Construction Update Special Bulletin June 30, 2014 1/2 Demolion and Excavaon Demolion has begun on the connectors between SHY A wing and the Children’s and Women’s main building, and the SHY E to SHY L wing bridge connector. The MERU building will follow, with demolion beginning in early July. Throughout July, Affinity will separate A wing from B wing. Every eff ort will be made to minimize noise and vibraon associated with this work. The work is being completed by specialist contractors to meet and exceed WorkSafe BC protocols and procedures. Crews will use jack hammers, saws, cranes and excavators. It will be noisy as they remove glass and steel from the buildings as well as cut into the concrete walls to make the separaon. All materials will be trucked off site for recycling and/ or proper disposal. As the secons are removed, the contractor will construct a temporary exterior wall to protect the building. Working hours will be from approximately 07:30-17:00. Excavaon is beginning on a poron of the parking lot east of the ACB to construct a new fire department access road. In order to access the northeast parking lot, staff and visitors now need to walk around the north end of the Construcon Zone, as the road in front of the ACB and L wing is closed. The parking cket dispensers near the northeast parking lot (the “back 40”) will soon be moved as the current area is incorporated into the construcon zone. The cket dispensers will be relocated near the pedestrian walkway connecng the northeast parking lot to the ring road. Shaughnessy L Wing Exterior Demolion Affinity has begun superficial exterior demolion work on Shaughnessy L wing, underneath the white ‘shrink wrap’. This will connue unl the end of July and involves pressure washing and the removal of paint from L wing’s exterior. This work will be fully contained and is being completed by specialist contractors to meet and exceed WorkSafe BC protocols and procedures. Affinity’s specialist contractors use foam insulaon to buffer the noise, but clinical areas, especially in the Ambulatory Care Building will hear some noise. Noise and Vibraon Vibraon and sound monitors are in place around the perimeter of the construcon zone. Alarms will nofy us immediately if levels exceed the acceptable range and construcon work will be adjusted. As with Phase 1 construcon acvies, stop work protocols are also in place. However please keep in mind that this is an acve construcon site, and noise is a part of the process. Pictured above, map of campus, outlining construcon zone. 44 17 67 91 85 87 77 73 76 18 12 28 20 26 21 11 99 L 93 83 81 45 43 79 Children’s Hospital Women’s Hospital Ambulatory Care Women’s Health Centre Brock Fahrni Mental Health Plant Services Human Resources Child & Family Research Institute Clinical Support Building Shaughnessy Building Heather St. Entrance Underground Entrance E Ring Road Ring Road HEATHER STREET OAK STREET W 28th Ave W 29th Ave Devonshire Crescent W. 28TH AVENUE W 28th Ave W 29th Ave W 30th Ave W 31st Ave Canadian Blood Services W 32nd Ave W 32st Ave Landscapes/ Pedestrian Walkway Main Ring Road BC Women’s Labour & Admitting Key Entrance No. Campus Entrances L BC Children’s Emergency Department E N Destination + + Heli-Pad Oak St. Entrance Child Care Centre 11 New Public BC Children’s ED Entrance Emergency Vehicle Lane Ronald McDonald House Landscapes/ Pede s trian W alkway W W Main Ring R oad Parking BC Women’s Labour & A dmitting K e K K y Ent r an c e N o . Campus Ent r an c es L BC Children’s Eme r gency Department E 7 Destination + Heli-Pad Parking Valet 11 New Public BC Children’s ED Entrance Emergency Vehicle Lane W 4 45 43 Construction Zone (No Access) Issue 7

Transcript of Construction Update Issue 7...SHY A wing and the Children’s and Women’s main building, and the...

Page 1: Construction Update Issue 7...SHY A wing and the Children’s and Women’s main building, and the SHY E to SHY L wing bridge connector. The MERU building will follow, with demoliti

Construction Update

Special Bulletin

June 30, 2014

1/2

Demoliti on and Excavati onDemoliti on has begun on the connectors between SHY A wing and the Children’s and Women’s main building, and the SHY E to SHY L wing bridge connector. The MERU building will follow, with demoliti on beginning in early July. Throughout July, Affi nity will separate A wing from B wing. Every eff ort will be made to minimize noise and vibrati on associated with this work.

The work is being completed by specialist contractors to meet and exceed WorkSafe BC protocols and procedures. Crews will use jack hammers, saws, cranes and excavators. It will be noisy as they remove glass and steel from the buildings as well as cut into the concrete walls to make the separati on. All materials will be trucked off site for recycling and/or proper disposal. As the secti ons are removed, the contractor will construct a temporary exterior wall to protect the building. Working hours will be from approximately 07:30-17:00.

Excavati on is beginning on a porti on of the parking lot east of the ACB to construct a new fi re

department access road. In order to access the northeast parking lot, staff and visitors now need to walk around the north end of the Constructi on Zone, as the road in front of the ACB and L wing is closed.

The parking ti cket dispensers near the northeast parking lot (the “back 40”) will soon be moved as the current area is incorporated into the constructi on zone. The ti cket dispensers will be relocated near the pedestrian walkway connecti ng the northeast parking lot to the ring road.

