) DOCUMENT "HVAC DUCT CONSTRUCTION STANDARDS METAL ANDFLEXIBLE". SEAL ALL DUCT JOINTS TO SEAL CLASS "C".
6. ALL PIPES SHALL BE ADEQUATELY RESTRAINED AND SUPPORTED IN ACCORDANCE WITH SPECIFICATION SECTION 15094.
7. ALL PIPING SYSTEMS SHALL BE PRESSURE TESTED FOR TIGHTNESS IN ACCORDANCE WITH SPECIFICATION SECTION 15601. ALL LEAKS SHALLBE CORRECTED AND RETESTED UNTIL PRESSURE TEST IS SATISFACTORY PRIOR TO THE INSTALLATION OF PIPE INSULATION.
8. TEST REFRIGERANT PIPING IN ACCORDANCE WITH 2009 IMC, CHAPTER 11.
9. DO NOT SCALE DISTANCES OR DIMENSIONS FROM THE DRAWINGS. WRITTEN DIMENSIONS SHALL PREVAIL. REPORT ANY DISCREPANCIESIMMEDIATELY TO THE ENGINEER.
10. ALL MITERED ELBOWS, AND RADIUS ELBOWS HAVING RAD<1.0xDUCT WIDTH SHALL HAVE TURNING VANES INSTALLED.
DRAIN / FILL STATION
.043" ALUM. SHEET METALSKIN ALL AROUND
2" EXTRUDEDPOLYSTYRENEFOAM INSULATION
FLANGE FOUR SIDES
NEOPRENE GASKETFOUR SIDES
LOUVER BLANK-OFF PANEL
NTS
EXPANSIONBOLTS @ 1'-0"
LOUVER
20°
MAX
30°
MAX
20°
30°M
AXMAX
EQU
IPM
ENT
AIRFLOW
TYPICAL DUCTWORK TRANSITIONPLAN OR SIDE VIEW
TYPICAL DUCTWORK TRANSITION WITHEQUIPMENT MOUNTED IN DUCT
PLAN OR SIDE VIEW
15°
MAX
15°M
AX
TYPICAL DUCTWORK TRANSITION
NTS
NOTE: UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUMANGLES SHOWN SHALL APPLY
AIRFLOW
LOUVER & DAMPER DETAIL
NTS
DUCT (ASREQUIRED)
CLIP ANGLE
DAMPER
EXTENDEDSILL
BIRDSCREEN
LOUVER
CAULKING
WALL
HWR
HWS
UNION (TYP)
GATE VALVE
3/4" DRAIN VALVEW/HOSE CONNECTION
COMBINATION BALANCING& SHUT OFF VALVE
MANUAL AIR VENT
HORIZONTAL UNIT HEATER PIPING DETAIL
NTS
TERMINATE DUCTWORK JUSTBELOW DAMPER AND OPERATORWITH EGG CRATE FACE GRILLE ORCONTINUE DUCTWORK AS SHOWNON THE DWGS
WHEN MOTOROPERATED DAMPER ISCALLED FOR INSTALLOUT OF THE AIRSTREAM
WHEN EXPLOSION PROOFMOTOR OPERATOR IS CALLEDFOR SUPPORT FROMSTRUCTURE
WEATHER BAFFLE
VIBRATION ELIMINATORS SPUN ALUMINUMHOUSING
CENTRIFIGAL ROOF VENTILATOR DETAIL
NTS
PROVIDE WOODSPACERS BETWEEN FANAND EXISTING ROOFCURB AS REQUIRED.
NEW OR EXISTINGROOF CURB
DAMPERS-MOTOR OPERATED
CIRCULATING PUMP INSTALLATION DETAIL
NTS
STRAINER
FLOW METER TAP (TYP)
PRESSURE GAUGE (TYP)
BALL VALVECOMBINATION BALANCING/SHUT OFF VALVE
CHECK VALVE
UNION (TYP)
CIRCULATING PUMP
SUMP PIT
EXTERNAL
10"19
-3/4
"PU
MP
ON
PUM
PO
FF
JUNCTION BOX
SIMPLEX SUMP PUMP DETAIL
NTS
FLOAT SWITCH
LOUVER INSTALLATION DETAIL
NTS
DUCT
CLIP ANGLE (TYP)
DAMPER
EXTENDEDSILL
BIRDSCREEN
LOUVER
CAULKING
WALL
SLOPE1/4" / FT
2" DISCHARGE
CHECK VALVE
GATE VALVE
UNION
0.43" ALUMINUMSHEET METAL
VERIFY EXACT FLOATPOSITIONS WITHEXISTING SUMP PIT
GLYCOL FILL STATION DETAIL
NTS
CHECK VALVE
3/4" HOSE-ENDVALVE (TYP)
CUT AND CLEAN EXISTINGREINFORCING BARS 2"FROM FINISHED OPENING
1" SAW CUT JOINT TYPICALALL AROUND BOTH SIDES
EXISTING CONCRETEWALL
CHIP AND REMOVEEXISTING CONCRETE
APPLY EPOXY ADHESIVE BONDINGCOMPOUND ON CLEANED,ROUGHENED SURFACE PRIOR TOPLACING NON-SHRINK GROUT
4" MINIMUMNON-SHRINK GROUT
NEW OPENING
OPENING IN EXISTING WALL
NTS
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
MEC
\140
64-M
S-N
OTE
S-LE
G-A
BBRV
.DW
G |
Sch
edul
es |
1:1
0.12
3646
77 |
----
| 7/
12/2
019
3:31
:20
PM |
ELL
IOTT
.LAG
NER
LAST
SAV
ED B
Y: R
ODN
EY.G
REEN
E 7/
12/2
019
2:45
PM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
MEC
HAN
ICAL
EQ
UIP
MEN
T SC
HEDU
LES
& D
ETAI
LS
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
M-2
ISSU
ED F
OR
BIDD
ING
RTG
,GBH N
SBO
CTO
BER
2018
NSB
OCT
OBE
R 20
1814
064
DAD
07-1
9BB
BRT
G
REGISTERS, GRILLES, AND DIFFUSERS SCHEDULE
TAG
FACE SIZE
WxH (IN)
NECK SIZE
WxH (IN)
CFM
MAX ΔP
IN WC
NC
RATING
TYPE REMARKS NOTES
S-1 16x16 14x14 580 0.04 17 SUPPLY REGISTER NAILOR 51DV-OAOR EQUIVALENT PRODUCT -
S-2 12x12 10x10 330 0.05 17 SUPPLY REGISTER NAILOR 51DV-OAOR EQUIVALENT PRODUCT -
HYDRONIC UNIT HEATER SCHEDULE
UNIT
NO.
LOCATION
MBH @
180°F
GPM @
180°F
CFM WPD EAT LAT
ELECTRICAL DATA
NEMA REMARKS NOTES
RPM HP FLA VOLTS PHASE
UH-ON1 OLD NORWICH PSCONTROL ROOM 134.0 15 2900 0.96 50 92.6 1140 1/3 4.5 120 1 - TRANE UHSB204
OR EQUIVALENT 1
UH-ON2 OLD NORWICH PSINTERMEDIATE LEVEL 11.8 1.25 395 0.006 50 77.4 1550 16W 0.8 120 1 - TRANE UHSB018
OR EQUIVALENT 1
UH-ON3 OLD NORWICH PSPUMP ROOM 11.8 1.25 395 0.006 50 77.4 1550 16W 0.8 120 1 - TRANE UHSB018
OR EQUIVALENT 1,3
UH-ON4 OLD NORWICH PSFAN ROOM 31.4 3.5 750 0.15 50 88.6 1000 1/20 1.4 120 1 - TRANE UHSB048
OR EQUIVALENT 2,3
UH-ON5 OLD NORWICH PSCOMMINUTOR ROOM 14.0 1.75 380 0.017 50 84.0 1350 16W 0.8 120 1 - TRANE UHSB024
OR EQUIVALENT 2,3
NOTES: 1. PROVIDE WITH TEFC MOTOR. 2. PROVIDE WITH EXPLOSION PROOF MOTOR. 3. PROVIDE WITH PHENOLIC COATING.
LOUVER AND DAMPER SCHEDULE
UNIT
NO.
LOCATION
SERVED
DIMENSIONS (IN)
MIN. FREE AREA
SQFT.
TYPE REMARKS NOTES
WIDTH HEIGHT DEPTH
L-ON1 OLD NORWICH PSDRY WELL 36 24 6 2.89 EXHAUST GREENHECK EDJ-601
OR EQUIVALENT PRODUCT -
L-ON2 OLD NORWICH PSWET WELL 24 24 6 1.84 INTAKE GREENHECK EDJ-601
OR EQUIVALENT PRODUCT -
D-ON1 OLD NORWICH PSDRY WELL 36 18 5 - OPPOSED GREENHECK VCD-23
OR EQUIVALENT PRODUCT -
D-ON2 OLD NORWICH PSWET WELL 24 24 5 - OPPOSED GREENHECK VCD-43
OR EQUIVALENT PRODUCT -
D-EG1 EVERGREEN PSWET WELL 24 18 5 - OPPOSED GREENHECK VCD-43
OR EQUIVALENT PRODUCT -
D-EG2 EVERGREEN PSWET WELL 8 8 5 - PARALLEL GREENHECK VCD-43
OR EQUIVALENT PRODUCT -
D-BH1 BLUE HILLS PSDRY WELL 24 18 5 - OPPOSED GREENHECK VCD-23
OR EQUIVALENT PRODUCT -
PACKAGED AIR HANDLING UNIT SCHEDULE
UNIT
NO.
LOCATION
SERVED
CFM
MIN
OA
ESP
IN WC
BTUH
INPUT
BTUH
OUTPUT
THERMAL
EFFICIENCY
DX COOLING (100% OA) DX COOLING (75% RECIRC)
REFRIG
TYPE
ELECTRICAL
REMARKS NOTES
EAT
DB/WB
LAT
DB/WB
REHEAT
MBH
FAT
DB/WB
MBH TC/SC
EAT
DB/WB
LAT
DB/WB
REHEAT
MBH
FAT
DB/WB
MBH TC/SC HP VOLTS PHASE MCA MOCP
AHU-EG1 EVERGREEN PSDRY WELL 3400 850/3400 1.25 300,000 240,000 80% 87.4/73.3 64.8/63.2 19.5 70.6/64.5 124.79/85.15 78.1/65.5 56.3/54.8 39.1 66.4/57.3 110.54/81.67 410A 3 460 3 35.8 40 REZNOR YHDA-120
OR EQUIVALENT 1-14
NOTES: 1. FACTORY MOUNTED AND WIRED VARIABLE FREQUENCY DRIVE 4. INTEGRAL OUTSIDE AIR AND RETURN DAMPERS 7. FACTORY MOUNTED AND WIRED NON-FUSED DISCONNECT SWITCH 10. 36" HIGH SIDE DISCHARGE CURB 13. HIGH CAPACITY REHEAT PUMP
2. 316 STAINLESS STEEL HEAT EXCHANGER 5. HOT GAS BYPASS 8. 120V NON-POWERED CONVENIENCE OUTLET11. PHASE / VOLTAGE MONITOR14. ADJUSTABLE CONSTANT VOLUME FAN CONTROL
3. INDIRECT FIRED NATURAL GAS, 5:1 MODULATING 6. 4" MERV 8 PLEATED FILTERS 9. FILTER DIFFERENTIAL PRESSURE SENSOR12. REMOTE DISPLAY / CONTROL / SENSOR MODULE WITH TEMPERATURE AND DEHUMIDIFICATION CONTROLS
DEHUMIDIFIER SCHEDULE
UNIT
NO.
LOCATION CFM
ESP
IN WC
PINTS
PER HR
ELECTRICAL
REMARKS NOTES
VOLTS PHASE MCA MOCP
DH-ON1 OLD NORWICH PSCONTROL ROOM 365 0 120 120 1 15 20 SANTA FE ADVANCE120
OR EQUIVALENT PRODUCT 1
DH-ON2 OLD NORWICH PSPUMP ROOM 365 0 120 120 1 15 20 SANTA FE ADVANCE120
OR EQUIVALENT PRODUCT 1
NOTES: 1. PROVIDE WITH HANG KIT.
AIR SEPARATOR SCHEDULE
UNIT
NO.
LOCATION
MAX
GPM
REMARKS NOTES
AS-ON1 OLD NORWICH PSINTERMEDIATE LEVEL 40 SPIROTHERM VJR200
OR EQUIVALENT PRODUCT -
EXPANSION TANK SCHEDULE
UNIT
NO.
LOCATION TYPE
DIMENSIONS
VOLUME (GALLONS)
REMARKS NOTES
DIAMETER HEIGHT TANK ACCEPTANCE
ET-ON1 OLD NORWICH PSINTERMEDIATE LEVEL DIAPHRAGM 16 33 25 20.2 WESSELS NTA-40
OR EQUIVALENT -
PUMP SCHEDULE
UNIT
NO.
LOCATION TYPE GPM
TOTAL
HEAD
PUMP
EFF.
INPUT
W
SUCTION / DISCHARGE
INCHES
MOTOR DATA
REMARKS NOTES
HP VOLTS PHASE
CP-ON1 OLD NORWICH PSINTERMEDIATE LEVEL IN-LINE 22.75 8.5 55.8% 92.2 1.25 / 1.25 107W 120 1 GRUNDFOS MAGNA1 32-60F
OR EQUIVALENT -
BP-ON1 OLD NORWICH PSINTERMEDIATE LEVEL IN-LINE 19 4 - 179 1 / 1 197W 120 1 GRUNDFOS UPS 26-99 FC
OR EQUIVALENT 1
NOTES: 1. VARIABLE SPEED BOILER PUMP PROVIDED BY BOILER MANUFACTURER.
INDIRECT GAS FIRED MAKE UP AIR UNIT SCHEDULE
UNIT
NO.
LOCATION
SERVED
CFM
MIN
OA
ESP
IN WC
BTUH
INPUT
BTUH
OUTPUT
THERMAL
EFFICIENCY
ELECTRICAL
REMARKS NOTES
HP VOLTS PHASE MCA MOCP
MUA-EG1 EVERGREEN PSWET WELL 3350 3350 1.25 225,000 180,000 80% 3 480 3 6.6 10 REZNOR RDH-225
OR EQUIVALENT 1-9
NOTES: 1. 409 STAINLESS STEEL HEAT EXCHANGER 4. BAFFLED INTAKE HOOD 7. FACTORY MOUNTED AND WIRED DISCONNECT SWITCH
2. 4:1 MODULATION5. 4" MERV 8 FILTERS8. FILTER PRESSURE SWITCH
3. LOW LEAKAGE MOTORIZED SUPPLY DAMPER6. DOUBLE WALL INSULATED CABINET9. DISCHARGE AIR TEMPERATURE CONTROL
FAN SCHEDULE
UNIT
NO.
LOCATION
SERVED
CFM
T.S.P.
IN WC
FAN
RPM
SONES
DRIVE
TYPE
TYPE
MOTOR DATA
NEMA REMARKS NOTES
HP RPM VOLTS PHASE
EF-ON1 OLD NORWICH PSDRY WELL 1980 1 1487 13.7 DIRECT INLINE
CENTRIFUGAL 3/4 1500 120 1 4X GREENHECK SQ-140-VGOR EQUIVALENT PRODUCT 1,3,5,6,9
EF-ON2 OLD NORWICH PSWET WELL 600 0.5 1209 9.7 BELT INLINE
MIXED FLOW 1/3 1725 120 1 7 GREENHECK QEI-9-II-3OR EQUIVALENT PRODUCT 2,3,5,7,10,11
SF-ON1 OLD NORWICH PSDRY WELL 1980 0.75 1375 12.5 DIRECT INLINE
CENTRIFUGAL 3/4 1500 120 1 4X GREENHECK SQ-140-VGOR EQUIVALENT PRODUCT 1,5,6,8
EF-EG1 EVERGREEN PSWET WELL 3350 0.968 1180 15.5 BELT CENTRIFUGAL
SIDEWALL 1-1/2 1725 460 3 7 GREENHECK CUBE-180-15OR EQUIVALENT PRODUCT 2,4,5,7,10
EF-EG2 EVERGREEN PSDRY WELL 3200 1.25 1500 18.3 DIRECT INLINE
CENTRIFUGAL 2 1725 460 3 4X GREENHECK SQ-160-AOR EQUIVALENT PRODUCT 1,5,12
EF-BH1 BLUE HILLS PSDRY WELL 2900 1 1114 14.3 DIRECT CENTRIFUGAL
UPBLAST 1 1725 460 3 4X GREENHECK CUBE-180-VGD-10OR EQUIVALENT PRODUCT 1,4,5,6,9,13
NOTES: 1. PERMATECTOR OR EQUIVALENT FINISH. 3. MOTOR OPERATED DAMPER (FINISH SAME AS FAN). 5. FACTORY MOUNTED AND WIRED DISCONNECT SWITCH. 7. ADJUSTABLE PULLEY, SPARE BELTS 9. FACTORY MOUNTED AND WIRED TWO-SPEED CONTROLLER. 11. BOLTED ACCESS DOOR 13. PROVIDE TRANSITION CURB AS NECESSARY FOR MOUNTING ON EXISTING CURB.
2. HI-PRO POLYESTER OR EQUIVALENT FINISH. 4. GRAVITY OPERATED DAMPER. 6. ELECTRONICALLY COMMUTATED MOTOR. 8. FACTORY MOUNTED AND WIRED POTENTIOMETER DIAL. 10. EXPLOSION PROOF MOTOR, SPARK RESISTANT CONSTRUCTION. 12. PROVIDE WITH VFD RATED TEFC MOTOR WITH SHAFT GROUNDING PROTECTION.
SUMP PUMP SCHEDULE
UNIT
NO.
LOCATION TYPE GPM
TOTAL
HEAD
DISCHARGE
INCHES
MOTOR DATA
NEMA REMARKS NOTES
HP VOLTS PHASE RPM
SP-ON1 OLD NORWICH PSPUMP ROOM SUBMERSIBLE 20 22 2.0 0.5 120 1 1750 7 ZOELLER MX282
OR EQUIVALENT 1
NOTES: 1. SIMPLEX PUMP WITH INTEGRAL CONTROLS.
BOILER SCHEDULE
UNIT
NO.
LOCATION
GROSS
OUTPUT
MBH
NET I-B-R
RATING
MBH
GAS
INPUT
CU FT
GPM ΔT
ΔP
(FT HD)
AHRI
EFF.
VENT INTAKE GAS REMARKS NOTES
B-ON1 OLD NORWICH PSINTERMEDIATE LEVEL 184 160 199.9 19 20 1.1 95% 4" 4" 1/2" LOCHINVAR WHN200
OR EQUIVALENT PRODUCT 1,2
NOTES: 1. PROVIDE WITH CONDENSATE NEUTRALIZATION KIT, ALARM SYSTEM, FLOW SWITCH KIT, PROPANE CONVERSION KIT, AND VARIABLE SPEED BOILER PUMP. 2. 30% PROPYLENE GLYCOL SOLUTION.
PIPE BOILER DRAIN TOSUMP PIT WITH ACIDNEUTRALIZING KIT
DRAIN WITH HOSEEND CONNECTION 6"ABOVE FLOOR
UNION (TYP)
BOILER PIPING DETAIL
NTS
12" MAX.
BOILER CIRCULATING PUMPSEE "CIRCULATING PUMPINSTALLATION DETAIL"
2" HWS
2" HWR
2" HWR
PSV
SEE "GLYCOL FILLSTATION DETAIL"
AIR VENT
2" HWS TO SYSTEM
2" HWR FROM SYSTEM
TEMPERATURE ANDPRESSURE RELIEF VALVE
PIPE TO FLOOR DRAIN
THERMOMETER (TYP)
FLOOR
1"
2
ELECTRIC UNIT HEATER
6
4
4
3
CONVECTOR
5
2
ELECTRIC UNIT HEATER
4
M
CONTROL ROOM
FAN ROOM
CONVECTORCONVECTOR
1
1
22
4
4
8"Ø E 12"x8" E
UTILITYSET FAN
3
33
5
5
ELECTRIC UNIT HEATER
ELECTRIC UNIT HEATER
1
-
MOTORIZEDINTAKEDAMPER(D-ON-E1)
ATC-
1
7
1 1
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
MEC
\140
64-M
S-O
LDN
ORW
ICHR
DPS-
DEM
OM
OD.
DWG
| O
ldN
orw
ichR
dPS-
Dem
o |
1:10
.123
6467
7 |
---- |
7/1
2/20
19 3
:31:
28 P
M |
ELL
IOTT
.LAG
NER
LAST
SAV
ED B
Y: R
ODN
EY.G
REEN
E 7/
12/2
019
2:47
PM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
OLD
NO
RWIC
H RO
AD P
UM
P ST
ATIO
NDE
MO
LITI
ON
PLA
NS
AND
SECT
ION
M-3
ISSU
ED F
OR
BIDD
ING
BBB
NSB
OCT
OBE
R 20
18N
SBO
CTO
BER
2018
1406
4
DAD
07-1
9BB
BRT
G
DRAWING NOTES:
1. FOR MECHANICAL NOTES, LEGEND AND ABBREVIATIONS, REFER TO DRAWING M-1.
DEMOLITION NOTES:
1 REMOVE/DEMOLISH EXISTING INLINE EXHAUST FAN IN ITS ENTIRETY INCLUDING, BUTNOT LIMITED TO; FAN, SUPPORTS, WIRING AND CONTROLS. CUT BACK EXISTINGDUCTWORK AS SHOWN IN SECTION. INSULATE, CAP, AND SEAL EXISTING DUCT AT WALLPENETRATION
REMOVE/DEMOLISH EXISTING ELECTRIC UNIT HEATER IN ITS ENTIRETY INCLUDING, BUTNOT LIMITED TO; UNIT HEATER, SUPPORTS, WIRING, AND CONTROLS.
REMOVE/DEMOLISH EXISTING UTILITY SET EXHAUST FAN IN ITS ENTIRETY INCLUDING,BUT NOT LIMITED TO; FAN, SUPPORTS, WIRING, CONTROLS, DUCTWORK, AND ALLASSOCIATED APPURTENANCES.
REMOVE/DEMOLISH EXISTING DEHUMIDIFIER IN ITS ENTIRETY INCLUDING, BUT NOTLIMITED TO; UNIT, SUPPORTS, WIRING, CONTROLS, DUCTWORK, AND ALL ASSOCIATEDAPPURTENANCES.
REMOVE/DEMOLISH EXISTING ELECTRIC CONVECTOR IN ITS ENTIRETY INCLUDING, BUTNOT LIMITED TO; UNIT, SUPPORTS, WIRING AND CONTROLS.
REMOVE/DEMOLISH EXISTING SUMP PUMP IN ITS ENTIRETY. CUT BACK ASSOCIATEDPIPING TO UNION, CLEAN AND PREPARE FOR CONNECTION TO NEW.
REMOVE/DEMOLISH EXISTING AUTOMATIC TEMPERATURE CONTROL PANEL IN ITSENTIRETY INCLUDING BUT NOT LIMITED TO; PANEL, WIRING, CONTROL DEVICES, ANDALL ASSOCIATED APPURTENANCES.
2
3
4
5
6
CONTROL ROOM AND FAN ROOM DEMOLITION PLAN
SCALE: 1/4"=1'-0"
SCALE:SECTION
"SCANNED"1
-
(APPROX. 1/4"=1'-0")
PUMP ROOM & WET WELL DEMOLITION PLAN
SCALE: "SCANNED"(APPROXIMATELY 1/4"=1'-0")
MOTOR ROOM AND COMMINUTOR ROOM DEMOLITION PLAN
SCALE: "SCANNED"(APPROXIMATELY 1/4"=1'-0")
N
7
REBALANCETO 660 CFM
REBALANCESUPPLYREGISTER TO660 CFM
1" DRAIN DN TOSUMP PIT
1-1/2" SDTO EXISTING
UHON3
DHON2
SPON1
3/4" HWS& HWR UP
3/4" HWS & HWR
VH/S-ON4
1-1/2" HWS & HWRUP AND 3/4" HWS& HWR DN
3/4" HWS & HWR
REBALANCESUPPLYREGISTER TO660 CFM
REBALANCETO 660 CFM
1-1/2" HWS & HWR
3/4" HWS & HWR
G G G G G G
1" G UP 1" G
1" G DN TO B-ON1
12"Ø E UP& DN TOOED/WWMS 18"AFF
4" AIR INTAKE AND VENT UP
2" HWS & HWR
1-1/2" HWS & HWR
1" HWS &HWR UP
CPON1
BPON1
BON1
UHON2
UHON5
ASON1
ETON1
2" HWS & HWR
1"
VH/S-ON3
GAS TIGHT SEALS(TYP. FOR 4)
1
-
M
CONTROL ROOM
FAN ROOM
12"Ø E DN THRU FLOOR
1" HWS & HWR DN
12"Ø E
10"Ø E
12"Ø E TRANSITIONTO EXISTING
1" GX TO 1000 GALLONPROPANE TANK. COORDINATEEXACT LOCATION OF TANKWITH PROPANE SUPPLIER ANDEXISTING SITE CONDITIONS
1" G DNSHUTOFF VALVEIN VERTICAL
1-1/2" HWS& HWR DN
18"x18"
4" AIR INTAKE AND VENT - TERMINATE INSTRICT ACCORDANCE WITHMANUFACTURERS RECOMMENDATIONS
(IN VERTICAL)
L-ON1
M
M
1" DRAIN DNTO UTILITYSINK
EFON1
DHON1
SFON1
UHON1
UHON4 EF
ON2(IN VERTICAL)
(IN VERTICAL)
D-ON1
L-ON2
MD-ON2
FFSL-ON1
H/S-ON1V
VH/S-ON2
ATC-ON1
M
MOTORIZEDINTAKEDAMPER(D-ON-E1)
TV
SFON1
REBALANCE TO660 CFM (TYP)
18"x18" OEDW/ WMS
EFON1
24"x36"x36"PLENUM
18"x18"
12"Ø E
10"Ø E
12"Ø E TRANSITIONTO EXISTING
FFSL-ON2
S S
NEW LOUVERAND MOD
58" PLYWOOD
PT 2x3
SHINGLE SIDING
EXISTINGCONCRETE
EXIS
TIN
G C
ON
CRET
E
58" WOOD TRIM
MATCH EXISTING
2"
LOUVER SILL DETAIL
NTS
S S
SHINGLE SIDING
EXISTINGCONCRETE
58" WOOD TRIM
MATCH EXISTING
LOUVER JAMB DETAIL
NTS
NOTE:1. ALL SIDING AND TRIM SHALL BE CLEAR WHITE CEDAR
AND SHALL MATCH EXISTING.2. NEW MATERIALS SHALL MATCH EXISTING.3. ALL CONCRETE SHALL BE 4000 PSI.4. PAINT ALL NEW ITEMS INSTALLED.5. STAIN/PAINT THE NEW SIDING AND TRIM TO MATCH
THE EXISTING.
