Construction Traffic Management Report Helios Apartments CG140222 Prepared for Spec Property 9 May 2014 Construction Traffic Management Report Helios Apartments CG140222

Transcript of Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments...

Page 1: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report

Helios Apartments CG140222

Prepared for Spec Property 9 May 2014

Construction Traffic Management Report

Helios Apartments CG140222

Page 2: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno ii

Document Information Prepared for Spec Property Project Name Helios Apartments File Reference CG140222REP001F02.docx Job Reference CG140222 Date 9 May 2014

Contact Information Cardno Victoria Pty Ltd Trading as Cardno ABN 47 106 610 913 150 Oxford Street, Collingwood Victoria 3066 Australia Telephone: (03) 8415 7777 Facsimile: (03) 8415 7788 International: +61 3 8415 7777 [email protected] www.cardno.com

Document Control Version Date Author Author

Initials Reviewer Reviewer

Initials

F02 9/05/14 Brendan Rodgers

Glenn Carey

© Cardno. Copyright in the whole and every part of this document belongs to Cardno and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on any media to any person other than by agreement with Cardno.

This document is produced by Cardno solely for the benefit and use by the client in accordance with the terms of the engagement. Cardno does not and shall not assume any responsibility or liability whatsoever to any third party arising out of any use or reliance by any third party on the content of this document.

Page 3: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno iii

Table of Contents 1 Introduction 4

2 Background and Existing Conditions 5 2.1 Location and Land Use 5 2.2 Road Network 6

2.2.1 Flemington Road 6 2.2.2 Little George Street 7 2.2.3 TravelSmart Map 8 2.2.4 Public Transport 8

3 Site Access and Traffic Management 9

4 Work Site Hazard Assessment – Construction Traffic 10

5 Staged Construction Process 11

6 Proposed Traffic Management 11 6.1 General 12 6.2 Demolition and Earthworks 12

6.2.1 Little George Street 12 6.2.1 Flemington Road 12

6.3 Construction 13 6.3.1 Little George Street 13 6.3.2 Flemington Road 13

7 Major Site Access Routes 15

Appendices Appendix A Traffic Management Plans Appendix B Worksite Hazard Assessment

Tables Table 2-1 Public Transport Provision 8

Figures Figure 2-1 Site Location 5 Figure 2-2 Flemington Road service lane, looking northwest past the subject site 6 Figure 2-3 Little George Street, looking northwest towards the subject site 7 Figure 2-4 TravelSmart Map 8 Figure 7-1 Truck Access Routes and Height Clearance Warnings 15

Page 4: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno 4

1 Introduction

Cardno has been retained by Spec Property to prepare Traffic Management Plans (TMPs) for the demolition and earthworks stage and the construction stage of the proposed Helios Apartments at 91-95 Flemington Road, North Melbourne. Cardno has also been retained by HACER Group to prepare TMPs for a neighbouring construction project, Nord Apartments at 81-85 Flemington Road, North Melbourne. The TMPs for both sites have been coordinated to produce the most efficient solution.

Page 5: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno 5

2 Background and Existing Conditions

2.1 Location and Land Use The subject site is located 91-95 Flemington Road, North Melbourne, as shown in Figure 2-1.

Figure 2-1 Site Location

The site is rectangular in shape with an approximate frontage of 14 metres to Flemington Road. Land use surrounding the site is mixed in nature, with various commercial and retail uses located in the immediate vicinity of the site. Land uses of note within the surrounding area include the Royal Women’s Hospital and the University of Melbourne located to the east of the site

SUBJECT SITE

Page 6: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno 6

2.2 Road Network

2.2.1 Flemington Road Flemington Road is a primary arterial road running in a northwest-southeast orientation between Royal Parade in the southeast and Citylink in the northwest.

In the vicinity of the site, Flemington Road consists of a main carriageway that allows for one lane of traffic in each direction separated by two sets of tram tracks as well as a service lane on either side of the carriageway that allows two lanes of traffic, a bicycle lane and a kerbside parking lane in the corresponding direction. The Flemington Road service lane adjacent to the subject site is shown in Figure 2-2.

At the frontage of the subject site, a speed limit of 40km/h applies Monday-Friday 8:00am to 9:30am and 2:30pm to 4:00pm. A speed limit of 60km/h applies all other times.

Figure 2-2 Flemington Road service lane, looking northwest towards the subject site

Page 7: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno 7

2.2.2 Little George Street Little George Street operates northwest-southeast from Villiers Street in the southeast and Harcourt Street in the northwest.

Little George Street provides a trafficable width of around 4.0 metres and provides access to the rear of adjacent properties, which front onto Flemington Road.

Little George Street, looking southeast towards the subject site, is shown in Figure 2-3.

Figure 2-3 Little George Street, looking southeast towards the subject site

Page 8: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno 8

2.2.3 TravelSmart Map The site is located in close proximity to numerous sustainable transport modes, including tram, bus and train services as shown in the TravelSmart map at Figure 2-4.

Figure 2-4 TravelSmart Map

2.2.4 Public Transport

The subject site has excellent public transport accessibility, with the following services located within close proximity.

The full public transport provision is indicated in Table 2-1.

Table 2-1 Public Transport Provision Service Route

No’s Route Description Nearest Stop

Tram 19 North Coburg - City Elizabeth St Cnr Flemington Road and Grattan Street

55 West Coburg - Domain Interchange

59 Airport West - City Elizabeth St Bus 401 North Melbourne - University of Melbourne via Royal

Melbourne Hospital Grattan Street east of Flemington Road

402 Footscray - East Melbourne via North Melbourne 546 Heidelberg - Melbourne University - Queen Victoria Market via

Clifton Hill and Carlton

SUBJECT SITE

Page 9: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno 9

3 Site Access and Traffic Management

The project construction will involve vehicle and pedestrian movements within and around the site. This will interface with existing vehicle and pedestrian activity within the surrounding precinct.

During the work, the objective for managing traffic will be to:

> Implement an effective management plan that achieves the planned construction activities in a safe and timely manner;

> Provide for public safety;

> Protect the environment; and

> Minimise the disruption to both vehicular and pedestrian traffic.

