CONTENTS

37
STRENGTHENING NATIONAL COMPREHENSIVE AGRICULTURAL PUBLIC EXPENDITURE IN SUB-SAHARAN AFRICA Agricultural Public Expenditure Training Workshop Accra, Ghana (April 13 -14, 2011) MODULE 3 SPECIALIZED STUDIES: EXPENDITURE COMPONENT IMPACT EVALUATION

description

STRENGTHENING NATIONAL COMPREHENSIVE AGRICULTURAL PUBLIC EXPENDITURE IN SUB-SAHARAN AFRICA Agricultural Public Expenditure Training Workshop Accra, Ghana (April 13 -14, 2011) MODULE 3 SPECIALIZED STUDIES: EXPENDITURE COMPONENT IMPACT EVALUATION. CONTENTS. BACKGROUND OBJECTIVE/SCOPE - PowerPoint PPT Presentation

Transcript of CONTENTS

Page 1: CONTENTS

STRENGTHENING NATIONAL COMPREHENSIVE AGRICULTURAL PUBLIC EXPENDITURE IN SUB-SAHARAN

AFRICA

Agricultural Public Expenditure Training WorkshopAccra, Ghana

(April 13 -14, 2011)

MODULE 3SPECIALIZED STUDIES:

EXPENDITURE COMPONENT IMPACT EVALUATION

Page 2: CONTENTS

CONTENTS

I) BACKGROUND

II) OBJECTIVE/SCOPE

III) METHODOLOGY

IV) DATA SOURCES

V) PROCESS

VI) TA TEAM

VII) TIMELINE

2

Page 3: CONTENTS

I) BACKGROUND

• A common constraint in most SSA countries is the absence of sound impact studies on agriculture public expenditures (AgPEs).

• Such impact studies could help enhance substantially the outcomes and sustainability of AgPEs.

• Expenditure component impact evaluation (IE) comprise one of the key components of the specialized studies, focusing on outcomes of AgPEs.

• There are template TOR for IE (A3.1), to help ensure a checklist of key items for soundness, country consistency and comparisons, and which draw for their methodology on various reports.

Background Objective/Scope Methdology Data Sources Process TA Team Timeline

3

Page 4: CONTENTS

II) OBJECTIVES AND SCOPE Objectives:

• To   assist governments in SSA to enhance the outcomes and sustainability of their agriculture sector programming and budgeting and the efficiency and effectiveness of their AgPEs.

• To strengthen the evidence base for  policy making, scaling-up successful  programmes, identifying corrective actions in existing programmes to ensure that both current and future investments in key subsectors generate the expected and sustainable outcomes.

• To help create a “management-for-results” environment and capacity, with a focus on enhancing the efficiency of budget planning, execution and analytical assessment.

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 4

Page 5: CONTENTS

Scope:• Scale and complexity of IEs vary greatly (see Charts)

– Simple level: determine impact of one specific aspect of large public investment/project

– Complex level: assess the impact of entire sector PE programme on the economy, especially on growth and poverty reduction (A3.3, A3.4)

• Under this SSA programme, the emphasis will be on narrowly focused impact evaluations, such as for a strategic component or sub-component for which there is scope for improved outcomes. (A3.2, A3.5, A3.6)

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 5

Page 6: CONTENTS

Impact Assessment: Selected Country Examples……

• The Vietnam Agriculture PER (Volume II) (World Bank 2005b) relied on existing impact studies showing that government expenditure have been crucial to growth and poverty reduction in Vietnam. Two studies have measured the impact of this spending. The first, by Fan et al (2004, from IFPRI) found that government spending on irrigation, roads and agricultural research has contributed to both agriculture growth and poverty reduction. The second study, by Baker et al (2002), estimated determinants of agriculture growth for the same period and found that public investment in irrigation was the most important source of agriculture growth (accounting for 28 percent of the growth), followed by agriculture research (27 percent). An important finding from these two studies is that while irrigation has been the largest source of growth, the aggregate irrigation investment programmed has become uneconomic. The conclusion is that the sector expenditure program should select only those irrigation investments with acceptable rates of return and that savings should be reallocated to high-return activities, particularly agricultural research.

•  

6

Page 7: CONTENTS

Impact Assessment: Selected Country Examples

The Nigeria agriculture PER (World Bank 2008a) summarizes key findings from a comprehensive literature review used to analyze the impact of agricultural research and extension in the country. The agriculture PER also undertakes qualitative assessment of the core agricultural subsectors in relation to their institutional and public finance characteristics. These sub-sectors include: agricultural input supply and subsidies, agricultural financial services, national strategic food reserve.

