CONSTRUCTION UPDATE – February 2015 Dr. Prem Reddy Health & Science

Transcript of Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Page 1: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

CONSTRUCTION UPDATE – February 2015Dr. Prem Reddy Health & Science

Page 2: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Perimeter wall framing in SIM Labs

Page 3: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Metal Framing of west wall of cadaver room / cat storage

Page 4: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Looking at wall framing for cadaver room/cat storage rooms from anatomy lab

Page 5: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Student restroom area, overhead fire sprinkler piping, perimeter wall framing

Page 6: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Overhead ductwork in beds/equipment room

Page 7: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Templates for medical headwalls in Nursing

Fundamentals

Page 8: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Front entry, shot of overhead work

Page 9: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Perimeter wall framing in nursing fundamentals and

corridor 127. Fire sprinkler piping and duct

overhead

Page 10: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Install of columns for shade structures has started in courtyard

Page 11: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

South west side exterior.

Metal deck installed at sloped roof

Page 12: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Wall Framing of observation, control, and

SIM labs

Page 13: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Posts for shade structure, outside deans office

Page 14: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Framing at faculty offices area.

Looking in from exterior door on west

side

Page 15: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Looking up at rotunda framing

Page 16: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Rotunda steel being welded.

Page 17: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

CMU block being installed for main covered walkway

to existing bldg

Page 18: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Looking down upon covered walkway columns

in progress.

Page 19: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Mechanical unit set on mezzanine level

Page 20: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

South side flat metal decking, sloped roof

metal decking

Page 21: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Penetrations in deck for solatubes (skylights)

Page 22: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Air handler unit on mezzanine (AHU 2)

Page 23: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Emergency eyewash installed at chemistry lab

Page 24: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Wall framing at chemical balance room, exit foyer

Page 25: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Overhead duct & walls framed in nursing

fundamental

Page 26: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Installing overhead duct in corridor 127.

Page 27: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Medical supplies and utility rooms framed up. Overhead duct installed

Page 28: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Deans office, and meeting room to the right.

Page 29: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Bottom side of metal deck, with cut outs for solatube. Anatomy lab.

Page 30: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Concrete just poured at north covered walkway

Page 31: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Emergency eyewash installed at anatomy lab

Page 32: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

SIM lab, control room, observation room wall

framing. Overhead duct.

Page 33: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

In wall plumbing at patient toilet rm 150

Page 34: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Aluminum frames for glass along corridor 127

Page 35: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Window in digital nurse proctor room, looking into

digital nurse test lab

Page 36: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Piping ran to medical headwall template,

nursing fundamentals lab

Page 37: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Overhead ducts in nursing fundamentals

Page 38: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Looking at south covered walkway, from roof.

Page 39: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

North side roofing install

Page 40: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

South roof

Page 41: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Mezzanine level. Mechanical unit & piping

Page 42: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Looking from south, to north.

Rotunda and mechanical attic to the right

Page 43: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Mock up of medical headwall in nursing

fundamentals

Page 44: Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Building Project

Plumbing for washer & dryer in utility room