Construction site safety is the sole responsibility of the ... · construction site safety note...

5
Construction site safety is the sole responsibility of the contractor. Ducks Unlimited, Inc. shall not assume any responsibility for the safety of the work performed, persons engaged in the work, nearby structures or of other persons on-site. This material, data and information is the property of Ducks Unlimited, Inc. It may not be used or reproduced for any purpose without the prior written consent of an authorized agent of Ducks Unlimited, Inc. Ducks Unlimited, Inc. makes no representation or warranty of any kind regarding this material, data and information, including, but not limited to, the accuracy of the material, data and information or its suitability for any purpose. All use of the material, data and information is at the users sole risk. By using any of this material, data and information, user agrees that Ducks Unlimited, Inc. is not responsible for their use of the material, data and information or the results thereof.

Transcript of Construction site safety is the sole responsibility of the ... · construction site safety note...

Page 1: Construction site safety is the sole responsibility of the ... · construction site safety note construction site safety is the sole responsibility of contractor. ducks unlimited,

Construction site safety is the sole responsibility of the contractor. Ducks Unlimited, Inc. shallnot assume any responsibility for the safety of the work performed, persons engaged in thework, nearby structures or of other persons on-site.

This material, data and information is the property of Ducks Unlimited, Inc. It may not be usedor reproduced for any purpose without the prior written consent of an authorized agent ofDucks Unlimited, Inc. Ducks Unlimited, Inc. makes no representation or warranty of any kindregarding this material, data and information, including, but not limited to, the accuracy of thematerial, data and information or its suitability for any purpose. All use of the material, dataand information is at the users sole risk. By using any of this material, data and information,user agrees that Ducks Unlimited, Inc. is not responsible for their use of the material, data andinformation or the results thereof.

AutoCAD SHX Text
R
AutoCAD SHX Text
JOB SITE
AutoCAD SHX Text
DUCKS UNLIMITED
AutoCAD SHX Text
DUCKS UNLIMITED
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
ABRAHAM
AutoCAD SHX Text
SECTION 24, TOWNSHIP 137N, RANGE 74W
AutoCAD SHX Text
KIDDER COUNTY, ND
AutoCAD SHX Text
ND-591-4 ABRAHAM
AutoCAD SHX Text
CAD FILE:
AutoCAD SHX Text
-
AutoCAD SHX Text
TRE
AutoCAD SHX Text
MMS
AutoCAD SHX Text
KIDDER COUNTY, ND
AutoCAD SHX Text
ABRAHAM RESTORATION
AutoCAD SHX Text
PROJECT LOCATION MAPS
AutoCAD SHX Text
MMS
AutoCAD SHX Text
9/21/2020
AutoCAD SHX Text
SHEET 1
AutoCAD SHX Text
US-ND-591-4
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
SURVEYED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
BOOK NO.
AutoCAD SHX Text
GREAT PLAINS REGIONAL OFFICE
AutoCAD SHX Text
Global Leader in Wetlands & Wildlife Conservation
AutoCAD SHX Text
R
AutoCAD SHX Text
D
AutoCAD SHX Text
UCKS
AutoCAD SHX Text
NLIMITED
AutoCAD SHX Text
U
AutoCAD SHX Text
No.
AutoCAD SHX Text
No.
AutoCAD SHX Text
Revisions
AutoCAD SHX Text
Sheet
AutoCAD SHX Text
Revision
AutoCAD SHX Text
BISMARCK, NORTH DAKOTA
AutoCAD SHX Text
(701) 355-3500
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
By
AutoCAD SHX Text
Date
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
CONSTRUCTION SPECIFICATIONS 201 MOBILIZATION 202 SITE PREPARATION 203 EXCAVATION 204 EMBANKMENT CONSTRUCTION 205 WATER 305 RIPRAP, REVETMENT & AGGREGATE PLACEMENT 402 SEEDING & MULCHINGSEEDING & MULCHING
AutoCAD SHX Text
PLAN INDEX 1. PROJECT LOCATION MAPS PROJECT LOCATION MAPS 2. ESTIMATED QUANTITIES & CONSTRUCTION NOTES ESTIMATED QUANTITIES & CONSTRUCTION NOTES 3. SITE TOPOGRAPHY SITE TOPOGRAPHY 4. PLAN VIEW RESTORATION SITE PLAN VIEW RESTORATION SITE 5. PROFILE VIEWS AND DETAILSPROFILE VIEWS AND DETAILS
AutoCAD SHX Text
NTS
AutoCAD SHX Text
%%UVICINITY MAP
AutoCAD SHX Text
NTS
AutoCAD SHX Text
%%ULOCATION MAP
AutoCAD SHX Text
PROJECT COORDINATES: 46.66637 -99.95432
AutoCAD SHX Text
DIRECTIONS TO SITE: MAP POINT " " IS LOCATED AT THE INTERSECTION OF COUNTY ROAD 10 AND 26TH AVE SE IN STEELE, ND JUST SOUTH OF THE STEELE I-94 EXIT AND EAST OF THE TRAVEL PLAZA IN TOWN. TO SITE FROM MAP POINT: HEAD SOUTH ON 26TH AVE SE TOWARD 5TH ST NE FOR 12 MILES. TURN RIGHT ONTO 50TH ST SE AND CONTINUE FOR 1 MILE. TURN LEFT ONTO 25TH AVE SE AND HEAD SOUTH FOR 1.5 MILES. TURN RIGHT AND HEAD WEST FOR 1 MILE, THEN TURN LEFT ONTO 24TH AVE SE FOR 0.2 MILES TO THE SITE ACCESS/DRIVEWAY, MARKED AS MAP POINT " ".
AutoCAD SHX Text
PROJECT CONTACTS: MADDIE SAYLOR, ENGINEER DUCKS UNLIMITED-BISMARCK, ND 734-645-5030 (MOBILE) DANE BUYSSE, BIOLOGIST DUCKS UNLIMITED-BISMARCK, ND 701-425-4852 (MOBILE) 701-355-3584 (OFFICE)
AutoCAD SHX Text
N
AutoCAD SHX Text
IF THESE PLANS ARE NOT PLOTTED AND/OR REPRODUCED AT THE ORIGINAL SIZE OF 24"x36" ANY SCALE REFERENCED HEREIN SHOULD BE DISREGARDED AND THE PLANS SHOULD BE CONSIDERED "NOT TO SCALE."
AutoCAD SHX Text
N
AutoCAD SHX Text
STEELE, ND
AutoCAD SHX Text
DRISCOLL, ND
AutoCAD SHX Text
SLADE NATIONAL WILDLIFE REFUGE
AutoCAD SHX Text
DAWSON, ND
AutoCAD SHX Text
LAKE ETTA
AutoCAD SHX Text
ALKALI LAKE
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
I-94
AutoCAD SHX Text
I-94
AutoCAD SHX Text
I-94
AutoCAD SHX Text
LONG LAKE
AutoCAD SHX Text
26TH AVE SE
AutoCAD SHX Text
CO. RD. 10
AutoCAD SHX Text
25TH AVE SE
AutoCAD SHX Text
50TH ST SE
AutoCAD SHX Text
25TH AVE SE
AutoCAD SHX Text
24TH AVE SE
AutoCAD SHX Text
WETLAND RESTORATION PROJECT
Page 2: Construction site safety is the sole responsibility of the ... · construction site safety note construction site safety is the sole responsibility of contractor. ducks unlimited,