7

Page 8: CONTENTS

Summary Empirical IA of NAADS Program:

8

Page 9: CONTENTS

Impact Assessment: Selected Country Examples (cont.)

The Ghana Agriculture PER (2008) highlights that lack of information limit the possibility to conduct impact analysis on key subsectors. Required data include: (i) time-series data, disaggregated by region and district, on government and other public expenditures on the various agricultural subsectors (crops, livestock, fishery, forestry, and natural resource management) and data on (ii) functions or activities (research, extension and training, marketing, inputs (such as seed, fertilizer, and chemicals), and infrastructure (irrigation, feeder roads, marketing information system, and post-harvest handling). However, the Ghana agriculture PER uses various quantitative methods to assess the effectiveness of public spending, including benefit-incidence analysis of impacts at the local level. Data from the fifth Ghana Living Standards Survey were used to understand the geographical distribution of households’ income and showed that the effects of ongoing poverty reduction strategy were mainly benefitting the South of the country, deepening the divide between North and South.

9

Page 10: CONTENTS

Impact Assessment: Selected Country Examples (cont.)

Econometric analysis from Benin et al (2008) was used to guide new efforts to target agricultural and rural development analysis (case of Ghana). A cost-benefit analysis was undertaken. Results showed (i) that different agro-ecological zones have different comparative advantage in production; (ii) that there is a trade-off between allocating resources to areas where the growth effects are highest (Southern Savannah) and areas where the prevalence of poverty is highest (Northern Savannah). Results suggested that an effective strategy should take into account returns associated with different types of agriculture expenditures (e.g.: extension, research, input support or irrigation) in different regions.

10

Page 11: CONTENTS

11

Page 12: CONTENTS

Impact Assessment: Selected Country Examples (cont.)

• Empirical Results: The Mexico agriculture PER (World Bank 2009a) presents empirical results showing that the impact of Mexico’s agricultural public expenditure (APE) on agricultural growth seems comparatively small, that the impact of APE on total factor productivity (TFP) is also low, and that a negative correlation exists between public spending on private good and state agricultural growth.

• A negative correlation between spending in private agricultural goods and state level AGDP growth was found. Controlling for the levels of mechanization, fertilization and expenditures in public goods, a 10 percent increase in APE in private goods as a percentage of the value of agricultural production is associated with a 2.6 percent reduction in AGDP growth. 12

Page 13: CONTENTS

Ghana Uganda Tanzania Ethiopia China India Thailand

Agriculture 16.8 12.4 12.5 0.14 6.8 13.5 12.6

Education -0.2 7.2 9 0.56 2.2 1.4 2.1

Health 1.3 0.9 n.e. -0.03 n.e. 0.8 n.e.

Roads 8.8 2.7 9.1 4.22 1.7 5.3 0.9

Agriculture n.e. 1 2 n.e. 2 2 1

Education n.e. 3 1 n.e. 1 3 3

Health n.e. 4 n.e. n.e. n.e. 4 n.e.

Roadsd n.e. 2 3 n.e. 3 1 2

Sector

Returns to agriculture or rural income

(local currency/local currency spending)b

Ranking in returns to poverty reduction

However, other countries achieve positive returns to agricultural public investments

Page 14: CONTENTS

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0.4

0.5

Private Goods

Public

Equity

Confidence interval (95%) for the correlation with Ag. Domestic Growth (ADP)

- 0.052

+ 0.143

+ 0.081

Dissaggregaed Impact Analysis of GPA: Case of Guatemala (1980 – 2008)

Page 15: CONTENTS

Outcome Indicators:Agricultural Sector Performance

AGRICULTURAL SECTOR

PERFORMANCE

Use of factors (land, labor, capital) and inputs by:sub-sector, commodity,

gender, socio-economic group, Space

Growth returns to different types of investments by:

sub-sector, commodity, space

Sub-sector growth and contribution to

AgGDP by:Space

Commodity growth, contribution to

AgGDP by:Space

Productivity of factors (land, labor, capital)

and inputs by:sub-sector, commodity,

gender, socio-economic group, space

Sector growth and contribution to overall GDP by:

Space

Production, trade and prices by:

sub-sector, commodity, space

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 15

Page 16: CONTENTS

Impact Indicators

INCOME, POVERTY, FOOD AND NUTRITION

SECURITY, HUNGER

Returns to different types of investments by:

gender, socio-economic group, space

Decomposition by:

sector (agriculture, services, industry); sub-sector (crops, livestock,

fishery, forestry); commodity (staples, high

value, export, etc.)

