Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida,...
Transcript of Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida,...
![Page 1: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/1.jpg)
![Page 2: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/2.jpg)
2
Contents• Introduction
• Roles & Responsibilities
• Clients
• Project Management
• Major Development Capability – Case Studies
• Complex Engineering Projects– Case Studies
• Green Building Projects– Case Studies
• ERSG – “Value Add” Proposition
![Page 3: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/3.jpg)
Introduction
Enterprise Risk Solutions Group Ltd. (ERSG) – Development & Projects Division.• ERSG is a privately owned company having been in operation for over 10 years
• ERSG are a combination of permanent and full time contract staff having qualifications in Building / Architecture / Engineering & CPA’s
o Collectively over 200 years of project related experience
• Specialist Property Developers & Managers, Project Directors & Project Managers, Strategic Property & Facility Planning.
• Export services throughout the Asia Pacific Region having completed projects in:
o Japan / China / Singapore / Hong Kong / India / Malaysia / Indonesia / Australia / New Zealand
• Diverse client base in the Commercial, Industrial, Residential & Information Technology industries
• Offers its clients a “one stop shop” option in the delivery of Property, Real Estate, Engineering and Project solutions
![Page 4: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/4.jpg)
ERSG has been responsible for a diverse variety of projects & client requirements:• Completed projects have included Commercial Buildings / Data Centre projects / Large
scale and Luxury Residential projects (High & Low rise) / Universities / Hotels & Hospitals / Airports
• Design & Construction delivery of major projects in the capacity of Development Directors, Project Directors, Project Managers and Engineers that has involved:
o Establishing project brief(s)
o Project cost plan
o Forecast cash flow projections
o Developing business cases to support client decisions.
o Selecting, appointing & managing the design team.
o Tender, award & management of major construction contractors
o Managing project performance.
o Handover & completion of projects inclusive of financial closure.
Roles & Responsibilities
![Page 5: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/5.jpg)
ERSG Development & Projects Division has a diverse cross section of key clients that include:
• Computer Sciences Corporation (CSC)
• Compuware• SuperPartners• Computer Associates• Eli Lilly• BHP & Bluescope Steel • Commonwealth & Westpac Banks• Central Bank of Malaysia• Southern Pacific & Hyatt Hotel
Groups• Qantas & Garuda International
Airlines• Institutional Funds & Fund
Managers• Private Investors
![Page 6: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/6.jpg)
ERSG – Project ManagementERSG manage the projects utilising proven project management tools and will incorporate the following:
• ERSG will be the single point of control for the project• Confirm the project sponsors & key stakeholders, and ensure all required briefs and
specs are incorporated into the project• Define the project escalation requirements to ensure “No Surprises”• Establish a clearly defined project structure & project program• Identify the project critical path and high risk elements of the project• Conduct weekly “checkpoint” meetings to confirm the health of the project – ERSG
report using “stop” / “go” format.• Undertake monthly steering committee meetings based on comprehensive monthly
reports – ERSG chair & minute meetings• Implement weekly project team meetings – ERSG chair & minute meetings• ERSG attendance on site throughout duration of the design construction & handover
works.• ERSG Directors are fully engaged in all aspects of the project.
![Page 7: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/7.jpg)
ERSG provides a complete schedule of project management services that extend from project inception through to project completion
• Strategic Planning• Feasibility Studies• Development Management• Project Direction• Project Management• Value Engineering• Design Management• Cost Management• Construction Management• Relocation Management• Engineering• ESD / Green Star
ERSG - Project Management Services
![Page 8: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/8.jpg)
CapabilityMajor Developments
![Page 9: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/9.jpg)
ERSG’s Capability• Extensive experience in the development, design &
construction of major commercial projects + US$ value of projects;
– CSC Noida, India (45,000 sqm) US$350Mill– Westpac Headquarters Projects (+250,000
sqm) US$950Mill– CSC Talavera Rd, Macquarie Park (22,000 sqm)
US$105Mill– World Square, Sydney (+300,000 sqm)
US$750Mill– Maritime Trade Towers, Sydney (100,000 sqm)
US$220Mill– No. 1 O’Connell St, Sydney (30,000 sqm)
US$120Mill– Central Plaza One, Brisbane (40,000 sqm)– NAB HQ, Sydney (36,000 sqm)– Northpoint Redevelopment
CapabilityMajor CommercialDevelopments
![Page 10: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/10.jpg)
ERSG’s Capability• Extensive experience in the planning,
development, design & construction of major Domestic & International Airport projects.