Page 10: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno 10

4 Work Site Hazard Assessment – Construction Traffic

A work site hazard assessment is the first step in developing a construction traffic management plan for a work site and is a requirement of the Road Management Act 2004 – Code of Practice. The purpose of the Risk Assessment is to identify the risk of events, the probability of the event occurring and the severity of the consequences if the risk was to lead to, or contribute to an incident. Based on those assessments the Risk Assessment process then identifies appropriate design elements and management procedures to eliminate or minimise the risk.

This Construction Traffic Management Plan outlines the design elements and management procedures that are to be put in place for vehicles accessing the site during the construction phase of the project.

The risk assessment process has been documented using the Road Management Act 2004 Worksite safety – Traffic Management site risk rating checklist and is attached as Appendix B.

Page 11: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno 11

5 Staged Construction Process

The number of personnel and vehicle deliveries during the staged construction process has been provided by Spec Property as follows.

The traffic management plans may be required to be modified to accommodate the construction stages as detailed below:

Early Works – To commence August, 2014, duration 1 month

> Construct site hoarding, crossovers and loading zones, make signage changes and install construction traffic management signage and line marking.

> During this phase there are likely to be approximately 10 personnel on site; 4 semi-trailers plus 5 other delivery vehicles per day.

Site Establishment - To commence August 2014 duration 1 month

> Install site amenities. Install overhead gantries.

> During this phase there are likely to be approximately 10 personnel on site; 4 semi-trailers per day plus 5 other delivery vehicles per day.

Demolition- To commence September 2014, duration 1 month.

> During this phase there are likely to be approximately 6 personnel on site; 1 semi-trailers, 3 truck and dog combinations (quarry trucks), plus 1 other delivery vehicles per day.

Ground support and Bulk Excavation - To commence October 2014, duration 3 months

> During this phase there are likely to be approximately 10 personnel on site; 1 semi-trailers, 7 truck and dog combinations (quarry trucks) plus 2 other delivery vehicles per day

Construct Structure to Ground Level - To commence February 2015, duration 3 months

> During this stage there are likely to be approximately 45 personnel on site; 2 semi-trailers per day; concrete pours 1 times per week with up to 10 concrete trucks per day plus 3 other delivery vehicles per day.

Tower Construction- To commence May 2015, duration 5 months

> During this stage there are likely to be approximately 70 personnel on site; 3 semi-trailers per day; concrete pours 1 times per week with up to 10 concrete trucks per day plus 3 other delivery vehicles per day.

Shellworks and Finishes Stage - To commence June 2015 duration 11 months

> During this stage there will be up to 150 personnel on site and up to 1 semi-trailers and 8 single-unit trucks per day up to 10m long plus 5 other delivery vehicles per day.

Commissioning and Handover - To commence March 2016, duration 2 months

> During this stage there will be up to 50 personnel on site and 1 other delivery vehicles per day.

Final commissioning and handover - To commence May 2016, duration 1 month

> Removal and reinstatement of existing conditions – trees, line marking, make good etc.

> Removal of hoarding.

The project duration is approximately 24 months.

Page 12: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno 12

6 Proposed Traffic Management

6.1 General Traffic Management Plans (TMPs) have been developed for the earthworks and demolition, and construction stages. The TMPs are found attached as Appendix A.

The proposed hours of operation during these two phases are 7:00AM – 7:00PM Monday to Friday and 8:00AM – 3:00PM Saturday.

Detailed discussion of the proposed traffic management for each stage of construction is as follows.

6.2 Demolition and Earthworks

6.2.1 Little George Street During the demolition and earthworks stage, construction activity is to be contained within the site. It is proposed that Little George Street be closed from Harcourt Street up to the eastern boundary of the Nord Apartments subject site. The western end of the laneway closure will be occupied by Helios Apartments construction site, and the eastern end will be occupied by Nord Apartments, as detailed in Cardno Drawing CG140222/T/03. The occupied section of the laneway is to be gated and car park access at the eastern end of Little George Street is to be maintained. The laneway is to be re-opened to traffic at the end of each shift and remain open to traffic outside working hours.

During the demolition and earthworks stage, material removal is proposed using tandem tippers, which have been model using an 8.8 metre twin-steer agitator truck to be conservative, as detailed in Cardno Drawing CG140222/T/03. Whether driving onto the site, or only into the laneway, a change of direction will be required at the Harcourt Street / Little George Street intersection. This manoeuvre is to occur under traffic control, as detailed in Cardno Drawing CG140222/T/03.

In order to accommodate vehicle ingress and egress a construction zone is proposed on Harcourt Street at the loss of one parking bay signed “4P meter 7:30am-6:30pm Mon-Fri, 7:30am-12:30pm Sat”, as detailed in Cardno Drawing CG140075/SK/01.

A traffic controller will supervise pedestrians, local traffic and construction vehicle movements into Little George St on Harcourt Street and manage the gate, as required.

A demountable fence 2.4m high is to be erected along the Little George Street frontage.

All construction works will be advised by standard traffic management signage as appropriate.

6.2.2 Flemington Road During the times when pedestrian protection is required on Flemington Road an overhead protection gantry will be installed with a minimum footpath width of 1.5 metres along the site frontage to Flemington Road, as required. Timber hoarding 2.4 metres high is also to be installed along the site frontage, as detailed in CG140222/T/03.

Site amenities are to be set up in the adjoining property to the east. Access and operation of the debating club room and camera shop within this adjoining property are to be maintained.

Page 13: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno 13

6.3 Construction

6.3.1 Little George Street Little George Street is to be occupied by the two construction sites as per the demolition and earthwork stages. The laneway is to be re-opened to traffic at the end of each shift and remain open to traffic outside working hours.

During the construction stage Little George Street will be used as a loading bay to cater for 19.0 metre semi-trailers. Little George Street will be shared by the two construction sites as it was in the demolition and earthwork stages with the boundary of the sites loading bays defined by a front and a rear gate, as detailed in CG140222/T/04.

Truck ingress into Little George Street will occur via a reverse manoeuvre from Harcourt Street. Truck egress out of Little George Street will occur in a forward direction via a right turn into Harcourt Street, as detailed on Cardno Drawing CG140222/T/04. The ingress reverse manoeuvre is to be conducted under traffic control supervision. Two traffic controllers (one each direction of traffic) are required to hold traffic as the reverse manoeuvre is performed.