Distribution by:

gender, socio-economic group,

space

Returns to commodity growth by:

gender, socio-economic group, Space

Unit costs by:

gender, socio-economic group,

space

Returns to sub-sector growth by:

gender, socio-economic group, Space

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 16

Page 17: CONTENTS

Study Focus Themes: • Each  evaluation  is  likely  to  cover  just  one  of  the  following key themes:

 – Extension  and  training– Agricultural  research– Input  supply  interventions– Support  for  marketing  and  value  chains– Infrastructure  development  (such  as:  irrigation,  feeder  roads, others)– Support  for a specific commodity, product group (such as specific

crops,  livestock,  fisheries, or forestry products), value chain analysis– Institutional  issues such as access to land/credit

Country Selection Criteria: Impact evaluation studies should be conducted in countries which meet key criteria, including: adequate level of PEM; functional M&E framework; completed “Basic” Ag. PER; Govt. “openness”

Institutional Scope: Choice of thematic focus of IA will determine responsible and collaborating institution (normally MOA)

Background Objective/Scope Methdology Data Sources Process TA Team Timeline

17

Page 18: CONTENTS

III. METHODOLOGY: Overview

• Scale and complexity of  IE to be undertaken is likely to vary greatly, due to:

– Complexity of expenditure component selected

– Adequacy and reliability of data– Scale of data gathering required

• Difficult to propose a “standard” methodology

• See Table for comparison of “simple” vs. “complex” Expenditure Impact Evaluation 

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 18

Page 19: CONTENTS

Simple vs. Complex Impact EvaluationsSimple Evaluation Complex Evaluation

Study Focus • Small  country• Comparatively new service or programme• Largely undifferentiated   population with respect to topic• Centrally  managed

• Large  country• Large-scale, long-term service• Need for careful stratification of  sample• Many administrative layers• Decentralized responsibilities

Data Availability • Good M&E system in place• Baseline undertaken• Target and non-target population  data available

• Poor or non-existent  M&E  system• No  baseline  data  available• Data do no address survey issues

Data Gathering • TA  team• Small  counterpart  team

• TA team• Counterparts• Interviewers/enumerators

Additional Costs • Small  – can be accommodated within existing budget

• Substantial costs for hiring and   mobilizing interviewers and   enumerators

Background Objective/Scope Methdology Data Sources Process TA Team Timeline

19

Page 20: CONTENTS

Main Factors/Requirements • Analytical   skills:   Requires analytical skills, such as modeling

and regression analysis, which are often in short supply.

• Available   data: Heavy reliance upon existing sources of data; availability and quality of data will determine scope.    

• M&E:  Data will come primarily from M&E systems in place; if these do not generate evidence-based results, more data gathering may be necessary.

• Limited  resources implies:  IE topic to be targeted; farm level data collection to be minimized; focus on existing  sources  of  data, including component assessments.

• Sub-sector  selection:  Methodology to be tailored to the specific  sub-sector  or  type  of expenditure  component  selected.

Some country examples/types of IE results are in the next slides.

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 20

Page 21: CONTENTS

Uganda - Effects of Rural Investment

• Returns in shilling per shilling Investment

• Number of poor reduced per million shillings investment

0

5

10

15

20Agricultural R&D

Education

Feeder Roads

Health

0

5

10

15

20Agricultural R&D

Education

Feeder Roads

Health

Background Objective/Scope Methdology Data Sources Process TA Team Timeline

Page 22: CONTENTS

Evidence: Ethiopia (by Mogues, et al.)

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 22

Page 23: CONTENTS

Summary of Public Investment Impact(Mogues, et al.)

Ghana Uganda Tanzania Ethiopia China India Thailand

Agriculture 16.8 12.4 12.5 0.14 6.8 13.5 12.6

Education -0.2 7.2 9 0.56 2.2 1.4 2.1

Health 1.3 0.9 n.e. -0.03 n.e. 0.8 n.e.

Roads 8.8 2.7 9.1 4.22 1.7 5.3 0.9

Agriculture n.e. 1 2 n.e. 2 2 1

Education n.e. 3 1 n.e. 1 3 3

Health n.e. 4 n.e. n.e. n.e. 4 n.e.