• Airport requirements have included airport master planning, feasibility studies, operational assessments, construction & project management and compliance auditing on “live” and “new build”airports.
• ERSG have completed works in China, Hong Kong, Malaysia, Australia & New Zealand such as:
– Kuala Lumpa Int. Airport – A380 Upgrade Operational & Construction
– China Airports Study – master planning of Xiamen & Jiang Jing Airports
– Sydney Airport – upgrade airfield to A380 Code F capability
– North Airport Development (161ha) – design, consenting & construction of a staged rollout for a commercial and aviation subdivision
CapabilityMajor Airport Projects
![Page 11: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/11.jpg)
Airport ProjectsERSG have the internal capacity, specialist project & construction management skills and co-ordination ability to undertake a broad cross section of Airport projects .
The ERSG approach to undertaking Airport projects include:• Internationally experienced Project Managers and Engineers• Liaison with Airport Authority & integration of requirements to ensure all operational &
code compliance requirements are satisfied• Ensure all aspects of development for Airfield & Landside projects are:
• Effectively & economically planned • Fit for Purpose• Satisfy quality standards & requirements• On time and On budget
• Preparation of concept & detailed designs, technical and commercial documentation• Intimate knowledge of ground handling equipment works, terminal forecourt road
networks and underground & aboveground infrastructure to support terminal operations
• Project administration & on site supervision of complex restricted access multi-disciplinary projects
• Provision of expert advice to support a client’s due diligence processes, project procurement, auditing, compliance and environmental audits
• Engagement in all aspects of design and construction
![Page 12: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/12.jpg)
Airport Projects – Engineering Systems & ServicesERSG provide to it’s clients comprehensive services in the specialist area of Engineering Systems & Services. Examples of Airport projects where ERSG have provided these services include:
• Hyderabad Int. Airport (open 2008) – 12 mill passengers per annum / A380 compatible runway / modular terminal building / High end Technology + Business Hotel
• Delhi Int. Airport (opens 2010) – 37 mill passengers per annum / modular terminal building / High end Technology & integrated Terminal
• Lucknow Airport (opens 2009) – 800 passengers during peak periods / modular terminal building / high end Technology
• Vadodara Airport (opens 2011) – 700 passengers (500 domestic & 200 Intl.) during peak periods / modular terminal building / high end technology
• Goa Airport (opens 2011) – 1200 passengers peak arrive & depart / modular terminal building / high end Technology
• Port Blair Airport (opens 2011) – 800 passengers during peak / modular terminal building / high end technology
• Indore Airport (opens 2010) – 700 passengers during peak / modular terminal building
![Page 13: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/13.jpg)
ERSG’s Capability• Extensive experience in the establishment of a
overall master plan and the development of business parks and resorts + US$ project values;
– Sanctuary Cove, Queensland US$150Mill– Sydney Airport Centre, Mascot US$220Mill– Talavera Rd, Macquarie Park US$105Mill– CSC Noida US$350Mill– CSC Hyderebad US$80Mill– Rydalmere Industrial Park US$45Mill– Pavilion on the Harbour, Milsons Point
US$62Mill– Peninsula Apartments, Milsons Point
US$38Mill
CapabilityBusiness Parks, Resorts & Residential Developments
![Page 14: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/14.jpg)
Project Objectives• Create Australia's leading leisure & Lifestyle
residential complex • Masterplan was designed to position & enrich
Sanctuary Cove for the future.• Plan that focuses on lifestyle, recreation,
security and a sense of community.
Project Description• 474 Hectare residential enclave.• High quality residential lifestyle options that
are complimented by:o Two championship golf courseso 4 Harbourso 15 restaurants & harbourside cafeso Fashion boutiques & specialty shopso Recreation club
• Prestigious residential community is set among native Australian Fauna.