In order to accommodate vehicle ingress and egress, nine parking bays on Harcourt Street have been replaced with:

- A construction zone at the loss of seven parking bays signed “4P meter 7:30am-6:30pm Mon-Fri, 7:30am-12:30pm Sat”.

- Two “No Parking 6:00am-6:30pm Mon-Sat” bays at the loss of two parking bays signed “1P 7:30am-6:30pm Mon-Fri”.

A timber hoarding 2.4m high is to be erected along the Little George Street frontage.

6.3.2 Flemington Road

6.3.2.1 Construction Zone

On Flemington Road, the two sites (Helios Apartments and Nord Apartments) each propose a concrete pump and a waste bin on the nature strip and concrete pour bays in the existing parking and bicycle lane on Flemington Road. The concrete pouring bays will be protected by omni-stop bollards and mesh fence. To accommodate the two concrete pour bays, a construction zone is proposed that accommodates the ingress and egress paths of twin-steer agitators, with a shared entry/exit between the two bays. To prevent parking in the construction zone, the pour bays are to be gated and chevrons marked on the ungated section of the construction zone.

6.3.2.2 Loss of Parking

The construction zone will be implemented at the loss of the following parking spaces:

- Five parking bays signed “2P meter 7:30am-6:30pm, Mon-Fri, 7:30am-12:30pm Sat”.

- A 20 metre long loading zone signed “Loading zone 30 Minute 7:30am-6:30pm”.

- Four parking bays signed “1/4P meter 7:30am-6:30pm, Mon-Fri, 7:30am-12:30pm Sat”.

6.3.2.3 Bicycle Lane Closure

It is proposed that the bicycle lane be closed for the length of the construction zone.

6.3.2.4 Waste Bin Access In order to empty the waste bin a waste truck is required to reverse up to the bin, as detailed in CG140222/T/04. This reverse manoeuvre is to be supervised by two traffic controllers to hold traffic in each lane of Flemington Road, and is to occur before the morning peak starts, i.e. approximately 6:00am.

Page 14: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno 14

6.3.2.5 Pedestrian Protection An overhead protection gantry with a minimum footpath width of 1.5 metres is proposed along the entire site frontage to Flemington Road, as detailed in CG140222/T/04. Typical hoarding will also be installed along the frontage to protect the work zone.

A traffic controller will supervise local traffic, construction vehicles, cyclists and pedestrian movements along Flemington Road, as required.

All construction works will be advised by standard traffic management signage as appropriate.

Page 15: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno 15

7 Major Site Access Routes

The recommended ingress and egress route is prescribed as follows as shown in Figure 7-1:

The City Link will be the preferred major access route to and from the site.

> Inbound (all vehicles): City Link – Footscray Road – Dudley Street – Peel Street – Flemington Road;

> Outbound (all vehicles): Flemington Road – Racecourse Road – City Link.

Figure 7-1 Truck Access Routes and Height Clearance Warnings

Spec Property will require all subcontractors to advise (and induct as required) operatives/drivers of the approved access route plan and the traffic management plan for the proposed development. Drivers are to be provided with a map highlighting the approved routes and potential hazards in the vicinity of the project.

SUBJECT SITE

LEGEND Low Bridge with clearance * indicates carriageways with differing clearance (lowest clearance shown.) Recommended inbound route Recommended outbound route

3.5m*

Page 16: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno 16

Helios Apartments

APPENDIX

A TRAFFIC MANAGEMENT PLANS

Page 17: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

VALE STREET

LIT. GEORGE STREET

VALE STREET

VIL

LIE

RS S

TR

EE

T

HA

RC

OU

RT S

TR

EE

T

FLEMINGTON ROAD

7/05/2014

2:2

7:2

4 P

MD

AT

E P

LO

TT

ED:

O:\

DR

AT

RA

FF\2014\

CG14

0075\

Dra

win

gs\

CG14

0075S

K01.dgn

CA

D FIL

E:

PEDESTRIAN ROUTEPEDESTRIAN ROUTE

MELWAY 2A K7

SCALE - 1:500 @ A3 DATE - 06-05-14

DESIGN VEHICLES

SKETCH CG140075SK01 P1 - NORD & HELIOS APARTMENTS - PROPOSED PARKING CHANGES

EXCAVATION STAGE

NO S

TOPPIN

G (E)

1P 9:3

0A

M-3:0

0P

M

MO

N-FRI, 4:0

0-6:3

0

MO

N-FRI (E)

NO P

AR

KIN

G (5

MIN) 7:3

0-9:3

0A

M, 3:0

0-4:0

0P

M

MO

N-FRI

1P 7:3

0A

M-6:3

0P

M

MO

N-FRI (E)

N.S. (E)

AR

EA 18

97:3

0A

M-6:3

0P

M

MO

N-FRI, 7:3

0-12:3

0P

M

SA

T

2P

TIC

KET

N.S. T.P.I's E

XCEP

TE

D (E)

N.S. (E)

(E)

15

MIN

P

7:3

0-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

2P

MET

ER

N.S. (E)

AR

EA 18

97:3

0-12:3

0P

M

SA

T

7:3

0A

M-6:3

0P

M

MO

N-FRI,

2P

TIC

KET

4P

DIS

AB

LE

D (E)

AR

EA 18

97:3

0A

M-6:3

0P

M

MO

N-FRI, 7:3

0-12:3

0P

M

SA

T

2P

TIC

KET

N.S. (E)

7:3

0-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

4P

MET

ER

7:3

0-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

4P

MET

ER

7:3

0-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

4P

MET

ER

7:3

0-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

4P

MET

ER

7:3

0-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

4P

MET

ER

7:3

0-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

4P

MET

ER

N.S. (E) NO PARKING

7:30AM-12:30PM SAT (E)

7:30AM-6:30PM MON-FRI,

2P METER

7:30AM-6:30PM (E)

LOADING ZONE 30 MINUTE

7:30AM-12:30PM SAT (E)

7:30AM-6:30PM MON-FRI,

1/4P METER

N.S. (E) 7:30AM-12:30PM SAT (E)7:30AM-6:30PM MON-FRI, 2P METER

N.S. 7:30AM-6:30PM (E)30 MINUTE LOADING ZONE

N.S. (E)

NO PARKING N.S. (E)

N.S. (E)

7:3

0A

M-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

2P

T.P.I.'s E

XCEP

TE

DN.S.