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
MEC
\140
64-M
S-O
LDN
ORW
ICHR
DPS-
DEM
OM
OD.
DWG
| O
ldN
orw
ichR
dPS-
Mod
| 1
:10.
1236
4677
| --
-- |
7/12
/201
9 3:
31:3
0 PM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
RO
DNEY
.GRE
ENE
7/12
/201
9 2:
47 P
M
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
OLD
NO
RWIC
H RO
AD P
UM
P ST
ATIO
NM
ODI
FICA
TIO
NS
PLAN
S, S
ECTI
ON
, & D
ETAI
LS
M-4
ISSU
ED F
OR
BIDD
ING
BBB,
GBH N
SBO
CTO
BER
2018
NSB
OCT
OBE
R 20
1814
064
DAD
07-1
9BB
BRT
G
DRAWING NOTES:
1. FOR MECHANICAL NOTES, LEGEND AND ABBREVIATIONS, REFER TO DRAWING M-1.
CONTROL ROOM AND FAN ROOM MODIFICATIONS PLAN
SCALE: 1/4"=1'-0"
SCALE:SECTION
"SCANNED"1
-
(APPROX. 1/4"=1'-0")
PUMP ROOM & WET WELL MODIFICATIONS PLAN
SCALE: "SCANNED"(APPROXIMATELY 1/4"=1'-0")
MOTOR ROOM AND COMMINUTOR ROOM MODIFICATIONS PLAN
SCALE: "SCANNED"(APPROXIMATELY 1/4"=1'-0")
N
5"x14"
10"x14"
24"x12"
SR-2
SR-2
ER-X
TWO (2) ADDITIONALSUPPLY REGISTERSSR-2 BELOW
SR-310"x12"
10"x12"
6"x12"
PUMP
CONTROL ROOM
GRINDER ROOM
1
1
12
6"x4" S
24"x12" S UP & DN
18"x15" E
18"Ø E
14"x20" E
14"x20" E
SR-X
SR-X
ER-X
ER-X
G G G G
1-1/2" G
30"x10"
FILTER PULLSPACE
REFRIGERATIONPIPING UP
FC
FC
SR-X
SR-X
1" CW
1" BACKFLOW PREVENTER
1-1/2" CW
1" PW1/2" CW
AIR COMPRESSOR
INSULATEDDUCTWORK
1-1/2" G UPTO GAS METER
CONTROLPANEL (AHU)
1" GATE VALVE (TYP)
PLANT WATER PUMP
GG
ELECTRICAL ROOM
STAIR
BATHROOM
6"x10" S
FILTER RACK
VIBRATIONISOLATION(TYP OF 4) COOLING COIL
AHUX
4
2
1
1
6
4
4
18"Øx22"Ø ELBOW
M
FCFC
TV
VD
VD IN DROP
30"x30" DOWNTHROUGH CURBTO DUCT BELOW
FC
FC
24"x12" S DN
60"x24"LOUVER
VD
ATC-1
MOD
MOD
MOD
M
BACKDRAFTDAMPER
INSULATED DUCTWORK
DUCTWORKINSULATED
STAIR
STAIR
WETWELL ENTRY
DRYWELL ENTRY
CUX
EFX
M
SFX
EFX
5
6
2
2
1
1
3 1-1/2" G DN4GAS METER
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
MEC
\140
64-M
S-EV
ERG
REEN
PS-D
EMO
MO
D.DW
G |
Eve
rgre
enPS
-Dem
o |
1:10
.123
6467
7 |
---- |
7/1
2/20
19 3
:31:
43 P
M |
ELL
IOTT
.LAG
NER
LAST
SAV
ED B
Y: R
ODN
EY.G
REEN
E 7/
12/2
019
2:48
PM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
EVER
GRE
EN P
UM
P ST
ATIO
NDE
MO
LITI
ON
PLA
NS
M-5
ISSU
ED F
OR
BIDD
ING
BBB
NSB
OCT
OBE
R 20
18N
SBO
CTO
BER
2018
1406
4
DAD
07-1
9BB
BRT
G
PUMP CONTROL ROOM & GRINDER ROOM DEMOLITION PLAN
SCALE: 1/4"=1'-0"
ELECTRICAL ROOM DEMOLITION PLAN
SCALE: 1/4"=1'-0"
ENTRY LEVEL DEMOLITION PLAN
SCALE: 1/4"=1'-0"
DRAWING NOTES:
1. FOR MECHANICAL NOTES, LEGEND AND ABBREVIATIONS, REFER TO DRAWING M-1.
DEMOLITION NOTES:
1 REMOVE/DEMOLISH EXISTING SUPPLY FAN IN ITS ENTIRETY INCLUDING, BUT NOTLIMITED TO; FAN, SUPPORTS, WIRING & CONTROLS. DEMOLISH ALL ASSOCIATEDDUCTWORK AND APPURTENANCES. BLANK OFF EXISTING LOUVER.
REMOVE/DEMOLISH EXISTING EXHAUST FAN IN ITS ENTIRETY INCLUDING, BUT NOTLIMITED TO; FAN, SUPPORTS, WIRING & CONTROLS. DEMOLISH ALL ASSOCIATEDDUCTWORK AND APPURTENANCES.
REMOVE/DEMOLISH EXISTING EXHAUST FAN IN ITS ENTIRETY INCLUDING, BUT NOTLIMITED TO; FAN, SUPPORTS, WIRING & CONTROLS. CUT BACK DUCTWORK ASNECESSARY FOR INSTALLATION OF NEW FAN.
REMOVE/DEMOLISH EXISTING DIRECT GAS FIRED AIR HANDLER IN ITS ENTIRETYINCLUDING, BUT NOT LIMITED TO; UNIT, SUPPORTS, WIRING & CONTROLS. DEMOLISHASSOCIATED DUCTWORK, PIPING, AND APPURTENANCES TO POINTS INDICATED.
REMOVE/DEMOLISH EXISTING LOUVER AND ASSOCIATED DUCTWORK ANDAPPURTENANCES. COORDINATE INFILL OF EXISTING OPENING WITH GENERALCONTRACTOR.
REMOVE/DEMOLISH DEHUMIDIFICATION COIL AND ASSOCIATED CONDENSING UNIT INTHEIR ENTIRETY, INCLUDING BUT NOT LIMITED TO; EQUIPMENT, REFRIGERANT PIPING,SUPPORTS, WIRING, & CONTROLS.
2
3
4
5
6
N
PUMP
CONTROL ROOM
GRINDER ROOM
6"x12" S UP
6"x12" S
S-1580
E-11180
(EL 8'-0" AFF)
18"x18" E UP
E-11180
(EL 2'-0" AFF)
S-1580
(EL 10'-0" AFF)
S-1580
(EL 1'-0" AFF)
20"x14" SUP & DN
14"x12" STOD 8'-0" AFF
VH/S-EG3
1" CW
1" BACKFLOW PREVENTER
1-1/2" CW
1" PW1/2" CW
AIR COMPRESSOR
CONTROLPANEL (AHU)
1" GATE VALVE (TYP)
PLANT WATER PUMP
ELECTRICAL ROOM
STAIR
BATHROOM
VD VD 18"x18" E DN
10"Ø OEDW/WMS -340 CFMTV
TV
TV6"x12" S DN
6"x12" S
24"x14" S UP &20"x14" S DN
S-1580
20"x20" S 30"x14" S UP
S-2330
(EL 7'-0" AFF)
18"x20" E
18"x20" E UPTO 20"Ø E UP
FFSL-EG1
VH/S-EG2
M
TV
30"x30" DOWNTHROUGH CURBTO DUCT BELOW
ATC-EG1
MOD
STAIR
STAIR
WETWELL ENTRY
DRYWELL ENTRY
1-1/2" GGAS METER
GG
GG
60"x24"LOUVER
G G G G G G G
G G
G
G G
LOUVER BLANK-OFF PANEL -REFER TO DETAIL
EFEG2
1" GCL EL 8'-4" AFF
1-1/2" GCL EL 8'-4" AFF
1-1/4" GCL EL 8'-4" AFF
18"x18" ETOD 8'-0" AFF
30"x14" S DN
AHUEG1
30"x14" S
1-1/4" G
EFEG1
24"x30"x24"PLENUM
20"Ø E DN
18"x18" EBOD 1'-0" AFF
12"Ø OED W/WMS -650 CFM
12"Ø ETOD 8'-0" AFF
18"x18" E
MUAEG1
VD
1" G
24"x18" S DN -TRANSITION DN TO24"x14" PRIOR TOFLOOR PENETRATION
S-1650
VD
24"x18" S
RE-USEEXISTING WALLPENETRATION
PROVIDE STRUCTURAL STEEL SUPPORTFRAME. REFER TO MAKEUP AIR UNITMUA-EG1 SUPPORT FRAME DETAIL THISSHEET. COORDINATE EXACT LOCATIONWITH EXISTING SITE CONDITIONS.
MD-EG1
MD-EG2
NEW WALLPENETRATION.REFER TO WALLPENETRATIONDETAIL.
NEW WALLPENETRATION.REFER TO WALLPENETRATIONDETAIL.
V H/S-EG1
FFSL-EG2
GAS TIGHT SEAL
2'-9
3/4
"**
6'-4 1/2"**
L3x3x38
COLUMN(TYP OF 4)
L4x4x12 (TYP)
A
-
PLAN
SCALE: 3/4"=1'-0"
4'-6
"
1" GROUT
10"Ø SONOTUBEW/3 #4 VERTAND #3 TIES 9" OC
L3 W/ 1 2" WELDEDBASE PLATEAND 1-3
4"Ø SS EPOXYANCHOR
L3 W/2-3
4"Ø BOLTS
6"
L4
3" SQx12" PLATE
WELDED TO L4
SCALE:DETAIL
1"= 1'-0"A
-
2'-6
"
CONCRETE FOOTING
S
THRU WALL FLASHING& WEEPS @ 1'-4" OC
EXIST BRICK
CONC
L312x5x5
16 (GALV)
1/2
MJ
WALL PENETRATION DETAIL
NTS
SS
S
DUCT
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
MEC
\140
64-M
S-EV
ERG
REEN
PS-D
EMO
MO
D.DW
G |
Eve
rgre
enPS
-Mod
| 1
:10.
1236
4677
| --
-- |
7/12
/201
9 3:
31:4
5 PM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
RO
DNEY
.GRE
ENE
7/12
/201
9 2:
48 P
M
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
EVER
GRE
EN P
UM
P ST
ATIO
NM
ODI
FICA
TIO
NS
PLAN
S &
DET
AILS
M-6
ISSU
ED F
OR
BIDD
ING
RTG
,BBB N
SBO
CTO
BER
2018
NSB
OCT
OBE
R 20
1814
064
DAD
07-1
9BB
BRT
G
PUMP CONTROL ROOM & GRINDER ROOM MODIFICATIONS PLAN
SCALE: 1/4"=1'-0"
ELECTRICAL ROOM MODIFICATIONS PLAN
SCALE: 1/4"=1'-0"
ENTRY LEVEL MODIFICATIONS PLAN
SCALE: 1/4"=1'-0"
DRAWING NOTES:
1. FOR MECHANICAL NOTES, LEGEND AND ABBREVIATIONS, REFER TO DRAWING M-1.
NOTE: EQUIPMENT NOT SHOWN FOR CLARITY
MAKEUP AIR UNIT MUA-EG1 SUPPORT FRAME
GENERAL NOTES:1. ** INDICATES THAT THE GENERAL CONTRACTOR SHALL COORDINATE EXACT DIMENSION AND/OR ELEVATION BASED ON EQUIPMENT SUPPLIED. ALL CHANGES SHALL BE REVIEWED WITH NO EXCEPTIONS TAKEN BY THE ENGINEER.
STRUCTURAL STEEL NOTES:
1. STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING:A. CHANNELS AND ANGLES - ASTM A36 (GRADE 36)B. PLATES - ASTM A572 (GRADE 50)STRUCTURAL STEEL SHALL BE FABRICATED IN COMPLIANCE WITH THE
THIRTEENTH (13TH) EDITION OF THE AISC STEEL CONSTRUCTION MANUAL.2. FIELD CONNECTIONS SHALL BE BY ASTM A325-N HIGH STRENGTH BOLTS EXCEPT AS NOTED.
BOLTS SHALL BE 3/4"Ø IN 13/16"Ø HOLES EXCEPT AS NOTED. ALL BOLTED CONNECTIONS SHALLBE CONSIDERED "SNUG TIGHTENED" UNLESS SPECIFICALLY INDICATED AS "SLIP-CRITICAL".WHERE FIELD WELDING IS REQUIRED DUE TO MISMATCHED BOLT HOLES OR OTHER FIELDMODIFICATIONS, SUBMIT DETAILS TO THE ENGINEER FOR REVIEW.
STRUCTURAL NOTES:
N
RS
RS RS
RL
RL RL
1-1/8" RS &1/2" RL
CAPPED
FOS
FOS
FOR
FOR
FOR
FOSFORFOR FOR
FOS
FOS
FOS
FC
FC
1-1/8" RS &1/2" RL UPTHRU ROOF
20"x18" S
TV
CONTROL ROOM
3/4" RS &3/8" RL
3/4" GENERATOR FOS &FOR UP TO GENERATOR
3/4" FOS UP TO PUMP
3/4" GENERATOR FOR UP
3/4" OVERFLOW UP
3/4" GENERATORFOS UP
3/4"Ø CONDENSATEDRAIN
TV
FS
RS
RS RS
RL
RL RL
3/4" RS &3/8" RL UPTHRU ROOF
DC1
HV1
DUCT MOUNTEDFILTER RACK
EF1
1
2
RS
RS RS
RL
RL
1-1/8" RS &1/2" RL
CAPPED
FOS
FOS
FOR
FOR
FOR
FOSFORFOR FOR
FOS
FOS
FOS
FC
FC
1-1/8" RS &1/2" RL UPTHRU ROOF
20"x18" S
TV
CONTROL ROOM
3/4" RS &3/8" RL
3/4" GENERATOR FOS &FOR UP TO GENERATOR
3/4" FOS UP TO PUMP
3/4" GENERATOR FOR UP
3/4" OVERFLOW UP
3/4" GENERATORFOS UP
3/4"Ø CONDENSATEDRAIN
TV
FS
RS
RS
RL
RL RL
3/4" RS &3/8" RL UPTHRU ROOF
DC1
HV1
MD-BH1
24"x24"x2" FILTERFRAME - SEAL-TITEMODEL 254 (OREQUIVALENT)
24"x18"
(ON ROOF)
EFBH1
SEE NOTE 2
SEE NOTE 3
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
MEC
\140
64-M
S-BL
UEH
ILLS
PS-D
EMO
MO
D.DW
G |
Blu
eHill
sPS-
Dem
oMod
| 1
:10.
1236
4677
| --
-- |
7/12
/201
9 3:
31:5
3 PM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
RO
DNEY
.GRE
ENE
7/12
/201
9 2:
48 P
M
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
BLU
E HI
LLS
PUM
P ST
ATIO
NDE
MO
LITI
ON
& M
ODI
FICA
TIO
NS
PLAN
S
M-7
ISSU
ED F
OR
BIDD
ING
BBB
NSB
OCT
OBE
R 20
18N
SBO
CTO
BER
2018
1406
4
DAD
07-1
9BB
BRT
G
CONTROL LEVEL - DEMOLITION PLAN
SCALE: "SCANNED"(APPROXIMATELY: 1/4"=1'-0")
N
CONTROL LEVEL - MODIFICATIONS PLAN
SCALE: "SCANNED"(APPROXIMATELY: 1/4"=1'-0")
DRAWING NOTES:
1. FOR MECHANICAL NOTES, LEGEND AND ABBREVIATIONS, REFER TO DRAWING M-1.
2. REINSTALL DEHUMIDIFICATION COIL DC-1. RECONNECT CONDENSATE DRAIN ANDREFRIGERANT PIPING. RECHARGE SYSTEM WITH R-410a.
3. REPLACE EXISTING HV-1 MOTOR WITH NEW TWO-SPEED MOTOR (460V, 3PH, 2HP).REPLACE EXISTING MOTOR STARTER WITH TWO-SPEED MOTOR STARTER. PROVIDEWIRING TO ATC-1 FOR FAN SPEED CONTROL PER SEQUENCES OF OPERATION.
4. MODIFY EXISTING CONTROLS AS NECESSARY TO ACHIEVE THE SEQUENCES OFOPERATION LOCATED IN SPECIFICATIONS SECTION 15604.
DEMOLITION NOTES:
1 TEMPORARILY REMOVE EXISTING DEHUMIDIFICATION COIL (DC-1) AND STORE FORREINSTALLATION. RECOVER REFRIGERANT AND CUT BACK EXISTING PIPING ANDASSOCIATED APPURTENANCES AS NECESSARY TO SERVE NEW LOCATION. DEMOLISHASSOCIATED DUCTWORK AND APPURTENANCES TO POINTS INDICATED; CLEAN ANDPREPARE FOR CONNECTION TO NEW.
REMOVE/DEMOLISH EXISTING ROOF MOUNTED EXHAUST FAN ABOVE, INCLUDING BUTNOT LIMITED TO: FAN, WIRING, & CONTROLS. EXISTING DUCTWORK AND ROOF CURBTO REMAIN.
2
NEMA CLASSIFICATIONS FOR ELECTRICAL
EQUIPMENT AND ENCLOSURES
(UNLESS OTHERWISE NOTED - SEE NOTE BELOW)
PRESSURE SWITCH
FLOAT SWITCH
AMBER
GREEN
PILOT LIGHT,
TIMED CONTACT
TEMPERATURE SWITCH
R
ARG
RED
LIGHTING FIXTURES
INCANDESCENT CEILING FIXTURE
INCANDESCENT LIGHT
INCANDESCENT WALL
Ma,#3
ELECTRICAL HANDHOLE
ELECTRIC WATER HEATER
PRESSURE SWITCH
JUNCTION BOX
PS
H
EWH
RED MUSHROOM-HEAD
OVERLOAD HEATER ELEMENT
LIMIT SWITCH
START PUSHBUTTON,
SELECTOR SWITCH
SINGLE POLE SINGLE
CONTACT NORMALLY CLOSED
CONTACT NORMALLY OPEN
SCHEMATIC DIAGRAM
MOTOR CONTACTOR
TRANSFER SWITCH
CONTROL RELAY
M
CR
EN
FUSE AMPERE RATING
MOTOR
PANELBOARD, FLUSH MTD.
PAD MOUNTED TRANSFORMER
MANUAL MOTOR STARTER, O/L, RIL
EQUIPMENT, TERMINAL,
PANELBOARD, SURFACE MTD.
TRANSFORMERT
MS
UTILITY METER
THERMOSTAT
ENCLOSED CIRCUIT BREAKER
MOTOR OPERATED DAMPER
LIGHTING OR POWER
MOTOR STARTER, RATING
MAGNETIC MOTOR STARTER,
RELAY
SOLENOID
CB
AS NOTED
1
NEMA SIZE
SWITCH AMPERE RATING
GENERATOR
MOTOR (HP AS SHOWN)
GROUND CONNECTION
WYE CONNECTION
DELTA CONNECTION
REVERSING MOTOR STARTER
LIGHTNING ARRESTER
SURGE CAPACITOR
AUTOTRANSFORMER-TYPE
COMBINATION MOTOR
TRIP AMPSCIRCUIT BREAKER
POTENTIAL TRANSFORMER
CURRENT TRANSFORMER
70AT
PT
CT
POWER
FUSED SAFETY SWITCH,
UNFUSED SAFETY SWITCH,
30/15/3
200/3
POLES
POLES
AMPERES
SINGLE LINE DIAGRAM
TRANSFORMER
SAFETY DISCONNECT SWITCH
WEATHERPROOF
SECURITY SYSTEM
GLASS BREAK CONTACT,
DOOR CONTACT
SECURITY SYSTEM FUNCTIONWP
D
W
KTELEPHONE/PAGING/INTERCOM SYSTEM
PAGING HORN, WALL MTD.
PAGING SPEAKER, CEILING MTD.
FIROMATIC SWITCHFIRE ALARM SYSTEM CONTROL
DUCT-MOUNTED SMOKE
S
S
FACPFI
SD
FIRE ALARM SYSTEM
CONDUIT UP
CONDUIT DOWN
CONDUIT AND WIRE
HEAT DETECTOR
SMOKE DETECTOR
AUDIO/VISUAL ALARM STATION
MANUAL PULL STATION
135°H
S
F
F
3C#12 W/GND, .75"C
20 AMPERE, 120 VOLT QUAD
HOME RUN (NO. REFERS TO
HOME RUN TO DEVICE
WIRING INSTALLED IN OR
WIRING, CONCEALED IN
20 AMPERE, 120 VOLT SINGLE
KEY OPERATED
DC WIRING
WHERE PERMITTED BY
EBU-XX
DC
TDEP EXPLOSION PROOF
WIRING
DIMMER SWITCHMOTOR RATED
CLOCK OUTLET
PLUGMOLD
SINGLE POLE WALL SWITCH
SINGLE SPECIAL PURPOSE
P
KWP
43
SDP
30
NEON PILOT LIGHTFOUR WAY SWITCHTHREE WAY SWITCHDOUBLE POLE SWITCH
WEATHERPROOF
INDICATES AMPERE SIZE
20 AMPERE, 120 VOLT DUPLEX
INDICATES INCHES AFF
WIRING DEVICES
IG
WP
+48"
ISOLATED GROUNDCOUNTER TOP
WEATHERPROOF
R
C
T
5
J
H.I.D. WALL MOUNTED FIXTURE
UNIT WITH 2 LAMP HEADS
H.I.D. CEILING FIXTURE
POLE MOUNTED SITE LIGHT
LOCATION
ROOM NAME NEMA RATING
C COOLING ONLYFD
FREEZESTATDUCT-MOUNTED
E ELECTRIC ACTUATED VALVE
OHOVERHEAD DOOR TYPE
AREA GLASS BREAK DETECTORG
A
TWO-SPEED TWO-WINDING
REDUCED VOLTAGE SOLID-STATE MOTOR STARTER
MOUNTED FIXTURE
WITH GLOBE AND GUARD
EMERGENCY LIGHTING BATTERY
DESCRIPTION
FRACTIONAL H.P.
OR CONTROL CABINET
CONTACTOR
HEAD EMERGENCY STOP P.B.
COMBINATION TYPE MAGNETIC
RATING AS NOTED
RATING AS NOTED
RATING AS NOTED
DESCRIPTION
STARTER AND BREAKER
MOTOR STARTER
MOTOR STARTER
LETTER INDICATES COLOR
THROW SWITCH
MOMENTARY CONTACT
STOP PUSHBUTTON,MOMENTARY CONTACT
MAINTAINED-TYPE EMERGENCYSTOP PUSHBUTTON
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
KEYPAD
GLASS MOUNTED TYPE
DESCRIPTION
DESCRIPTION
DETECTOR, REMOTE ALARM & TEST
PANEL
CONDUIT AND WIRE SCHEDULE)
(EBU, ATC, ETC.)
BELOW FLOOR SLAB
FINISHED AREAS, EXPOSED
SPECIFICATIONS
DESCRIPTION
RECEPTACLE
RECEPTACLE
RECEPTACLE
MOUNTING HEIGHT
RECEPTACLE
CTR
A
IR INFRARED INTRUDER SENSOR
FRAME SIZE100AF
VISUAL ALARML
TEMP RATING
(ADA COMPLIANT)
(ADA COMPLIANT)
ES EMERGENCY STOPMUSHROOM SWITCH (RED)
SACP SECURITY ALARM CONTROL PANEL
TELEPHONE OUTLET RJ11
TELEPHONE RJ11/DATA RJ45TD
WALL MOUNTEDW
REMOTE EMERGENCY LIGHTING1 OR 2 LAMP HEADS
FIXTURE (M) SWITCH (a) CIRCUIT (3)
1. ALL SYMBOL LISTS SHALL BE CONSIDERED AS APPLICABLE TO ALL ELECTRICALDRAWINGS FOR THIS PROJECT. SYMBOLS SHOWN ON THIS SHEET ARE FORREFERENCE ONLY AND DO NOT INDICATE THEIR INCORPORATION IN THE DESIGN.
NOTE:
GROUND ROD
EXOTHERMIC WELD CONNECTION
RUN EXPOSED
BOLTED CONNECTION
BARE COPPER CONDUCTOR
GROUNDING
G
G
SPD SURGE PROTECTION DEVICE
MAINTAINED RED MUSHROOM-
MOD
HZ - FREQUENCY METERVAR - VAR METERKWH - KILOWATT HOUR
PF - POWER FACTOR METER
A - AMMETERV - VOLTMETERW - WATTMETERWH - WATT HOURMETER
METER
FLUORESCENT FIXTURE, 2x4 SURFACE TROFFER TYPE
FLUORESCENT FIXTURE, STRIP, OPEN REFLECTOR, ENCLOSED OR WRAPAROUNDTYPE
EXIT SIGN, CEILING MOUNTED ARROW INDICATES EGRESS DIRECTION SHADINGINDICATES SIGN FACE
EXIT SIGN, WALL MOUNTED SHADING INDICATES SIGN FACE
TS SPRINKLER SYSTEM TAMPER SWITCH
FIRE ALARM ANNUNCIATORFAA
RECEPTACLEGFI 20 AMPERE, 120 VOLT DUPLEX
BARE COPPER CONDUCTOR EMBEDDED IN CONCRETE OR BURIED
FUSE
SPRINKLER SYSTEM FLOW SWITCHFS
P PHOTOELECTRIC CELL
P101
THE AREAS NOTED SHALL BE RATED AS INDICATED, EXCEPT THAT EQUIPMENTSUCH AS MOTOR CONTROL CENTERS, SWITCHBOARDS, AND TRANSFORMERSSHALL BE RATED AS SPECIFIED. PANELBOARDS AND TRANSFORMERS SHALL BE,AT A MINIMUM, RATED NEMA 12 IF NOT SPECIFIED.