• First development of its kind, being Australia's leading lifestyle community offering unique lifestyle, facilities and 24hr active land & water security.
Case StudySanctuary Cove, Queensland, Australia
![Page 15: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/15.jpg)
++++++++++++
ERSG’s Role in the Project• Project & Construction managers• Golf course villa’s (60) & Ambassador Residence (4)
projects.• Design & Construction management that involved:
o Managing the project design & Deliveryo Construction management that included appointing &
managing all subcontractors & suppliers.o Project finishes & quality control
• Client relationship management – reported to client • Assist in sales & Marketing program to ensure pre-
sales of the product.Project Outcomes
• Completed project “on time & on budget”.• Client/owner handover acceptance signed off prior to
contractual PC date.
Case StudySanctuary Cove, Queensland, Australia
![Page 16: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/16.jpg)
Case StudyCSC Headquarters – Sydney Australia
![Page 17: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/17.jpg)
Project Objectives• Significantly lower future occupancy costs
by consolidating 9 existing Sydney area leased facilities into a single new build-to-suit complex
• Introduce New Workplace Standards• Establish One CSC Culture• Flexibility for future growth (or
contraction) + Exit StrategyProject Description• 20,000 sqm NLA - 2,000 sqm floor plates• 2 linked towers - Building A (5 stories) &
Building B (6 stories)• A Grade standard finishes & services• 1,200 plus staff, including critical support
functions, help desks & operations / monitoring centres.
Case StudyCSC Headquarters – Sydney Australia
![Page 18: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/18.jpg)
ERSG’s Role in the Project• Project Directors and Project Managers • Established CSC Australia’s Facilities
Strategy and the Sydney Project Brief• Prepared and presented the detailed
Project Business Case to CSC Corporate and Local Senior Management
• Sort and Reviewed 27 property submissions
• Undertook the premises negotiations• Managed the project’s briefing, design,
procurement, construction & relocation phases
• Integrated CSC’s IT, Telephony & Defence solutions into the project
Case StudyCSC Headquarters – Sydney Australia
$NPV per FTE pa - 10 year lease
$-
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
$7,000
$8,000
$9,000
$10,000
$11,000
$12,000
53 N
icho
lson
St
201
Mille
r S
t
460
Pac
ific
Hw
y
Gla
desv
ille
15 H
elp
St
69 C
hris
tie S
t
Ind
exed
Bon
d O
ptio
n
Gilb
arco
- S
ch 1
- S
tru
ctur
ed
BA
E S
ite
Mac
quar
ie U
ni -
Lot
s 2
& 8
11-1
7 K
hart
oum
Rd
Cam
pus
21
2 R
icha
rdso
n Pl
ace
Lots
8 &
9
Gilb
arco
- S
ch 1
- L
ease
Mac
quar
ie U
ni -
Lot
5
Eden
Par
k
5 T
ala
vera
Rd
Cen
trec
ourt
105
Del
hi R
d
1-25
Del
hi R
d
100
Pac
ific
Hw
y
Mac
quar
ie U
ni -
Lot
1
66 W
ater
loo
Rd
2 Ly
on P
ark
Rd
396
Lane
Cov
e R
d
394
Lane
Cov
e R
d
15 R
ailw
ay S
t
207
Pac
ific
Hw
y
Fou
ndat
ion
Mac
q P
ark
60 D
elhi
Rd
37 E
ppin
g R
d
504
Pac
ific
Hw
y
107
Mou
nt S
t
Total Net Lettable Area
2,671
5,544
3,386
3,869
5,408
3,200
20,000
14,000
6,000
1,575
0
5,000
10,000
15,000
20,000
25,000
30,000
Now7 properties25,653 sqm
1,300 people
after SAC1 property20,000 sqm
1,300 people
SACif hand backs
instigated by CSC14,000 sqm
sq
m N
et
Le
tta
ble
Are
a
53 Nicholson St 460 Pacific Hwy 201 Miller St 69 Christie St 15 Help St 486 Pacific Hwy Gladesville SAC
![Page 19: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/19.jpg)
Project Outcomes• Consolidated 9 properties into one facility• New Collaborative Workplace.
o High level of acceptance from staff across all levels & business units
o Significant increase in effective communication between staff and business units.