7:3

0A

M-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

2P

6:0

0A

M-6:3

0P

M

MO

N-S

AT (E)

CO

NS

TR

UCTIO

N

ZO

NE

N.S. (E)

(3 SP

ACES, P

ROP

OS

ED)

CO

NS

TR

UCTIO

N

ZO

NE

LEGEND

SUBJECT SITES

EXISTING PARKING RESTRICTIONS

PROPOSED PARKING RESTRICTIONS

POTENTIAL TRUCK SWEPT PATHS

SITE

CONSTRUCTION

FLEMINGTON ROAD)

91-95

APARTMENTS,

(HELIOS

(PR

OP

OS

ED)

ZO

NE (1 S

PA

CE)

CO

NS

TR

UCTIO

N

SITE

CONSTRUCTION

FLEMINGTON ROAD)

81-85

APARTMENTS,

(NORD

First Part Width

Trailer Width

First Part Track

Trailer Track

:

:

:

:

Steering Angle

Lock to Lock Time

:

:

meters

30.0

6.0

2.50

2.50 Articulating Angle 70.0:

TANDEM TIPPER + QUAD DOG

5.70

8.307.90

5.004.501.67 1.73

20.0

1.20

2.50

2.50:

:2.50

2.50

:

:31.5

6.0

Track

Width

Steering Angle

Lock to Lock Time

meters

(Twin Steer Conc Agi used)8.8m TRUCK

5.451.47

8.77

Page 18: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

7/05/2014

2:2

8:0

9 P

MD

AT

E P

LO

TT

ED:

O:\

DR

AT

RA

FF\2014\

CG14

0075\

Dra

win

gs\

CG14

0075S

K02.d

gn

CA

D FIL

E:

VALE STREET

LIT. GEORGE STREET

VALE STREET

VIL

LIE

RS S

TR

EE

T

HA

RC

OU

RT S

TR

EE

T

FLEMINGTON ROAD

SCALE - 1:500 @ A3 DATE - 06-05-14

MELWAY 2A K7

DESIGN VEHICLES 13.70

1.60 5.30

4.20

0.20

1.40 9.50

Articulating Angle

Lock to Lock Time

:2.50Trailer Width Steering Angle

Tractor Track

Trailer Track

:2.50

2.50:

Tractor Width

S ARTICULATED 19M

2.50:

meters

27.7:

70.0:

6.0:

SKETCH CG140075SK02 P1 - PROPOSED PARKING CHANGES - NORD & HELIOS APARTMENTS

CONSTRUCTION STAGE

NO S

TOPPIN

G (E)

1P 9:3

0A

M-3:0

0P

M

MO

N-FRI, 4:0

0-6:3

0

MO

N-FRI (E)

NO P

AR

KIN

G (5

MIN) 7:3

0-9:3

0A

M, 3:0

0-4:0

0P

M

MO

N-FRI

1P 7:3

0A

M-6:3

0P

M

MO

N-FRI (E)

N.S. (E)

AR

EA 18

97:3

0A

M-6:3

0P

M

MO

N-FRI, 7:3

0-12:3

0P

M

SA

T

2P

TIC

KET

N.S. T.P.I's E

XCEP

TE

D (E)

N.S. (E)

(E)

15

MIN

P

7:3

0-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

2P

MET

ER

N.S. (E)

AR

EA 18

97:3

0-12:3

0P

M

SA

T

7:3

0A

M-6:3

0P

M

MO

N-FRI,

2P

TIC

KET

4P

DIS

AB

LE

D (E)

AR

EA 18

97:3

0A

M-6:3

0P

M

MO

N-FRI, 7:3

0-12:3

0P

M

SA

T

2P

TIC

KET

N.S. (E)

7:3

0-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

4P

MET

ER

7:3

0-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

4P

MET

ER

7:3

0-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

4P

MET

ER

7:3

0-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

4P

MET

ER

7:3

0-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

4P

MET

ER

7:3

0-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

4P

MET

ER

N.S. (E) NO PARKING

7:30AM-12:30PM SAT (E)

7:30AM-6:30PM MON-FRI,

2P METER

7:30AM-6:30PM (E)

LOADING ZONE 30 MINUTE

7:30AM-12:30PM SAT (E)

7:30AM-6:30PM MON-FRI,

1/4P METER

N.S. (E) 7:30AM-12:30PM SAT (E)7:30AM-6:30PM MON-FRI, 2P METER

N.S. 7:30AM-6:30PM (E)30 MINUTE LOADING ZONE

N.S. (E)

NO PARKING N.S. (E)

N.S. (E)

7:3

0A

M-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

2P

T.P.I.'s E

XCEP

TE

DN.S.

7:3

0A

M-12:3

0P

M

SA

T7:3

0A

M-6:3

0P

M

MO

N-FRI,

2P

6:0

0A

M-6:3

0P

M

MO

N-S

AT (E)

CO

NS

TR

UCTIO

N

ZO

NE

N.S. (E)

(PR

OP

OS

ED)

(2 SP

ACES)

NO P

AR

KIN

G

(PR

OP

OS

ED)

4P

DIS

AB

LE

D

MO

N-S

AT

6:0

0A

M-6:3

0P

M

NO P

AR

KIN

G(2 SP

ACES, P

ROP'D)

MO

N-S

AT

6:0

0A

M-6:3

0P

M

NO P

AR

KIN

G

(3 SP

ACES, P

ROP

OS

ED)

CO

NS

TR

UCTIO

N

ZO

NE

LEGEND

SUBJECT SITES

EXISTING PARKING RESTRICTIONS

PROPOSED PARKING RESTRICTIONS

POTENTIAL TRUCK SWEPT PATHS

(PR

OP

OS

ED)

ZO

NE (3 SP

ACES)

CO

NS

TR

UCTIO

N

SITE

CONSTRUCTION

FLEMINGTON ROAD)

91-95

APARTMENTS,

(HELIOS

(PR

OP

OS

ED)

ZO

NE (4 SP

ACES)

CO

NS

TR

UCTIO

N

CONSTRUCTION ZONE (PROPOSED)