This material, data and information in these plans is the property of Ducks Unlimited, Inc. It may not be used or reproduced for any purpose without the prior written consent of an authorized agent of Ducks Unlimited, Inc. Ducks Unlimited, Inc.makes no representation or warranty of any kind regarding this material, data and information, including, but not limited to, the accuracy of the material, data and information or its suitability for any purpose. All use of the material, data andinformation is at the users sole risk. By using any of this material, data and information, user agrees that Ducks Unlimited, Inc. is not responsible for their use of the material, data and information or the results thereof.

BID ITEM SHALL INCLUDE LEVELING AND DRAGGING OR DISKING AFTER TOPSOIL IS REPLACED ON

ALL DISTURBED AREAS NOT RECEIVING RIPRAP TO A LEVEL SUITABLE ENOUGH FOR SEEDING (TO BE

DONE BY DUCKS UNLIMITED) AND MULCHING.

RIPRAP SUPPLY SOURCE

SHALL BE IDENTIFIED ON-SITE DURING THE PRE-CONSTRUCTION MEETING. THERE ARE MULTIPLE

EXISTING ROCK PILES ON-SITE; CONTRACTOR TO UTILIZE EXISTING ROCK PILES FOR SPILLWAY.

ROCK CHECK DAM

SUPPLY SOURCE SHALL BE IDENTIFIED ON-SITE DURING THE PRE-CONSTRUCTION MEETING. THERE

ARE MULTIPLE EXISTING ROCK PILES ON-SITE; CONTRACTOR TO UTILIZE EXISTING ROCK PILES FOR

ROCK CHECK DAMS.

NOTE: CONTRACTOR MUST PREPARE TOPSOIL PRIOR TO SEEDING (TO

BE DONE BY DUCKS UNLIMITED) AND MULCHING; SEE SITE PREPARATION CONSTRUCTION NOTE #2

FOR TOPSOIL PREPARATION.