Roadsd n.e. 2 3 n.e. 3 1 2

Sector

Returns to agriculture or rural income

(local currency/local currency spending)b

Ranking in returns to poverty reduction

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 23

Page 24: CONTENTS

What Have We Learnt from Impact Studies?• Targeted spending needed for agricultural growth

and poverty reduction– Agricultural research/extension, rural infrastructure

and education have largest impact on both growth and poverty reduction

• Impact of spending changes over time– Subsidies initially important to promote use of

technologies, but need to be phased out over time– Irrigation often has large returns during initial stage

of development

• Large regional variations in impact exist within countries

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 24

Page 25: CONTENTS

Main Steps for Conducting IEStep 1: Selection of Evaluation Topic: consensus by key actors• Selection Criteria:

– Programme is a core part of the sector– Programme share of total public expenditure in  the sector

is large (say,  >20%)– There is scope for replication or scaling-up– It  has innovative features, but where the impact needs

substantiation– It  is  a  substantial programme, but there are questions

over its impact and sustainability

TA team to propose research hypotheses and “results chains” to facilitate public investment-to-impacts linkages and focus

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 25

Page 26: CONTENTS

• Indicators: Determine key indicators of impact to be measured, involving five types of impact: (A3.7, A3.8)– Return to investment– Household level impact– Technical impact– Institutional impact– Sustainability

• Key Analytical Challenge: To devise appropriate way to filter out “noise” in data to determine sound cause-effect links in impacts, in controlling for external factors

Background Objective/Scope Methdology Data Sources Process TA Team Timeline

26

Page 27: CONTENTS

Main Steps for Conducting IE (cont.)Step 2: Assessment of Data & Information Sources:

Key Features to include:– Time   series  – Level  of  detail – Quality  – Baseline – Raw  data 

Secondary information and other data sources (evaluations, beneficiary impact assessments) are to be used for consistency cross-checks

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 27

Page 28: CONTENTS

Main Steps for Conducting IE (cont.)

Step 3: Supplementary  Data  Gathering – Key Steps

(a) Design Sample and questionnaire: will involve qualitative and quantitative data; 

(b) Prepare   draft   questionnaire: simplify, tailor to the various admin. levels, and test; 

(c) Implement Survey: simple and complex evaluations will entail different requirements;

(d) Conduct Case Studies: can generate useful insights, especially if quality data are lacking.

 

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 28

Page 29: CONTENTS

Main Steps for Conducting IE (cont.)

Step 4: Key components -

(a) Data analysis: to be carried out by TA team

(a) Reporting: summary of the data analysis and initial conclusions of the evaluation

(c) Dissemination of IE report: to be agreed with key agency and to be discussed at a workshop with key stakeholders

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 29

Page 30: CONTENTS

Methodology: Conclusions and Recommendations

• Emerging directly from the IE analysis

• Arising beyond the scope of the IE report:

– Where data  availability or quality have proved to be an issue, there will be a need to introduce a  functional or  enhanced M&E framework for the sector

– The creation of institutional and sectoral data systems to enable better analysis in the future

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 30

Page 31: CONTENTS

IV) SOURCES OF DATA AND INFORMATION• An IE uses existing data as well as generating specific new data in agric sector.• An IE starts with solid grasp of the sector, AgPE and main expenditure programs.

Official  sources include:– Programme  and  project  design/appraisal  documents– Electronic  data  from  MoA  and  MoF– Published  reports  and  statistics  from  MoA  and  associated  agencies  such  as  the

 Ministry  of  Trade  and/or  Commerce

Secondary  sources include:– MoA  studies  and  reports– Project  mid-term  reviews,  ICRs– Donor  reports  on  programme  implementation– CAADP  Country  Roundtable  reports– Poverty  assessment  reports– Household  income  and  expenditure  surveys– Crop  and  livestock  survey  reports  and  data– Focus  group  discussions  with  project  managers  and  teams– Donor  evaluation  reports– Beneficiary  impact  assessments (including incidence analyses)

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 31

Page 32: CONTENTS

V) PROCESSParticipatory Process

• Establish working partnership with key actors (MOA, MOF, DWG, others)

• Ensure TA team has active counterparts (especially from MOA)

Key Phases (3): to be carried out by the TA team, guided by Steering Group (SG)

• Preparatory Phase

– Stakeholder Briefing

– Inception Workshop

– Setting up SG

• Implementation Phase

– Survey Implementation

– Technical Workshop

– Data Analysis

• Reporting Phase: draft summary report (as soon as data analysis is completed); draft report/workshop (after 4 months); Final Report (5 months)