SITE

CONSTRUCTION

FLEMINGTON ROAD)

81-85

APARTMENTS,

(NORD

:

:2.50

2.50

:

:31.5

6.0

Track

Width

Steering Angle

Lock to Lock Time

meters

(Twin Steer Conc Agi used)8.8m TRUCK

5.451.47

8.77

Page 19: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

PEDESTRIAN ROUTEPEDESTRIAN ROUTE

Email: [email protected] Web: www.cardno.com.au/victoria

Phone (+61 3) 8415 7777 Fax (+61 3) 8415 7788

150 Oxford Street, Collingwood, VIC Australia 3066

ABN: 47 106 610 913

content of this document.

party arising out of any use or reliance by third party on the

assume any responsibility or liability whatsoever to any third

of the retainer. Cardno Limited does not and shall not

benefit of and use by the client in accordance with the terms

This document is produced by Cardno Limited solely for the

Cardno Limited All Rights Reserved. ã

NOT TO BE USED FOR CONSTRUCTION PURPOSES

Sheet NumberAuthorised

Drawn

Designed

Checked

Title

Project

Client

Date

Status

Scale Size

RevisionProject Number

PRELIMINARY

Rev Date Description Drawn Appr.

glenn.care

yB

Y:

EXACT POSITION SHOULD BE PROVEN ON SITE.

SHOWN ARE APPROXIMATE ONLY AND THEIR

THE LOCATIONS OF UNDERGROUND SERVICES

BEWARE OF UNDERGROUND SERVICES

WARNING

O:\D

RATR

AFF\2014\C

G140222\Dra

wings\C

G140222T03.dgn

CA

D FIL

E:

DATE P

LO

TTE

D:

9/05/2014

12:01:18 P

M

SU

BJECT SIT

E

BUIL

DIN

G

ADJA

CE

NT

PATH

FOOT

SECTION B

ZONE

LOADING

4.0

0.8

SU

BJECT SIT

E

SECTION A

LANE

TRAFFIC

PATH

FOOT

5.2

3.0

2.7

LANE

TRAFFICNATURE STRIP

2.7

OVERHEAD PROTECTION GANTRY (AS REQUIRED)

1.5

PARKING

2.0

1.5 MIN

LANE

CYCLE

1:500 A3

P2T 03GC ACS

0 5

P1 06.05.14 ISSUED FOR INFORMATION

P2 ACSGC

ACS

ACS 09.05.14

GC

DETAIL TRAFFIC MANAGEMENT PLAN

DEMOLITION & EARTHWORKS STAGE

GC

CG140222

91-95 FLEMINGTON ROAD, NORTH MELBOURNE1:500 @ A3

2.5 10

09.05.14

B

-

EGRESS SWEPT PATH8.8m TIPPER FORWARD DIRECTION

TRUCK REVERSING (AS REQUIRED)TRAFFIC CONTROLLER TO SUPERVISE

PROTECTIVE GANTRY (AS REQUIRED)

MELWAY 2A K7

LANEWAY OCCUPATION FOR NORD APARTMENTS

OF TRAFFIC CONTROL DEVICES. CODE OF PRACTICE TO ENSURE CORRECT INSTALLATION AS1742.3-2009 AND ROAD MANAGEMENT ACT 2004, CONJUNCTION WITH AUSTRALIAN STANDARD3.TRAFFIC MANAGEMENT PLAN SHOULD BE READ IN LOCAL ROAD - HARCOURT STREET (SPEED ZONE 40KM/H)2.DECLARED ROAD - FLEMINGTON ROAD (SPEED ZONE 60KM/H) UNLESS NOTED OTHERWISE.1.ALL DIMENSIONS ARE TO FACE OF KERB AND CHANNEL

DESIGN VEHICLES

AND CAMERA SHOPEXCEPT FOR DEBATING CLUB ROOM NORD SITE OFFICES AND AMENITIES BUILDING OCCUPIED FOR HELIOS &

REMOVE TREE AND PLANTER BOX STCA

INGRESS SWEPT PATH8.8m TIPPER FORWARD DIRECTION

INGRESS SWEPT PATH8.8m TIPPER REVERSE DIRECTION

2.4m HIGH TIMBER HOARDING

-

A

FLEMINGTON ROAD

VIL

LIE

RS S

TR

EE

T

VALE STREET

HA

RC

OU

RT S

TR

EE

T

HELIOS APARTMENTS

SPEC PROPERTY

CARDNO PROJECT CG140222MANAGEMENT REFER TO FOR DETAILS OF PROPOSED TRAFFIC OCCUPATION & POTENTIAL GANTRY SHOWN.OUTLINE OF SITE, HOARDING, LANEWAY NORD APARTMENTS CONSTRUCTION SITE.

8:00AM - 3:00PM SATURDAY

1. 7:00AM - 7:00PM MONDAY TO FRIDAY

HOURS OF OPERATION

6. FOR PROPOSED PARKING RESTRICTIONS, REFER TO CARDNO SKETCH CG140075SK01

REQUIRED) IN ACCORDANCE WITH ROAD MANAGEMENT ACT 2004, CODE OF PRACTICE - CLAUSE 84.

5. TRAFFIC CONTROLLERS TO ACT (SUPERVISE CONSTRUCTION TRAFFIC, PEDESTRIAN AND CYCLIST MOVEMENTS AS

4. THE SIGNS SHOWN ON THIS PLAN ARE TO BE DISPLAYED ONLY WHILE TRAFFIC CONTROLLERS ARE WORKING

OF SIGHT FROM THE DRIVER TO THE SIGN.