NOTE:
J
MSMANUAL MOTOR STARTER
CONNECTION POINT FOR EXTERNAL DEVICE
INTERNAL CONNECTION POINT
DESCRIPTION
EM EMERGENCY SHUT-OFF
PAGING HANDSET, WALL MOUNTEDHS
FIRE ALARM REMOTE POWER SUPPLYFRPS
FIRE ALARM SYSTEM "MONITOR MODULE"MM
FAULT ISOLATING MODULE
REMOTE TEST STATIONTS
FIM
#XX INDICATES THE CIRCUIT # OF THE RESPECTIVEPANELBOARD REFERENCED. SEE GENERALNOTES 6 AND 26 FOR CONDUIT AND WIRINGREQUIREMENTS
INTEGRAL LIGHTNING CIRCUIT PROTECTORILCP
1/123R
4
4X
4X CORROSIVE
4X CORROSIVE ABOVE 8'
7
* IN CONCRETE SLAB
ALUMINUMALUMINUM
ALUMINUM
ALUMINUM
RGS PVC COATED
PVC SCHEDULE 80
RGS PVC COATED
N/A
N/A
N/A
EMTRGS
RGS
RGS
RGS
RGS
RGS
PVC SCHEDULE 40
PVC SCHEDULE 40
PVC SCHEDULE 80
RGS PVC COATEDRGS PVC COATED
RGS PVC COATED
RGS PVC COATED
RGS PVC COATED
N/A
RGS PVC COATED
RGS PVC COATED
RGS PVC COATED
RGS PVC COATED
* BELOW GRADE DUCTENCASED IN CONCRETE
* BELOW GRADE DUCTNON ENCASED
AREA NEMA RATINGPER E-1
CONDUIT REQUIRED INEXPOSED AREAS
CONDUIT REQUIREDIN NON EXPOSED
AREAS
CONDUITS EMERGINGFROM GRADE OR
SLAB 12" AFF
** CONDUIT INSTALLATION SCHEDULE
** SEE SPECIFICATIONS FOR FURTHER INFORMATION* SIGNAL CONDUITS BELOW GRADE SHALL BE RGS
BLUE HILLS PUMP STATION
CONTROL ROOMBATH ROOM**ROOFPUMP ROOM
4X124X4X
WETWELL SIDE**WET WELL**INTERMEDIATE LEVEL (WET WELL SIDE)
7 (CLASS I, DIV. 1 GR. C&D)7 (CLASS I, DIV. 1 GR. C&D)
DRYWELL SIDE
GENERAL OUTDOORS 4X
INTERIOR - ALL LOCATIONS 7, (CL I, DIV 1, GR D)
WITHIN 36 INCHES RADIUS OUTSIDE WETWELLOPENINGS (HATCH, VENT, DOOR, ETC.) 7, (CL I, DIV 1, GR D)
ADDITIONAL 24 INCHES RADIUS AROUND ENVELOPENOTED ABOVE (VENTS ONLY) 7, (CL I, DIV 2, GR D)
**
LCSPUSHBUTTON OR LOCALCONTROL STATION
EVERGREEN PUMP STATION
DRYWELL ENTRY 12WETWELL ENTRY 7(CL. I, DIV. 1, GR. C&D)DRYWELL STAIRS 12ELECTRICAL ROOM 12BATHROOM 12WETWELL STAIRS 7(CL. I, DIV. 1, GR. C&D)PUMP CONTROL ROOM 4XGRINDER ROOM 7(CL. I, DIV. 1, GR. C&D)PUMP ROOM 7(CL. I, DIV. 2, GR. C&D)WETWELL NO. 1 7(CL. I, DIV. 1, GR. C&D)WETWELL NO. 2 7(CL. I, DIV. 1, GR. C&D)GENERAL OUTDOORS 4X
OLD NORWICH ROAD PUMP STATION
CONTROL ROOM 12FAN ROOM 4XPUMP ROOM 4XCOMMINUTOR ROOM 7(CL. I, DIV. 1, GR. C&D)WETWELL 7(CL. I, DIV. 1, GR. C&D)MOTOR ROOM 12
GENERAL OUTDOORS 4X
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-1
1406
4A-E
S-LE
GEN
DABB
REVI
ATIO
NN
OTE
S.DW
G |
E-1
| 1:
10.1
2364
677
| ---
- | 7
/18/
2019
11:
48:0
0 AM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
DAN
.GLI
DDEN
7/1
8/20
19 1
0:49
AM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
ELEC
TRIC
AL L
EGEN
D AN
D N
EMA
SCHE
DULE
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
E-1
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
GENERAL NOTES
ABBREVIATIONS
1. ALL GENERAL NOTES, AND ABBREVIATIONS SHALL BE CONSIDERED AS APPLICABLE TOALL ELECTRICAL DRAWINGS FOR THIS PROJECT. ABBREVIATIONS SHOWN ON THIS SHEETARE FOR REFERENCE ONLY AND DO NOT INDICATE THEIR INCORPORATION IN THE DESIGN.
NOTE:
1. THE EXISTING ELECTRICAL DRAWINGS FOR THIS PROJECT ARE BASED ONINFORMATION PRESENTED IN THE AS-BUILT CONTRACT DRAWINGSPROVIDED FOR THIS PROJECT. GENERAL CONTRACTOR SHALL FIELD VERIFYALL DIMENSIONS AND ELEVATIONS AND NOTIFY THE ENGINEER OF ANYDISCREPANCIES.
2. FIELD VERIFY ALL CONDITIONS AFFECTING THE WORK PRIOR TOCONSTRUCTION AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. PROTECT ALL EXISTING ITEMS AND EQUIPMENT ADJACENT TO THE WORKAREA. ALL EXISTING ITEMS, EQUIPMENT AND MATERIALS DAMAGED ORAFFECTED BY THE WORK SHALL BE REPAIRED OR REPLACED AT NOADDITIONAL COST TO THE OWNER.
4. EACH OF THE EXISTING PROJECT LOCATIONS SHALL REMAIN IN OPERATIONDURING THE CONSTRUCTION OF THE PROJECT. THE CONTRACTOR WILLCOORDINATE THE DEMOLITION AND CONSTRUCTION WITH THE OWNER'SREQUIREMENTS TO MAINTAIN EACH OF THE PROJECT LOCATIONSOPERATIONAL. THE CONTRACTOR SHALL PROVIDE TEMPORARY SERVICES ASNECESSARY.
5. PROVIDE ALL TEMPORARY BRACING REQUIRED AND SUPPORT ALL ITEMSAND EQUIPMENT MOUNTED TO THE WALLS WHICH ARE DESIGNATED TO BEREMOVED. REINSTALL ALL ITEMS AFTER THE NEW WALLS ARE COMPLETED.
6. PATCH, REPAIR AND REFINISH ALL EXISTING SURFACES AFFECTED BY THEWORK, TO THE SATISFACTION OF THE ENGINEER.
7. REMOVE, REINSTALL OR REPLACE ALL MISCELLANEOUS ITEMS MOUNTED TOTHE WALLS DESIGNATED TO BE REMOVED OR RENOVATED.
8. ALL ITEMS SHOWN ON THE PLANS WITH SHADING ARE TO BE REMOVEDAND DISPOSED OF, UNLESS OTHERWISE INDICATED. THIS SHALL INCLUDEALL ASSOCIATED CONDUIT, WIRING, BOXES, DEVICES, CONTROLS, ETC.UNLESS OTHERWISE NOTED. THE OWNER RESERVES THE RIGHT TO RETAINANY EQUIPMENT OR MATERIALS. THE CONTRACTOR WILL STORE ON SITEAND PROTECT SUCH ITEMS IN A MANNER ACCEPTABLE TO THE OWNER ANDENGINEER. ALSO REFER TO THE STRUCTURAL, MECHANICAL, PROCESS ANDELECTRICAL DRAWINGS FOR A COMPLETE REQUIREMENT OF DEMOLITIONWORK FOR THIS PROJECT.
9. ALL 120/208V ELECTRICAL EQUIPMENT TO REMAIN WHICH IS FED FROMPANELBOARDS OR EQUIPMENT DESIGNATED AS BEING REMOVED ORRELOCATED, SHALL REMAIN AND BE REWIRED FROM NEW OR RELOCATEDPANELBOARDS OR EQUIPMENT AS NOTED ON THE MODIFIED DRAWINGS ORAS REQUIRED BY THE INTENDED OVERALL DEMOLITION OF THIS WORK.REMOVE EXISTING CONDUIT AND WIRING FROM THE APPLICABLE EXISTINGPANELBOARD OR EQUIPMENT BACK TO THE CIRCUITS NEAREST PULLBOX,CONTROLLING DEVICE OR FIXTURE LOCATED OUTSIDE THE AREA BEINGDEMOLISHED AND RE-FEED AS NOTED ON THE MODIFIED DRAWINGS.RE-FEED THE EXISTING EQUIPMENT WITH NEW CONDUIT AND WIRING FORA COMPLETE INSTALLATION. SPLICING OF WIRING SHALL NOT BE ALLOWED.
10. THE EXISTING PANELBOARD CIRCUIT DESCRIPTIONS SHOWN WERE TAKENFROM EXISTING PANELBOARD DIRECTORIES OBTAINED IN THE FIELDAND/OR BY EXISTING RECORD DRAWING PANELBOARD SCHEDULES. THEACCURACY OF THESE DESCRIPTIONS HAS NOT BEEN FIELD VERIFIED. THECONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL CIRCUITRY,AS APPLICABLE FOR THIS PROJECT, ASSOCIATED WITH THE PANEL, ANDREPORT ANY DISCREPANCIES TO THE ENGINEER.
GENERAL DEMOLITION NOTES: 27. POWER CONDUITS FOR THREE PHASE AND SINGLE PHASE CIRCUITS(DESIGNATED WITH "P" NUMBERS) ARE SHOWN ON POWER PLANS, WITHCONDUIT SIZES AND WIRING INFORMATION INDICATED IN THE CONDUITAND WIRE SCHEDULES.
28. CONTROL AND INSTRUMENTATION SIGNAL CONDUITS (DESIGNATED WITH"C" AND "S" NUMBERS OR, ALTERNATIVELY, INDICATED BY WAY OF ALEGEND) ARE SHOWN ON CONTROL AND INSTRUMENTATION WIRINGDIAGRAMS, WITH CONDUIT SIZES AND WIRING INFORMATION INDICATEDEITHER IN THE LEGEND OR IN CONDUIT AND WIRE SCHEDULES. THECONTRACTOR SHALL NOTE THAT THE MAJORITY OF CONTROL ANDINSTRUMENTATION SIGNAL CONDUITS AND WIRING REQUIRED FOR THISCONTRACT IS INDICATED IN THE AFOREMENTIONED LEGEND AND DOES NOTAPPEAR IN THE CONDUIT AND WIRE SCHEDULES. FOR INSTRUMENTSREQUIRING 120V POWER SUPPLIES, THIS INFORMATION IS ALSO SHOWN ONTHE CONTROL AND INSTRUMENTATION WIRING DIAGRAMS.
29. CONTRACTOR SHALL LABEL EACH RESPECTIVE DISTRIBUTION PANEL,SWITCHBOARD OR MCC WITH THE FEEDER POWER CIRCUIT NAME ANDLOCATION PER NEC REQUIREMENTS.
30. ALL PRIMARY FEEDER DISCONNECTS SERVING REMOTELY LOCATEDTRANSFORMERS SHALL BE LOCKABLE. CONTRACTOR SHALL LABEL PRIMARYDISCONNECT LOCATION AT THE TRANSFORMER SERVED PER NECREQUIREMENTS.
31. FOR ALL OUTDOOR ELECTRICAL EQUIPMENT AND INSTRUMENTATION,CONTRACTOR SHALL USE CONDUIT INSTALLATION MEANS AND METHODSNECESSARY TO MITIGATE MOISTURE AND CONDENSATION PER NEC ANDINSTALLATION METHODS LISTED IN SPECIFICATIONS. MITIGATION METHODSINCLUDE DRIP LOOPS, AVOIDING TOP ENTRY, USE OF BREATHERS, DRAINS,AND DUCT SEALANT AS NECESSARY.
32. DO NOT SCALE DISTANCES OR DIMENSIONS FROM THE DRAWINGS.WRITTEN DIMENSIONS SHALL PREVAIL. REPORT AND DISCREPANCIES TO THEENGINEER.
A AMPEREAC ALTERNATING CURRENTACR CONTROL RELAY "A" (TYP)AFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEAI ANALOG INPUT (PLC)AIC AMPERE INTERRUPTING CAPACITYAL ALUMINUMAO ANALOG OUTPUT (PLC)ASYM ASYMMETRICALATC AUTOMATIC TEMPERATURE CONTROLATS AUTOMATIC TRANSFER SWITCHAUX AUXILIARYAWG AMERICAN WIRE GAUGEBFG BELOW FINISHED GRADEBKR BREAKERBOS BOTTOM OF STEELC CONDUITCATV CABLE TELEVISIONCB CIRCUIT BREAKERCCF CARBON CANISTER FILTERCI CONTROL INTERLOCKCKT CIRCUITCP CONTROL PANELCR CONTROL RELAYCPT CONTROL POWER TRANSFORMERCT CURRENT TRANSFORMERCU COPPERDACT DIGITAL ALARM COMMUNICATOR
TRANSMITTERDB DIRECT BURIEDDBH DIESEL BLOCK HEATERDC DIRECT CURRENTDI DIGITAL INPUT (PLC)DISC DISCONNECTDN DOWNDO DIGITAL OUTPUT (PLC)EBU EMERGENCY BATTERY UNITEC ELECTRICAL CONTRACTOREF EXHAUST FANEG EQUIPMENT GROUNDEH ELECTRICALLY HELDEHH ELECTRICAL HANDHOLEEM EMERGENCYEMT ELECTRICAL METALLIC TUBINGEO ELECTRICALLY OPERATEDEP EXPLOSION PROOF CL I DIV 1 GR DEPR ETHYLENE PROPYLENE RUBBEREQUIP EQUIPMENTES EMERGENCY STOPEWC ELECTRIC WATER COOLEREWH ELECTRIC WATER HEATEREX EXTERIOREXIT EXISTINGF FIELDFA FIRE ALARMFAA FIRE ALARM ANNUNCIATORFACP FIRE ALARM CONTROL PANELFBO FURNISHED BY OTHERSFC FOOTCANDLEFE FLOW ELEMENTFIT FLOW INDICATOR TRANSMITTERFLUOR FLUORESCENTFNR FORWARD NEUTRAL REVERSEFS FLOW SWITCHFTR FIN TUBE RADIATORFU FUSEFWE FURNISHED WITH EQUIPMENTFVNR FULL VOLTAGE NON-REVERSINGFVR FULL VOLTAGE REVERSINGGCP GENERATOR CONTROL PANELGEN GENERATORGF GROUND FAULTGFI GROUND FAULT CIRCUIT INTERRUPTERGND GROUNDHH HANDHOLEHID HIGH INTENSITY DISCHARGEHIT HIGH INTENSITY TUNGSTENHOA HAND-OFF-AUTOMATICHP HORSEPOWERHPS HIGH PRESSURE SODIUMHTR HEATERHV HIGH VOLTAGEHVAC HEATING VENTILATING AIR CONDITIONINGHWV HOT WATER VALVEHZ HERTZIG ISOLATED GROUNDIMC INTERMEDIATE METAL CONDUITINCAND INCANDESCENTISR INTRINSICALLY SAFE RELAYJB JUNCTION BOXK KILOKCMIL THOUSAND CIRCULAR MILSKV KILOVOLTKVA KILOVOLT-AMPEREKVAR KILOVOLT-AMPERE REACTIVEKW KILOWATTKWH KILOWATT-HOURL LOCALLA LIGHTNING ARRESTERLCP LOCAL CONTROL PANELLCS LOCAL CONTROL STATIONLE LEVEL ELEMENTLI LEVEL INDICATORLIT LEVEL INDICATOR TRANSMITTERLP LIGHTING PANELLPS LOW PRESSURE SODIUMLSW LIGHT SWITCHLS LEVEL SWITCH
L=LOW, H=HIGH, LL=LOW LOW, HH=HIGH HIGHLT LEVEL TRANSMITTERLTG LIGHTINGLV LOW VOLTAGEMC METAL CLADMCB MAIN CIRCUIT BREAKERMCC MOTOR CONTROL CENTERMCP MOTOR CIRCUIT PROTECTOR
MFR MANUFACTURERMI MINERAL INSULATEDMH MANHOLEMLO MAIN LUG ONLYMO MECHANICALLY OPERATEDMOD MOTOR OPERATED DAMPERMOV MOTOR OPERATED VALVEMS MOTOR STARTERMTD MOUNTEDMTS MANUAL TRANSFER SWITCHMVA MEGAVOLT-AMPEREMV MEDIUM VOLTAGENC NORMALLY CLOSEDNEG NEGATIVENEU NEUTRALNIC NOT IN CONTRACTNO NORMALLY OPENNTS NOT TO SCALEOEM FURNISHED BY MANUFACTUREROH OVERHEADOL OVERLOADOOA ON-OFF-AUTOMATICOSY OUTSIDE STEM AND YOKE VALVE (FA SYSTEM)P POLEPB PUSHBUTTONPC PERSONAL COMPUTERPE PRESSURE ELEMENTPF POWER FACTORPH PHASEPIT PRESSURE INDICATOR TRANSMITTERPLC PROGRAMMABLE LOGIC CONTROLLERPNL PANELPRI PRIMARYPT POTENTIAL TRANSFORMERPT PRESSURE TRANSMITTERPVC POLYVINYL CHLORIDEQI LOAD KW INDICATORR REMOTERGS RIGID GALVANIZED STEEL CONDUITRIL RED INDICATING LIGHT (TYP)
B=BLUE, G=GREEN, A=AMBERRSC RIGID STEEL CONDUITRTD RESISTANCE TEMPERATURE DETECTORRVSS REDUCED VOLTAGE SOLID STATES SURFACESEC SECONDARYSF SUPPLY FANSHLD SHIELDED CABLESI SPEED INDICATORSN SOLID NEUTRALSP SPARESPD SURGE PROTECTIVE DEVICESS SURGE SUPPRESSORSTP SHIELDED TWISTED PAIRSTT SHIELDED TWISTED TRIPLETSV3 3 WAY VALVESW SWITCHSWBD SWITCHBOARDSWGR SWITCHGEARSYM SYMMETRICALT TRANSFORMERTB TERMINAL BLOCKSTOS TOP OF STEELTS THERMOSTATTC COOLING THERMOSTATTD TEL DIALERTDR TIME DELAY RELAYTE TEMPERATURE ELEMENTTEL TELEPHONETF FREEZE STATTH HUMIDISTATTIT TEMPERATURE INDICATING TRANSMITTERTL TEMPERATURE LOWTOA THERMOSTAT OUTSIDE AIRTRANSF TRANSFORMERTS THERMOSTATTS TEMPERATURE SWITCHTWS TWISTED SHIELDED CABLEUG UNDERGROUNDUH UNIT HEATERUPS UNINTERRUPTIBLE POWER SUPPLYV VOLTVA VOLT-AMPEREVAR VOLT-AMPERE REACTIVEVFD VARIABLE FREQUENCY DRIVEVPS VACUUM PRESSURE SWITCHW WIREWH WATT HOURWM WATT METERWP WEATHERPROOFXLP CROSS LINKED POLYETHYLENEXFMR TRANSFORMERZSC LIMIT SWITCH CLOSEDZSO LIMIT SWITCH OPEN
1. ALL CONDUIT AND EQUIPMENT SHALL BE INSTALLED AND GROUNDED IN ACCORDANCE WITH THERULES AND REGULATIONS OF THE CURRENT NATIONAL ELECTRICAL CODE.
2. CONDUIT RUNS ARE SHOWN DIAGRAMMATICALLY ONLY AND SHALL BE INSTALLED IN A MANNER TOPREVENT CONFLICTS WITH EQUIPMENT AND STRUCTURES. EXPOSED CONDUITS SHALL BE INSTALLEDPARALLEL TO BEAMS AND WALLS.
3. CONDUITS SHALL BE PROPERLY TERMINATED WITH NEAT CONNECTIONS TO ALL ASSOCIATEDEQUIPMENT.
4. CONTROL AND INSTRUMENTATION CONDUIT SIZES AND NUMBER OF CONDUCTORS ARE TO BEDETERMINED FROM SCHEMATIC DIAGRAMS, INSTRUMENTATION DIAGRAMS, AND/ORSPECIFICATIONS, IF NOT DIRECTLY SHOWN ON POWER PLANS. THE WIRING DIAGRAMS, QUANTITYAND SIZE OF WIRES AND CONDUIT REPRESENT A SUGGESTED ARRANGEMENT BASED UPON SELECTEDSTANDARD COMPONENTS OF ELECTRICAL AND INSTRUMENTATION EQUIPMENT. MODIFICATIONSREVIEWED BY THE ENGINEER WITH NO EXCEPTIONS TAKEN, MAY BE MADE BY THE CONTRACTOR TOACCOMMODATE EQUIPMENT ACTUALLY PURCHASED. THE BASIC SEQUENCE AND METHOD OFCONTROL MUST BE MAINTAINED AS INDICATED ON THE DRAWINGS AND SPECIFICATIONS. EACHCONTROL AND INSTRUMENTATION CONDUIT SHALL ALSO CONTAIN 10 PER CENT SPARE CONDUCTORS,WITH A MINIMUM OF TWO SPARES, UP TO THE LIMIT OF CONDUIT FILL AS SPECIFIED BY THENATIONAL ELECTRICAL CODE. INSTRUMENTATION SHIELDED CABLES SHALL BE INSTALLED IN RGSCONDUIT. SEPARATE FROM OTHER POWER WIRING.
5. EACH CONDUIT TO CARRY GROUND WIRE(S) IN ADDITION TO NUMBER OF CONDUCTORS SHOWN ONDRAWINGS OR PER NOTE 4 ABOVE. ALL GROUNDING MUST CONFORM TO ARTICLE 250 OF CURRENTNATIONAL ELECTRICAL CODE.
6. MINIMUM CONDUIT SIZE SHALL BE 3/4" TRADE SIZE, UNLESS OTHERWISE NOTED ON THE ELECTRICALDRAWINGS. GENERAL LIGHTING, RECEPTACLE AND HVAC POWER CIRCUITS MAY BE 1/2" TRADE SIZECONDUIT INSTALLED PER NEC. MINIMUM POWER WIRING SHALL BE 2C#12 AWG WITH GROUND AND2C#14 AWG FOR CONTROL. MINIMUM INSTRUMENTATION CABLE SHALL BE 2/C#16 AWG TWS AND3C#16 AWG TWS FOR SPEED POTENTIOMETERS AND RTD'S. PROVIDE CONDUIT AND WIRING ASINDICATED.
7. ALL SURFACE MOUNTED PANELS ON THE INSIDE OF EXTERIOR WALLS ABOVE GRADE, OR IN OTHERLOCATIONS CONSIDERED AS DAMP, SHALL BE MOUNTED TO MAINTAIN A 1/4" AIR SPACE BETWEENTHE ENCLOSURE AND THE WALL.
8. ELECTRICAL EQUIPMENT LOCATIONS ARE APPROXIMATE ONLY. COORDINATE LOCATIONS WITHPROCESS PIPING AND OTHER DRAWINGS. CONTRACTOR SHALL COORDINATE MANUFACTURER'SEQUIPMENT REQUIREMENTS WITH SPACE AVAILABLE. FINAL CONTROL PANEL LOCATIONS SHALL BEFIELD COORDINATED.
9. ALL FIELD CONTROL CONDUCTORS WILL TERMINATE AT INDIVIDUAL TERMINAL BLOCKS WITHIN THECONTROL ENCLOSURE. SERIES AND PARALLEL CONNECTION OF FIELD CONTROL CONDUCTORS WILL BEMADE ONLY AT CONTROL PANEL OR MOTOR CONTROL CENTER TERMINAL BLOCKS.
10. GROUND ALL CONDUCTOR SHIELDS AT CONTROL PANEL ONLY - DO NOT GROUND SHIELDS AT BOTHENDS.
11. AT THE FOLLOWING LOCATIONS, UNLESS OTHERWISE NOTED, PULL, JUNCTION, TERMINAL, SWITCH,AND OUTLET BOXES SHALL BE CAST IRON WHERE STEEL CONDUIT IS TERMINATED; OR SHALL BE CASTALUMINUM WHERE ALUMINUM CONDUIT IS TERMINATED:
A - AT LOCATIONS WHERE VAPORTIGHT LIGHTING FIXTURES AND/OR WATERTIGHT RECEPTACLES ARE INDICATED.
B - AT LOCATIONS ON OR IN ALL OUTSIDE WALLS.C - OUTDOORS.D - REFER TO THE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
12. NAMEPLATES SHALL CONFORM STRICTLY TO INSTRUCTIONS IN THE ELECTRICAL SPECIFICATIONS ANDON THE DRAWINGS. THE FOLLOWING SHALL HAVE NAMEPLATES:
A - ALL LOCAL CONTROL STATIONS AT OR NEAR EQUIPMENTB - ALL PANELBOARDSC - GANGED LIGHT SWITCHES
D - PROCESS CONTROL PANELSE - REFER TO THE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
13. CONTRACTOR SHALL PROVIDE ALL CONDUIT, WIRING, EQUIPMENT, AND CONTROL DEVICES ASINDICATED BY SCHEMATICS, SINGLE LINE DIAGRAMS, SCHEDULES, PLANS, SPECIFICATIONS, ANDVENDOR DOCUMENTATION TO PROVIDE A COMPLETE WORKING SYSTEM. SINCE NOT ALL HOME RUNSARE SHOWN ON PLANS, THE CONTRACTOR SHALL REFERENCE ALL SINGLE LINE AND SCHEMATICDIAGRAMS, SCHEDULES, AND VENDOR DOCUMENTATION TO DETERMINE CONDUIT AND WIRINGREQUIREMENTS.
14. PROVIDE CONCRETE HOUSEKEEPING PADS (4" HIGH) UNDER ELECTRICAL AND INSTRUMENTATIONEQUIPMENT THAT IS DESIGNED TO BE FLOOR MOUNTED. PROVIDE SUBMITTAL SKETCH FOR ENGINEERREVIEW.
