    EIA Report for ESAB,Chennai

    CONTENTS

    CHAPTER 1.0- INTRODUCTION

    1.1 Background 2

    1.2 Land Use Details 3

    1.3 Project Location 4

    1.4 Objectives of the EIA Study 4

    1.5 Methodology of the study 4

    1.6 Structure of EIA Report 6

    CHAPTER 2.0- PROJECT DESCRIPTION

    2.1 Introduction 9

    2.2 Plant Location 9

    2.3 Project Cost 14

    2.4 Site Setting 14

    2.5 Manufacturing Process 15

    2.6 Process Description 18

    2.7 Plant & Machinery 24

    2.8 Raw Material and Fuels Consumption 25

    2.9 Product Detail 26

    2.10 Project Infrastructure and Utilities Planned 27

    2.11 Water Requirement 27

    2.12 Solid Waste 35

    2.13 Hazardous Waste 35

    2.14 Rain Water Harvesting 35

  • 7/28/2019 Content ESAB Chennai

    2/6

    EIA Report for ESAB,Chennai

    2.15 Power Generation and Consumption 36

    2.16 Smoke Detection and Fire Fighting System 37

    2.17 Fire Extinguishing Systems 37

    CHAPTER 3.0- EXISTING ENVIRONMENTAL SCENARIO

    3.1 Meteorology 41

    3.2 Ambient Air Quality 44

    3.3 Noise Environment 51

    3.4 Water Quality 53

    CHAPTER 4.0- IMPACT ASSESMENT

    4.1 Introduction 56

    4.2 Pollution Sources 57

    4.3 Identification of Impacts 58

    4.4 Air Environment 59

    4.5 Noise Environment 59

    4.6 Impacts on Water Resources 59

    4.7 Impacts on Land Environment 60

    4.8 Waste Disposal 61

    4.9 Socio-Economic Environment 62

    4.10 Summary of Impacts 63

    4.11 Assessment of Impacts 64

    4.12 Concluding Remarks 68

  • 7/28/2019 Content ESAB Chennai

    3/6

    EIA Report for ESAB,Chennai

    CHAPTER 5.0-ENVIRONMENTAL MANAGEMENT PLAN

    5.1 Introduction 70

    5.2 Air Environment 71

    5.3 Noise Environment 72

    5.4 Impacts on Water Resources 72

    5.5 Impacts on Land Environment 73

    5.6 Safety Measures 74

    5.7 Earthquake Resistant Buildings 74

    5.8 Biological Environment 74

    5.9 Energy Conservation 76

    5.10 Other Measures 77

    5.11 Implementation Schedule of Mitigation Measures 78

    5.12 Environmental Management Programme 79

    5.13 Management Commitment 79

    5.14 Environmental Management Cell 80

    5.15 Setting Environmental Policy and Objectives 81

    5.16 Environment Management Programme 83

    5.17 Implementation of Environmental Management Plan 83

    5.18 Environmental Monitoring System 84

    5.19 Environmental Monitoring 84

    5.20 Awareness & Training 86

    5.21 Record Keeping and Reporting 86

    5.22 Environmental Audit & Corrective Action Plans 87

    5.23 Management of Environment, Health and Safety 88

  • 7/28/2019 Content ESAB Chennai

    4/6

    EIA Report for ESAB,Chennai

    5.24 Reducing Greenhouse Gases 89

    5.25 Water Management 89

    5.26 Waste Management 90

    5.27 Hazardous Waste 91

    5.28 Rain Water Harvesting 91

    CHAPTER 6.0-CONCLUSION

    6.0 Conclusion 93

  • 7/28/2019 Content ESAB Chennai

    5/6

    EIA Report for ESAB,Chennai

    TABLES

    1.1 Details of Project 3

    1.2 Survey of Environmental Attributes 5

    2.1 Project Cost Details 14

    2.2 Raw Material Consumption 26

    2.3 Products Manufactured 26

    2.5 Water Requirement 28

    2.6 Solid Waste Generation Details 35

    2.7 Specifications of the Proposed DGs 36

    3.1 Ambient Noise Standard 51

    4.1 Pollutant Sources & Characteristics 57

    4.2 Identification of Impacts 58

    4.3 Solid Waste Generation Details 61

    4.4 Summary Matrix of Predicted Impacts 63

    5.1 Implementation Schedule 78

    5.2 Equipments used for Environmental Management 78

    5.3 Suggested Monitoring Progra12m 85

    5.4 Record Keeping Requirements 87

  • 7/28/2019 Content ESAB Chennai

    6/6

    EIA Report for ESAB,Chennai

    FIGURES

    2.1 Satellite imagery 9

    2.2 Topo Plan 13

    2.3 Site Plan 27

    2.4 Water Balance Chart 28

    2.5 CETP Flow Chart 34

    3.1 Wind Roses at 0830 Hrs 42

    3.2 Wind Roses at 1730 Hrs 43

    3.3 AAQ Report Near Parking Area 44

    3.4 AAQ Report Near Fire Hydrant Room 45

    3.5 AAQ Report Back Side of SAF Plant 46

    3.6 AAQ Report Near DG Room 47

    3.7 DG Set 500 KVA - Stack Report 48

    3.8 DG Set 625 KVA - Stack Report 49

    3.9 Boiler( Thermic Fluid Heater) Stack Details Report 50

    3.10 Noise Level Report 52

    3.11 STP Treated water Report 53

    3.12 ETP Treated water Report 54