3. SIGNS SHALL FACE TOWARDS APPROACHING TRAFFIC APPROXIMATELY AT RIGHT ANGLES TO THE LINE

2. ALL SIGNS SHALL BE PERMANENTLY HIGH MOUNTED, UNLESS INDICATED OTHERWISE.

1. ADVANCED WARNING SIGNS TO BE FITTED WITH FLAGS AS SHOWN.

INSTALLATION NOTES

TRUCK REVERSING (AS REQUIRED)TRAFFIC CONTROLLER TO SUPERVISE

FOR PROPOSED PARKING RESTRICTIONS, REFER TO CARDNO SKETCH CG140075SK01

LANEWAY OCCUPATION FOR HELIOS APARTMENTS

* LANEWAY IS TO BE OPEN TO TRAFFIC OUTSIDE WORKING HOURS *

2.4m HIGH DEMOUNTABLE FENCE

MANAGE SITE ACCESS (AS REQUIRED)TRAFFIC CONTROLLER TO

COUNCIL COMMENTS - LANE TO BE OPEN AT NIGHT

PREPARE TO STOP

PREPARE TO STOP

LEGEND

PEDESTRIAN ROUTE

SUBJECT SITE

PROTECTIVE GANTRY

LANEWAY OCCUPATION

SUBJECT SITE HOARDING

NORD APARTMENTS WORKSITE

PARKING RESTRICTIONS

SKETCH 140075/SK/01 FOR PROPOSED

CLOSED PARKING BAY. REFER CARDNO

FLEMINGTON ROAD

91-95

APARTMENTS,

HELIOS

FLEMINGTON ROAD)

81-85

APARTMENTS,

(NORD

SITE

SUBJECT

First Part Width

Trailer Width

First Part Track

Trailer Track

:

:

:

:

Steering Angle

Lock to Lock Time

:

:

meters

30.0

6.0

2.50

2.50 Articulating Angle 70.0:

TANDEM TIPPER + QUAD DOG

5.70

8.307.90

5.004.501.67 1.73

20.0

1.20

2.50

2.50:

:2.50

2.50

:

:31.5

6.0

Track

Width

Steering Angle

Lock to Lock Time

meters

(Twin Steer Conc Agi used)8.8m TRUCK

5.451.47

8.77

Page 20: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

B

-

MELWAY 2A K7

LANEWAY OCCUPATION FOR HELIOS APARTMENTS

OF TRAFFIC CONTROL DEVICES. CODE OF PRACTICE TO ENSURE CORRECT INSTALLATION AS1742.3-2009 AND ROAD MANAGEMENT ACT 2004, CONJUNCTION WITH AUSTRALIAN STANDARD3.TRAFFIC MANAGEMENT PLAN SHOULD BE READ IN LOCAL ROAD - HARCOURT STREET (SPEED ZONE 40KM/H)2.DECLARED ROAD - FLEMINGTON ROAD (SPEED ZONE 60KM/H) UNLESS NOTED OTHERWISE.1.ALL DIMENSIONS ARE TO FACE OF KERB AND CHANNEL

DESIGN VEHICLES

A

-

FLEMINGTON ROAD

VALE STREET

HA

RC

OU

RT S

TR

EE

T

13.70

1.60 5.30

4.20

0.20

1.40 9.50

Articulating Angle

Lock to Lock Time

:2.50Trailer Width Steering Angle

Tractor Track

Trailer Track

:2.50

2.50:

Tractor Width

S ARTICULATED 19M

2.50:

meters

27.7:

70.0:

6.0:

TREE AND PLANTER BOX REMOVED IN PRIOR STAGE

1:500 A3

P3T 04GC ACS

0 5

P1 07.05.14 ISSUED FOR INFORMATION

P2

P3

ACSGC

ACSGC

ACS

ACS 09.05.14

GC

DETAIL TRAFFIC MANAGEMENT PLAN

GC

CG140222

91-95 FLEMINGTON ROAD, NORTH MELBOURNE1:500 @ A3

2.5 10

08.05.14

09.05.14

CONSTRUCTION STAGE

HELIOS APARTMENTS

SPEC PROPERTY

AND CAMERA SHOPEXCEPT FOR DEBATING CLUB ROOM NORD SITE OFFICES AND AMENITIES BUILDING OCCUPIED FOR HELIOS &

ALIMAK HOISTSTOWER CRANE

VIL

LIE

RS S

TR

EE

T

FENCE

ON END OF

MOUNTED MOUNTED ON GATE

608277

CARDNO PROJECT CG140075MANAGEMENT REFER TO FOR DETAILS OF PROPOSED TRAFFIC OCCUPATION & GANTRY SHOWN.OUTLINE OF SITE, HOARDING, LANEWAY NORD APARTMENTS CONSTRUCTION SITE.

DEVICES NOT REQUIRED OUTSIDE HOURS OF OPERATION.

3. REMOVE OR COVER UP TEMPORARY TRAFFIC MANAGEMENT SIGNS AND OTHER TRAFFIC CONTROL

SIGNS DURING HOURS OF OPERATION.

2. REMOVE OR COVER UP PERMANENT SIGNS THAT CONFLICT WITH TEMPORARY TRAFFIC MANAGEMENT

8:00AM - 3:00PM SATURDAY

1. 7:00AM - 7:00PM MONDAY TO FRIDAY

HOURS OF OPERATION

7. FOR PROPOSED PARKING RESTRICTIONS, REFER TO CARDNO SKETCH CG140075/SK/02

6. LINE MARKING TO BE IN ACCORDANCE WITH VICROADS TRAFFIC ENGINEERING MANUAL VOLUME 2.

REQUIRED) IN ACCORDANCE WITH ROAD MANAGEMENT ACT 2004, CODE OF PRACTICE - CLAUSE 84.

5. TRAFFIC CONTROLLERS TO ACT (SUPERVISE CONSTRUCTION TRAFFIC, PEDESTRIAN AND CYCLIST MOVEMENTS AS

ONLY WHILE TRAFFIC CONTROLLERS ARE WORKING

4. THE TRUCK / TRAFFIC CONTROLLER / PREPARE TO STOP SIGN ASSEMBLIES ARE TO BE DISPLAYED

OF SIGHT FROM THE DRIVER TO THE SIGN.

