Demoliti on and Excavati onDemoliti on has begun on the connectors between SHY A wing and the Children’s and Women’s main building, and the SHY E to SHY L wing bridge connector. The MERU building will follow, with demoliti on beginning in early July. Throughout July, Affi nity will separate A wing from B wing. Every eff ort will be made to minimize noise and vibrati on associated with this work.
The work is being completed by specialist contractors to meet and exceed WorkSafe BC protocols and procedures. Crews will use jack hammers, saws, cranes and excavators. It will be noisy as they remove glass and steel from the buildings as well as cut into the concrete walls to make the separati on. All materials will be trucked off site for recycling and/or proper disposal. As the secti ons are removed, the contractor will construct a temporary exterior wall to protect the building. Working hours will be from approximately 07:30-17:00.
Excavati on is beginning on a porti on of the parking lot east of the ACB to construct a new fi re
department access road. In order to access the northeast parking lot, staff and visitors now need to walk around the north end of the Constructi on Zone, as the road in front of the ACB and L wing is closed.
The parking ti cket dispensers near the northeast parking lot (the “back 40”) will soon be moved as the current area is incorporated into the constructi on zone. The ti cket dispensers will be relocated near the pedestrian walkway connecti ng the northeast parking lot to the ring road.
Shaughnessy L Wing Exterior Demoliti onAffi nity has begun superfi cial exterior demoliti on work on Shaughnessy L wing, underneath the white ‘shrink wrap’. This will conti nue unti l the end of July and involves pressure washing and the removal of paint from L wing’s exterior. This work will be fully contained and is being completed by specialist contractors to meet and exceed WorkSafe BC protocols and procedures.
Affi nity’s specialist contractors use foam insulati on to buff er the noise, but clinical areas, especially in the Ambulatory Care Building will hear some noise.
Noise and Vibrati onVibrati on and sound monitors are in place around the perimeter of the constructi on zone. Alarms will noti fy us immediately if levels exceed the acceptable range and constructi on work will be adjusted.
As with Phase 1 constructi on acti viti es, stop work protocols are also in place. However please keep in mind that this is an acti ve constructi on site, and noise is a part of the process.
Pictured above, map of campus, outlining constructi on zone.
44
1767
91
85
87
77
73 76
1812
28
20
26
21
11
99
L
93
83
81
45
43
79
Children’s Hospital
Women’s Hospital
Ambulatory
Care
Women’s Health Centre
Brock Fahrni
Mental Health
Plant
Service
s
Human
Resource
s
Child & Family Research Institute
Clinical Support Building
Shaughnessy
Buildin
g
Heather St. Entrance
Underground
Entrance
W. 28th Ave Entrance
ERing Road
Ring Road
HE
AT
HE
R S
TR
EE
T
OA
K S
TR
EE
T
W 28th Ave
W 29th Ave
Devonshire Crescent
W. 28TH AVENUE W 28th Ave
W 29th Ave
W 30th Ave
W 31st Ave
CanadianBlood
Services
W 32nd Ave
W 32st Ave
Landscapes/ Pedestrian Walkway
Main Ring Road
Parking
BC Women’s Labour & Admitting
Key Entrance No.
Campus Entrances
L
BC Children’s Emergency DepartmentE
97
N
Destination
+
+ Heli-Pad
Oak St. Entrance
Child
Care
Centre
Parking Valet
11 New Public BC Children’s ED Entrance
Emergency Vehicle Lane
RonaldMcDonald
HouseLandscapes/ Pedestrian WalkwayWalkwayW
Main Ring Road
Parking
BC Women’s Labour & Admitting
KeKeK y Entrance No.
Campus Entrances
L
BC Children’s Emergency DepartmentE
97
Destination
+ Heli-Pad
Parking ValetParking ValetParking Valet
11 New Public BC Children’s ED Entrance
Emergency Vehicle LaneEmergency Vehicle Lane
W 32nd Ave
44
45
43Construction
Zone(No Access)
Issue 7
2/2
Special Bulletin
Window and Pati o ClosuresDuring demoliti on and constructi on, pati ent and staff safety conti nues to be our fi rst priority. Measures are in place to miti gate dust as much as possible during demoliti on and constructi on, including hosing down the area during demoliti on. There will also be ground level irrigati on to keep dust under control.
SHY and C&W Main Building Window ClosuresTo protect staff and pati ents during demoliti on of the connectors, all windows facing the orange constructi on zone (as shown in the map on front) must remain closed. All pati os at BC Children’s and on the east side of BC Women’s will also remain closed throughout demoliti on and constructi on.
Ambulatory Care Building (ACB) Window ClosuresAll windows in the ACB must remain closed during demoliti on, excavati on and constructi on to ensure the health and well-being of pati ents, families and staff . Access from the east parking lot will be north of the Constructi on Zone. Pati o Closure Outside C&W Cafeteria All doors opening onto the pati o outside the C&W cafeteria will be closed between June 27th – July 11th, while a temporary covered walkway for pedestrian access is put in place. The cafeteria doors will remain closed (emergency exit only) and the SHY B2 exit by the SHY Auditorium (the shortcut from B2) will re-open once the walkway is in place, to allow pedestrians to enter the covered walkway. A new outdoor eati ng area will be opening soon on the other side of the cafeteria.
Teck ACC Constructi on Webcam Launches Want behind-the-scenes access to the Constructi on Zone? Affi nity Partnerships has launched a webcam, available from the Redevelopment Project website: www.newcw.ca which provides a bird’s-eye view of the constructi on area. Check back oft en to see constructi on progress.
More Informati on or Questi ons Visit the www.newcw.ca or the Teamsite (htt p://teamsites/sites/newcw/default.aspx) and follow us on social media.
Concerns or issues related to constructi on, traffi c or noise while building the new Teck Acute Care Centre at the Oak Street Campus can be directed 24/7 to 1-888-587-9911.
For all other informati on inquiries about the redevelopment on the Oak Street campus, please call the C&W Redevelopment Informati on Line: 1-855-857-3897, Monday to Friday during regular business hours.
www.newcw.ca
@CWRedevelopment
@cwredevelopment
Issue 7 - June 30, 2014