• Reduced area occupied from 21 sqm per person to 14 sqm per person
• Significant hard $ and soft cost savings realised
Case StudyCSC Headquarters – Sydney, Australia
![Page 20: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/20.jpg)
Case StudyCSC Headquarters – Noida, India
![Page 21: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/21.jpg)
Project Objectives• Significantly lower occupancy costs through consolidation
• Simultaneously manage YoY growth of 100% in interim
• Introduce New Alternative Workplace Standardso Efficiency, energize, transform, pride, model of who CSC are
• Establish One CSC Culture
• Flexibility for future growth/contraction + Exit Strategy
Project Description• 45,000 sqm fit-outs - 3,000 sqm floor plates
• 2 linked towers - Building A (7 stories) & Building B (8 stories)
• A Grade standard finishes & services
• 3,000 staff, including critical support functions, data centre, help desks & operations / monitoring centres.
Case StudyCSC Headquarters – Noida, India
![Page 22: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/22.jpg)
ERSG’s Role in the Project• Project Directors and Project Managers
• Established CSC India’s Real Estate Strategy
• Prepared and presented the detailed Project Business Case to CSC Corporate and Local Senior Management
• Sort & reviewed property submissions and then undertook the premises negotiations
• Carried out alternate workplace study
• Managed the project’s briefing, design, procurement, construction & relocation phases
Case StudyCSC Headquarters – Noida, India
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
8am
10am
12Noo
n2p
m4p
m6p
m8p
m10
pm12
AM 2am
4am
6am
![Page 23: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/23.jpg)
Project Outcomes• Interim growth managed in 6 incubations negotiated
with min. lock-ins before being consolidated
• Workplace design and management process became benchmark for future
• New Collaborative Workplaceo High level of acceptance from staff across all
levels & business unitso Significant increase in effective communication
between staff and business unitso Increase in utilization
• Formulated global and local standards for projects implementation
• Significant savings due to rigorous analysis and discussions
Case StudyCSC Headquarters – Noida, India
![Page 24: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/24.jpg)
ERSG’s Role in the Project• Development Director / Project Director• Repositioning and Redevelopment of all of Westpac’s
CBD High Rise Headquarters throughout Australia– 60 Martin Place, Sydney– 360 Collins St, Melbourne– 109 St Georges Terrace, Sydney– Plus other operational
• Development Management that involved:o Establishing Asset Strategies & Feasibility Studieso Design & Construction management of projectso Project Financial Control
Case StudyWestpacCorporate Headquarters
![Page 25: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/25.jpg)
ERSG’s Role in the Project (cont.)• Total area of projects = 250,000 sqm• Overall Asset Value = +$1 Billion AUD• Management of Sales & Leaseback program.• Projects also included refit of corporate offices.
Project Outcomes• Significant increase in asset value.• Release of Capital thru sales & leaseback process• All projects achieved original business case objectives
Case StudyWestpacCorporate Headquarters
![Page 26: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/26.jpg)
Complex Engineering Projects
ERSG have the internal capacity, specialist engineering skills and co-ordination
ability to undertake complex engineering projects across a wide range of
engineering disciplines.