15. CONTRACTOR SHALL PROVIDE A COMPLETE WORKING OPERATING SYSTEM IN ACCORDANCE WITH ALLDRAWINGS, SPECIFICATIONS, CODES AND STANDARDS.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING ALL OF THE ELECTRICAL DRAWINGS ANDCONDUIT AND WIRE SCHEDULES RELATIVE TO THE CONDUIT AND WIRE TO BE PROVIDED ON THISPROJECT. THE INTENT OF THE CONTRACT DOCUMENTS IS TO PROVIDE DETAILED INFORMATION OF
VSCVSC
654
5
COMMINUTOR#2
1VS
WHM CT'S
PT'SV
3P
400A, 480V, 3 POLEAUTOMATIC TRANSFER SWITCH
METERCABINET
EMERGENCY GENERATOR(250KW, 312.50KVA, 277/480V,
3 PHASE, 4 WIRE)
3
5
COMMINUTOR#1
UTILITYPRIMARY
ELECTRICALSERVICE
400A
T-115 KVA480V-120/208V3 PHASE,4 WIRE
1.5
DUPLEXSEAL
WATERPUMP
#1
3/4
WET WELLUTILITY
SETEXHAUST
FAN
75
SEWAGEPUMP #3
1
CONTROLROOM
VENT FAN#2
1
CONTROLROOM
VENT FAN#1
75
SEWAGEPUMP #2
75
SEWAGEPUMP #1
CONTROLROOM
ELECTRICALHEATER #1
WET WELLCONVECTORHEATER #2
WET WELLCONVECTORHEATER #1
WET WELLCONVECTORHEATER #3
PUMPMOTORFLOOR
ELECTRICALHEATER
CONTROLROOM
ELECTRICALHEATER #2
PUMPROOM
ELECTRICALDEHUMIDIFIER
7.5KW
7.5KW
7.5KW
6KW
4.0KW
7.5KW
5.5KW 1.5
DUPLEXSEAL
WATERPUMP
#2
3
PLANTWATERPUMP
#1
COMPRESSOR
DUPLEXAIR
#2
120/208V3 PHASEPANELBOARDLP-1
3/4 3/4
1110987
VSC
12 13 14 15 16 17 18
600A, 277/480V, 3 PHASE, 4 WIRE, 60HZ
2019
CP
22
21
PORTABLETRAILER-MOUNTED STANDBY
GENERATOR(BY OWNER)
(125KW, 156.25 KVA, 3PHASE)
G1 G2
E
SPARE
24
23
25
26
MOTOR CONTROL CENTER MCC
SINGLE LINE DIAGRAM - DEMOLITION
NTS
OLD NORWICH ROAD PUMP STATION
200A3P
400A3P
2
1
SEE NOTES THIS DRAWING
2 2 2
6 2 2 2 2 2 2
3
27
SPARE
GEN-1
PGMCB-1
MTS-1
ATS-1
EXISTING MOTOR CONTROL CENTER MCC
MCB
MLO
5
UTILITYTRANSFORMER277/480V3 PHASE, 4 WIRESERVICE
GND
1 2 3 19 7 10 15 26
5 20 8 11 16
4 6 9 12 17
25
24
23 13 19
14 18
21
22
FLO
WRE
CORD
ER
FLO
WRE
CORD
ER
FLO
WRE
CORD
ER
FLO
WRE
CORD
ER
MOTOR CONTROL CENTER MCC
FRONT ELEVATION - DEMOLITION
NTS
22
2
2
2
26
2
22
3
SEE NOTES THIS DRAWING
SPACESPACE
27
2
TOTAL
ESTIMATED DEMAND LOADDEMAND LINE CURRENT
KVAAMP
SUB-TOTAL --
--
--
PHASE LOAD (VA)DESCRIPTIONAMPS
A<
B CDESCRIPTIONCKT
NO.NO.
POLES
-
<1 1 CONTROL ROOM LIGHTS20 1 220
CKTNO.AMPSNO.
POLES
<3 1 STAIRWAY LIGHTS20 1 420
<5 1 MOTOR ROOM LIGHTS20 1 620
<9 1 WET WELL LIGHTS20 1 1020
<7 1 PUMP ROOM LIGHTS20 1 820
<15 1 UPS GAS MONITORS / FLOW METER20 1 1620
<11 1 WET WELL LIGHTS20 1 1220
<17 1 ATTIC LIGHTS20 1 1820
<19 1 SPARE20 1 2020
<21 1 SPARE20 1 2220
<23 1 VENTILATION LOUVERS20 1 2420
<25 1 UNKNOWN20 1 2620
<27 1 SPARLING ALARM15 2 2820
<29 1 OZONE GENERATOR30 30
<13 1 AUTOMATIC TEMPERATURE CONTROL PANEL ATC-120 1 1420
-RECEPTACLES
RECEPTACLES
RECEPTACLES
BATTERY CHARGER
RECEPTACLES WET WELL
BUBBLER
IKOR UNIT CONTROL POWER
GENERATOR BLOCK HEATER
SPARE
FLOW METER
EXTERIOR LIGHT
GAS ALARM
SUMP PUMP
EMERGENCY CONTROL POWER
-
<
<
<
<
<
<
<
<
<
<
<
<
<
<
-
--
--
-
-
--
--
-
-
--
--
-
-
--
--
-
-
--
PANEL LOCATION:
VOLTAGE:PHASE:
WIRE:AIC:
FEEDER POINT:MOUNTING:BUS RATING:
MAIN TYPE: MCB TRIP AMPSMLO{
PANELBOARD LP-1MOTOR CONTROL CENTER MCC
120/2083410000
TRANSFORMER T-1 LOCATED IN MCCSURFACE
100 AMPS
X--
43
3
5
4
SEE NOTE 5
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-3
1406
4A-E
S-SL
DDEM
O.D
WG
| E
-3 |
1:1
0.12
3646
77 |
----
| 7/
18/2
019
11:4
8:10
AM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
DAN
.GLI
DDEN
7/1
8/20
19 1
0:43
AM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
OLD
NO
RWIC
H RO
AD P
UM
P ST
ATIO
NM
OTO
R CO
NTR
OL
CEN
TER
"MCC
" SI
NG
LE L
INE
DIAG
RAM
- DE
MO
LITI
ON
E-3
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
ELECTRICAL EQUIPMENT INDICATED WITH SHADINGSHALL BE DISCONNECTED AND REMOVED IN ITSENTIRETY FOR A COMPLETE DEMOLITION. REFER TONOTE 1 THIS DRAWING.
ELECTRICAL EQUIPMENT INDICATED SHALL REMAINAND BE MODIFIED AS SHOWN AND NOTED ON THISDRAWING AND THE MODIFICATION DRAWINGS. REFERTO NOTE 4 THIS DRAWING FOR ADDITIONALREQUIREMENTS.
THE EXISTING PANELBOARD LP-1 SHALL REMAIN ANDBE MODIFIED AS INDICATED IN THE PANELBOARDSCHEDULE THIS DRAWING AND ON THE MODIFICATIONDRAWINGS. DISCONNECT AND REMOVE IN ITSENTIRETY ALL CONDUIT AND WIRING ASSOCIATEDWITH THE EQUIPMENT SHOWN AS BEING DEMOLISHEDFOR A COMPLETE DEMOLITION. PROVIDE A NEWTYPEWRITTEN PANELBOARD DIRECTORY TO REFLECTALL MODIFICATIONS ASSOCIATED WITH THE WORK OFTHIS CONTRACT.
THE EXISTING CIRCUIT BREAKER INDICATED SHALLREMAIN AND SHALL BE DESIGNATED AS A SPARECIRCUIT BREAKER. REFER TO THE MODIFICATIONDRAWINGS FOR ADDITIONAL REQUIREMENTS.
REMOVE THE EXISTING FEEDER WIRING FROM THETRANSFORMER SECONDARY TO PANELBOARD LP-1.THE EXISTING PANELBOARD IS A MAIN LUG ONLYPANEL AND DOES NOT HAVE SECONDARYOVERCURRENT PROTECTION AS REQUIRED BY THE NEC.REFER TO THE MODIFICATION DRAWINGS FORADDITIONAL REQUIREMENTS.
REMOVE THE EXISTING FEEDER CIRCUIT BREAKER ANDCOMPARTMENT IN ITS ENTIRETY AND REPLACE WITH ACOMPLETELY NEW COMPARTMENT BUCKET AS SHOWNON THE MODIFICATION DRAWINGS.
1
DEMOLITION NOTES:
NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, ANDADDITIONAL GENERAL DEMOLITION NOTES ANDGENERAL NOTES REFER TO DRAWINGS E-1 AND E-2.
2. INFORMATION CONTAINED ON THIS DRAWING HAS BEENOBTAINED IN PART FROM EXISTING ELECTRICALDRAWINGS, PHOTOGRAPHS, SITE CONDITIONS AND SHOPDRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALLINFORMATION AND CIRCUITRY AFFECTING HIS OR HERWORK PRIOR TO COMMENCING THE WORK FOR THISCONTRACT. THE CONTRACTOR SHALL NOTIFY THEENGINEER OF ANY DISCREPANCIES.
3. THE EXISTING MOTOR CONTROL CENTER MCC ISMANUFACTURED BY GENERAL ELECTRIC CORPORATION.THE EXISTING MOTOR CONTROL CENTER SHALL BEMODIFIED AS SHOWN ON THIS DRAWING AND THEDEMOLITION AND MODIFICATION DRAWINGS. REFER TOTHIS DRAWING AND THE CONTRACT DRAWINGS FORADDITIONAL INFORMATION ON DEMOLITION ANDMODIFICATION REQUIREMENTS TO THIS MOTORCONTROL CENTER AND ASSOCIATED CONNECTEDEXISTING EQUIPMENT.
4. UPON DISCONNECTION OF EXISTING CABLES/BUSSING,CLEAN, INSPECT AND CHECK FOR PROPER TERMINATIONSTO EXISTING EQUIPMENT WHICH IS TO REMAIN. ANYTERMINATIONS, LUGS, CLAMPS, ETC., WHICH REQUIREREPLACEMENT OR ARE FOUND TO BE DEFICIENT OR NOTSERVICEABLE, SHALL BE PROVIDED AS PART OF THEWORK OF THIS CONTRACT. PROVIDE NEW LAMACOIDNAMEPLATE ON THE FRONT OF THE COMPARTMENTDOOR TO READ "SPARE CIRCUIT BREAKER" OR "SPARESTARTER" AS APPLICABLE . REFER TO SPECIFICATIONSFOR ADDITIONAL REQUIREMENTS.
5. REFER TO THE MOTOR CONTROL CENTER "MCC" SINGLELINE DIAGRAM - MODIFICATIONS DRAWINGS FORREVISED PANELBOARD LP-1 SCHEDULE AND FINALESTIMATED DEMAND LOAD INFORMATION.
2
3
4
5
6
2
1GENERATOR
7
911
1312
3
14
6
158
10
DN
DN
DN
DN
OLD NORWICH ROAD PUMP STATION
CONTROL ROOM PLAN DEMOLITION
SCALE: 1/4"=1'-0"
MOD-D-ON-E1 (INTAKE DAMPER)
CONTROL ROOM
FAN ROOM
16
17
18
19
20
21
22
SEE NOTES THIS DRAWING
1
2
2 2
MOTOR CONTROL CENTER
LP-1
ATC-1
PGCCP-1
PGMCB-1
39
TO ATC-1(SEE NOTE 3)
3
40
4
42
MTS-1
541
22
UP
WETWELL
WETWELL
PUMP ROOM
33
35
32
31UP
UP
OLD NORWICH ROAD PUMP STATION
PUMP ROOM AND WETWELL - DEMOLITION
SCALE: 1/4"=1'-0"
34
SEE NOTES THIS DRAWING
1
36 37 38
DN UP
DN
23 24 25
26
28
3029
MOTOR ROOM
OLD NORWICH ROAD PUMP STATION
MOTOR AND COMMINUTOR ROOM - DEMOLITION
SCALE: 1/4"=1'-0"
BREAK
TANK
27
SEE NOTES THIS DRAWING
1
COMMINUTOR ROOM
43
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-4
1406
4A-E
S-O
LDN
ORW
HICH
RDPL
ANDE
MO
.DW
G |
E-4
| 1
:10.
1236
4677
| --
-- |
7/18
/201
9 11
:48:
15 A
M |
ELL
IOTT
.LAG
NER
LAST
SAV
ED B
Y: D
AN.G
LIDD
EN 7
/18/
2019
10:
44 A
M
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
OLD
NO
RWIC
H RO
AD P
UM
P ST
ATIO
NFL
OO
R PL
ANS
- DEM
OLI
TIO
N
E-4
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
PORTABLE GENERATOR CABLE CONNECTION PANEL "PGCCP-1"
PORTABLE GENERATOR MAIN CIRCUIT BREAKER "PGMCB-1"
EMERGENCY GENERATOR EMERGENCY STOP PUSHBUTTON
PORTABLE GENERATOR MANUAL TRANSFER SWITCH "MTS-1", 400 AMPERE, 3 POLE
TELEMETRY CONTROL PANEL TO BE MODIFIED
MOTOR CONTROL CENTER TO BE MODIFIED
PANELBOARD LP-1 TO BE MODIFIED
AUTOMATIC TEMPERATURE CONTROL PANEL "ATC-1" TO BE REMOVED
225 KW, 277/480V, 3 PHASE, 4 WIRE EMERGENCY GENERATOR
EMERGENCY GENERATOR BATTERY
EMERGENCY GENERATOR MAIN CIRCUIT BREAKER
EMERGENCY GENERATOR CONTROL PANEL GCP-1
EMERGENCY GENERATOR BLOCK HEATER
EMERGENCY GENERATOR BATTERY CHARGER
LEAK DETECTION PANEL
ELECTRIC UNIT HEATER TO BE REMOVED
EXHAUST FAN TO BE REMOVED
ELECTRIC UNIT HEATER TO BE REMOVED
UTILITY SET EXHAUST FAN TO BE REMOVED
CONVECTOR TO BE REMOVED
CONVECTOR TO BE REMOVED
EXHAUST FAN TO BE REMOVED
PUMP MOTOR NO. 1
PUMP MOTOR NO. 2
PUMP MOTOR NO. 3
ELECTRIC UNIT HEATER TO BE REMOVED
PLANT WATER PUMP
CONVECTOR TO BE REMOVED
COMMUNINUTOR NO. 1
COMMUNINUTOR NO. 2
DEHUMIDIFIER TO BE REMOVED
ELECTRIC UNIT HEATER TO BE REMOVED
AIR COMPRESSOR MOTOR NO. 1
AIR COMPRESSOR MOTOR NO. 2
SUMP PUMP TO BE REMOVED
PUMP NO. 1
PUMP NO. 2
PUMP NO. 3
CONTROL ROOM LIGHT SWITCH - TO BE REMOVED (SEE NOTE 4)
FAN ROOM / WETWELL AREA LIGHT SWITCH - TO BE REMOVED (SEE NOTE 5)
WETWELL GAS DETECTION CONTROL PANEL - TO BE MODIFIED
DRYWELL GAS DETECTION CONTROL PANEL - TO BE MODIFIED
SEWAGE PUMP VARIABLE SPEED CONTROL PANEL
1
2
3
4
EQUIPMENT LEGEND:
5
6
7
8
9
10
11
12
13
14
15
ELECTRICAL EQUIPMENT INDICATED WITH SHADING SHALL BEDISCONNECTED AND REMOVED IN ITS ENTIRETY FOR ACOMPLETE DEMOLITION. REFER TO NOTE 1 THIS DRAWING.
ELECTRICAL EQUIPMENT INDICATED SHALL REMAIN AND BEMODIFIED AS SHOWN AND NOTED ON THE MODIFICATIONDRAWINGS.
DISCONNECT AND REMOVE THE EXISTING CONDUIT ANDWIRING THAT IS CONNECTED TO THE EXISTING ATC-1CONTROL PANEL AND RECONNECT TO THE NEW ATC-ON1CONTROL PANEL. REFER TO THE MODIFICATION DRAWINGSFOR ADDITIONAL REQUIREMENTS.
1
DEMOLITION NOTES:
NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERALDEMOLITION NOTES AND GENERAL NOTES REFER TO DRAWINGS E-1AND E-2.
2. INFORMATION CONTAINED ON THIS DRAWING HAS BEEN OBTAINED INPART FROM EXISTING ELECTRICAL DRAWINGS, PHOTOGRAPHS, SITECONDITIONS AND SHOP DRAWINGS. THE CONTRACTOR SHALL FIELDVERIFY ALL INFORMATION AND CIRCUITRY AFFECTING HIS OR HERWORK PRIOR TO COMMENCING THE WORK FOR THIS CONTRACT. THECONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. THE EXISTING INTAKE DAMPER PROVIDES COOLING AND COMBUSTIONAIR TO THE EXISTING GENERATOR. ANY EXISTING CONDUIT AND WIRINGPRESENTLY INSTALLED FOR THIS APPLICATION SHALL REMAIN. ONLYDEMOLISH THE EXISTING CONDUIT AND WIRING THAT IS PRESENTLYINSTALLED TO EXISTING ATC-1 CONTROL PANEL.
4. DISCONNECT AND REMOVE THE EXISTING CONTROL ROOM LIGHTSWITCH AND INSTALL A NEW LIGHT SWITCH AS SHOWN ON THEMODIFICATION DRAWINGS.
5. DISCONNECT AND REMOVE THE EXISTING FAN ROOM / WETWELL AREALIGHT SWITCH AND INSTALL A NEW LIGHT SWITCH AS SHOWN ON THEMODIFICATION DRAWINGS.
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
2
36
37
38
39
40
3
41
42
43
MOTOR CONTROL CENTER MCC
SINGLE LINE DIAGRAM - MODIFICATIONS
NTS
OLD NORWICH ROAD PUMP STATION
SEE NOTES THIS DRAWING
VSCVSC
654
5
COMMINUTOR#2
1VS
WHM CT'S
PT'SV
3P
400A, 480V, 3 POLEAUTOMATIC TRANSFER SWITCH
METERCABINET
EMERGENCY GENERATOR(250KW, 312.50KVA, 277/480V,
3 PHASE, 4 WIRE)
3
5
COMMINUTOR#1
UTILITYTRANSFORMER277/480V3 PHASE, 4 WIRESERVICE
400A
T-115 KVA480V:120/208V3 PHASE, 4 WIRE
1.5
DUPLEXSEAL
WATERPUMP
#1
75
SEWAGEPUMP #3
75
SEWAGEPUMP #2
75
SEWAGEPUMP #1
1.5
DUPLEXSEAL
WATERPUMP
#2
3
PLANTWATERPUMP
#1
COMPRESSOR
DUPLEXAIR
#2
120/208V 3PHASEPANELBOARDLP-1
3/4 3/4
1110987
VSC
13 14 15 16 17 18
600A, 277/480V, 3 PHASE, 4 WIRE, 60HZ
2019
CP
22
21
PORTABLETRAILER-MOUNTED STANDBY
GENERATOR(BY OWNER)
(125KW, 156.25 KVA, 3PHASE)
G1 G2
E
SPARE
24
23
25
26
200A3P
400A3P
2 27
SPARE
GEN-1
PGMCB-1
MTS-1
ATS-1
EXISTING MOTOR CONTROL CENTER MCC
MCB
SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE
SEE NOTE 4
ENCLOSEDCIRCUIT
BREAKER CB-1
UTILITYPRIMARY
ELECTRICALSERVICE
GND
(12)
100AF60AT
T-1A30 KVA480V:120/208V3 PHASE,4 WIRE
MCB
GND
GND
100AF50AT
PANELBOARDLP-1A
1 2 3 19 7 10 15 26
5 20 8 11 16
4 6 9 12 17
25
24
23 13 19
14 18
21
22
FLO
WRE
CORD
ER
FLO
WRE
CORD
ER
FLO
WRE
CORD
ER
FLO
WRE
CORD
ER
MOTOR CONTROL CENTER MCC
FRONT ELEVATION - MODIFICATIONS
NTS
SEE NOTES THIS DRAWING
27
SPACESPACE
PHASE LOAD (VA)DESCRIPTIONAMPS
A<
B CDESCRIPTIONCKT
NO.NO.
POLES
600
<1 1 CONTROL ROOM LIGHTS20 1 220
CKTNO.AMPSNO.
POLES
<3 1 STAIRWAY LIGHTS20 1 420
<5 1 MOTOR ROOM LIGHTS20 1 620
<9 1 WET WELL LIGHTS20 1 1020
<7 1 PUMP ROOM LIGHTS20 1 820
<15 1 UPS GAS MONITORS / FLOW METER20 1 1620
<11 1 WET WELL LIGHTS20 1 1220
<17 1 ATTIC LIGHTS20 1 1820
<19 1 SPARE20 1 2020
<21 1 SPARE20 1 2220
<23 1 VENTILATION LOUVERS20 1 2420
<25 1 UNKNOWN20 1 2620
<27 1 SPARLING ALARM15 2 2820
<29 1 OZONE GENERATOR30 30
<13 SPARE 1 1420
400RECEPTACLES
RECEPTACLES
RECEPTACLES
BATTERY CHARGER
RECEPTACLES WET WELL
BUBBLER
IKOR UNIT CONTROL POWER
GENERATOR BLOCK HEATER
SPARE
FLOW METER
EXTERIOR LIGHT
GAS ALARM
SPARE
EMERGENCY CONTROL POWER
400
TOTAL
ESTIMATED DEMAND LOADDEMAND LINE CURRENT
KVAAMP
SUB-TOTAL 25009900
45002900
9.927.5
<
<
<
<
<
<
<
<
<
<
<
<
<
<
200
700400
600200
200
400
400800
-800
2000
100
200400
--
100
-
300100
200100
-
100
200-
PANEL LOCATION:
VOLTAGE:PHASE:
WIRE:AIC:
FEEDER POINT:MOUNTING:BUS RATING:
MAIN TYPE: MCB TRIP AMPSMLO
{
PANELBOARD LP-1MOTOR CONTROL CENTER MCC
120/2083410000
TRANSFORMER T-1 LOCATED IN MCCSURFACE
100 AMPS
X--
120
SEE NOTE 4
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-5
1406
4A-E
S-SL
DMO
D.DW
G |
E-5
| 1
:10.
1236
4677
| --
-- |
7/18
/201
9 11
:48:
19 A
M |
ELL
IOTT
.LAG
NER
LAST
SAV
ED B
Y: D
AN.G
LIDD
EN 7
/18/
2019
10:
44 A
M
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
OLD
NO
RWIC
H RO
AD P
UM
P ST
ATIO
NM
OTO
R CO
NTR
OL
CEN
TER
"MCC
" SI
NG
LE L
INE
DIAG
RAM
- M
ODI
FICA
TIO
NS
E-5
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, ANDADDITIONAL GENERAL DEMOLITION NOTES ANDGENERAL NOTES REFER TO DRAWINGS E-1 AND E-2.
2. INFORMATION CONTAINED ON THIS DRAWING HAS BEENOBTAINED IN PART FROM EXISTING ELECTRICALDRAWINGS, PHOTOGRAPHS, SITE CONDITIONS ANDSHOP DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFYALL INFORMATION AND CIRCUITRY AFFECTING HIS ORHER WORK PRIOR TO COMMENCING THE WORK FORTHIS CONTRACT. THE CONTRACTOR SHALL NOTIFY THEENGINEER OF ANY DISCREPANCIES.
3. PROVIDE NEW LAMACOID NAMEPLATES ON THE FRONTOF THE MODIFIED COMPARTMENT DOOR TO READ"SPARE CIRCUIT BREAKER" OR "SPARE STARTER" ASAPPLICABLE . REFER TO SPECIFICATIONS FORADDITIONAL REQUIREMENTS.
4. PROVIDE NEW CONDUIT AND WIRING AS SHOWN TO ANEW SECONDARY ENCLOSED CIRCUIT BREAKER CB-1.REFER TO THE OLD NORWHICH ROAD PUMP STATIONFLOOR PLANS - MODIFICATIONS DRAWING FORADDITIONAL REQUIREMENTS.
MOTOR CONTROL CENTER
2
4
1 GENERATOR
7
911
1312
3
14
6
15
10
52
DN
DN
DN
DN
OLD NORWICH ROAD PUMP STATION
CONTROL ROOM PLAN - MODIFICATIONS
SCALE: 1/4"=1'-0"
MODMS
MOD-D-ON-E1
MS
CONTROL ROOM
FAN ROOM
SEE NOTES THIS DRAWING
18EF-ON1
MOD-D-ON1 TO ATC-ON1
19 DH-ON1
17SF-ON1
16
J
P100
MS
UH-ON1
J MSTO ATC-ON1
J
MSP103
21
JMS
UH-ON4
J
MSTO ATC-ON1
20EF-ON2
J TO ATC-ON1
MS
LP-1
MTS-1
PGCCP-1
PGMCB-1
38
J
TO ATC-ON1
H/S-ON2
8JTO ATC-ON1
HVAC DUCTWORK
39 ATC-ON1
P102
FSL-ON2
MOD-D-ON2 TO ATC-ON1
MOD
PROVIDED BYMANUFACTURER
V
V
40
FSL-ON1
H/S-ON1
J
P110P109
46 CB-1
P101
Sb2
2#12 AND 1#12 GND IN 3/4"C TOTHE EXISTING LIGHTS IN THE FANROOM / WETWELL AREATO ATC-ON1
Sa2
C
TO ATC-ON1
2#12 AND 1#12 GND IN 3/4"CTO THE EXISTING LIGHTS INTHE CONTROL ROOM
TO ATC-ON1
50
49
5 51
UP
54
P113
55 P114
56
P115
WETWELL
WETWELL
PUMP ROOM
33
UP
UP
OLD NORWICH ROAD PUMP STATION
PUMP ROOM AND WETWELL - MODIFICATIONS
SCALE: 1/4"=1'-0"
34
SEE NOTES THIS DRAWING
37
36 DH-ON2SP-ON1
FS
26
UH-ON3
J
2#12 AND 1#12GND IN 3/4"C TOUH-ON2 IN MOTORROOM ABOVE
MS
JMS
P105
JMS
P104
45 H/S-ON4
J TO ATC-ON1V
41 42 43
DN UP
DN
23 24
25
3029
MOTOR ROOM
COMMINUTOR ROOM
OLD NORWICH ROAD PUMP STATION
MOTOR AND COMMINUTOR ROOM - MODIFICATIONS
SCALE: 1/4"=1'-0"
BREAK
TANK
27
SEE NOTES THIS DRAWING
28B-ON1
31
32
22
JMS
UH-ON2
35
JMS
UH-ON5
J
MS
JMS
JMS
BP-ON1
CP-ON1
44
J TO ATC-ON1
H/S-ON3
V
47 48
P111
LP-1A
T-1A
P112
2#12 AND 1#12 GND IN 3/4"C TOUH-ON4 IN FAN ROOM ABOVE
2#12 AND 1#12 GND IN 3/4"C TOUH-ON1 IN CONTROL ROOM ABOVE
P106
P107
P108
53
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-6
1406
4A-E
S-O
LDN
ORW
HICH
RDPL
ANM
OD.
DWG
| E
-6 |
1:1
0.12
3646
77 |
----
| 7/
18/2
019
11:4
8:25
AM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
DAN
.GLI
DDEN
7/1
8/20
19 1
0:43
AM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
OLD
NO
RWHI
CH R
OAD
PU
MP
STAT
ION
FLO
OR
PLAN
S - M
ODI
FICA
TIO
NS
E-6
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
BOILER PUMP BP-ON1
CIRCULATING PUMP CP-ON1
AIR COMPRESSOR MOTOR NO. 1
AIR COMPRESSOR MOTOR NO. 2
HYDRONIC UNIT HEATER UH-ON5
DEHUMIDIFIER DH-ON2
SUMP PUMP SP-ON1
ALARM LIGHT AND HORN H/S-ON2
AUTOMATIC TEMPERATURE CONTROL PANEL ATC-ON1
LOW AIR FLOW SWITCH FSL-ON1
PUMP NO. 1
PUMP NO. 2
PUMP NO. 3
ALARM LIGHT AND HORN H/S-ON3
ALARM LIGHT AND HORN H/S-ON4
ENCLOSED CIRCUIT BREAKER CB-1 - SEE NOTE 3
TRANSFORMER T-1A
PANELBOARD LP-1A
TWO POLE LIGHT SWITCH FOR CONTROL ROOM LIGHTS AND INTERLOCK WITHTHE VENTILATION SYSTEM
TWO POLE LIGHT SWITCH FOR FAN ROOM / WETWELL AREA LIGHTS ANDINTERLOCK WITH THE VENTILATION SYSTEM
MODIFIED WETWELL GAS DETECTION CONTROL PANEL
MODIFIED DRYWELL GAS DETECTION CONTROL PANEL
SEWAGE PUMP VARIABLE SPEED CONTROL PANEL
GAS DETECTION RELAY CONTROL PANEL
DRYWELL GAS DETECTION ALARM STROBE LIGHT - SEE NOTE 4
WETWELL GAS DETECTION ALARM STROBE LIGHT - SEE NOTE 4
NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERALDEMOLITION NOTES AND GENERAL NOTES REFER TO DRAWINGS E-1AND E-2.
