Page 1: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

CONSULTANCY ACTIVITY

1I.S.G. S.p.A. - Presentation

Page 2: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

CONSULTANCY – REVAMPING ‐ DEBOTTLENECKINGISG can offer support for Process & Technology for either Oil & Gas and Refinery Sectors. The following main kind of Projects (Greenfield / Brownfield) can be covered:can be covered: Feasibility & Conceptual Studies Economic & Financial Evaluations Linear Programming Studies & Master Plans Linear Programming Studies & Master Plans Screening of Configurations & detailed Feasibility Studies Process Optimizations Energy Saving & Pinch Technology Studies Hydraulic Studies Hydraulic Studies Process Simulations (Steady State & Dynamic) Process Packages, Basic Design, Front End Engineering Design Evaluation of Licensors & Technology Selections Evaluation of Licensors & Technology Selections Process ConsultancyThe Projects can be developed for Open-art Plants as well as for various Licensed Processes, either ISG patented or through agreements with various Process Licensors /Processes, either ISG patented or through agreements with various Process Licensors / Catalyst Vendors.

I.S.G. S.p.A. - Presentation 2

Page 3: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2013 (ON GOING)CLIENT : GAS OIL GAZPROM (RUSSIA)CLIENT : GAS-OIL GAZPROM (RUSSIA)SUBJECT : OPTIMIZATION OF LNG PLANTCONSULTANCY ACTIVITY : FEASIBILITY STUDY, PROCESS PACKAGE

ISG has studied various levels of modifications to the existing plant for the following scopes:Increase LNG production;pDecrease operating costs;Increase plant availability.

I.S.G. S.p.A. - Presentation 3

Page 4: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2013 (ON GOING)CLIENT : ENI RAFFINERIA DI SANNAZZARO (ITALY)CLIENT : ENI RAFFINERIA DI SANNAZZARO (ITALY)SUBJECT : GTL SYNGAS PURIFICATION CONSULTANCY ACTIVITY : FEASIBILITY STUDY, PROCESS PACKAGE

ISG has studied the catalytic/adsorption system needed to remove various contaminants from the syngas stream.

I.S.G. S.p.A. - Presentation 4

Page 5: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2013 (ON GOING)CLIENT : ENI RAFFINERIA DI TARANTO (ITALY)CLIENT : ENI RAFFINERIA DI TARANTO (ITALY)SUBJECT : VAPOUR RECOVERY & PURIFICATION FOR A

CRUDE OIL MARINE LOADING SYSTEM CONSULTANCY ACTIVITY : FEASIBILITY STUDY, PROCESS PACKAGE

ISG has studied and compared various plant options needed to recovery and purify p p p y p ythe vapor stream resulting from the loading of sour crude (containing H2S) into the sea-going vessels.Light naphtha/LPG components have been recovered by refrigeration.H2S has been removed by an adsorbent system in order to obtain an off-gas environmentally acceptable for burning as low BTU gas.

I.S.G. S.p.A. - Presentation 5

Page 6: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2013 (ON GOING)CLIENT : ENI PAKISTANCLIENT : ENI PAKISTANSUBJECT : CAPACITY INCREASE FOR AN EXISTING

NATURAL GAS DEHYDRATION PLANT CONSULTANCY ACTIVITY : FEASIBILITY STUDY

ISG has defined and investigated the modifications requested to an existing NG dehydration plant (based on molecular sieves) for incrementing the plantdehydration plant (based on molecular sieves) for incrementing the plant throughput.By increasing inlet pressure, decreasing inlet temperature (by “recovery” streams available from other plants) and changing the adsorbent mix, the NG flowrate has been considerably increased without heavy structural changes to the existing plant.