The ERSG approach to making complex projects simple include:
• Internationally experienced and Chartered Engineers• High project management and pro-active project planning skills• Site survey, measurement and pre-condition assessments• Computer modeling and drafting• Budget preparation and option studies• High and regular liaison with user groups, equipment suppliers and installers• Risk analysis built into commissioning and post handover defects reporting• Engagement in all aspects of design and construction
![Page 27: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/27.jpg)
Green Building ProjectsERSG can conduct or review energy audits, energy star ratings and detailed energy efficiency and Ecologically (Or Environmentally) Sustainable Design (or Development) -(ESD). Our specialists are typically accredited for various star rating systems internationally:
• Energy Efficiency reviews• Building fabric, glazing, thermal mass and wall roof and floor insulation• Shading and protection advice• Building/facade glazing and sky-lighting advice and assessment• Building Sealing recommendation and infiltration minimization• Natural ventilation and cross flow maximization• Mechanical services energy efficient design, energy efficiency ratios and co-efficients
of performance• Electrical services energy efficient design including lighting and day-lighting• Hot water system insulation and reticulation• Maintenance and spatial service allowances• Holistic Building rating including land use and site ecology, public transport, energy,
indoor environment quality, building management, materials, emissions and water management
![Page 28: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/28.jpg)
• Recognised industry experts with a collective experience totaling +200yrs
• Manage client requirements from “cradle to grave”
• Successful delivery of major projects involving the design, construction & handover.
• Extensive experience & exposure to working abroad such as Asia.
• Vendor independent – our interests are solely our “clients”
• Provide a “one stop shop” option to clients
• Ability to turn the clients “vision” into the clients “reality”
• Incorporation of sustainability and energy efficiency principals
What is the ERSG value add proposition?
![Page 29: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/29.jpg)
ERSG Contacts
Troy O’Connor MD Neil Watson DirectorPH: +61 7 3325 0034 PH: +61 410 501 411email [email protected] email [email protected]
John Turner Construction Head Darren Miller Project DirectorPH: +61 412 417 709 PH: +61 417 887 288email [email protected] email [email protected]
WEBSITE: www.ersgltd.com
![Page 30: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/30.jpg)
THANK YOU
![Page 31: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/31.jpg)
APPENDICES
![Page 32: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/32.jpg)
ERSG – Complex Engineering Projects
NaturalGas
NaturalGas GeneratorsGenerators
CoolingWater
CoolingWater
Cooling TowersCooling Towers
AbsorptionChillers
AbsorptionChillers
ElectricityElectricity
Waste
Heat
Waste
Heat
ChilledWaterChilledWater
Heating &
HotWater
Heating &
HotWater
![Page 33: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/33.jpg)
Complex Engineering Projects
ERSG have the internal capacity, specialist engineering skills and co-ordination
ability to undertake complex engineering projects across a wide range of
engineering disciplines.
The ERSG approach to making complex projects simple include:
• Internationally experienced and Chartered Engineers• High project management and pro-active project planning skills• Site survey, measurement and pre-condition assessments• Computer modeling and drafting• Budget preparation and option studies• High and regular liaison with user groups, equipment suppliers and installers• Risk analysis built into commissioning and post handover defects reporting• Engagement in all aspects of design and construction
![Page 34: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/34.jpg)
Project Objectives• Research and analyze energy efficient
cooling and heating option
• Minimise need to upgrade transformer
• Project risk, redundancy and mitigation strategies
Project Description• Existing campus In Brisbane - 1,000 high
school students across 6 main buildings plus sports centre.