2. INFORMATION CONTAINED ON THIS DRAWING HAS BEEN OBTAINED INPART FROM EXISTING ELECTRICAL DRAWINGS, PHOTOGRAPHS, SITECONDITIONS AND SHOP DRAWINGS. THE CONTRACTOR SHALL FIELDVERIFY ALL INFORMATION AND CIRCUITRY AFFECTING HIS OR HERWORK PRIOR TO COMMENCING THE WORK FOR THIS CONTRACT. THECONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. THE CONTRACTOR SHALL FURNISH AND INSTALL A NEW 60 AMPERE, 3POLE HEAVY DUTY TYPE ENCLOSED CIRCUIT BREAKER CB-1 FORPANELBOARD LP-1 OVERCURRENT PROTECTION AS INDICATED. FIELDLOCATE CIRCUIT BREAKER CB-1 AS REQUIRED FOR FINAL LOCATION.MOUNT CIRCUIT BREAKER CB-1 SUCH THAT THE OPERATING HANDLE ISNO HIGHER THAN 6'-0" ABOVE THE FINISHED FLOOR.
4. PROVIDE A HAZARDOUS GAS DETECTED WARNING LIGHT AS INDICATED.PROVIDE A LARGE LAMACOID WARNING SIGN TO READ "WARNING -HAZARDOUS GAS PRESENT - DO NOT ENTER".
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
PORTABLE GENERATOR CABLE CONNECTION PANEL "PGCCP-1"
PORTABLE GENERATOR MAIN CIRCUIT BREAKER "PGMCB-1"
EMERGENCY GENERATOR EMERGENCY STOP PUSHBUTTON
PORTABLE GENERATOR MANUAL TRANSFER SWITCH "MTS-1", 400 AMPERE, 3 POLE
MODIFIED TELEMETRY CONTROL PANEL
MODIFIED MOTOR CONTROL CENTER
MODIFIED PANELBOARD LP-1
ALARM LIGHT AND HORN H/S-ON1
225 KW, 277/480V, 3 PHASE, 4 WIRE EMERGENCY GENERATOR
EMERGENCY GENERATOR BATTERY
EMERGENCY GENERATOR MAIN CIRCUIT BREAKER
EMERGENCY GENERATOR CONTROL PANEL GCP-1
EMERGENCY GENERATOR BLOCK HEATER
EMERGENCY GENERATOR BATTERY CHARGER
LEAK DETECTION PANEL
HYDRONIC UNIT HEATER UH-ON1
SUPPLY FAN SF-ON1
EXHAUST FAN EF-ON1
DEHUMIDIFIER DH-ON1
EXHAUST FAN EF-ON2
HYDRONIC UNIT HEATER UH-ON4
HYDRONIC UNIT HEATER UH-ON2
PUMP MOTOR NO. 1
PUMP MOTOR NO. 2
PUMP MOTOR NO. 3
HYDRONIC UNIT HEATER UH-ON3
PLANT WATER PUMP
BOILER B-ON1
COMMUNINUTOR NO. 1
COMMUNINUTOR NO. 2
1
2
3
4
EQUIPMENT LEGEND:
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
55
56
OLD NORWICHROAD PUMP
STATION
AUTOMATICTEMPERATURE
CONTROL PANELATC-ON1
CONTROL ROOM
HAND-AUTOMATICSELECTOR SWITCH
REPEAT CYCLETIMER
(SPEC. 15604)
120V (LP-1A) (50A)
HVAC/ATC CONTRACTOR ELEC CONTRACTOR
LIGHT SWITCH INTERLOCKFOR FANS
TO RESPECTIVE LIGHTINGCIRCUIT FOR CONTROLROOM LIGHTS
2-POLE LIGHT SWITCH (ENTRANCE TOCONTROL ROOM) (BY DIVISION 16)
TOUTSIDE AIRTEMPERATURESENSOR
OLD NORWICH ROAD PUMP STATION
H&V WIRING DIAGRAM
NTS
(DRYWELL SIDE)
LIGHT SWITCH INTERLOCKFOR FANS
TO RESPECTIVE LIGHTINGCIRCUIT FOR CONTROLROOM LIGHTS
2-POLE LIGHT SWITCH (ENTRANCE TO FANROOM / WETWELL AREA) (BY DIVISION 16)
(WETWELL SIDE)
EF-ON1 (DRYWELL)3/4 MS
MOD-D-ON-E1 (EXISTING INTAKE DAMPER)
MOD-D-ON1
FSL-ON1
H/S-ON1V
SF-ON1 (DRYWELL)3/4 MS
EF-ON2 (WETWELL)1/3 MS
MOD-D-ON2 (INTAKE)
FSL-ON2
H/S-ON2V
MOD-EF-ON2 (EXHAUST)
EXISTINGGAS DETECTIONCONTROL PANEL
(DRYWELL)GAS DETECTIONRELAY CONTROL
PANEL(BY DIVISION 16)
120V (LP-1A) 120V
EXISTINGGAS DETECTIONCONTROL PANEL
(WETWELL)
120V
TO SCADA TELEMETRY PANEL
4#14 IN 3/4"C
2#12 & 1#12 GND IN 3/4"C
4#14 IN 3/4"C
H/S-ON3V
H/S-ON4V
EXISTINGTELEMETRY
CONTROL PANEL
120V
8#14 IN 3/4"C12#14 IN 3/4"C
H
OL
N
MOTORFAN
120 VOLTS FROM AUTOMATIC TEMPERATURE CONTROLPANEL ATC-ON1
MOD
MANUALMOTOR STARTER
EXHAUST FAN EF-ON1(DRYWELL)
MOD-D-ON1
V
H/S-ON1
HORN/STROBEAUDIO/VISUAL ALARM
MOD-D-ON-E1 (EXISTINGINTAKE DAMPER)
(ATC-ON1)MOD
(ATC-ON1)
(ATC-ON1)
(ATC-ON1)
OLMOTOR
FAN
MANUALMOTOR STARTER
SUPPLY FAN SF-ON1(DRYWELL)
(ATC-ON1)
OLMOTOR
FAN
MANUALMOTOR STARTER
EXHAUST FAN EF-ON2(WETWELL)
(ATC-ON1)
MOD MOD-D-ON2(INTAKE DAMPER)
V
H/S-ON2
HORN/STROBEAUDIO/VISUAL ALARM
(ATC-ON1)
(ATC-ON1)
MOD MOD-EF-ON2(EXHAUST DAMPER)
(ATC-ON1)
EXHAUST FANS EF-ON1 (DRYWELL), EF-ON2 (WETWELL)
AND SUPPLY FAN SF-ON1 (DRYWELL)
NTS
PARTIAL SCHEMATIC DIAGRAM
SEE NOTE 2
V
H/S-ON3
HORN/STROBEAUDIO/VISUAL ALARM
(ATC-ON1)
V
H/S-ON4
HORN/STROBEAUDIO/VISUAL ALARM
(ATC-ON1)
1AR
120V POWER SUPPLY FROM PANELBOARD LP-1A
R
2AR
R
1. THE RELAY PANEL AND ALL COMPONENTS INSIDE THE DASHED LINES SHALL BE FURNISHED AND INSTALLED UNDERDIVISION 16 - ELECTRICAL. THE RELAY PANEL SHALL BE RATED NEMA 4X AND SHALL BE FURNISHED AS SPECIFIED.
2. FURNISH AND INSTALL A NEMA 4X (PVC) ENCLOSURE WITH SPRING ACTIVATED SIDE LATCHES (THREE SIDES) AND FULLLEFT SIDE HINGE. PROVIDE LAMACOID NAMEPLATES FOR ALL FRONT MOUNTED DEVICES. NAMEPLATE MATERIAL ANDSIZING SHALL BE AS SPECIFIED. SIZE OF ENCLOSURE SHALL BE SUFFICIENT TO SERVICE AND HOUSE ALL DEVICES ANDSHALL BE AS APPROVED BY THE ENGINEER.
3. INSTALL EQUIPMENT ON FRONT OF ENCLOSURE AS NOTED AND SHOWN.
4. PROVIDE A NEMA 4 STROBE AT EXTRANCES AS SHOWN ON THE DRAWINGS. PROVIDE THE FOLLOWING SIGN:(WARNING - HAZARDOUS GAS PRESENT - DO NOT ENTER) AT EACH LOCATION WHERE THERE IS A WARNING STROBE.
2AR
1AR
L1
RELAY CONTROL PANEL -BY DIV 16 (SEE NOTESBELOW)
TELEMETRYCONTROLPANEL
TO ATC-ON1CONTROLPANEL
1AR
1AR
N
R
ALARM LIGHT
SEE NOTE 3
1AR
R
ALARM LIGHT
RESETPUSHBUTTON
2AR
(WETWELL)
(DRYWELL)
TELEMETRYCONTROLPANEL
2AR
TO ATC-ON1CONTROLPANEL
2AR
SCHEMATIC DIAGRAM
HAZARDOUS GAS DETECTION SYSTEM RELAY CONTROL PANEL
NTS
SEE NOTE 3
ALARM STROBEWETWELL AREA(ENTRANCE)
ALARM STROBEDRYWELL AREA(ENTRANCE)
TYPICAL SCHEMATIC DIAGRAM
LIGHTING AND VENTILATION INTERLOCKING
NTS
TO AUTOMATIC TEMPERATURECONTROL PANEL ATC-ON1
2-POLELIGHT SWITCH
(BY DIVISION 16)
120 VOLTS FROM PANELBOARD LP-1 (EXISTING CIRCUIT)
H N
ROOM LIGHT FIXTURES(AS INDICATED ON THE DRAWINGS)
H
MOTOROL
N
PUMP
SCHEMATIC DIAGRAM
CIRCULATION PUMP CP-ON1
MANUALMOTOR STARTER
(DIVISION 16)
(DIVISION 15)
(BY DIVISION 15)
ON/OFFBOILER CONTROL
120 VOLTS FROM PANELBOARD LP-1AH
MOTOROL
N
PUMP
SCHEMATIC DIAGRAM
BOILER PUMP BP-ON1
MANUALMOTOR STARTER
(DIVISION 16)
(DIVISION 15)
(BY DIVISION 15)
ON/OFFBOILER CONTROL
120 VOLTS FROM PANELBOARD LP-1AH
MOTOROL
N
BOILER
SCHEMATIC DIAGRAM
BOILER B-ON1
MANUALMOTOR STARTER
(DIVISION 16)
(DIVISION 15)
(BY DIVISION 15)
ON/OFFBOILER CONTROL
120 VOLTS FROM PANELBOARD LP-1A
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-7
1406
4A-E
S-O
LDN
ORW
ICHR
OAD
SCHE
MAT
ICDI
AGRA
M.D
WG
| E
-7 |
1:1
0.12
3646
77 |
----
| 7/
18/2
019
11:4
8:29
AM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
DAN
.GLI
DDEN
7/1
8/20
19 1
0:43
AM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
OLD
NO
RWHI
CH R
OAD
PU
MP
STAT
ION
SCHE
MAT
IC D
IAG
RAM
S
E-7
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERALDEMOLITION NOTES AND GENERAL NOTES REFER TO DRAWINGS E-1 AND E-2.
2. THIS IS A PARTIAL SCHEMATIC DIAGRAM WHICH SHOWS THE POWER FEEDAND CONTROL OF THE EQUIPMENT NOTED BEING FED FROM AUTOMATICTEMPERATURE CONTROL PANEL ATC-ON1 AT THIS LOCATION.
PHASE LOAD (VA)DESCRIPTIONAMPS
A<
B CDESCRIPTION
PANEL LOCATION:VOLTAGE:
PHASE:WIRE:
AIC:
FEEDER POINT:MOUNTING:
BUS RATING:
MAIN TYPE:
AMPS
MCB TRIP AMPSMLO{
CKTNO.
NO.POLES
4000
<1 1 AUTOMATIC TEMPERATURE CONTROL PANEL ATC-ON150 1 220
CKTNO.AMPSNO.
POLES
<3 1 DEHUMIDIFIER DH-ON120 1 420
<5 1 DEHUMIDIFIER DH-ON220 1 620
<9 1 BOILER PUMP BP-ON120 1 1020
<7 1 BOILER B-ON120 1 820
<15 1 SPARE20 1 1620
<11 1 CIRCULATING PUMP CP-ON120 1 1220
<17 1 SPARE20 1 1820
<19 1 SPARE20 1 2020
<21 1 SPARE20 1 2220
<23 1 SPARE20 1 2420
<25 1 SPARE20 1 2620
<27 1 SPARE20 1 2820
<29 1 SPARE20 1 3020
<31 1 SPARE20 1 3220
<33 1 SPARE20 1 3420
<35 1 SPARE20 1 3620
<37 1 SPARE20 1 3820
<39 1 SPARE20 1 4020
<41 1 SPARE20 1 4220
<13 1 SPARE20 1 1420
575UNIT HEATERS UH-ON1, UH-ON2 AND UH-ON3
UNIT HEATERS UH-ON4 AND UH-ON5
SUMP PUMP SP-ON1
SPARE
GAS DETECTION RELAY CONTROL PANEL
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
1200
TOTAL
ESTIMATED DEMAND LOADDEMAND LINE CURRENT
KVAAMP
SUB-TOTAL 190010275
29005475
10.335.5
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
1500
1500200
600300
-
200
200-
--
-
-
--
--
-
-
--
--
-
-
--
--
-
-
--
--
-
-
--
1. FOR LEGEND AND GENERAL NOTES, REFER TO DRAWINGS E-1 ANDE-2.
2. ALL MOTOR FEEDER WIRING ORIGINATING FROM VARIABLEFREQUENCY DRIVE (VFD) PANELS SHALL BE INSTALLED IN RIGIDGALVANIZED STEEL (RGS) CONDUIT OR PVC-COATED RIGID STEELCONDUIT, IN ACCORDANCE WITH THE NEMA CLASSIFICATIONSINDICATED ON DRAWING E-1.
3. ALL INSTRUMENTATION SIGNAL CABLES (IN CONDUITS WITH "S"NUMBERS) SHALL BE INSTALLED IN RIGID GALVANIZED STEELCONDUIT, IMC. OR PVC-COATED RIGID STEEL CONDUIT, INACCORDANCE WITH NEMA RATING OF THE AREA OFINSTALLATION AS INDICATED ON DRAWING E-1. REFER TOSPECIFICATION SECTION 16050 FOR FURTHER INFORMATION.
P100
P101
P102
P103
P104
P105
P106
P107
P108
P109
P110
P111
P112
P113
P114
P115
3/4" 2 #12 AND 1 #12 GND UNIT HEATER UN-ON1 PANELBOARD LP-1A
3/4" DRYWELL GAS DETECTION ALARM STROBE LIGHT GAS DETECTION RELAY CONTROL PANEL
MOTOR ROOM208/1203410,000
MCC VIA TRANSFORMER T-1ASURFACE100
X 100
3/4" 2 #12 AND 1 #12 GND UNIT HEATER UN-ON4 PANELBOARD LP-1A
2 #6 AND 1 #10 GND AUTOMATIC TEMP. CONTROL PANEL ATC-ON1 PANELBOARD LP-1A3/4"
DEHUMIDIFIER DH-ON1 PANELBOARD LP-1A3/4"
DEHUMIDIFIER DH-ON2 PANELBOARD LP-1A
2 #12 AND 1 #12 GND
3/4" 2 #12 AND 1 #12 GND
3/4" 2 #12 AND 1 #12 GND SUMP PUMP SP-ON1 PANELBOARD LP-1A
3/4" 2 #12 AND 1 #12 GND BOILER B-ON1 PANELBOARD LP-1A
3/4" 2 #12 AND 1 #12 GND BOILER PUMP BP-ON1 PANELBOARD LP-1A
3/4" 2 #12 AND 1 #12 GND CIRCULATING PUMP CP-ON1 PANELBOARD LP-1A
TRANSFORMER T-1 LOCATED IN MCC ENCLOSED CIRCUIT BREAKER CB-1
ENCLOSED CIRCUIT BREAKER CB-1 PANELBOARD LP-1 LOCATED IN MCC
PANELBOARD LP-1A TRANSFORMER T-1A
TRANSFORMER T-1A MOTOR CONTROL CENTER MCC
4 #1 AND 1 #6 GND2"
1-1/4" 3 #4 AND 1 #6 GND
4 #6 AND 1 #10 GND
4 #6 AND 1 #10 GND
1"
1"
3/4" 2 #12 AND 1 #12 GND GAS DETECTION RELAY CONTROL PANEL PANELBOARD LP-1A
3/4" WETWELL GAS DETECTION ALARM STROBE LIGHT GAS DETECTION RELAY CONTROL PANEL
2 #12 AND 1 #12 GND
2 #12 AND 1 #12 GND
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-8
1406
4A-E
S-CO
NDU
ITW
IREP
ANEL
.DW
G |
E-8
| 1
:10.
1236
4677
| --
-- |
7/18
/201
9 11
:48:
33 A
M |
ELL
IOTT
.LAG
NER
LAST
SAV
ED B
Y: D
AN.G
LIDD
EN 7
/18/
2019
10:
44 A
M
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
OLD
NO
RWHI
CH R
OAD
PU
MP
STAT
ION
CON
DUIT
AN
D W
IRE
AND
PAN
ELBO
ARD
SCHE
DULE
E-8
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
L
N E
UNDERGROUND PRIMARYELECTRICAL SERVICE
PAD-MOUNTEDTRANSFORMER
GF
800AF600AT 400KW 500KVA
277/480V3 PHASEEMERGENCYGENERATOR
GENERATORFAILURE
GENERATORRUN
NORMALPOSITION POSITION
EMERGENCY
1200AF1000AT
800AF600AT
MICROPROCESSORBASED METERINGAND PROTECTION
NORMAL POWER FAILURETO SCADA SYSTEMCONTROL PANEL
1 2
SWITCHBOARD SWBD-1
(SEE NOTE 3)
21
TVSS
1200 AMPERE, 277/480 VOLTS, 3PHASE. 4 WIRE, 4 POLE
TO SWBD-1 CONDENSING HEATERS
1200A, 277/480V, 3 PHASE, 4 WIRE, 60HZ
MOTOR CONTROL CENTER MCC-1B
SINGLE LINE DIAGRAM - DEMOLITION
NTS
EVERGREEN PUMP STATION
1
SEE NOTES THIS DRAWING
135
SEWAGEPUMPNO. 2
VFD NO. 2CONTROL PANEL
135
SEWAGEPUMPNO. 3
VFD NO. 3CONTROL PANEL
(3)
250A3P
(4)
250A3P
VFD NO. 4CONTROL PANEL
(FUTURE)
(5)
250A3P
135
SEWAGEPUMPNO. 4
(FUTURE)
(6)
20A3P
5
GRINDERNO. 1GR-1
GRINDER NO. 1CONTROL PANEL
30A
3 PO
LE
(7)
20A3P
5
GRINDERNO. 2GR-2
GRINDER NO. 2CONTROL PANEL
30A
3 PO
LE
(8)
20A3P
5
GRINDERNO. 3GR-3
GRINDER NO. 3CONTROL PANEL
30A
3 PO
LE
1.5
WETWELLEXHAUST
FANEF-1
30A
3 PO
LE
(9)
MCP5AFVNRSIZE 1
1.5
WETWELLSUPPLY
FANSF-1
30A
3 PO
LE
(10)
MCP5AFVNRSIZE 1
1.5
DRYWELLEXHAUST
FANEF-2
30A
3 PO
LE
(11)
MCP5AFVNRSIZE 1
5
DRYWELLAIR
HANDLINGUNIT
AHU-1
30A
3 PO
LE
(12)
MCP30AFVNRSIZE 1
5
PLANTWATERPUMP
30A
3 PO
LE
(13)
MCP30AFVNRSIZE 1
1
AIRCOMPRESSOR
30A
3 PO
LE
(14)
20A3P
3
PUMPROOM
MONORAILHOISTNO. 1
30A
3 PO
LE
(15)
20A3P
3
PUMPCONTROL ROOM
MONORAILHOISTNO. 2
30A
3 PO
LE
(16)
20A3P
1
SLIDEGATENO. 1
30A
3 PO
LE
(17)
20A3P
1
SLIDEGATENO. 2
30A
3 PO
LE
(18)
20A3P
(19)
60A3P
TRANSFORMERT-1480V:208/120V3 PHASE30 KVA
LP-1B
LIGHTINGPANELBOARD
(20)
60A3P
35KW
CONDENSING UNIT
(2)
300A3P
MOTOR CONTROL CENTER MCC-1B
(1)
(1)
(1) TVSS
MAIN LUGS ONLY
OUTDOOR WEATHERPROOFGENERATOR ENCLOSURE AND
EMERGENCY GENERATORGENERATOR
CIRCUIT BREAKERGCB-1 - SECTION 2
AUTOMATIC TRANSFERSWITCH ATS-1 -SECTION 3
MAIN CIRCUIT BREAKERMCB-1 - SECTION 1
TO SCADA SYSTEMCONTROL PANEL
KILOWATT HOURMETER AND SOCKET
2
3
FEEDER TO MOTORCONTROL CENTER
MCC-1A
SEE NOTE 5
AHU-1CONTROL PANEL
SEE NOTE 6 SEE NOTE 6 SEE NOTE 6
TO SCADA SYSTEMCONTROL PANEL
3 6 20 SPACE
7 12 16
8 13 17
4
5
MOTOR CONTROL CENTER MCC-1B
FRONT ELEVATION - DEMOLITION
NTS
SEE NOTES THIS DRAWING
1
2 9
11
10
14
SPACE
15
18
SPACE
19
2
SEENOTE 5
SEENOTE 6
SEENOTE 6
SEENOTE 6
PANEL LOCATION:
VOLTAGE:PHASE:
WIRE:AIC:
FEEDER POINT:MOUNTING:BUS RATING:
MAIN TYPE: MCB TRIP AMPSMLO{
PANELBOARD LP-1BELECTRICAL ROOM
120/2083410000
TRANSFORMER T-1SURFACE
100 AMPS
100X
3 4
SEE NOTE 7
3 4
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-9
1406
4A-E
S-SI
NG
LELI
NED
IAG
RAM
DEM
O.D
WG
| E
-9 |
1:1
0.12
3646
77 |
----
| 7/
18/2
019
11:4
8:39
AM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
DAN
.GLI
DDEN
7/1
8/20
19 1
0:44
AM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
EVER
GRE
EN P
UM
P ST
ATIO
NM
OTO
R CO
NTR
OL
CEN
TER
MCC
-1B
SIN
GLE
LIN
E DI
AGRA
M -
DEM
OLI
TIO
N
E-9
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
ELECTRICAL EQUIPMENT INDICATED WITH SHADING SHALL BEDISCONNECTED AND REMOVED IN ITS ENTIRETY FOR ACOMPLETE DEMOLITION. REFER TO NOTE 1 THIS DRAWING.
ELECTRICAL EQUIPMENT INDICATED SHALL REMAIN AND BEMODIFIED AS SHOWN AND NOTED ON THIS DRAWING ANDTHE MODIFICATION DRAWINGS. REFER TO NOTE 4 THISDRAWING FOR ADDITIONAL REQUIREMENTS.
THE EXISTING PANELBOARD LP-1B SHALL REMAIN AND BEMODIFIED AS INDICATED ON THE DEMOLITION ANDMODIFICATION PANELBOARD SCHEDULE AND AS REQUIRED BYTHE MODIFICATION DRAWINGS. DISCONNECT AND REMOVEIN ITS ENTIRETY ALL CONDUIT AND WIRING ASSOCIATED WITHTHE EQUIPMENT SHOWN AS BEING DEMOLISHED FOR ACOMPLETE DEMOLITION. PROVIDE A NEW TYPEWRITTENPANELBOARD DIRECTORY TO REFLECT ALL MODIFICATIONSASSOCIATED WITH THE WORK OF THIS CONTRACT.
THE EXISTING CIRCUIT BREAKER INDICATED SHALL REMAINAND SHALL BE DESIGNATED AS A SPARE CIRCUIT BREAKER.REFER TO THE MODIFICATION DRAWINGS FOR ADDITIONALREQUIREMENTS.
1
DEMOLITION NOTES: NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERAL DEMOLITIONNOTES AND GENERAL NOTES REFER TO DRAWINGS E-1 AND E-2.
2. INFORMATION CONTAINED ON THIS DRAWING HAS BEEN OBTAINED IN PART FROMEXISTING ELECTRICAL DRAWINGS, PHOTOGRAPHS, SITE CONDITIONS AND SHOPDRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL INFORMATION ANDCIRCUITRY AFFECTING HIS OR HER WORK PRIOR TO COMMENCING THE WORK FORTHIS CONTRACT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANYDISCREPANCIES.
3. THE EXISTING MOTOR CONTROL CENTER MCC IS A EVOLUTION SERIES E9000 ASMANUFACTURED BY GENERAL ELECTRIC CORPORATION. THE EXISTING MOTORCONTROL CENTER SHALL BE MODIFIED AS SHOWN ON THIS DRAWING AND THEDEMOLITION AND MODIFICATION DRAWINGS. REFER TO THE CONTRACT DRAWINGSFOR ADDITIONAL INFORMATION ON DEMOLITION AND MODIFICATIONREQUIREMENTS TO THIS MOTOR CONTROL CENTER AND ASSOCIATED CONNECTEDEXISTING EQUIPMENT.
4. UPON DISCONNECTION OF EXISTING CABLES/BUSSING, CLEAN, INSPECT, CLEAN ANDCHECK FOR PROPER TERMINATIONS TO EXISTING EQUIPMENT WHICH IS TO REMAIN.ANY TERMINATIONS, LUGS, CLAMPS, ETC., WHICH REQUIRE REPLACEMENT OR AREFOUND TO BE DEFICIENT OR NOT SERVICEABLE, SHALL BE PROVIDED AS PART OF THEWORK OF THIS CONTRACT. PROVIDE NEW LAMACOID NAMEPLATE ON THE FRONT OFTHE COMPARTMENT DOOR TO READ "SPARE CIRCUIT BREAKER" OR "SPARE STARTER"AS APPLICABLE . REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
5. DISCONNECT AND REMOVE IN ITS ENTIRETY THE EXISTING MOTOR STARTER,CONTROLS AND COMPARTMENT DOOR FOR A COMPLETE DEMOLITION. PROVIDE ANEW FEEDER BREAKER, COMPARTMENT DOOR AND NAMEPLATE AS SHOWN ON THEMODIFICATION DRAWINGS.