3. SIGNS SHALL FACE TOWARDS APPROACHING TRAFFIC APPROXIMATELY AT RIGHT ANGLES TO THE LINE

2. ALL SIGNS SHALL BE PERMANENTLY HIGH MOUNTED, UNLESS INDICATED OTHERWISE.

1. ADVANCED WARNING SIGNS TO BE FITTED WITH FLAGS AS SHOWN.

INSTALLATION NOTES

FOR PROPOSED PARKING RESTRICTIONS, REFER TO CARDNO SKETCH CG140075SK02

CLIENT COMMENTS - CHEVRON MARKINGS ADDED

TRUCK REVERSING (AS REQUIRED)TRAFFIC CONTROLLER TO SUPERVISE

TRUCK REVERSING (AS REQUIRED)TRAFFIC CONTROLLER TO SUPERVISE

LANEWAY ACCESS (AS REQUIRED)TRAFFIC CONTROLLER TO MANAGE

LANEWAY OCCUPATION FOR NORD APARTMENTS

* LANEWAY IS TO BE OPEN TO TRAFFIC OUTSIDE WORKING HOURS *

COUNCIL COMMENTS - LANE TO BE OPEN AT NIGHT

PEDESTRIAN ROUTEPEDESTRIAN ROUTE

Email: [email protected] Web: www.cardno.com.au/victoria

Phone (+61 3) 8415 7777 Fax (+61 3) 8415 7788

150 Oxford Street, Collingwood, VIC Australia 3066

ABN: 47 106 610 913

content of this document.

party arising out of any use or reliance by third party on the

assume any responsibility or liability whatsoever to any third

of the retainer. Cardno Limited does not and shall not

benefit of and use by the client in accordance with the terms

This document is produced by Cardno Limited solely for the

Cardno Limited All Rights Reserved. ã

NOT TO BE USED FOR CONSTRUCTION PURPOSES

Sheet NumberAuthorised

Drawn

Designed

Checked

Title

Project

Client

Date

Status

Scale Size

RevisionProject Number

PRELIMINARY

Rev Date Description Drawn Appr.

glenn.care

yB

Y:

EXACT POSITION SHOULD BE PROVEN ON SITE.

SHOWN ARE APPROXIMATE ONLY AND THEIR

THE LOCATIONS OF UNDERGROUND SERVICES

BEWARE OF UNDERGROUND SERVICES

WARNING

O:\D

RATR

AFF\2014\C

G140222\Dra

wings\C

G140222T04.dgn

CA

D FIL

E:

DATE P

LO

TTE

D:

9/05/2014

12:17:37 P

M

SU

BJECT SIT

E

SECTION A

LANE

TRAFFIC

PATH

FOOT

5.2

3.0

2.7

LANE

TRAFFICNATURE STRIP

2.7

OVERHEAD PROTECTION GANTRY (AS REQUIRED)

1.5 MIN

SU

BJECT SIT

E

BUIL

DIN

G

ADJA

CE

NT

PATH

FOOT

SECTION B

ZONE

LOADING

4.0

0.8

OMNI-STOP BOLLARD

0.3

0.2

LOADING

3.0

PAD (STCA)

PROTECTIVE CONCRETE PUMP

LANER7-1-4 (B)

R7-4END

PREPARE TO STOP

LANER7-1-4 (B)

WATCH FORROADWORK

END

T2-16

ROADWORK

END

T2-16

R3-1B

R3-1B

AHEAD

ROADWORK

T1-1A

T1-1A

AHEAD

ROADWORK

R3-1B

R3-1B

PREPARE TO STOP

LEGEND

PEDESTRIAN ROUTE

SUBJECT SITE

PROTECTIVE GANTRY

LANEWAY OCCUPATION

SUBJECT SITE HOARDING

COUNCIL ARBORIST'S SATISFACTION

ROOT PROTECTION SLABS TO

NORD APARTMENTS WORKSITE

PARKING RESTRICTIONS

SKETCH 140075/SK/01 FOR PROPOSED

CLOSED PARKING BAY. REFER CARDNO

FLEMINGTON ROAD

91-95

APARTMENTS,

HELIOS

EGRESS SWEPT PATHAUSTROADS 19m SEMI-TRAILER

INGRESS SWEPT PATHAUSTROADS 19m SEMI-TRAILER

8.8m BIN TRUCK SWEPT PATH

TRAFFIC FOR BIN TRUCK TRAFFIC CONTROLLERS TO HOLD

WITH WIRE MESH FENCE BETWEENABSORBING FOUNDATIONS AT 2m CENTRES,

OMNI-STOP BOLLARDS WITH IMPACT

WITH DDA COMPLIANT RAMP OVERCONCRETE LINE ABOVE GROUND,

ENDS

LANE

CYCLE

AHEAD

WASTE BIN

CONCRETE PUMP

FLASHING YELLOW LIGHT

HELIOS APARTMENTS SITESWEPT PATH TO

8.8m (TWIN-STEER) AGITATOR TRUCK

TELSTRA MICRO-CELL (EXISTING)

SECTIONS OF THE CONSTRUCTION ZONECHEVRON MARKINGS PROPOSED FOR UNGATED

FLEMINGTON ROAD)

81-85

APARTMENTS,

(NORD

SITE

SUBJECT

:

:2.50

2.50

:

:31.5

6.0

Track

Width

Steering Angle

Lock to Lock Time

meters

(Twin Steer Conc Agi used)8.8m TRUCK

5.451.47

8.77

Page 21: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Construction Traffic Management Report Helios Apartments

9 May 2014 Cardno 17

Helios Apartments

APPENDIX

B WORKSITE HAZARD ASSESSMENT

Page 22: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Page 1 of 2Cardno Victoria Pty Ltd

8 May 2014 N:\WINDOWS\2014\CG140222\Documents\CG140222WHA01.docx

Worksite Hazard Assessment Checklist

Project No: CG140222 Prepared By: BR Checked By: GC Project: HELIOS APARTMENTS Date: 08.05.14

Work Location: Little George St Step 1 - Worksite Hazard Rating Road Type: Local Traffic Road Traffic speed: 50 km/h

Clearance between workers and traffic: >3.0m Worksite Hazard Rating: Low

Step 2 - Required Level of Planning A site specific traffic management plan has been prepared and reviewed by Cardno and discussed with and communicated to those on the worksite.

Step 3 - Hazards at Worksite and Step 4 - Hazard Control Measures Safety Hazard / Risk Factors Present at

Worksite Hazard Control Measure(s)

Clearance to traffic No

High speed traffic through worksite No

Poor advance sight distance to worksite (<200 metres) No

Poor observance of directions / instructions by motorists No

Narrow pavement with no escape path (<2.9 metres width) No

Presence of workers at the worksite No

Excavations adjacent to worksite No

Presence of unprotected hazards within the clear zone No

Rough or unsealed road surface No

High volume of traffic through worksite (>10,000 vpd) No

End-of-queue build-up of traffic / Poor sight distance to end-of-queue

No

High volume of heavy vehicles No

Works vehicles entering/leaving worksite Yes Road closure, with traffic controllers at Harcourt Street to supervise truck reversing movements, supported by parking bans and standard advance warning signage.