I.S.G. S.p.A. - Presentation 6

Page 7: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2012CLIENT : IES/MOL RAFFINERIA DI MANTOVA (ITALY)CLIENT : IES/MOL RAFFINERIA DI MANTOVA (ITALY)SUBJECT : VOC RECOVERY FROM BITUMEN TANKS CONSULTANCY ACTIVITY : FEASIBILITY STUDY, PROCESS PACKAGE

ISG has studied the vapor recovery system installed on seven bitumen tanks in order to remove the troubles generating smells in the surrounding environment.Various levels of modifications have been defined to stage the investment costsVarious levels of modifications have been defined to stage the investment costs

I.S.G. S.p.A. - Presentation 7

Page 8: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2012CLIENT : TUPRAS KIRIKKALE REFINERY (TURKEY)CLIENT : TUPRAS KIRIKKALE REFINERY (TURKEY)SUBJECT : REVAMP OF CDU/VDU PREHEATING TRAINCONSULTANCY ACTIVITY : SIZING OF SHELL&TUBES HEAT EXCHANGERS

ISG has developed the sizing of some S&T’s on the basis of process data sheets prepared during the previous project phases.

I.S.G. S.p.A. - Presentation 8

Page 9: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2012 (ON GOING)CLIENT : SIDPEC (EGYPT)CLIENT : SIDPEC (EGYPT)SUBJECT : CO2 REMOVAL FROM ETHYLENE CRACKING FEEDCONSULTANCY ACTIVITY : FEASIBILITY STUDY, PROCESS PACKAGE

ISG has evaluated, under a technical and economic point of view, two different options to reduce CO2 content in the feed gas (mainly ethane plus propane) to anoptions to reduce CO2 content in the feed gas (mainly ethane plus propane) to an ethylene cracking plant:Amine washing;Membrane purification.p

I.S.G. S.p.A. - Presentation 9

Page 10: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2012CLIENT : AMMONIA CASALECLIENT : AMMONIA CASALESUBJECT : SYNGAS PURIFICATIONCONSULTANCY ACTIVITY : FEASIBILITY STUDY, BASIC DESIGN

ISG has developed and studied the most economical configuration of a complex plant requested to obtain a purified syngas stream (less than 0.1 ppmv of NH3 and H2O).y g ( 3 2 )The final configuration includes the following main sections:Refrigeration and cold recovery;Water washing and recovery of NH3;g y ;Adsorption (molecular sieves) with TSA regeneration.

I.S.G. S.p.A. - Presentation 10

Page 11: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2012 (ON GOING)CLIENT : ABU QIR PETROLEUM (EGYPT)CLIENT : ABU QIR PETROLEUM (EGYPT)SUBJECT : REVAMP OF EXISTING CONDENSATE STABILIZERCONSULTANCY ACTIVITY : FEASIBILITY STUDY,PROCESS PACKAGE

ISG has studied the best ways to revamp the existing condensate stabilizing unit under three different design flowrates:7000 BPSD of condensate;7000 BPSD of condensate;7000 BPSD of condensate + 2000 BPSD of crude oil;9000 BPSD of condensate.As an alternative also the case of new plant for the three flowrates have beenAs an alternative, also the case of new plant for the three flowrates have been studied.The final design, chosen by the client, envisages the replacement of single pieces of equipment, in a defined sequence but different times, in a new area and by q p q ymaintaining the unit in operation.

I.S.G. S.p.A. - Presentation 11

Page 12: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2011CLIENT : BASHRA REFINERY (IRAQ)CLIENT : BASHRA REFINERY (IRAQ)SUBJECT : HYDROGEN PURIFICATION BY PSACONSULTANCY ACTIVITY : FEASIBILITY STUDY, PROCESS PACKAGE

ISG has designed a PSA unit to purify raw hydrogen stream up to 99% purity. Moreover, the final plant includes a hydrogen compression and bottling section, for storage of produced hydrogen in 230 barg bottles.

I.S.G. S.p.A. - Presentation 12

Page 13: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2011CLIENT : OMV BOREALIS (AUSTRIA)CLIENT : OMV BOREALIS (AUSTRIA)SUBJECT : ETHYLENE PURIFICATIONCONSULTANCY ACTIVITY : FEASIBILITY STUDY

ISG has studied the complex plant configuration needed to remove a series of contaminants from a raw ethylene stream.The resulting plant includes the following sections:Compression;Distillation; Refrigeration; Catalytic purification.