6. DISCONNECT AND REMOVE IN ITS ENTIRETY THE EXISTING MOTOR STARTER,CONTROLS AND COMPARTMENT DOOR FOR A COMPLETE DEMOLITION. PROVIDE ANEW MOTOR STARTER OR FEEDER BREAKER, CONTROLS, COMPARTMENT DOOR ANDNAMEPLATE AS SHOWN ON THE MODIFICATION DRAWINGS.
7. REFER TO THE EVERGREEN PUMP STATION CONDUIT AND WIRE SCHEDULE DRAWINGFOR REVISED PANELBOARD LP-1B SCHEDULE AND FINAL ESTIMATED DEMAND LOADINFORMATION.
2
3
4
EVERGREEN PUMP STATION
ENTRY LEVEL FLOOR PLAN - DEMOLITION
SCALE: 1/4"=1'-0"
DRY WELL ENTRY
STAIR
WET WELL ENTRY
STAIR
SEE NOTES THIS DRAWING
1
Xref G:\dwgs\10232I\mech\10232IM02.dwg
2
9
DN
DN
7
6
8
HATCH OPENINGIN FLOOR
HATCH OPENINGIN FLOOR
3
MOD
5
1
MOD
4 CU-1
EF-2
EF-1
SF-1
MOD
ATC-1
N
HATCH OPENINGIN FLOOR
21
2
EVERGREEN PUMP STATION
ELECTRICAL ROOM FLOOR PLAN - DEMOLITION
SCALE: 1/4"=1'-0"
STAIR
ELECTRICAL ROOM
BATHROOM
SEE NOTES THIS DRAWING
1
10
19 15
11
20
FUTURE SPACEREQUIREMENTS
14AHU-1
13
MCC-1B
LP-1B18 17 16
T-1
12
N
2
2
DN
DNDN22
2
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-10
140
64A-
ES-E
VERG
REEN
FLO
ORP
LAN
SDEM
O.D
WG
| E
-10
| 1:
10.1
2364
677
| ---
- | 7
/18/
2019
11:
48:4
5 AM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
DAN
.GLI
DDEN
7/1
8/20
19 1
0:44
AM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
EVER
GRE
EN P
UM
P ST
ATIO
NEN
TRY
AND
ELEC
TRIC
AL R
OO
M F
LOO
R PL
ANS
- DEM
OLI
TIO
N
E-10
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
SUPPLY FAN SF-1 TO BE REMOVED
EXHAUST FAN EF-1 TO BE REMOVED
WETWELL FANS HAND-OFF-AUTO SELECTOR SWITCH TO BE REMOVED
CONDENSER UNIT CU-1 TO BE REMOVED
AUTOMATIC TEMPERATURE CONTROL PANEL ATC-1 TO BE REMOVED
AUTOMATIC TRANSFER SWITCH ATS-1
GENERATOR CIRCUIT BREAKER GCB-1
MAIN CIRCUIT BREAKER MCB-1
EXHAUST FAN EF-2 TO BE REMOVED
MOTOR CONTROL CENTER MCC-1B TO BE MODIFIED
PLANT WATER PUMP
AIR HANDLING UNIT DISCONNECT SWITCH TO BE REMOVED
AIR HANDLING UNIT AHU-1 REMOTE CONTROL PANEL TO BE REMOVED
AIR HANDLING UNIT AHU-1 TO BE REMOVED
GAS DETECTION SYSTEM CONTROL PANEL (DRYWELL) (BELOW)
TELEMETRY CONTROL PANEL
TRANSFORMER T-1
PANELBOARD LP-1B TO BE MODIFIED
TELEPHONE INTERFACE CABINET
TELEMETRY TERMINAL CABINET
GAS DETECTION RELAY CONTROL PANEL TO BE MODIFIED
GAS DETECTION SYSTEM CONTROL PANEL (WETWELL) (ABOVE)
1
2
EQUIPMENT LEGEND:
ELECTRICAL EQUIPMENT INDICATED WITH SHADING SHALL BEDISCONNECTED AND REMOVED IN ITS ENTIRETY FOR ACOMPLETE DEMOLITION. REFER TO NOTE 1 THIS DRAWING.
ELECTRICAL EQUIPMENT INDICATED SHALL REMAIN AND BEMODIFIED AS SHOWN AND NOTED ON THE DEMOLITION ANDMODIFICATION DRAWINGS.
1
DEMOLITION NOTES:
NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERALDEMOLITION NOTES AND GENERAL NOTES REFER TO DRAWINGS E-1AND E-2.
2. INFORMATION CONTAINED ON THIS DRAWING HAS BEEN OBTAINED INPART FROM EXISTING ELECTRICAL DRAWINGS, PHOTOGRAPHS, SITECONDITIONS AND SHOP DRAWINGS. THE CONTRACTOR SHALL FIELDVERIFY ALL INFORMATION AND CIRCUITRY AFFECTING HIS OR HERWORK PRIOR TO COMMENCING THE WORK FOR THIS CONTRACT. THECONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
L
N E
UNDERGROUND PRIMARYELECTRICAL SERVICE
PAD-MOUNTEDTRANSFORMER
GF
800AF600AT 400KW 500KVA
277/480V3 PHASEEMERGENCYGENERATOR
GENERATORFAILURE
GENERATORRUN
NORMALPOSITION POSITION
EMERGENCY
1200AF1000AT
800AF600AT
MICROPROCESSORBASED METERINGAND PROTECTION
NORMAL POWER FAILURETO SCADA SYSTEMCONTROL PANEL
1 2
SWITCHBOARD SWBD-1
(SEE NOTE 3)
21
TVSS
1200 AMPERE, 277/480 VOLTS, 3PHASE. 4 WIRE, 4 POLE
TO SWBD-1 CONDENSING HEATERS
1200A, 277/480V, 3 PHASE, 4 WIRE, 60HZ
MOTOR CONTROL CENTERS MCC-1A AND MCC-1B
SINGLE LINE DIAGRAMS - MODIFICATIONS
NTS
EVERGREEN PUMP STATION
SEE NOTES THIS DRAWING
135
SEWAGEPUMPNO. 2
VFD NO. 2CONTROL PANEL
135
SEWAGEPUMPNO. 3
VFD NO. 3CONTROL PANEL
(3)
250A3P
(4)
250A3P
VFD NO. 4CONTROL PANEL
(FUTURE)
(5)
250A3P
135
SEWAGEPUMPNO. 4
(FUTURE)
(6)
20A3P
5
GRINDERNO. 1GR-1
GRINDER NO. 1CONTROL PANEL
30A
3 PO
LE
(7)
20A3P
5
GRINDERNO. 2GR-2
GRINDER NO. 2CONTROL PANEL
30A
3 PO
LE
(8)
20A3P
5
GRINDERNO. 3GR-3
GRINDER NO. 3CONTROL PANEL
30A
3 PO
LE
5
PLANTWATERPUMP
30A
3 PO
LE
(13)
MCP30AFVNRSIZE 1
1
AIRCOMPRESSOR
30A
3 PO
LE
(14)
20A3P
3
PUMPROOM
MONORAILHOISTNO. 1
30A
3 PO
LE
(15)
20A3P
3
PUMPCONTROL ROOM
MONORAILHOISTNO. 2
30A
3 PO
LE
(16)
20A3P
1
SLIDEGATENO. 1
30A
3 PO
LE
(17)
20A3P
1
SLIDEGATENO. 2
30A
3 PO
LE
(18)
20A3P
(19)
60A3P
TRANSFORMERT-1480V:208/120V3 PHASE30 KVA
LP-1B
LIGHTINGPANELBOARD(MODIFIED)
(2)
300A3P
MOTOR CONTROL CENTER MCC-1B
(1)
600A, 277/480V, 3 PHASE, 4 WIRE, 60HZ
MOTOR CONTROL CENTER MCC-1A
135
SEWAGEPUMPNO. 1
VFD NO. 1CONTROL PANEL
250A3P
3
WETWELLMIXERNO. 1
MCP15AFVNRSIZE 1
3
WETWELLMIXERNO. 2
MCP15AFVNRSIZE 1
MCP15AFVNRSIZE 1
SPARE
20A3P
1
INFLUENTSLUICEGATE
OPERATOR
(1)
(1) TVSS
MAIN LUGS ONLY
OUTDOOR WEATHERPROOFGENERATOR ENCLOSURE AND
EMERGENCY GENERATORGENERATOR
CIRCUIT BREAKERGCB-1 - SECTION 2
AUTOMATIC TRANSFERSWITCH ATS-1 -SECTION 3
MAIN CIRCUIT BREAKERMCB-1 - SECTION 1
TO SCADA SYSTEMCONTROL PANEL
KILOWATT HOURMETER AND SOCKET
SPARE
3
AIRHANDLING
UNITAHU-EG1DRY WELL
AIR HANDLING UNITAHU-EG1
CONTROL PANEL(BY DIVISION 15)
(9)
100AF40AT
1.5
WETWELLEXHAUST
FANEF-EG1
30A
3 PO
LE
3
MAKE-UPAIR
UNITMUA-EG1
2
DRYWELLEXHAUST
FANEF-EG2
30A
4 PO
LE
(10)
MCP15AFVNRSIZE 1
MAKE-UP AIR UNITMUA-EG1
CONTROL PANEL(BY DIVISION 15)
(11)
100AF20AT
(20)
60A3P
TO SCADA SYSTEMCONTROL PANEL
**
*- S
EE N
OTE
4
*- S
EE N
OTE
4
(12)
100AF20AT
EF-EG2 VFDCONTROL PANEL(BY DIVISION 16)
3 6 20 SPACE
7 12 16
8 13 174
5
MOTOR CONTROL CENTER MCC-1B
FRONT ELEVATION - MODIFICATIONS
NTS
SEE NOTES THIS DRAWING
1
2 9
11
10
14
SPACE
15
18
SPACE
19
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-11
140
64A-
ES-E
VERG
REEN
SIN
GLE
LIN
EDIA
GRA
MM
OD.
DWG
| E
-11
| 1:
10.1
2364
677
| ---
- | 7
/18/
2019
11:
48:4
9 AM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
DAN
.GLI
DDEN
7/1
8/20
19 1
1:19
AM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
EVER
GRE
EN P
UM
P ST
ATIO
NM
OTO
R CO
NTR
OL
CEN
TER
MCC
-1B
& M
CC-1
A SI
NG
LE L
INE
DIAG
RAM
S - M
ODI
FICA
TIO
NS
E-11
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERAL DEMOLITIONNOTES AND GENERAL NOTES REFER TO DRAWINGS E-1 AND E-2.
2. INFORMATION CONTAINED ON THIS DRAWING HAS BEEN OBTAINED IN PART FROMEXISTING ELECTRICAL DRAWINGS, PHOTOGRAPHS, SITE CONDITIONS AND SHOPDRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL INFORMATION AND CIRCUITRYAFFECTING HIS OR HER WORK PRIOR TO COMMENCING THE WORK FOR THISCONTRACT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. THE EXISTING MOTOR CONTROL CENTER MCC IS A EVOLUTION SERIES E9000 ASMANUFACTURED BY GENERAL ELECTRIC CORPORATION. THE EXISTING MOTORCONTROL CENTER SHALL BE MODIFIED AS SHOWN ON THIS DRAWING AND THEDEMOLITION AND MODIFICATION DRAWINGS. REFER TO THE CONTRACT DRAWINGSFOR ADDITIONAL INFORMATION ON DEMOLITION AND MODIFICATIONREQUIREMENTS TO THIS MOTOR CONTROL CENTER AND ASSOCIATED CONNECTEDEXISTING EQUIPMENT.
4. THE CONTRACTOR SHALL FURNISH AND INSTALL A 3 POLE, FUSED, DISCONNECTSWITCH AS NOTED. COORDINATE, FURNISH AND INSTALL FUSES SIZED AS REQUIREDPER THE MANUFACTURER'S REQUIREMENTS FOR THIS EQUIPMENT.
EVERGREEN PUMP STATION
ENTRY LEVEL FLOOR PLAN - MODIFICATIONS
SCALE: 1/4"=1'-0"
DRY WELL ENTRY
STAIR
WET WELL ENTRY
STAIR
SEE NOTES THIS DRAWING
2
DN
DN
7
6
8
HATCH OPENINGIN FLOOR
HATCH OPENINGIN FLOOR
3
5
EF-EG1
MOD
ATC-EG1
N
10
J
EF-EG2
9 AHU-EG1
J
P205
P204
P206
JP203
1 MUA-EG1
J
P201
P202
MOD-EF-EG1TO ATC-EG1
4
4
(SEE NOTE 8)
(SEE NOTE 7)
(SEE NOTE 7)
SEE NOTE 3
SEE NOTE 3
FSL-EG2
MOD-D-EG2
MOD-D-EG1 TO ATC-EG1
11
JV
(SEE NOTE 8)
12
P200TO ATC-EG1
H/S-EG1
C200
TO ATC-EG1
HATCH OPENINGIN FLOOR
TO ATC-EG1(SEE NOTE 10)
(SEE NOTE 10)
1314
P207
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-12
140
64A-
ES-E
VERG
REEN
ENTR
YRO
OM
FLO
ORP
LAN
MO
D.DW
G |
E-1
2 |
1:10
.123
6467
7 |
---- |
7/1
8/20
19 1
1:48
:55
AM |
ELL
IOTT
.LAG
NER
LAST
SAV
ED B
Y: D
AN.G
LIDD
EN 7
/18/
2019
10:
44 A
M
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
EVER
GRE
EN P
UM
P ST
ATIO
NEN
TRY
ROO
M F
LOO
R PL
AN -
MO
DIFI
CATI
ON
S
E-12
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
MAKE-UP AIR UNIT MUA-EG1
EXHAUST FAN EF- EG1
HAND-OFF-AUTO SELECTOR SWITCH FOR WETWELL AREA VENTILATION
DUPLEX MAINTENANCE RECEPTACLE - SEE NOTE 7
AUTOMATIC TEMPERATURE CONTROL PANEL ATC-EG-1 - BY DIVISION 15
AUTOMATIC TRANSFER SWITCH ATS-1
GENERATOR CIRCUIT BREAKER GCB-1
MAIN CIRCUIT BREAKER MCB-1
AIR HANDLING UNIT AHU-EG1
EXHAUST FAN EF-EG2
ALARM LIGHT AND HORN
AIR HANDLING UNIT AHU-EG1 CONTROL PANEL - BY DIVISION 15 (SEE NOTE 9)
GAS DETECTION RELAY CONTROL PANEL
EXHAUST FAN EF-EG2 VFD CONTROL PANEL (BY DIVISION 16)
1
2
EQUIPMENT LEGEND:
NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERALDEMOLITION NOTES AND GENERAL NOTES REFER TO DRAWINGS E-1AND E-2.
2. INFORMATION CONTAINED ON THIS DRAWING HAS BEEN OBTAINED INPART FROM EXISTING ELECTRICAL DRAWINGS, PHOTOGRAPHS, SITECONDITIONS AND SHOP DRAWINGS. THE CONTRACTOR SHALL FIELDVERIFY ALL INFORMATION AND CIRCUITRY AFFECTING HIS OR HERWORK PRIOR TO COMMENCING THE WORK FOR THIS CONTRACT. THECONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. FOR CLARITY PURPOSES NOT ALL OF THE EXISTING ELECTRICALEQUIPMENT LOCATED ON THESE FLOOR PLANS HAS BEEN SHOWN. ITSHALL BE THE CONTRACTORS RESPONSIBILITY TO COORDINATED ALLNEW INSTALLATIONS WITH THE EXISTING AND NEW EQUIPMENT,DEVICES, DUCTWORK, LIGHTING, ETC., FOR A NEAT AND COMPLETEINSTALLATION.
4. CIRCUIT NUMBERS INDICATED ON THIS DRAWING REFER TOPANELBOARD LP-1B LOCATED IN THE ELECTRICAL ROOM, UNLESSOTHERWISE NOTED.
5. FOR PANELBOARD SCHEDULES REFER TO THE CONTRACT DRAWINGS.
6. FOR CONDUIT AND WIRING SCHEDULES REFER TO THE CONTRACTDRAWINGS
7. PROVIDE A WEATHER-PROOF, 120V, 20 AMPERE, GFCI TYPE DUPLEXMAINTENANCE RECEPTACLE WITH A WEATHER-PROOF WHILE-IN-USETYPE COVER NEXT TO THE MECHANICAL EQUIPMENT INDICATED.LOCATE THE RECEPTACLE A MINIMUM OF 4'-0" ABOVE FINISHED GRADE.
8. UNLESS OTHERWISE INDICATED, REFER TO THE HVAC BLOCK DIAGRAMDRAWING FOR CONDUIT AND WIRE REQUIREMENTS ASSOCIATED WITHTHIS EQUIPMENT.
9. THE LOCATION OF THE AIR HANDLING CONTROL PANEL AHU-EG1 HASBEEN SHOWN DIAGRAMMATICALLY FOR REFERENCE ONLY. THECONTROL PANEL AND ITS LOCATION ON THE UNIT SHALL BE PROVIDEDBY DIVISION 15. THE ELECTRICAL CONTRACTOR SHALL COORDINATE ALLFINAL LOCATIONS OF ELECTRICAL EQUIPMENT AND CONNECTIONS WITHDIVISION 15 FOR A FINAL INSTALLATION.
10. THE CONTRACTOR SHALL FURNISH AND INSTALL A FUSED DISCONNECTSWITCH AS NOTED. COORDINATE, FURNISH AND INSTALL FUSES SIZEDAS REQUIRED PER THE MANUFACTURER'S REQUIREMENTS FOR THISEQUIPMENT.
3
4
5
6
7
8
9
10
11
12
13
14
EVERGREEN PUMP STATION
ELECTRICAL ROOM FLOOR PLAN - MODIFICATIONS
SCALE: 1/4"=1'-0"
STAIR
ELECTRICAL ROOM
BATHROOM
SEE NOTES THIS DRAWING
1
7 3
2
8
FUTURE SPACEREQUIREMENTS
MCC-1B
LP-1B6 5 4
T-1
N
DN
DNDN
SEE NOTE 3
FSL-EG19
JTO ATC-EG1H/S-EG2 V
(SEE NOTE 4)
(SEE NOTE 5)
10
N
EVERGREEN PUMP STATION
PUMP CONTROL AND GRINDER ROOM FLOOR PLAN - MODIFICATIONS
SCALE: 1/4"=1'-0"
SEE NOTES THIS DRAWING
9JTO ATC-EG1
H/S-EG3 V
UP
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-13
140
64A-
ES-E
VERG
REEN
ELEC
TRIC
ALRO
OM
FLO
ORP
LAN
MO
D.DW
G |
E-1
3 |
1:10
.123
6467
7 |
---- |
7/1
8/20
19 1
1:49
:02
AM |
ELL
IOTT
.LAG
NER
LAST
SAV
ED B
Y: D
AN.G
LIDD
EN 7
/18/
2019
10:
44 A
M
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
EVER
GRE
EN P
UM
P ST
ATIO
NEL
ECTR
ICAL
, PU
MP
CON
TRO
L AN
D G
RIN
DER
RO
OM
FLO
OR
PLAN
- M
ODI
FICA
TIO
NS
E-13
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
MODIFIED MOTOR CONTROL CENTER MCC-1B
PLANT WATER PUMP
GAS DETECTION SYSTEM CONTROL PANEL (DRYWELL) (BELOW)
TELEMETRY CONTROL PANEL
TRANSFORMER T-1
MODIFIED PANELBOARD LP-1B
TELEPHONE INTERFACE CABINET
MODIFIED TELEMETRY TERMINAL CABINET
ALARM LIGHT AND HORN
GAS DETECTION SYSTEM CONTROL PANEL (WETWELL) (ABOVE)
1
2
EQUIPMENT LEGEND:
NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERALDEMOLITION NOTES AND GENERAL NOTES REFER TO DRAWINGS E-1AND E-2.
2. INFORMATION CONTAINED ON THIS DRAWING HAS BEEN OBTAINED INPART FROM EXISTING ELECTRICAL DRAWINGS, PHOTOGRAPHS, SITECONDITIONS AND SHOP DRAWINGS. THE CONTRACTOR SHALL FIELDVERIFY ALL INFORMATION AND CIRCUITRY AFFECTING HIS OR HERWORK PRIOR TO COMMENCING THE WORK FOR THIS CONTRACT. THECONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. FOR CLARITY PURPOSES NOT ALL OF THE EXISTING ELECTRICALEQUIPMENT LOCATED ON THESE FLOOR PLANS HAS BEEN SHOWN. ITSHALL BE THE CONTRACTORS RESPONSIBILITY TO COORDINATED ALLNEW INSTALLATIONS WITH THE EXISTING AND NEW EQUIPMENT,DEVICES, DUCTWORK, LIGHTING, ETC., FOR A NEAT AND COMPLETEINSTALLATION.
4. FOR MODIFICATION REQUIREMENTS ASSOCIATED WITH THISEQUIPMENT, REFER TO THE EVERGREEN PUMP STATION MOTORCONTROL CENTER MCC-1B AND MCC-1A SINGLE LINE DIAGRAMS -MODIFICATIONS DRAWING.
5. FOR MODIFICATION REQUIREMENTS ASSOCIATED WITH THISEQUIPMENT, REFER TO THE EVERGREEN PUMP STATION PANELBOARDAND CONDUIT AND WIRING SCHEDULE DRAWING.
3
4
5
6
7
8
9
10
EVERGREEN PUMPSTATION
AUTOMATICTEMPERATURE
CONTROL PANELATC-EG1
CONTROL ROOM
HAND-AUTOMATICSELECTOR SWITCH
REPEAT CYCLETIMER
(SPEC. 15604)
120V (LP-1B)
HVAC/ATC CONTRACTOR ELEC CONTRACTOR
LIGHT SWITCH INTERLOCKFOR FANS
TO RESPECTIVE LIGHTINGCIRCUIT FOR CONTROL ROOMLIGHTS
TOUTSIDE AIRTEMPERATURESENSOR
EVERGREEN PUMP STATION
H&V WIRING DIAGRAM
NTS
(DRYWELL SIDE)
LIGHT SWITCH INTERLOCKFOR FANS
TO RESPECTIVE LIGHTINGCIRCUIT FOR CONTROL ROOMLIGHTS
2-POLE LIGHT SWITCH(ENTRANCE TO WETWELL AREA)
(WETWELL SIDE)
EF-EG1 (WETWELL)1.5 MCC-1B
MOD-EF-EG1
H/S-EG1V
EXISTINGGAS DETECTIONCONTROL PANEL
(DRYWELL)
GAS DETECTIONRELAY CONTROL
PANEL
120V (LP-1B)
EXISTINGGAS DETECTIONCONTROL PANEL
(WETWELL)
4#14 IN 3/4"C
2#12 & 1#12 GND IN 3/4"C
AHU-EG1CONTROL PANEL(BY DIVISION 15)
MUA-EG1CONTROL PANEL(BY DIVISION 15)
MOD (EF-EG2)
FSL-EG2
MOD-D-EG1
MOD-D-EG2
H/S-EG2V
FSL-EG1
H/S-EG3V
AHU-EG1 (DRYWELL)3
MUA-EG13
2-POLE LIGHT SWITCH(ENTRANCE TO DRYWELL AREA)
C200 H-O-A SELECTOR SWITCH(ENTRANCE TO WETWELL AREA)
EF-EG2 VFDCONTROL PANEL(BY DIVISION 16)
EF-EG2 (DRYWELL)2
12 #14 IN 3/4"C
2 - 2/C #16 TWS IN 1"C
EXISTINGTELEMETRY
CONTROL PANEL
120V
8#14 IN 3/4"C12#14 IN 3/4"C
(BY DIVISION 15)
(BY DIVISION 15)
120V
120V
SCHEMATIC DIAGRAM
WETWELL EXHAUST FAN EF-EG1
NTS
START/STOP
OFFHAND AUTO
FROM ATC-EG1(BY DIVISION 15)
480:120V
MCP
480
VOLT
S
M O/L DISC. SW.
MOTOR
LOCAL
MO/L
MG
(MCC)
RUNINDICATINGLIGHT
M
RUN STATUSTO ATC-EG1
OVERLOAD STATUSTO ATC-EG1
O/L
(MCC)(MCC)
120V POWER SUPPLYL1
RELAY CONTROL PANEL -(SEE NOTES BELOW)
TELEMETRYCONTROLPANEL
TO ATC-EG1CONTROLPANEL
1AR
1AR
N
TELEMETRYCONTROLPANEL
2AR
TO ATC-EG1CONTROLPANEL
2AR
SCHEMATIC DIAGRAM
HAZARDOUS GAS DETECTION SYSTEM RELAY CONTROL PANEL
NTS
ALARM STROBEWETWELL AREA(ENTRANCE)
ALARM STROBEDRYWELL AREA(ENTRANCE)
R
1AR
2AR
RESETPUSHBUTTON
2AR
1ARR
R
R
ALARM LIGHT(DRYWELL)
ALARM LIGHT(WETWELL)
1AR
2AR
SCHEMATIC DIAGRAM
DRYWELL EXHAUST FAN EF-EG2
NTS
RUN INDICATING LIGHT
CR1
(VFD)
G
(VFD)
START/STOP
OFFHAND AUTO
FROM ATC-EG1(BY DIVISION 15)
VARIABLE FREQUENCY DRIVE (SPEC. 16469)
MCP
480
VOLT
S
480:120V
INVERTER
REACTORLINE
MOTOR
DISC. SW.LOCAL
VFD FAULT TOATC-EG1
CR2
RUN STATUSTO ATC-EG1
CR2
(VFD)
RUN STATUS RELAY
VFD AUXRUN
CONTACT
VFDFAULT
CONTACT
VFDINTERLOCKCONTACT
(VFD)
SPEED SELECT INPUT CONTACTTO VFD (IN REMOTE)
TO VFDMANUALSPEED ADJ.