Cyclists/pedestrians through worksite No

Other No

Step 5 - Hazard Control Measures to be Used (include details of the assessment in accordance with the Hierarchy of Safety Controls indicating why higher levels were considered not to be reasonably practicable) Having considered the nature of the works and identified all hazards in accordance with Table 3 of the Road Management Act, 2004 (Worksite Safety – Traffic Management ), the hazard control measures to be applied, in consultation with those who will be working on the worksite or supervising the works, are shown on the Traffic Management Plan, Cardno drawing number CG140222/T/03

Step 6 - Traffic Management Plan Prepared and Implemented 1. For prepared traffic management plan refer to Cardno drawing number CG140222/T/03 2. It is important that workers are made aware of both the existence and contents of the traffic management plan that

applies to their worksite.

Step 7 - Traffic Management Plan in Practice Reviewed After the traffic management plan has been implemented, a review should be undertaken to ensure that it is operating as expected. This review should take place before work commences on site (refer also Clause 14 of the Road Management Act, 2004 (Worksite Safety – Traffic Management).

Step 8 - Carry out the Work The Road Safety (Traffic Management) Regulations 2009 require that a copy of the traffic management plan, a hazard assessment and measures to control identified hazards must be kept at the worksite at all times when workers are present.

Page 23: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

HELIOS APARTMENTS – CG140222 Worksite Hazard Assessment Checklist

Page 2 of 2Cardno Victoria Pty Ltd

8 May 2014 N:\WINDOWS\2014\CG140222\Documents\CG140222WHA01.docx

In addition, all necessary written authorisations as required for the erection of certain traffic control devices shall also be kept at the worksite when workers are present.

For more details of the steps involved in the worksite hazard assessment, refer to The Road Management Act, 2004 (Worksite Safety – Traffic Management) - Part 2 Worksite Hazard Management Process.

Page 24: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

Page 1 of 2 Cardno Victoria Pty Ltd

9 May 2014 \\AUMELCFS01.cardno.corp\Apps\WINDOWS\2014\CG140222\Documents\CG140222WHA02.docx

Worksite Hazard Assessment Checklist

Project No: CG140222 Prepared By: BR Checked By: GC Project: HELIOS APARTMENTS Date: 08.05.14

Work Location: Flemington Road

Step 1 - Worksite Hazard Rating

Road Type: Urban arterial or Rural 'M' Road Traffic speed: 60 km/h

Clearance between workers and traffic: <1.2m Worksite Hazard Rating: High

Step 2 - Required Level of Planning

A site specific traffic management plan has been prepared and reviewed by Cardno and discussed with and communicated to those on the worksite.

Step 3 - Hazards at Worksite and Step 4 - Hazard Control Measures

Safety Hazard / Risk Factors Present at Worksite

Hazard Control Measure(s)

Clearance to traffic Yes Concrete pour bay to be protected by impact-absorbing bollards and standard warning signage.

High speed traffic through worksite No

Poor advance sight distance to worksite (<200 metres) No

Poor observance of directions / instructions by motorists No

Narrow pavement with no escape path (<2.9 metres width) No

Presence of workers at the worksite Yes Concrete pour bay to be protected by impact-absorbing bollards and standard warning signage.

Excavations adjacent to worksite No

Presence of unprotected hazards within the clear zone No

Rough or unsealed road surface No

High volume of traffic through worksite (>10,000 vpd) Yes Concrete pour bay to be protected by impact-absorbing bollards and standard warning signage.

End-of-queue build-up of traffic / Poor sight distance to end-of-queue

No

High volume of heavy vehicles No

Works vehicles entering/leaving worksite Yes Drive-through concrete pour bay, with bay supervised by traffic controller. Bin pick-up to be performed under traffic controller supervision and at low traffic times.

Cyclists/pedestrians through worksite Yes Protective pedestrian gantry/ Warning signage advising bicycle lane closed.

Other – Elm Trees Yes Root protection slabs under concrete pump and waste bin to council arborist’s satisfaction

Step 5 - Hazard Control Measures to be Used (include details of the assessment in accordance with the Hierarchy of Safety Controls indicating why higher levels were considered not to be reasonably practicable)

Having considered the nature of the works and identified all hazards in accordance with Table 3 of the Road Management Act, 2004 (Worksite Safety – Traffic Management ), the hazard control measures to be applied, in consultation with those who will be working on the worksite or supervising the works, are shown on the Traffic Management Plan, Cardno drawing number CG140222/T/04

Step 6 - Traffic Management Plan Prepared and Implemented

1. For prepared traffic management plan refer to Cardno drawing number CG140222/T/04 2. It is important that workers are made aware of both the existence and contents of the traffic management plan that

applies to their worksite.

Page 25: Construction Traffic Management Report · Construction Traffic Management Report Helios Apartments 9 May 2014 Cardno 10 4 Work Site Hazard Assessment – Construction Traffic A work

HELIOS APARTMENTS – CG140222 Worksite Hazard Assessment Checklist

Page 2 of 2 Cardno Victoria Pty Ltd

9 May 2014 \\AUMELCFS01.cardno.corp\Apps\WINDOWS\2014\CG140222\Documents\CG140222WHA02.docx

Step 7 - Traffic Management Plan in Practice Reviewed

After the traffic management plan has been implemented, a review should be undertaken to ensure that it is operating as expected. This review should take place before work commences on site (refer also Clause 14 of the Road Management Act, 2004 (Worksite Safety – Traffic Management).

Step 8 - Carry out the Work

The Road Safety (Traffic Management) Regulations 2009 require that a copy of the traffic management plan, a hazard assessment and measures to control identified hazards must be kept at the worksite at all times when workers are present. In addition, all necessary written authorisations as required for the erection of certain traffic control devices shall also be kept at the worksite when workers are present.

For more details of the steps involved in the worksite hazard assessment, refer to The Road Management Act, 2004 (Worksite Safety – Traffic Management) - Part 2 Worksite Hazard Management Process.