• New library/resource Centre and refurbishment of one existing building
Case StudyCogeneration System Design – Private Girls College - Brisbane – Australia –Current Project
![Page 35: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/35.jpg)
Project Role• Research natural gas opportunities for cogeneration
• Conduct feasibility studies
• Consider noise, gas amplification and structural enhancement ramifications
• Identify risks and mitigate
Project Outcomes• On site power generation
• Waste heat provides cooling and heating
• Cogeneration (CHP) power can feeds electrical power grid
• Existing power supply now back up power supply
• Heating and cooling when street power not available
• Reduced greenhouse gas emission
Case StudyCogeneration System Design – Private Girls College - Current Project
![Page 36: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/36.jpg)
Project Objectives• No downtime during upgrade
• End state = Tier III resiliency infrastructure systems
• Concurrent Maintainability of infra-structure s
• Critical load density of up to 80 W/ft2
Case StudyLive IT Data Centre Extension and High Voltage Power Supply Upgrade – Petaling Jaya – KL - Malaysia
Project Description• CSC/CSA IT Data Centre with 16,000 ft2 of
technology space
• High Voltage and Mechanical Services Upgrade and data centre extension
• No downtime for major banking cliental such as Maybank
![Page 37: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/37.jpg)
Project Role• Crystallize data centre requirements in
conjunction with CSC/CSA• Project manage and monitor main
contractor, reporting report regularly• Report on project risk, redundancy and
mitigation strategies prior to changeover to new IT infrastructureProject Outcomes
• Additional extension work was encapsulated into the project during the delivery process with no adverse effect or downtime to critical systems
• Successful changeover of banking systems within a one and half hour window
• Standby generator successfully integrated into existing systems and ready for all new systems
• New extended area of the data centre also supplemented with additional UPS systems
Case StudyLive IT Data Centre Extension and High Voltage Power Supply Upgrade – Petaling Jaya – KL - Malaysia
KLDC Total Power Consumption
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
Wed, 08-Nov-06 Thu, 09-Nov-06 Fri, 10-Nov-06 Sat, 11-Nov-06 Sun, 12-Nov-06 Mon, 13-Nov-06 Tue, 14-Nov-06
Date (Time 09:00am)
Am
p
DC Feeder 1 (UPS1,2 &3) Total ampDC Feeder 2 (UPS1,2,3,4,5,&6) Total ampFeeder 1 total (UPS+PAC+ FCU) ampFeeder 2 total (UPS+PAC+ FCU) ampTotal per Feeder (amp)
Incoming Feeder = 2500Amp
Redistribution of DC PAC pow er f rom Feeder 2 to Feeder 1
27.6%
Motorola UPS still draw ing pow er from LV
![Page 38: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/38.jpg)
ERSG – Green Building Projects
![Page 39: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/39.jpg)
Green Building ProjectsERSG can conduct or review energy audits, energy star ratings and detailed energy efficiency and Ecologically (Or Environmentally) Sustainable Design (or Development) -(ESD). Our specialists are typically accredited for various star rating systems internationally:
• Energy Efficiency reviews• Building fabric, glazing, thermal mass and wall roof and floor insulation• Shading and protection advice• Building/facade glazing and sky-lighting advice and assessment• Building Sealing recommendation and infiltration minimization• Natural ventilation and cross flow maximization• Mechanical services energy efficient design, energy efficiency ratios and co-efficients
of performance• Electrical services energy efficient design including lighting and day-lighting• Hot water system insulation and reticulation• Maintenance and spatial service allowances• Holistic Building rating including land use and site ecology, public transport, energy,
indoor environment quality, building management, materials, emissions and water management
![Page 40: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/40.jpg)
Project Objectives• HIgh degree of glass façade area achieves a
minimum four(4) star base building rating to the National Australian Building Energy Rating Scheme
• Provide ESD and Energy Efficiency advice to ensure that the building design achieves Building Code compliance
Project Description• New seven(7) storey office building with the
following attributes:– Basements 1 & 2 – Car-parking– Ground – Approx 718m2 of commercial
tenancies– Mezzanine Level – Approx 935m2 of office
area– First Floor – Approx 1,008m2 of office area– Second Floor – Approx 1,008m2 of office area– Third Floor – Approx 238m2 of office and
204m2 of apartment area
Case Study - Green Building – DOMA Group, Canberra - Australia
![Page 41: Contentsprojectmanagement.ersgltd.com/pdf/other/ERSG-Project... · 2012-06-14 · – CSC Noida, India (45,000 sqm) US$350Mill – Westpac Headquarters Projects (+250,000 sqm) US$950Mill](https://reader033.fdocuments.net/reader033/viewer/2022042304/5ed0137eaf36fb567d19547e/html5/thumbnails/41.jpg)
Project Role• Attend meetings and prepare design brief
• Prepare 3D computer modeling to estimate annual energy consumption
• Prepare ESD report and energy rating to validation protocol criteria
• Analyze ways to mitigate high glazing to opaque wall ratio
• Prepare report, workshop Building Code compliance
Project Outcomes• The Building was able to achieve between 4 and 4.5
stars
• Computer modeling proved clients preferred glazing solution would work
• Approved authority applications
• Our client secured a major tenant
Case Study – Green Building – DOMA Group, Canberra - Australia