CONSTRUCTION UPDATE OF THE HEARTSONG – DECEMBER, 2016
![Page 3: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/3.jpg)
Our Endeavor
At Experion we believe that good experiences foster enduring relationships. We offer transparency in transaction, thought-leadership in action, customer insight in our developments and thus, transform every relationship into positive, engaging, memorable experiences that people would love to come back to.
![Page 4: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/4.jpg)
Recognition
• 2015 - HR Leadership Award by Global HR Excellence.
• 2015 – Dream Employer of the Year (In real estate sector) by World HRD Congress
• 2015 - Continuous Innovation in HR Strategy at Work Award by World HRD Congress.
• 2015 - Award for Institution Building by World HRD Congress.
• 2015 - Award for Best HR Strategy in Line with Business by World HRD Congress.
• 2016 – Occupation Certificate for ‘The Harmony’ (C block) obtained.
![Page 5: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/5.jpg)
a new beat at every square feet
The Project Spread across 15 acres, The Heartsong is an exquisite offering of beautifully and efficiently designed living spaces offering premium air-conditioned 2/3/4 BHK apartments & penthouses.
Key Highlights
Luxury living in a prestigious community Adjoining large township spread across 100+ acres Vantage location of Sector 108 and access through a 75 meter road 4 acres of themed landscape with activity hubs Meaningful leisure and recreation spaces in all towers All apartments are air conditioned and efficiently designed
![Page 6: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/6.jpg)
Design Highlights:
Choice of 2/3/4 BHK air-conditioned apartments and penthouses Concept and design by Woodhams, New Zealand 4 small pockets for efficient management of essential services Spacious rooms Premium fixtures & fittings Utility room provided with all apartments
Essential Services:
100% power backup in all apartments and common areas CCTV surveillance and two-tier security Dedicated bays for car wash Restroom and waiting lounges for drivers Free shuttle service to nearest metro stations Daily needs store operational within the complex
Bird’s eye view of The Heartsong
![Page 7: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/7.jpg)
The Heartsong Condominiums
The Melody
2BHK Apartments (1,283 sq. ft.)
The Rhythm
3BHK Apartments (1,758 – 2,003sq. ft.)
The Symphony
3BHK – 5BHK Apartments & Penthouses
(2,338 – 4,802sq. ft.)
The Harmony
2BHK Apartments (1,283sq. ft.)
Chorus
(Centralized Community Spaces)
![Page 8: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/8.jpg)
Click to take a look at our
Actual First Home
![Page 9: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/9.jpg)
Project Progress 17.50 million safe man hours clocked Regular site training / inductions are being carried out to ensure highest EHS standards Community Centre is functional Occupation Certificate for ‘The Harmony’ (C block) obtained Handing over of Possession for The Harmony completed and soon initiating the handover
of balance blocks
December‘16
![Page 10: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/10.jpg)
The Melody – Block A
Deep cleaning and preparing for possession in A1
External painting, Lift Installation, Aluminium door & window, electrical wiring, tile flooring, installation of AC, kitchen counter fixing at all floors have completed
External Landscape & Hardscaping work have completed
December‘16
![Page 11: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/11.jpg)
The Rhythm – Block B
Deep cleaning and preparing for possession in B1, B2 & B3
External painting, Lift Installation, Aluminium door & window, electrical wiring, tile flooring, installation of AC, kitchen counter fixing at all floors have completed
External Landscape & Hardscaping work have completed
December‘16
![Page 12: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/12.jpg)
The Rhythm – Block B
Deep cleaning and preparing for possession in B4, B5 & B6
External painting, Lift Installation, Aluminium door & window, electrical wiring, tile flooring, installation of AC, kitchen counter fixing at all floors have completed
External Landscape & Hardscaping work have completed
December‘16
![Page 13: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/13.jpg)
The Rhythm – Block B
External painting, lift installation, door shutter and kitchen counter fixing, tile flooring, electrical wiring in progress in B7, B8 & B9
Plumbing work, gypsum plaster, wall tiling and aluminium door & window, tile flooring work up to 9th floor and electrical wiring work up to 4th floor have completed in B7, B8 & B9
December‘16
![Page 14: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/14.jpg)
The Harmony – Block C
Occupation Certificate for ‘The Harmony’ (C block) obtained Conveyance Deed and handover of apartments in process
December‘16
![Page 15: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/15.jpg)
The Symphony – Block D
Electrical conduit, plumbing, and external plaster have completed
December‘16
External painting, aluminium door, window & shutter fixing, gypsum, stair case flooring, wall tiling work at 8th floor, tile flooring and lift installation works in progress
![Page 16: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/16.jpg)
Chorus – Community Centre
December‘16
![Page 17: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/17.jpg)
Chorus – Amenities functional at Community Centre
December‘16
Gym
Snooker + Table Tennis
Squash Court
Kids Play Area
![Page 18: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/18.jpg)
Residents Convenience
Convenience Store- Ration Shopping
December‘16
Shuttle Service
![Page 19: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/19.jpg)
EWS Block
EWS completed
December‘16
![Page 20: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/20.jpg)
DHVBN - Power Connection Sub Station
The sub-station has been energized through 2500 KVA transformer
December‘16
![Page 21: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/21.jpg)
Environment, Health & Safety (EHS)
December‘16
Tool Box Talk – Housekeeping December 2016
Tool Box Talk – Working at Height December 2016
![Page 22: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/22.jpg)
THE DWARKA EXPRESSWAY UPDATE
![Page 23: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/23.jpg)
Download the all new Experion App and stay updated with the progress of your prized investment.
Brief summary of units I Updates on latest developments Contact information I Project highlights & virtual walkthrough Location Map I Corporate information I Push Notifications
Available on:
PRESENTING EXPERION APP
![Page 24: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/24.jpg)
REFER YOUR FRIENDS AS YOUR NEIGHBORS AND EARN GREAT REWARDS.
![Page 25: CONSTRUCTION UPDATE OF THE HEARTSONG DECEMBER, 2016€¦ · Electrical conduit, plumbing, and external plaster have completed December‘16 External painting, aluminium door, window](https://reader033.fdocuments.net/reader033/viewer/2022042401/5f109a047e708231d449e95f/html5/thumbnails/25.jpg)
Information provided in the presentation is indicative, privileged and confidential, solely for the purpose of reference of the customers having booked a unit in the Project. The same may not be reproduced, copied, disseminated or in any manner distributed. The photographs of status of construction at site shown in the presentation are for reference only. The status/ plan(s) shown can get changed/modified/amended by the authorities and due to force majeure events for which EDPL shall not be responsible. Experion Developers Pvt Limited, Regd. Office Address: F- 9, First Floor, Manish Plaza 1, Plot No. 7, MLU, Sector 10, Dwarka, New Delhi - 110075, Delhi, INDIA. CIN : U70109DL2006FTC151343.
Thank you for investing with us. We value your relationship and are committed to deliver on our promises. Or click on “CUSTOMER LOGIN ” at www.experion.co
Email us at: [email protected]
Call us on: 1800 1200 640 (India)
Download Experion App: Available for IOS and Android platform only
Walk in to our corporate office: First India Place, 1st floor, Block-B, Sushant Lok-1, M.G Road, Gurgaon, Haryana-122002
Click to take a look of our Actual First Home
Click to login to our customer portal @ www.experioncare.com