I.S.G. S.p.A. - Presentation 13

Page 14: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2011CLIENT : TEKFEN SAMSUNG (TURKEY)CLIENT : TEKFEN-SAMSUNG (TURKEY)SUBJECT : AMMONIA STORAGE, HANDLING & VAPOUR RECOVERYCONSULTANCY ACTIVITY : FEASIBILITY STUDY,PROCESS PACKAGE

ISG has developed the basic design of the plant needed to recover/recycle the ammonia vapors coming from the refrigerated atmospheric ammonia tank and from p g g pthe boat loading/unloading operations.The final plants includes the following sections:Refrigeration cycle, based on wet screw compressors;g y pAmmonia storage tank;Ammonia transfer pumps;Marine loading armsgInterconnecting among tankage area, fertilizer plant and jetty.

I.S.G. S.p.A. - Presentation 14

Page 15: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2011CLIENT : MUSCAT GASES COMPANY (OMAN)CLIENT : MUSCAT GASES COMPANY (OMAN)SUBJECT : DEPROPANIZER PLANTCONSULTANCY ACTIVITY : PROCESS PACKAGE

ISG has developed a new depropanizer unit to obtain propane at 95-99% from a raw propane stream (25% purity).

I.S.G. S.p.A. - Presentation 15

Page 16: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2011CLIENT : BONATTI/ENI VAL D’AGRI (ITALY)CLIENT : BONATTI/ENI VAL D AGRI (ITALY)SUBJECT : REFRIGERATION CYCLESCONSULTANCY ACTIVITY : FEASIBILITY STUDY, PROCESS PACKAGE

ISG has performed various feasibility studies to allow the client to select the final configuration of two refrigeration cycles respectively dedicated to:Various process utilizers, mainly for HC dew point control of natural gas;p y p gCooling of amine solution to be circulated in a CANSOLV unit.The feasibility studies were relevant to:Comparison of refrigerants: propane vs R134Ap g p pLayout study to verify the plot area availability;Fire relief limitation study, to define the extent/quality of insulation required to maintain the flare loads within the maximum acceptable by the existing flare .The plant has been engineered by ISG, that is currently performing the fabrication in workshops nearly ISG premises.

I.S.G. S.p.A. - Presentation 16

Page 17: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2010CLIENT : ANRPC (EGYPT)CLIENT : ANRPC (EGYPT)SUBJECT : NAPHTHA HDT OFF-GAS WASHINGCONSULTANCY ACTIVITY : PROCESS PACKAGE

ISG has developed the basic design of a new amine sweetening unit needed to remove H2S from the rejected gas coming from two naphtha hydro-treating units.The sweet gas has 100 ppm H2S maximumThe sweet gas has 100 ppm H2S maximum.The adopted amine is DEA.Process simulations have been performed with PROMAX.The plant has been engineered and fabricated by ISG; it is currently underThe plant has been engineered and fabricated by ISG; it is currently under commissioning and the start-up is foreseen within summer 2013.

I.S.G. S.p.A. - Presentation 17

Page 18: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2010CLIENT : SAIPEM/KUWAIT OIL COMPANY (KUWAIT)CLIENT : SAIPEM/KUWAIT OIL COMPANY (KUWAIT)SUBJECT : NATURAL GAS HCDP CORRECTIONCONSULTANCY ACTIVITY : FEASIBILITY STUDY, PROCESS PACKAGE

ISG has studied and compared the refrigeration plant, needed to correct the hydrocarbon dew point of natural gas, for two different choices of refrigerant:- Propane mix- Butane mixThe final client decision has been in favour of butanes, for logistic reasons; in fact, ISG study results clearly indicated that propane were the best solution.The plant has been engineered and fabricated by ISG and it is now in the field construction phase; the start-up is currently foreseen within 2013.