Shaughnessy L Wing Exterior Demoliti onAffi nity has begun superfi cial exterior demoliti on work on Shaughnessy L wing, underneath the white ‘shrink wrap’. This will conti nue unti l the end of July and involves pressure washing and the removal of paint from L wing’s exterior. This work will be fully contained and is being completed by specialist contractors to meet and exceed WorkSafe BC protocols and procedures.

Affi nity’s specialist contractors use foam insulati on to buff er the noise, but clinical areas, especially in the Ambulatory Care Building will hear some noise.

Noise and Vibrati onVibrati on and sound monitors are in place around the perimeter of the constructi on zone. Alarms will noti fy us immediately if levels exceed the acceptable range and constructi on work will be adjusted.

As with Phase 1 constructi on acti viti es, stop work protocols are also in place. However please keep in mind that this is an acti ve constructi on site, and noise is a part of the process.

Pictured above, map of campus, outlining constructi on zone.

44

1767

91

85

87

77

73 76

1812

28

20

26

21

11

99

L

93

83

81

45

43

79

Children’s Hospital

Women’s Hospital

Ambulatory

Care

Women’s Health Centre

Brock Fahrni

Mental Health

Plant

Service

s

Human

Resource

s

Child & Family Research Institute

Clinical Support Building

Shaughnessy

Buildin

g

Heather St. Entrance

Underground

Entrance

W. 28th Ave Entrance

ERing Road

Ring Road

HE

AT

HE

R S

TR

EE

T

OA

K S

TR

EE

T

W 28th Ave

W 29th Ave

Devonshire Crescent

W. 28TH AVENUE W 28th Ave

W 29th Ave

W 30th Ave

W 31st Ave

CanadianBlood

Services

W 32nd Ave

W 32st Ave

Landscapes/ Pedestrian Walkway

Main Ring Road

Parking

BC Women’s Labour & Admitting

Key Entrance No.

Campus Entrances

L

BC Children’s Emergency DepartmentE

97

N

Destination

+

+ Heli-Pad

Oak St. Entrance

Child

Care

Centre

Parking Valet

11 New Public BC Children’s ED Entrance

Emergency Vehicle Lane

RonaldMcDonald

HouseLandscapes/ Pedestrian WalkwayWalkwayW

Main Ring Road

Parking

BC Women’s Labour & Admitting

KeKeK y Entrance No.

Campus Entrances

L

BC Children’s Emergency DepartmentE

97

Destination

+ Heli-Pad

Parking ValetParking ValetParking Valet

11 New Public BC Children’s ED Entrance

Emergency Vehicle LaneEmergency Vehicle Lane

W 32nd Ave

44

45

43Construction

Zone(No Access)

Issue 7

Page 2: Construction Update Issue 7...SHY A wing and the Children’s and Women’s main building, and the SHY E to SHY L wing bridge connector. The MERU building will follow, with demoliti

2/2

Special Bulletin

Window and Pati o ClosuresDuring demoliti on and constructi on, pati ent and staff safety conti nues to be our fi rst priority. Measures are in place to miti gate dust as much as possible during demoliti on and constructi on, including hosing down the area during demoliti on. There will also be ground level irrigati on to keep dust under control.

SHY and C&W Main Building Window ClosuresTo protect staff and pati ents during demoliti on of the connectors, all windows facing the orange constructi on zone (as shown in the map on front) must remain closed. All pati os at BC Children’s and on the east side of BC Women’s will also remain closed throughout demoliti on and constructi on.

Ambulatory Care Building (ACB) Window ClosuresAll windows in the ACB must remain closed during demoliti on, excavati on and constructi on to ensure the health and well-being of pati ents, families and staff . Access from the east parking lot will be north of the Constructi on Zone. Pati o Closure Outside C&W Cafeteria All doors opening onto the pati o outside the C&W cafeteria will be closed between June 27th – July 11th, while a temporary covered walkway for pedestrian access is put in place. The cafeteria doors will remain closed (emergency exit only) and the SHY B2 exit by the SHY Auditorium (the shortcut from B2) will re-open once the walkway is in place, to allow pedestrians to enter the covered walkway. A new outdoor eati ng area will be opening soon on the other side of the cafeteria.

Teck ACC Constructi on Webcam Launches Want behind-the-scenes access to the Constructi on Zone? Affi nity Partnerships has launched a webcam, available from the Redevelopment Project website: www.newcw.ca which provides a bird’s-eye view of the constructi on area. Check back oft en to see constructi on progress.

More Informati on or Questi ons Visit the www.newcw.ca or the Teamsite (htt p://teamsites/sites/newcw/default.aspx) and follow us on social media.

Concerns or issues related to constructi on, traffi c or noise while building the new Teck Acute Care Centre at the Oak Street Campus can be directed 24/7 to 1-888-587-9911.

For all other informati on inquiries about the redevelopment on the Oak Street campus, please call the C&W Redevelopment Informati on Line: 1-855-857-3897, Monday to Friday during regular business hours.

www.newcw.ca

@CWRedevelopment

@cwredevelopment

[email protected]

Issue 7 - June 30, 2014