SPEEDPOT ATVFDCONTROLPANEL
VFD SPEED IND.SIGNAL4-20 mA DC
ATC-EG1 AOSPEED SIGNAL4-20 mA DC
ATC-EG1 AISPEED
VFD AUTO SPEEDREFERENCE
VFD START COMMANDINPUT TO ATC-EG1
CR1
H N120 VOLTS FROM AUTOMATIC TEMPERATURE CONTROLPANEL ATC-EG1
MOD MOD-EF-EG1
V
H/S-EG1
HORN/STROBEAUDIO/VISUAL ALARM
MOD-EF-EG2(ATC-EG1)
MOD
(ATC-EG1)
(ATC-EG1)
FOR AUTOMATIC TEMPERATURE CONTROL PANEL
ATC-EG1
NTS
PARTIAL SCHEMATIC DIAGRAM
SEE NOTE 2
MOD MOD-D-EG1(ATC-EG1)
MOD MOD-D-EG2(ATC-EG1)
V
H/S-EG2
HORN/STROBEAUDIO/VISUAL ALARM
(ATC-EG1)
V
H/S-EG3
HORN/STROBEAUDIO/VISUAL ALARM
(ATC-EG1)
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-14
140
64A-
ES-O
LDN
ORW
ICHR
OAD
SCHE
MAT
ICDI
AGRA
M.D
WG
| E
-14
| 1:
10.1
2364
677
| ---
- | 7
/18/
2019
11:
49:0
9 AM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
DAN
.GLI
DDEN
7/1
8/20
19 1
0:44
AM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
EVER
GRE
EN P
UM
P ST
ATIO
NSC
HEM
ATIC
DIA
GRA
MS
E-14
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERALDEMOLITION NOTES AND GENERAL NOTES REFER TO DRAWINGS E-1 AND E-2.
2. THIS IS A PARTIAL SCHEMATIC DIAGRAM WHICH SHOWS THE POWER FEEDAND CONTROL OF THE EQUIPMENT NOTED BEING FED FROM AUTOMATICTEMPERATURE CONTROL PANEL ATC-EG1 AT THIS LOCATION.
PANEL LOCATION:
VOLTAGE:PHASE:
WIRE:AIC:
FEEDER POINT:MOUNTING:BUS RATING:
MAIN TYPE: MCB TRIP AMPSMLO
PANELBOARD LP-1BELECTRICAL ROOM
120/2083410000
TRANSFORMER T-1SURFACE
100 AMPS
100X
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-15
140
64A-
ES-C
ON
DUIT
WIR
EPAN
EL.D
WG
| E
-15
| 1:
10.1
2364
677
| ---
- | 7
/18/
2019
11:
49:1
3 AM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
DAN
.GLI
DDEN
7/1
8/20
19 1
1:18
AM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
EVER
GRE
EN P
UM
P ST
ATIO
NCO
NDU
IT A
ND
WIR
E SC
HEDU
LE
E-15
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
600A, 277/480V, 3 PHASE, 4 WIRE, 60HZ, 65 KAIC
MOTOR CONTROL CENTER MCC-1
5
COMMINUTORNO. 2SG-2
2
PUMP ROOMEXHAUST
FANEF-1
3
1 TONMONORAIL
HOIST
CONTROLPANEL
N E
L
AUTOMATIC TRANSFERSWITCH, 400A, 480/277V, 3PHASE, 3 POLE, SOLID NEUTRAL
EMERGENCYGENERATOR
LIGHTNINGARRESTERSAND SURGECAPACITORS
400 AMP FRAME,400 AMP TRIP3 POLE W/ SOLIDNEUTRAL AND SOLIDGROUND KITGROUND
BUS
BREAKER MCB-1
480/277V, 3 PHASE, 4W
MAIN CIRCUIT
60HZ, 65KAIC
CT/PT
METERING
CABINET
400 AMP FRAME300 AMP TRIP
GEN-1
GENERATOR SERVICE DISCONNECT
CIRCUIT BREAKER GDCB-1
480/277V, 3PHASE, 4W 60HZ, 65KAICKILOWATT HOURMETER AND SOCKET
UNDERGROUND 480/277V,3 PHASE, 4W, 60HZ SECONDARYELECTRICAL SERVICE
POWER COMPANYUNDERGROUND PRIMARY
ELECTRICAL SERVICE
INTERLOCKED TOGENERATOR
START/RUN CIRCUIT
3P200A
PT
CT
G2
G1
E
PGMTS-1
PGMCB-1
UTILITY TRANSFORMERT-1277/480V 3 PHASE,4 WIRE SERVICE
MCB-1A
MANUAL TRANSFERSWITCH, 400A, 480/277V,3 PHASE, 3 POLE21
200 KW, 250 KVA480/277V 3 PHASE, 4W
MOTOR CONTROL CENTER MCC-1
SINGLE LINE DIAGRAM - DEMOLITION
NTS
40
SEWAGEPUMPNO.4
5
COMMINUTORNO. 1SG-1
SPARE SPARE
SP-4
CONTROLPANEL
CONTROLPANEL
VFD WITHLINE REACTOR
HARMONIC FILTER
TRANSIENTVOLTAGE SURGE
SUPPRESSIONSYSTEM
VFD WITHLINE REACTOR
HARMONIC FILTER
VFD WITHLINE REACTOR
HARMONIC FILTER(FUTURE)
MLO
(FUTURE)
5
PLANTWATERPUMPPW-1
SPARE
CONTROL PANEL
36 KWELECTRICHEATER
CONTROL PANEL
SEE NOTES THIS DRAWING
ETHERNETCONNECTION FOR
TOTAL POWERUSAGE AND
MONITORING TOPUMP CONTROL
PANEL PCP
NORMAL POWERFAILURE TO
TELEMETRY PANEL
TVSSSYSTEM
VFD WITHLINE REACTOR
HARMONIC FILTER
SPARESPARE
40
SEWAGEPUMPNO. 3SP-3
7.3
COMPRESSOR
3/4
CONDENSOR
WET WELL HP-2 UNIT
7.5
COMPRESSOR
1
CONDENSOR
DRY WELL HP-1 UNIT
CONTROL PANEL LIGHTINGPANELLP-1A
T-1A480V:208/120V3 PHASE,30 KVA
1.5
#2
1.5
#1
DUPLEXAIR
COMPRESSORS
2
WET WELLEXHAUST
FANEF-2
40
SEWAGEPUMPNO. 2SP-2
40
SEWAGEPUMPNO. 1SP-1
30A
3 PO
LE
30A
3 PO
LE
30A
3 PO
LE60A,
3 P
OLE
100A
, 3 P
OLE
60A,
3 P
OLE
(4)
100AF30AT
(5)
100AF20AT
(6)
100AF20AT
(7)
100AF100AT
(8)
100AF100AT
(14)
100AF100AT
(10)
100AF100AT
(9)
MCP3AFVNRSIZE 1
(11)
MCP3AFVNRSIZE 1
(12)
MCP15AFVNRSIZE 1
(13)
100AF60AT
(16)
100AF80AT
(19)
100AF40AT
(20)
100AF20AT
(21)
100AF20AT
(15)
MCP7AFVNRSIZE 1
(17)
MCP7AFVNRSIZE 1
(18)
MCP7AFVNRSIZE 1
(23)
MCP3AFVNRSIZE 1
(22)
100AF60AT
(24)
100AF20AT
EMERGENCYPOSITION
NORMALPOSITION
(TELEMETRY PANEL)
400 AMP FRAME, 400AMP TRIP 3 POLE W/SOLID NEUTRAL ANDSOLID GROUND KIT
MICROPROCESSORBASED METERINGAND PROTECTION
TVSS
ATS-1
PORTABLEGENERATOR MAINCIRCUIT BREAKER"PGMCB-1"
PORTABLE GENERATORCABLE CONNECTION
PANEL "PGCCP-1"
400 AMP FRAME300 AMP TRIP3 POLE W/SOLID NEUTRALAND SOLID GROUND KIT
1
5
3
30A3 POLE
(1)
(3)
(2)
2
FANMOTOR
DRYWELLHV-1UNIT
34 KWELECTRICHEATER
SEE NOTE 5
4
DRYWELL HV-1 UNIT
SEE NOTE 6
SPACE
MOTOR CONTROL CENTER MCC-1
FRONT ELEVATION
NTS
MLO
1
2
3
4
5
6
7
9 15
10 16
11 17
12 18
13 19
20
21
22
23
24
SEE NOTES THIS DRAWING
ATS-1
SPACE
MCB-1A
8 14 SPACE
SPACE
5
SEE NOTE 65
MCB-1A MCC-1
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-16
140
64-E
S-M
CC-1
BLU
EHIL
LSSI
NG
LELI
NED
IAG
RAM
DEM
O.D
WG
| E
-16
| 1:
10.1
2364
677
| ---
- | 7
/18/
2019
11:
49:1
8 AM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
DAN
.GLI
DDEN
7/1
8/20
19 1
0:44
AM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
BLU
E HI
LLS
PUM
P ST
ATIO
NM
CC-1
SIN
GLE
LIN
E DI
AGRA
M -
DEM
OLI
TIO
N
E-16
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
ELECTRICAL EQUIPMENT INDICATED WITH SHADING SHALL BEDISCONNECTED AND REMOVED IN ITS ENTIRETY FOR ACOMPLETE DEMOLITION. REFER TO NOTE 1 THIS DRAWING.
ELECTRICAL EQUIPMENT INDICATED SHALL REMAIN AND BEMODIFIED AS SHOWN AND NOTED ON THIS DRAWING ANDTHE MODIFICATION DRAWINGS. REFER TO NOTE 4 THISDRAWING FOR ADDITIONAL REQUIREMENTS.
THE EXISTING PANELBOARD LP-1A SHALL REMAIN AND BEMODIFIED AS INDICATED IN THE PANELBOARD SCHEDULE THISDRAWING AND ON THE MODIFICATION DRAWINGS.DISCONNECT AND REMOVE IN ITS ENTIRETY ALL CONDUIT ANDWIRING ASSOCIATED WITH THE EQUIPMENT SHOWN AS BEINGDEMOLISHED FOR A COMPLETE DEMOLITION. PROVIDE A NEWTYPEWRITTEN PANELBOARD DIRECTORY TO REFLECT ALLMODIFICATIONS ASSOCIATED WITH THE WORK OF THISCONTRACT.
DISCONNECT AND REMOVE IN ITS ENTIRETY THE EXISTINGSINGLE SPEED FAN MOTOR INCLUDING ALL ASSOCIATEDCONDUIT AND WIRING FOR A COMPLETE DEMOLITION.
UPON REMOVAL OF THE EXISTING CONNECTED EQUIPMENTAND ASSOCIATED CONNECTIONS THE EXISTING STARTERCOMPARTMENT #17 SHALL BE REMOVED AND SHALL BERELOCATED TO ANOTHER COMPARTMENT AS NOTED. REFERTO THE MODIFICATION DRAWINGS FOR ADDITIONALREQUIREMENTS. PROVIDE A NEW STARTER IN THE LOCATIONOF COMPARTMENT #17 AS SHOWN ON THE MODIFICATIONDRAWINGS.
1
DEMOLITION NOTES:
NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERALDEMOLITION NOTES AND GENERAL NOTES REFER TO DRAWINGS E-1 AND E-2.
2. INFORMATION CONTAINED ON THIS DRAWING HAS BEEN OBTAINED IN PARTFROM EXISTING ELECTRICAL DRAWINGS, PHOTOGRAPHS, SITE CONDITIONSAND SHOP DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALLINFORMATION AND CIRCUITRY AFFECTING HIS OR HER WORK PRIOR TOCOMMENCING THE WORK FOR THIS CONTRACT. THE CONTRACTOR SHALLNOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. THE EXISTING MOTOR CONTROL CENTER MCC-1 IS A FREEDOM SERIES 2100 ASMANUFACTURED BY CUTLER-HAMMER CORPORATION. THE EXISTING MOTORCONTROL CENTER SHALL BE MODIFIED AS SHOWN ON THIS DRAWING ANDTHE DEMOLITION AND MODIFICATION DRAWINGS. REFER TO THIS DRAWINGAND THE CONTRACT DRAWINGS FOR ADDITIONAL INFORMATION ONDEMOLITION AND MODIFICATION REQUIREMENTS TO THIS MOTOR CONTROLCENTER AND ASSOCIATED CONNECTED EXISTING EQUIPMENT.
4. UPON DISCONNECTION OF EXISTING CABLES/BUSSING, CLEAN, INSPECT,CLEAN AND CHECK FOR PROPER TERMINATIONS TO EXISTING EQUIPMENTWHICH IS TO REMAIN. ANY TERMINATIONS, LUGS, CLAMPS, ETC., WHICHREQUIRE REPLACEMENT OR ARE FOUND TO BE DEFICIENT OR NOTSERVICEABLE, SHALL BE PROVIDED AS PART OF THE WORK OF THIS CONTRACT.PROVIDE NEW LAMACOID NAMEPLATE ON THE FRONT OF THECOMPARTMENT DOOR TO READ "SPARE CIRCUIT BREAKER" OR "SPARESTARTER" AS APPLICABLE OR AS NOTED FOR THE MODIFICATION AND USE OFTHIS EQUIPMENT. REFER TO SPECIFICATIONS FOR ADDITIONALREQUIREMENTS.
5. THE EXISTING FAN MOTOR SHALL BE REPLACED WITH A NEW TWO SPEEDMOTOR. REFER TO THE MODIFICATION DRAWINGS FOR ADDITIONALREQUIREMENTS.
6. RELOCATE THE EXISTING STARTER FROM COMPARTMENT 17 TOCOMPARTMENT NOTED FOR A COMPLETE RELOCATION. PROVIDE ALAMACOID NAMEPLATE ATTACHED TO THE DOOR TO READ "SPARE STARTER".REFER TO THE MODIFICATION DRAWINGS FOR ADDITIONAL REQUIREMENTS.
2
3
4
5
1
2
4 67 12
25
INTERMEDIATE LEVEL
CONTROL ROOM
UP
UP
UP
DN
FLOORHATCH
BLUE HILLS PUMP STATION
CONTROL ROOM FLOOR PLAN - DEMOLITION
SCALE: 1/4" = 1'-0"
11
17 18
19
20
3
MCB-1A
SP
-4
VF
D
SP
-3
VF
D
1510
21
8
23
22
1
(LOCATED ATTHE CEILING)
16
SINK
SINK
24
14
SP
-2
VF
D
SP
-1
VF
D
FLOORHATCH
MCC-1
DC-1
BATH ROOM
5
PSH-180 PSL-180 PE/PIT-170
FS
HV-1
SEE NOTES THIS DRAWING
1
2
31
13
PW-1
2
2
2
26
2927
9 3230
28
2
25
3
7
12
13
14
16
18 19
17
20
DN
ROOF
NO. 2
STAIR
FLOORHATCH
FLOORHATCH
5
6
PC
25
6
6
6
26
27
15
J
2
31
LS-1LS-2LS-3
28
2430 11
10
4
8
DN
9
STAIR NO. 1
MOD-EF-2
1
22
23
GFCI
29
DUCT
BLUE HILLS PUMP STATION
ROOF PLAN - DEMOLITION
SCALE: 1/4" = 1'-0"
SEE NOTES THIS DRAWING
1
HP-1
EF-1
EF-2
JJ
J
J
21
SEE NOTE 3
MOD-EF-1
2
2
PHASE LOAD (VA)DESCRIPTIONAMPS
A<
B CDESCRIPTIONCKT
NO.NO.
POLES
-
<1 1 BLOCK HEATER20 1 230
CKTNO.AMPSNO.
POLES
<3 1 BATTERY
CHARGER20 1 420
<5 1 -30 1 620
<9 1 ROOF LIGHTS20 1 1020
<7 1 CONTROL ROOM OUTLETS20 1 820
<15 1 1620
<11 1 ROOF OUTLETS20 1 1220
<17 1 POLE LIGHTS20 1 1820
<19 1 PUMP ROOM OUTLETS20 1 2020
<21 1 PUMP ROOM LIGHTS20 1 2220
<23 1 SPARE20 1 2420
<25 1 SPARE20 1 2620
<27 1 SPARE20 1 2820
<29 1 SPARE20 1 3020
<31 1 SPARE20 1 3220
<33 1 SPARE20 1 3420
<35 1 SPARE20 1 3620
<37 1 SPARE20 1 3820
<39 1 SPARE20 1 4020
<41 1 SPARE20 1 4220
<13 2 SUMP PUMP20 1 1420
--
DAY TANK
ALARM PANEL
PUMP CONTROL PANEL
ATC PANELS (ATC-1 AND ATC-2)
WET WELL LIGHTS
CONTROL ROOM LIGHTS
PUMP CONTROL PANEL
SPARE
GAS DETECTION
UNKNOWN
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
PUMP CONTROL PANEL
-
TOTAL
ESTIMATED DEMAND LOADDEMAND LINE CURRENT
KVAAMP
SUB-TOTAL --
--
--
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
-
--
--
-
-
--
--
-
-
--
--
-
-
--
--
-
-
--
--
-
-
--
--
-
-
--
PANEL LOCATION:
VOLTAGE:PHASE:
WIRE:AIC:
FEEDER POINT:MOUNTING:BUS RATING:
MAIN TYPE: MCB TRIP AMPSMLO{
PANELBOARD LP-1ACONTROL ROOM
120/2083410000
TRANSFORMER T-1ASURFACE
100 AMPS
X 100
SEE NOTE 7
SEE NOTE 8
SEE NOTE 9
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-17
140
64A-
ES-B
LUEH
ILLS
CON
TRO
LFLO
ORP
LAN
DEM
O.D
WG
| E
-17
| 1:
10.1
2364
677
| ---
- | 7
/18/
2019
11:
49:2
4 AM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
DAN
.GLI
DDEN
7/1
8/20
19 1
0:44
AM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
BLU
E HI
LLS
PUM
P ST
ATIO
NRO
OF
AND
CON
TRO
L RO
OM
FLO
OR
PLAN
S - D
EMO
LITI
ON
E-17
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
CONTROL ROOM EQUIPMENT LEGEND:
HVAC DUCT
24 HOUR TIME SWITCH (EXTERIOR LIGHTS)
MOTOR CONTROL CENTER MCC-1 SECTIONS
COMMINUTOR NO. 1 CONTROL PANEL
DEHUMIDIFICATION COIL DC-1 - TO BE MODIFIED (SEE NOTE 5)
MAIN CIRCUIT BREAKER SECTION MCB-1A SECTION
AUTOMATIC TRANSFER SWITCH ATS-1 SECTION
30 KVA DRY TYPE TRANSFORMER T-1A
PUMP CONTROL/TELEMETRY CONTROL PANEL - TO BE MODIFIED(SEE NOTE 6)
BATTERY CHARGER
DRY WELL HV-1 UNIT CONTROL PANEL - TO BE MODIFIED (SEE NOTE 4)
COMMINUTOR NO. 2 CONTROL PANEL
BATH ROOM LIGHT FIXTURE
FILE CABINET
PLANT WATER PUMP PW-1
POINT OF USE WATER HEATER
SEWAGE PUMP NO. 1 SP-1 VFD CONTROL PANEL
SEWAGE PUMP NO. 2 SP-2 VFD CONTROL PANEL
SEWAGE PUMP NO. 3 SP-3 VFD CONTROL PANEL
FUTURE SEWAGE PUMP NO. 4 SP-4 VFD CONTROL PANEL
LIGHTING PANEL LP-1A - TO BE MODIFIED
TELEPHONE INTERFACE EQUIPMENT
AQUATROL TELEMETRY PANEL RTU-0010 (CONNELLY PANEL)
HV-1 UNIT CONTROL PANEL DISCONNECT SWITCH
CONCRETE PAD LOCATED BELOW EQUIPMENT
GAS DETECTION SYSTEM RELAY CONTROL PANEL RCP (BELOW) - TO BE REMOVED
ISB RELAY CONTROL PANEL (ABOVE)
FLOW INDICATING TRANSMITTER
AUTOMATIC TEMPERATURE CONTROL PANEL ATC-1 (ABOVE) - TO BE MODIFIED (SEE NOTE 6)
AUTOMATIC TEMPERATURE CONTROL PANEL ATC-2 (BELOW) - TO BE MODIFIED (SEE NOTE 6)
HV-1 FAN MOTOR TO BE REMOVED (SEE NOTE 4)
BUBBLER SYSTEM CONTROL PANEL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
ELECTRICAL EQUIPMENT INDICATED WITH SHADING SHALL BEDISCONNECTED AND REMOVED IN ITS ENTIRETY FOR ACOMPLETE DEMOLITION. REFER TO NOTE 1 THIS DRAWING.
ELECTRICAL EQUIPMENT INDICATED SHALL REMAIN AND BEMODIFIED AS SHOWN AND NOTED ON THE DEMOLITION ANDMODIFICATION DRAWINGS.
1
DEMOLITION NOTES:
NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERALDEMOLITION NOTES AND GENERAL NOTES REFER TO DRAWINGS E-1AND E-2.
2. INFORMATION CONTAINED ON THIS DRAWING HAS BEEN OBTAINED INPART FROM EXISTING ELECTRICAL DRAWINGS, PHOTOGRAPHS, SITECONDITIONS AND SHOP DRAWINGS. THE CONTRACTOR SHALL FIELDVERIFY ALL INFORMATION AND CIRCUITRY AFFECTING HIS OR HERWORK PRIOR TO COMMENCING THE WORK FOR THIS CONTRACT. THECONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. THE EQUIPMENT LOCATED ON THE ROOF HAS BEEN INSTALLED IN ASPECIAL MANNER. THE UPPER ROOF AREA IS A SEALED MEMBRANETYPE ROOF. ALL CONDUIT PENETRATIONS HAVE BEEN SEALED IN ASPECIFIC MANNER. THE CONTRACTOR SHALL RE-USE EXISTINGCONDUITS WHEREVER POSSIBLE AT THIS LOCATION ONLY OR SHALL BERESPONSIBLE TO SEAL ALL ROOF PENETRATIONS IN THE SPECIFICMANNER REQUIRED FOR THE INSTALLATION FOR THE SPECIAL ROOFPENETRATION REQUIRED.
4. THE EXISTING HV-1 SINGLE SPEED FAN MOTOR SHALL BE DISCONNECTEDAND REMOVED AND SHALL BE REPLACED WITH A NEW TWO SPEEDMOTOR. THE HV-1 UNIT CONTROL PANEL SHALL BE MODIFIED BYDIVISION 15 FOR A NEW TWO SPEED STARTER AND ASSOCIATEDCONTROLS. DIVISION 16 SHALL DISCONNECT AND RE-CONNECT THENEW MOTOR FOR THIS INSTALLATION AS NOTED.
5. THERE ARE NO ELECTRICAL REQUIREMENTS FOR THISDEHUMIDIFICATION COIL, HOWEVER, REFER TO THE MODIFICATIONDRAWINGS FOR ADDITIONAL REQUIREMENTS FOR THIS EQUIPMENT.THIS IS A MECHANICAL MODIFICATION ONLY.
6. THE EXISTING ELECTRICAL EQUIPMENT INDICATED SHALL REMAIN ANDSHALL BE MODIFIED AS SHOWN ON THE SCHEMATIC DIAGRAMDRAWING.
7. THE EXISTING SPARE BREAKER INDICATED SHALL BE UTILIZED FORPOWER TO THE NEW HAZARDOUS GAS DETECTION SYSTEM RELAYCONTROL PANEL AS INDICATED ON THE MODIFICATION DRAWINGS.
8. THE EXISTING PANELBOARD SCHEDULE DIRECTORY HAS BEEN UPDATEDTO INCLUDE THE ATC PANELS FED FROM THIS CIRCUIT.
9. REFER TO THE ROOF AND CONTROL ROOM FLOOR PLANS -MODIFICATIONS DRAWINGS FOR REVISED PANELBOARD LP-1ASCHEDULE AND FINAL ESTIMATED DEMAND LOAD INFORMATION.