Background Objective/Scope Methdology Data Sources Process TA Team Timeline

32

Page 33: CONTENTS

Implementation Process/Arrangements:• Actively involve the relevant sector line ministry/agency• A Steering Group (SG) of key stakeholders will provide

“neutral” oversight and access to high level decision-makers • TA team to carry out the IA (with local counterparts)

– International Expert (1) : methodological & cross-country expertise

– Local Experts (2): country/sub-sector, knowledge, methodology

• Timing and length of IA will depend on its focus, complexity, and extent of seasonal characteristics (5-9 months)

Donor Working Group (DWG) Engagement:• Important to engage DWG in key aspects/phases, given its

role in funding sector & facilitating dialogue/decisions• DWG might facilitate supplemental funding of “complex” IA

Background Objective/Scope Methdology Data Sources Process TA Team Timeline

33

Page 34: CONTENTS

VI) TA TEAM: Tasks and Outputs

TA team, in collaboration with MOA, to conduct the following tasks/outputs: • Discuss with  government  & donors  the  evaluation topic• Help to  refine  the  research  hypothesis• Prepare  a  “results  chain”/expenditure-outcome linkages• Design the  supplementary  data  gathering (as needed)• Carry out  data  analysis• Carry out  on-the-job training in impact evaluation methodology and

 management• Design/manage inception, technical & draft report  workshops• Liaise with  the donor working group • Formulate recommendations for enhancing sector  M&E  systems  and  the

utilization  of  evaluation  results• Ensure all  evaluation data  utilized  can  be  put  online• Prepare  a  summary  report and a  full  evaluation  report

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 34

Page 35: CONTENTS

TA Team: Main Reports and Data Base Main Reports (based on consultation with key stakeholders):• Inception report: within  two  weeks of study launch, and raises key

issues.• Summary report:  presents the main results of the evaluation.• Full evaluation report: within one month of the completion of the

initial analysis, presents main conclusions and recommendations.• Final report: 5-9 months, incorporates key feedback.

Database• The TA team, in collaboration with MoA and MoF,  will establish a

database including: background documents and sources; evaluation methodology; data sampling frame and questionnaires; survey data, analytical working papers & analyses that can be put online.

• Database will be used for capacity building purposes as part of a joint learning activity under the overall public expenditure programme.

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 35

Page 36: CONTENTS

VII) TIMELINE

• About 5 months, for simple evaluation, and up to 9 months for “complex” evaluation, especially involving supplementary data.

Resources Required:• TA Consultant Team (1 international + 2 local

experts), each working about 12 weeks• MOA and/or other relevant agency to provide one full-

time counterpart or team equivalent for each consultant

• Think tanks, universities and other local participants will be encouraged to participate, but not remunerated

• For “complex” IEs, additional funds will need to be mobilized from other sources (ex. DWG)

Background Objective/Scope Methdology Data Sources Process TA Team Timeline 36

Page 37: CONTENTS

KEY REFERENCES/DOCUMENTS(See Annex 3 for selected excerpts)

A3.1: Template TOR for Ag. Expenditure Component Impact Evaluation (June 2010)

A3.2: Returns to spending on agricultural extension: the case of the National Agricultural Advisory Services (NAADS) program of Uganda, forthcoming journal article (Journal of Agricultural Economics, 2010) of larger research effort and Uganda Ag. PER (2010), prepared by Sam Benin et al. (IFPRI)

A3.3: Growth and Poverty Reduction Impacts of Public Investments in Agriculture and Rural Areas: Assessment Techniques, Tools, and Guide for Practitioners, prepared by S. Benin et al (IFPRI; Sept., 2008) (Excerpt: table of contents and abstract)

A3.4: Comprehensive  Monitoring  and  Evaluation  (M&E)  report  for  the   CAADP, B. Omilola et al (ReSAKSS), April 2010 (excerpt: Table of Contents)

A3.5: Country Experience of Impact Evaluation (several country excerpts/examples)

A3.6: Zambia Impact Assessment of the Fertilizer Support Program: Analysis of Effectiveness and Efficiency (World Bank, June 2010)

A3.7: Marginal Returns to Public Spending Across Sectors (several country examples)

A3.8: Elasticity Approaches to Expenditure Analysis

Website references: www.worldbank.org/afr/agperprogram and

web.worldbank.org/apea

Relevant Website references include: (to be completed)

www.worldbank.org/afr/agperprogram

web.worldbank.org/apea

37