I.S.G. S.p.A. - Presentation 18

Page 19: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2009CLIENT : KTI FOR POLAND PROJECTCLIENT : KTI FOR POLAND PROJECTSUBJECT : SWEETENINGCONSULTANCY ACTIVITY : PROCESS PACKAGE AND DETAILED ENGINEERING

ISG has provided complete process package for two process unit ( Natural Gas and LPG Sweetening) and detailed engineering including the issue of Material Requisition for the main itemsRequisition for the main items

I.S.G. S.p.A. - Presentation 19

Page 20: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2008YEAR : 2008CLIENT : PIDEC FOR IRAN PROJECT SUBJECT : MEG PLANTCONSULTANCY ACTIVITY : PROCESS PACKAGE

relevant to Natural Gas Purification (CRG low temperature reformer). Scope of ISGactivity was to supply Process Package including Plot Plan to allow client to developactivity was to supply Process Package including Plot Plan to allow client to developthe detailed engineering and issue orders for procurement activity and fabrication.Catalyst supply, operating manual and training was also provided by ISG.

I.S.G. S.p.A. - Presentation 20

Page 21: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2005CLIENT : JV BECHTEL TECHNIP SAUDI ARAMCOCLIENT : JV BECHTEL-TECHNIP, SAUDI ARAMCO, SUBJECT : NGL PLANTCONSULTANCY ACTIVITY : DESIGN REVIEW & OPTIMIZATION

For Khursanya Project ISG have provided design review and optimization relevantt th L D h d ti U it ( G D h d ti C d t D h d tito the Large Dehydration Units ( Gas Dehydration, Condensate Dehydration,Mercury Removal), including the selection of the adsorbent, sizing of adsorbent bedand regeneration rate/equipment. We have also provided the logic and functionaldescription to be implemented into DCS. ISG has participated to DCS FAT.p p p p

I.S.G. S.p.A. - Presentation 21

Page 22: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2005CLIENT : CALTEX AUSTRALIACLIENT : CALTEX AUSTRALIASUBJECT : LPG SWEETENING UNITCONSULTANCY ACTIVITY : DEBOTTLENECKING

ISG has provided the review of existing design and provided new process packagewith data for debottlenecking

I.S.G. S.p.A. - Presentation 22

Page 23: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2004CLIENT : JV TOYO JGCCLIENT : JV TOYO - JGCSUBJECT : SOUTH PARTS 6,7 & 8CONSULTANCY ACTIVITY : DESIGN REVIEW & OPTIMIZATION

ISG have provided design review and optimization relevant to Natural GasDehydration, Propane and Butane Dehydration, Fuel Gas Dehydration, including theselection of the adsorbent sizing of adsorbent bed and regenerationselection of the adsorbent, sizing of adsorbent bed and regenerationrate/equipment. We have also provided the logic and functional description to beimplemented into DCS.

I.S.G. S.p.A. - Presentation 23

Page 24: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 2003CLIENT : SAMSUNG ENGINEERING PETRONAS THAILANDCLIENT : SAMSUNG ENGINEERING - PETRONAS THAILANDSUBJECT : NATURAL GAS DEHYDRATION (MOLECULAR SIEVE)CONSULTANCY ACTIVITY : PROCESS PACKAGE

ISG has supplied complete process package, main detailed engineering documentsand also critical equipment

I.S.G. S.p.A. - Presentation 24

Page 25: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

YEAR : 1998CLIENT : SAMSUNG ENGINEERING PETROVIETNAMCLIENT : SAMSUNG ENGINEERING - PETROVIETNAMSUBJECT : NATURAL GAS DEHYDRATION (MOLECULAR SIEVE) CONSULTANCY ACTIVITY : PROCESS PACKAGE, PARTIAL DETAIL ENGINEERING

ISG has supplied complete process package and also detailed engineering relevantto main equipment, GA drawing. ISG has also supplied the on-off valve skid alongq p , g pp gwith control panel equipped with PLC.ISG took responsibility to review and approve the detailed engineering developed bySamsung for the direct procurement of large pieces of equipment.

I.S.G. S.p.A. - Presentation 25

Page 26: CONSULTANCY ACTIVITY I.S.G. S.p.A. - Presentation 1 · PDF fileISG has developed the basic design of the plant needed ... the detailed engineering and issue orders for ... JV BECHTEL-TECHNIP

Thanks for your attention

If you have an Inquiry, please contact

I.S.G. [email protected]

Tel +39 02 38 22 02 1

I.S.G. S.p.A. - Presentation 26