2
ROOF PLAN EQUIPMENT LEGEND:
DRY WELL HP-1 UNIT CONTROL PANEL
WET WELL HP-2 UNIT CONTROL PANEL
EXHAUST FAN EF-1 - TO BE REMOVED (SEE NOTE 3)
GAS MONITORING SYSTEM CONTROL PANEL (WETWELL) - TO BE MODIFIED (SEE NOTE 6)
RECEPTACLE (TYP)
METAL HALIDE WALLPACK LIGHT FIXTURE
EXHAUST FAN EF-2
GAS MONITORING CONTROL PANEL (DRYWELL) - TO BE MODIFIED (SEE NOTE 6)
GAS SENSOR
DAY TANK CONTROL PANEL
DAY TANK TRANSFER PUMP NO. 2
PORTABLE GENERATOR CABLE CONNECTION PANEL
PORTABLE GENERATOR MAIN CIRCUIT BREAKER PGMCB-1
PORTABLE GENERATOR MANUAL TRANSFER SWITCH PGMTS-1
STAND-BY EMERGENCY GENERATOR GEN-1
STAND-BY EMERGENCY GENERATOR MAIN CIRCUIT BREAKER
STAND-BY EMERGENCY GENERATOR CONTROL PANEL
STAND-BY EMERGENCY GENERATOR BATTERY CHARGER
STAND-BY EMERGENCY GENERATOR BATTERIES
STAND-BY EMERGENCY GENERATOR BLOCK HEATER
EXHAUST FAN EF-1 DISCONNECT SWITCH - TO BE REMOVED (SEE NOTE 3)
HP-1 UNIT CONTROL PANEL DISCONNECT SWITCH
HP-2 UNIT CONTROL PANEL DISCONNECT SWITCH
FUEL TRANSFER PUMP CONTROL PANEL
GFI TYPE RECEPTACLE
ROOF LIGHTING CONTROL PANEL (RLCP-1)
GENERATOR SERVICE DISCONNECT CIRCUIT BREAKER GDCB-1
200 GALLON DAY TANK
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
EMERGENCY GENERATOR E-STOP
DAY TANK TRANSFER PUMP NO. 1
DAY TANK LEVEL SWITCHES
29
30
31
31
32
MOTOR CONTROL CENTER MCC-1
SINGLE LINE DIAGRAM -MODIFICATIONS
NTS
SEE NOTES THIS DRAWING
600A, 277/480V, 3 PHASE, 4 WIRE, 60HZ, 65 KAIC
MOTOR CONTROL CENTER MCC-1
5
COMMINUTORNO. 2SG-2
3
1 TONMONORAIL
HOIST
CONTROLPANEL
N E
L
AUTOMATIC TRANSFERSWITCH, 400A, 480/277V, 3PHASE, 3 POLE, SOLID NEUTRAL
EMERGENCYGENERATOR
LIGHTNINGARRESTERSAND SURGECAPACITORS
400 AMP FRAME,400 AMP TRIP3 POLE W/ SOLIDNEUTRAL AND SOLIDGROUND KITGROUND
BUS
BREAKER MCB-1
480/277V, 3 PHASE, 4W
MAIN CIRCUIT
60HZ, 65KAIC
CT/PT
METERING
CABINET
400 AMP FRAME300 AMP TRIP
GEN-1
GENERATOR SERVICE DISCONNECT
CIRCUIT BREAKER GDCB-1
480/277V, 3PHASE, 4W 60HZ, 65KAICKILOWATT HOURMETER AND SOCKET
UNDERGROUND 480/277V,3 PHASE, 4W, 60HZ SECONDARYELECTRICAL SERVICE
POWER COMPANYUNDERGROUND PRIMARY
ELECTRICAL SERVICE
INTERLOCKED TOGENERATOR
START/RUN CIRCUIT
3P200A
PT
CT
G2
G1
E
PGMTS-1
PGMCB-1
UTILITY TRANSFORMERT-1277/480V 3 PHASE,4 WIRE SERVICE
MCB-1A
MANUAL TRANSFERSWITCH, 400A, 480/277V,3 PHASE, 3 POLE21
200 KW, 250 KVA480/277V 3 PHASE, 4W
40
SEWAGEPUMPNO.4
5
COMMINUTORNO. 1SG-1
SPARE SPARE
SP-4
CONTROLPANEL
CONTROLPANEL
VFD WITHLINE REACTOR
HARMONIC FILTER
TRANSIENTVOLTAGE SURGE
SUPPRESSIONSYSTEM
VFD WITHLINE REACTOR
HARMONIC FILTER
VFD WITHLINE REACTOR
HARMONIC FILTER(FUTURE)
MLO
(FUTURE)
5
PLANTWATERPUMPPW-1
SPARE
CONTROL PANEL
36 KWELECTRICHEATER
CONTROL PANEL
ETHERNETCONNECTION FOR
TOTAL POWERUSAGE AND
MONITORING TOPUMP CONTROL
PANEL PCP
NORMAL POWERFAILURE TO
TELEMETRY PANEL
TVSSSYSTEM
VFD WITHLINE REACTOR
HARMONIC FILTER
SPARESPARE
40
SEWAGEPUMPNO. 3SP-3
7.3
COMPRESSOR
3/4
CONDENSOR
WETWELL HP-2 UNIT
7.5
COMPRESSOR
1
CONDENSOR
DRY WELL HP-1 UNIT
CONTROL PANEL LIGHTINGPANELLP-1A
T-1A480V:208/120V3 PHASE,30 KVA
1.5
#2
1.5
#1
DUPLEXAIR
COMPRESSORS
2
WET WELLEXHAUST
FANEF-2
40
SEWAGEPUMPNO. 2SP-2
40
SEWAGEPUMPNO. 1SP-1
30A
3 PO
LE
30A
3 PO
LE60A,
3 P
OLE
100A
, 3 P
OLE
60A,
3 P
OLE
(4)
100AF30AT
(5)
100AF20AT
(6)
100AF20AT
(7)
100AF100AT
(8)
100AF100AT
(14)
100AF100AT
(10)
100AF100AT
(9)
MCP3AFVNRSIZE 1
(11)
MCP3AFVNRSIZE 1
(12)
MCP15AFVNRSIZE 1
(13)
100AF60AT
(16)
100AF80AT
(19)
100AF40AT
(20)
100AF20AT
(21)
100AF20AT
(15)
MCP7AFVNRSIZE 1
(18)
MCP7AFVNRSIZE 1
(23)
MCP3AFVNRSIZE 1
(22)
100AF60AT
(24)
100AF20AT
EMERGENCYPOSITION
NORMALPOSITION
(TELEMETRY PANEL)
400 AMP FRAME, 400AMP TRIP 3 POLE W/SOLID NEUTRAL ANDSOLID GROUND KIT
MICROPROCESSORBASED METERINGAND PROTECTION
TVSS
ATS-1
PORTABLEGENERATOR MAINCIRCUIT BREAKER"PGMCB-1"
PORTABLE GENERATORCABLE CONNECTION
PANEL "PGCCP-1"
400 AMP FRAME300 AMP TRIP3 POLE W/SOLID NEUTRALAND SOLID GROUND KIT
30A3 POLE
(1)
(3)
(2)
34 KWELECTRICHEATER
1
DRY WELLEXHAUST
FANEF-BH1
2
FANMOTOR
DRYWELLHV-1UNIT
(25)
MCP7AFVNRSIZE 1
SPARE
DRYWELL HV-1 UNIT
(17)
100AF20AT
EXHAUST FANCONTROL PANEL
WITH VFD(BY DIVISION 15)
*
*- S
EE N
OTE
4
MOTOR CONTROL CENTER MCC-1
FRONT ELEVATION
NTS
SPACE
MLO
1
2
3
4
5
6
7
9 15
10 16
11 17
12 18
13 19
20
21
22
23
24
ATS-1
SPACE
MCB-1A
8 14 SPACE
25
MCB-1A MCC-1
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-18
140
64A-
ES-B
LUEH
ILLS
PUM
PSTA
TIO
NM
CC!M
OD.
DWG
| E
-18
| 1:
10.1
2364
677
| ---
- | 7
/18/
2019
11:
49:2
8 AM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
DAN
.GLI
DDEN
7/1
8/20
19 1
0:44
AM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
BLU
E HI
LLS
PUM
P ST
ATIO
NM
OTO
R CO
NTR
OL
CEN
TER
MCC
-1B
AND
MCC
-1A
SIN
GLE
LIN
E DI
AGRA
MS
-M
ODI
FICA
TIO
NS
E-18
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERAL DEMOLITIONNOTES AND GENERAL NOTES REFER TO DRAWINGS E-1 AND E-2.
2. INFORMATION CONTAINED ON THIS DRAWING HAS BEEN OBTAINED IN PART FROMEXISTING ELECTRICAL DRAWINGS, PHOTOGRAPHS, SITE CONDITIONS AND SHOPDRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL INFORMATION ANDCIRCUITRY AFFECTING HIS OR HER WORK PRIOR TO COMMENCING THE WORK FORTHIS CONTRACT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANYDISCREPANCIES.
3. THE EXISTING MOTOR CONTROL CENTER MCC IS A EVOLUTION SERIES E9000 ASMANUFACTURED BY GENERAL ELECTRIC CORPORATION. THE EXISTING MOTORCONTROL CENTER SHALL BE MODIFIED AS SHOWN ON THIS DRAWING AND THEDEMOLITION AND MODIFICATION DRAWINGS. REFER TO THE CONTRACT DRAWINGSFOR ADDITIONAL INFORMATION ON DEMOLITION AND MODIFICATIONREQUIREMENTS TO THIS MOTOR CONTROL CENTER AND ASSOCIATED CONNECTEDEXISTING EQUIPMENT.
4. THE CONTRACTOR SHALL FURNISH AND INSTALL A 3 POLE, FUSED, DISCONNECTSWITCH AS NOTED. COORDINATE, FURNISH AND INSTALL FUSES SIZED AS REQUIREDPER THE MANUFACTURER'S REQUIREMENTS FOR THIS EQUIPMENT.
1
2
4 67 12
25
INTERMEDIATE LEVEL
CONTROL ROOM
UP
UP
UP
DN
FLOORHATCH
BLUE HILLS PUMP STATION
CONTROL ROOM FLOOR PLAN - MODIFICATIONS
SCALE: 1/4" = 1'-0"
11
19
20
3
MCB-1A
SP
-4
VF
D
SP
-3
VF
D
15
10
21
8
23
22
1
(LOCATED ATTHE CEILING)
16
SINK
SINK
24
14
SP
-2
VF
D
SP
-1
VF
D
26
29
FLOORHATCH
MCC-1
BATH ROOM
PSH-180 PSL-180 PE/PIT-170
FS
HV-1
SEE NOTES THIS DRAWING
MOD-D-BH1TO ATC-1
17 18
31
DC-15
P302
J
P301
SEE NOTE 3
27
9
C300
3230
28
25
7
12
13
14
16
18 19
17
20
DN
ROOF
NO. 2
STAIR
FLOORHATCH
FLOORHATCH
5
6
PC
25
6
6
6
26
27
15
J
2
31
LS-1LS-2LS-3
28
2430 11
10
4
8
DN
9
STAIR NO. 1
MOD-EF-2
1
22
23
GFCI
29
DUCT
BLUE HILLS PUMP STATION
ROOF PLAN - MODIFICATIONS
SCALE: 1/4" = 1'-0"
SEE NOTES THIS DRAWING
HP-1
EF-2
J
J
J
JP300
3 EF-BH1
TO ATC-1MOD-EF-BH1
33
323#12 AND 1#12GND IN 3/4"C
3#12 AND 1#12GND IN 3/4"C
34
PHASE LOAD (VA)DESCRIPTIONAMPS
A<
B CDESCRIPTIONCKT
NO.NO.
POLES
1400
<1 1 BLOCK HEATER20 1 230
CKTNO.AMPSNO.
POLES
<3 1 BATTERY
CHARGER20 1 420
<5 1 -30 1 620
<9 1 ROOF LIGHTS20 1 1020
<7 1 CONTROL ROOM OUTLETS20 1 820
<15 1 1620
<11 1 ROOF OUTLETS20 1 1220
<17 1 POLE LIGHTS20 1 1820
<19 1 PUMP ROOM OUTLETS20 1 2020
<21 1 PUMP ROOM LIGHTS20 1 2220
<23 1 HAZARDOUS GAS DETECTION SYSTEM RELAY CONTROL
PANEL20 1 2420
<25 1 SPARE20 1 2620
<27 1 SPARE20 1 2820
<29 1 SPARE20 1 3020
<31 1 SPARE20 1 3220
<33 1 SPARE20 1 3420
<35 1 SPARE20 1 3620
<37 1 SPARE20 1 3820
<39 1 SPARE20 1 4020
<41 1 SPARE20 1 4220
<13 2 SUMP PUMP20 1 1420
--
DAY TANK
ALARM PANEL
PUMP CONTROL PANEL
ATC PANELS (ATC-1 AND ATC-2)
WET WELL LIGHTS
CONTROL ROOM LIGHTS
PUMP CONTROL PANEL
SPARE
GAS DETECTION
UNKNOWN
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
PUMP CONTROL PANEL
400
TOTAL
ESTIMATED DEMAND LOADDEMAND LINE CURRENT
KVAAMP
SUB-TOTAL 580016000
46005600
1655.5
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
400
-600
8001200
1100
800
800600
1000600
900
1000
500800
600-
400
1000
500600
--
-
-
--
--
-
-
--
--
-
-
--
PANEL LOCATION:
VOLTAGE:PHASE:
WIRE:AIC:
FEEDER POINT:MOUNTING:BUS RATING:
MAIN TYPE: MCB TRIP AMPSMLO{
PANELBOARD LP-1ACONTROL ROOM
120/2083410000
TRANSFORMER T-1ASURFACE
100 AMPS
X 100
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-19
140
64A-
ES-B
LUEH
ILLS
CON
TRO
LFLO
ORP
LAN
MO
D.DW
G |
E-1
9 |
1:10
.123
6467
7 |
---- |
7/1
8/20
19 1
1:49
:35
AM |
ELL
IOTT
.LAG
NER
LAST
SAV
ED B
Y: D
AN.G
LIDD
EN 7
/18/
2019
10:
44 A
M
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
BLU
E HI
LLS
PUM
P ST
ATIO
NRO
OF
AND
CON
TRO
L RO
OM
FLO
OR
PLAN
S - M
ODI
FICA
TIO
NS
E-19
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
CONTROL ROOM EQUIPMENT LEGEND:
HVAC DUCT
24 HOUR TIME SWITCH (EXTERIOR LIGHTS)
MOTOR CONTROL CENTER MCC-1
COMMINUTOR NO. 1 CONTROL PANEL
DEHUMIDIFICATION COIL DC-1
MAIN CIRCUIT BREAKER SECTION MCB-1A
AUTOMATIC TRANSFER SWITCH ATS-1
30 KVA DRY TYPE TRANSFORMER T-1A
PUMP CONTROL/TELEMETRY CONTROL PANEL
BATTERY CHARGER
DRY WELL HV-1 UNIT CONTROL PANEL
COMMINUTOR NO. 2 CONTROL PANEL
BATH ROOM LIGHT FIXTURE
FILE CABINET
PLANT WATER PUMP PW-1
POINT OF USE WATER HEATER
SEWAGE PUMP NO. 1 SP-1 VFD CONTROL PANEL
SEWAGE PUMP NO. 2 SP-2 VFD CONTROL PANEL
SEWAGE PUMP NO. 3 SP-3 VFD CONTROL PANEL
FUTURE SEWAGE PUMP NO. 4 SP-4 VFD CONTROL PANEL
LIGHTING PANEL LP-1A
TELEPHONE INTERFACE EQUIPMENT
AQUATROL TELEMETRY PANEL RTU-0010 (CONNELLY PANEL)
HV-1 UNIT CONTROL PANEL DISCONNECT SWITCH
CONCRETE PAD LOCATED BELOW EQUIPMENT
HAZARDOUS GAS DETECTION SYSTEM RELAY CONTROL PANEL (BELOW)- SEE NOTE 4
ISB RELAY CONTROL PANEL (ABOVE)
FLOW INDICATING TRANSMITTER
MODIFIED AUTOMATIC TEMPERATURE CONTROL PANEL ATC-1 (ABOVE)
MODIFIED AUTOMATIC TEMPERATURE CONTROL PANEL ATC-2 (BELOW)
NEW TWO SPEED HV-1 MOTOR (BY DIVISION 15)
BUBBLER SYSTEM CONTROL PANEL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERALDEMOLITION NOTES AND GENERAL NOTES REFER TO DRAWINGS E-1AND E-2.
2. INFORMATION CONTAINED ON THIS DRAWING HAS BEEN OBTAINED INPART FROM EXISTING ELECTRICAL DRAWINGS, PHOTOGRAPHS, SITECONDITIONS AND SHOP DRAWINGS. THE CONTRACTOR SHALL FIELDVERIFY ALL INFORMATION AND CIRCUITRY AFFECTING HIS OR HERWORK PRIOR TO COMMENCING THE WORK FOR THIS CONTRACT. THECONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. THE EXISTING TEMPERATURE CONTROL PANELS ATC-1 AND ATC-2 SHALLBE MODIFIED AS SHOWN ON THE SCHEMATIC DIAGRAM DRAWING ANDAS DESCRIBED IN SPECIFICATION 15604.
4. REFER TO THE SCHEMATIC DIAGRAM DRAWING FOR ADDITIONALREQUIREMENTS.
5. PROVIDE AN ELECTRICAL EQUIPMENT MOUNTING STRUCTURE ASINDICATED. REFER TO THE CONDUIT AND WIRE SCHEDULE DRAWINGFOR CONSTRUCTION REQUIREMENTS FOR THIS MOUNTING STRUCTURE.
ROOF PLAN EQUIPMENT LEGEND:
DRY WELL HP-1 UNIT CONTROL PANEL
WET WELL HP-2 UNIT CONTROL PANEL
EXHAUST FAN EF-BH1
MODIFIED GAS MONITORING CONTROL PANEL (WETWELL) (SEE NOTE 4)
RECEPTACLE (TYP)
METAL HALIDE WALLPACK LIGHT FIXTURE
EXHAUST FAN EF-2
MODIFIED GAS MONITORING CONTROL PANEL (DRYWELL) (SEE NOTE 4)
GAS SENSOR
DAY TANK CONTROL PANEL
DAY TANK TRANSFER PUMP NO. 2
PORTABLE GENERATOR CABLE CONNECTION PANEL
PORTABLE GENERATOR MAIN CIRCUIT BREAKER PGMCB-1
PORTABLE GENERATOR MANUAL TRANSFER SWITCH PGMTS-1
STAND-BY EMERGENCY GENERATOR GEN-1
STAND-BY EMERGENCY GENERATOR MAIN CIRCUIT BREAKER
STAND-BY EMERGENCY GENERATOR CONTROL PANEL
STAND-BY EMERGENCY GENERATOR BATTERY CHARGER
STAND-BY EMERGENCY GENERATOR BATTERIES
STAND-BY EMERGENCY GENERATOR BLOCK HEATER
NOT USED
HP-1 UNIT CONTROL PANEL DISCONNECT SWITCH
HP-2 UNIT CONTROL PANEL DISCONNECT SWITCH
FUEL TRANSFER PUMP CONTROL PANEL
GFI TYPE RECEPTACLE
ROOF LIGHTING CONTROL PANEL (RLCP-1)
GENERATOR SERVICE DISCONNECT CIRCUIT BREAKER GDCB-1
200 GALLON DAY TANK
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
EMERGENCY GENERATOR E-STOP
DAY TANK TRANSFER PUMP NO. 1
DAY TANK LEVEL SWITCHES
EXHAUST FAN CONTROL PANEL WITH VFD (BY DIVISION 15)
3 POLE FUSED DISCONNECT SWITCH (BY DIVISION 16)
ELECTRICAL EQUIPMENT MOUNTING STRUCTURE - SEE NOTE 5
29
30
31
31
32
32
33
34
120V FROM LP-1A
LIGHT SWITCH INTERLOCKFOR FANS
TO RESPECTIVELIGHTING CIRCUIT
2-POLE LIGHT SWITCH
ECHVAC/ATC
HAND-OFF-AUTOSELECTOR SWITCH
EXISTING AUTOMATIC TEMPERATURE
CONTROL PANEL ATC-1
NTS
DRYWELL
34 KWELECTRIC HEATER
DRYWELLHP-1UNIT
CONTROLPANEL
AREA SPACEINDOORTHERMOSTAT
TO PUMP CONTROLPANEL PCP
TO TELEMETRY CONTROLPANEL (RTU-1)
1 CONDENSOR
7.5 COMPRESSOR
FLOW SWITCH (AIR)
T
2HV-1 (DRYWELL)ALL WORK ASSOCIATED WITH HV-1 ISBY DIVISION 15
MOD-D-BH1
EF-BH1 (DRYWELL)1.5
SEE NOTE 2
MOD-EF-BH1
4#14 IN 3/4"C
120V FROM LP-1A
EF-2
MOD-EF-2
ECHVAC/ATC
HAND-OFF-AUTOSELECTOR SWITCH
AUTOMATIC TEMPERATURE
CONTROL PANEL ATC-2
NTS
WETWELL
(MCC)2
OUTSIDE AIRTEMPERATURETHERMOSTAT
AREA SPACEINDOORTHERMOSTAT
36 KWELECTRIC HEATER
CONDENSOR
COMPRESSOR
INTERLOCK TO MCC-1(EF-2 STARTER)
TO PUMP CONTROLPANEL PCP
ATC-1(DRYWELL)
ATC-2(WETWELL)
3/4
7.3
T
T
2 - 2/C #16 TWS IN 1"C
12 #14 IN 3/4"C
DRYWELLHV-1 UNITCONTROL
PANEL
EF-BH1FAN CONTROL
PANEL WITH VFD(BY DIVISION 15)
SEE NOTE 3
EXISTING PUMPCONTROL/TELEMETRY
CONTROL PANEL
120V
EXISTINGGAS DETECTIONCONTROL PANEL
(DRYWELL)GAS DETECTIONRELAY CONTROL
PANEL(BY DIVISION 16)
120V (LP-1A) 120V
EXISTINGGAS DETECTIONCONTROL PANEL
(WETWELL)
120V
4#14 IN 3/4"C
8#14 IN 3/4"C
8#14 IN 3/4"C
8#14 IN 3/4"C
WETWELLHP-2UNIT
CONTROLPANEL
1AR
120V POWER SUPPLY FROM PANELBOARD LP-1A
R
2AR
R
1. THE RELAY PANEL AND ALL COMPONENTS INSIDE THE DASHED LINES SHALL BE FURNISHED AND INSTALLED UNDERDIVISION 16 - ELECTRICAL. THE RELAY PANEL SHALL BE RATED NEMA 4X AND SHALL BE FURNISHED AS SPECIFIED.
2. FURNISH AND INSTALL A NEMA 4X (PVC) ENCLOSURE WITH SPRING ACTIVATED SIDE LATCHES (THREE SIDES) AND FULLLEFT SIDE HINGE. PROVIDE LAMACOID NAMEPLATES FOR ALL FRONT MOUNTED DEVICES. NAMEPLATE MATERIAL ANDSIZING SHALL BE AS SPECIFIED. SIZE OF ENCLOSURE SHALL BE SUFFICIENT TO SERVICE AND HOUSE ALL DEVICES ANDSHALL BE AS APPROVED BY THE ENGINEER.
3. INSTALL EQUIPMENT ON FRONT OF ENCLOSURE AS NOTED AND SHOWN.
4. PROVIDE A NEMA 4 STROBE AT EXTRANCES AS SHOWN ON THE DRAWINGS. PROVIDE THE FOLLOWING SIGN:(WARNING - HAZARDOUS GAS PRESENT - DO NOT ENTER) AT EACH LOCATION WHERE THERE IS A WARNING STROBE.
2AR
1AR
L1
RELAY CONTROL PANEL -BY DIV 16 (SEE NOTESBELOW)
TO PUMPCONTROL/TELEMETRYCONTROL PANEL
TO ATC-2 CONTROLPANEL
1AR
1AR
N
R
ALARM LIGHT
SEE NOTE 3
1AR
R
ALARM LIGHT
RESETPUSHBUTTON
2AR
(WETWELL)
(DRYWELL)
TO PUMPCONTROL/TELEMETRYCONTROL PANEL
2AR
TO ATC-1CONTROL PANEL
2AR
SCHEMATIC DIAGRAM
HAZARDOUS GAS DETECTION SYSTEM RELAY CONTROL PANEL
NTS
SEE NOTE 3
ALARM STROBE WETWELL AREA(ENTRANCE)
ALARM STROBE DRYWELLAREA (ENTRANCE)
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-20
140
64A-
ES-S
CHEM
ATIC
DIAG
RAM
.DW
G |
E-2
0 |
1:10
.123
6467
7 |
---- |
7/1
8/20
19 1
1:49
:38
AM |
ELL
IOTT
.LAG
NER
LAST
SAV
ED B
Y: D
AN.G
LIDD
EN 7
/18/
2019
10:
44 A
M
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
BLU
E HI
LLS
PUM
P ST
ATIO
NSC
HEM
ATIC
DIA
GRA
MS
E-20
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D
NOTES:
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, AND ADDITIONAL GENERALDEMOLITION NOTES AND GENERAL NOTES REFER TO DRAWINGS E-1AND E-2.
2. THERE IS A CONTROL WRITE-UP IN SPECIFICATION SECTION 15604WHICH DEFINES THE NEW SEQUENCE OF OPERATION FOR EXISTINGATC-1 SPECIFIC EQUIPMENT BEING MODIFIED. REFER TO THIS SECTIONFOR ADDITIONAL REQUIREMENTS.
3. EXISTING ATC-2 SHALL REQUIRE SOME MODIFICATIONS FOR THEHAZARDOUS GAS DETECTION SYSTEM OPERATION AND FAN CONTROL.REFER TO SPECIFICATION SECTION 15604 FOR SPECIFIC REQUIREMENTS.
1. FOR ELECTRICAL LEGEND, ABBREVIATIONS, AND ADDITIONALGENERAL DEMOLITION NOTES AND GENERAL NOTES REFER TODRAWINGS E-1 AND E-2.
2. ALL MOTOR FEEDER WIRING ORIGINATING FROM VARIABLEFREQUENCY DRIVE (VFD) PANELS SHALL BE INSTALLED IN RIGIDGALVANIZED STEEL (RGS) CONDUIT OR PVC-COATED RIGID STEELCONDUIT, IN ACCORDANCE WITH THE NEMA CLASSIFICATIONSINDICATED ON DRAWING E-1.
3. ALL INSTRUMENTATION SIGNAL CABLES (IN CONDUITS WITH "S"NUMBERS) SHALL BE INSTALLED IN RIGID GALVANIZED STEELCONDUIT, IMC. OR PVC-COATED RIGID STEEL CONDUIT, INACCORDANCE WITH NEMA RATING OF THE AREA OFINSTALLATION AS INDICATED ON DRAWING E-1. REFER TOSPECIFICATION SECTION 16050 FOR FURTHER INFORMATION.
P300
P301
P302
C300
3/4" 3 #12 AND 1 #12 GND EXHAUST FAN EF-BH1 MOTOR CONTROL CENTER MCC-1
1" 6 #12 AND 1 #12 GND HV-1 MOTOR DRY WELL HV-1 UNIT CONTROL PANEL
3/4" 2 #12 AND 1 #12 GND HAZARDOUS GAS DETECTION SYSTEM RCP PANELBOARD LP-1A
HAZARDOUS GAS DETECTION SYSTEM RCP PUMP CONTROL/TELEMETRY CONTROL PANEL3/4" 12#14
BOTTOM MOUNTING PLATE(TYP)
4" STAINLESS STEELCHANNEL (C4x7.25) (TYP)
WELDED PLATECONNECTION TO "C"CHANNEL (TYP)
PROVIDE STAINLESS STEEL 4" MINIMUMDEPTH CONCRETE ANCHOR INSERT ANDHARDWARE (TYP)
BASEPLATE DETAIL "A"
NTS
1/2" FIBERGLASSEQUIPMENT MOUNTINGBACKBOARD
4" STAINLESS STEEL ANGLECHANNEL SUPPORT FRAME(TYP)
TOP OF STRUCTURE, ASAPPLICABLE
FRONT VIEW
PVC END CAPS (TYP)
ELECTRICALEQUIPMENT
(AS REQUIRED)
BASEPLATE, SEE DETAIL "A"ON THIS DRAWING FORADDITIONAL INFORMATION(TYP)
WIDTH AS REQUIRED
PROVIDE CROSS SUPPORTS ATTOP AND BOTTOM (TYP)
STAINLESS STEEL MOUNTINGHARDWARE (TYP)
EQUIPMENT MOUNTING STRUCTURE
TYPICAL
NTS
TOP VIEW
PVC END CAPS (TYP)
4" STAINLESS STEEL ANGLECHANNEL SUPPORT FRAME(TYP)
1/2" FIBERGLASS EQUIPMENTMOUNTING BACKBOARD
PROVIDE CROSS SUPPORTS ATTOP AND BOTTOM (TYP)
BASEPLATE (SEE DETAIL "A"THIS DRAWING)
J:\EN
G\C
T\W
ATER
FORD
\140
64-H
VAC-
UPG
RADE
S\DR
AWIN
GS\
ELE\
E-21
140
64A-
ES-C
ON
DUIT
WIR
EPAN
EL.D
WG
| E
-21
| 1:
10.1
2364
677
| ---
- | 7
/18/
2019
11:
49:4
3 AM
| E
LLIO
TT.L
AGN
ERLA
ST S
AVED
BY:
DAN
.GLI
DDEN
7/1
8/20
19 1
0:43
AM
DRAWING
APPR
OVED
BY:
CHEC
KED
BY:
CAD:
DATE
:
NO 1 2
SUBM
ISSI
ON
S/RE
VISI
ON
S
PROJ
ECT N
O:DA
TE:
3 4
APP'
DDA
TE
CAD
COOR
D:DE
SIGNE
D BY
:
WAT
ERFO
RD U
TILI
TY C
OM
MIS
SIO
NO
LD N
ORW
ICH
ROAD
, EVE
RGRE
EN A
VEN
UE
& B
LUE
HILL
S PU
MP
STAT
ION
SHV
AC IM
PRO
VEM
ENTS
BLU
E HI
LLS
PUM
P ST
ATIO
NCO
NDU
IT A
ND
WIR
E SC
HEDU
LE
E-21
ISSU
ED F
OR
BIDD
ING
DNG
AJD
OCT
OBE
R 20
18SA
LJU
LY 2
019
1406
4
DAD
07-1
9BB
BAJ
D