ESTIMATED QUANTITIES

NOTE SPEC.# ITEM UNIT QUANTITY

MOBILIZATION

SITE PREPARATION

EXCAVATION

EMBANKMENT

WATER

RIPRAP, REVETMENT AND AGGREGATE PLACEMENT

SEEDING & MULCHING

AutoCAD SHX Text
ND-591-4 ABRAHAM
AutoCAD SHX Text
CAD FILE:
AutoCAD SHX Text
-
AutoCAD SHX Text
TRE
AutoCAD SHX Text
MMS
AutoCAD SHX Text
ABRAHAM RESTORATION
AutoCAD SHX Text
ESTIMATED QUANTITIES &
AutoCAD SHX Text
MMS
AutoCAD SHX Text
9/21/2020
AutoCAD SHX Text
SHEET 2
AutoCAD SHX Text
US-ND-591-4
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
SURVEYED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
BOOK NO.
AutoCAD SHX Text
GREAT PLAINS REGIONAL OFFICE
AutoCAD SHX Text
Global Leader in Wetlands & Wildlife Conservation
AutoCAD SHX Text
R
AutoCAD SHX Text
D
AutoCAD SHX Text
UCKS
AutoCAD SHX Text
NLIMITED
AutoCAD SHX Text
U
AutoCAD SHX Text
No.
AutoCAD SHX Text
No.
AutoCAD SHX Text
Revisions
AutoCAD SHX Text
Sheet
AutoCAD SHX Text
Revision
AutoCAD SHX Text
BISMARCK, NORTH DAKOTA
AutoCAD SHX Text
(701) 355-3500
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
By
AutoCAD SHX Text
Date
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
UTILITIES NOTE BEFORE THE START OF CONSTRUCTION, THE OWNER OF ANY UTILITIES INVOLVED MUST BE NOTIFIED. THE CONTRACTOR IS RESPONSIBLE FOR GIVING THIS NOTICE BY CALLING 811 OR GOING TO NDONECALL.COM AT LEAST 48 HOURS PRIOR TO ANY EXCAVATION.
AutoCAD SHX Text
CONSTRUCTION NOTES: 1. BID ITEM FOR MOBILIZATION SHALL INCLUDE EQUIPMENT, LABOR AND ALL OTHER ASSOCIATED COSTS BID ITEM FOR MOBILIZATION SHALL INCLUDE EQUIPMENT, LABOR AND ALL OTHER ASSOCIATED COSTS REQUIRED TO TRANSPORT ALL EQUIPMENT, LABOR, AND MATERIAL TO AND FROM PROJECT SITE TO SUCCESSFULLY COMPLETE THE PROJECT AS DETAILED IN THESE PLANS AND SPECIFICATIONS. PAYMENT WILL BE MADE ON THE CONTRACTOR'S LUMP SUM(L.S.) PRICE. 2. SITE PREPARATION BID ITEM SHALL INCLUDE STRIPPING A MINIMUM OF 6" TOPSOIL BENEATH SITE PREPARATION BID ITEM SHALL INCLUDE STRIPPING A MINIMUM OF 6" TOPSOIL BENEATH EMBANKMENT, BORROW AREA, EMERGENCY SPILLWAY, AND CHANNEL FOOTPRINTS. TOPSOIL SHALL BE STOCKPILED AND REPLACED OVER DISTURBED AREAS NOT RECEIVING RIPRAP. IF ADDITIONAL TOPSOIL REMAINS FROM THE CHANNEL EXCAVATION, THIS TOPSOIL SHALL BE SPREAD ON TOP OF EMBANKMENT. SEE SHEET 4 FOR FOOTPRINT AREAS. PAYMENT WILL BE MADE ON THE CONTRACTOR'S LUMP SUM (L.S.) PRICE. 3. BID ITEM FOR EXCAVATION SHALL INCLUDE ALL WORK REQUIRED TO EXCAVATE THE CHANNEL AS BID ITEM FOR EXCAVATION SHALL INCLUDE ALL WORK REQUIRED TO EXCAVATE THE CHANNEL AS DETAILED AND NOTED ON SHEETS 4-5. THIS INCLUDES GRADING CHANNEL TO SLOPE AS SHOWN ON SHEETS 4-5. PRIOR TO EXCAVATION, CONTRACTOR WILL STRIP 6" TOPSOIL AS DESCRIBED IN CONSTRUCTION NOTE #2. ALL EXCAVATED MATERIAL OTHER THAN TOPSOIL WILL BE REMOVED FROM CHANNEL LOCATION AND PLACED ON DOWNSTREAM SLOPE OF EMBANKMENT TO FLATTEN AND THICKEN SLOPE, SEE DETAILS AND NOTES SHEETS 4-5. EXCAVATION QUANTITY SHOWN DOES NOT INCLUDE SITE PREPARATION; SITE PREPARATION TO BE PAID FOR UNDER SITE PREPARATION LINE ITEM. BID ITEM IS BASED ON CUBIC YARD PLAN (C.Y.-P.), THERE WILL BE NO ADJUSTMENT MADE FOR INCREASE OR DECREASE TO QUANTITY. 4. BID ITEM FOR EMBANKMENT SHALL INCLUDE ALL WORK REQUIRED TO CONSTRUCT THE EMBANKMENT BID ITEM FOR EMBANKMENT SHALL INCLUDE ALL WORK REQUIRED TO CONSTRUCT THE EMBANKMENT AS DETAILED AND NOTED ON SHEETS 4-5. MATERIAL SHALL BE TAKEN FROM DESIGNATED BORROW AREA AS SHOWN ON SHEET 4. BORROW AREA EXCAVATION NOT TO EXCEED 24" DEPTH FROM TOP OF EXISTING GROUND. MATERIAL SHALL BE PLACED AND COMPACTED AS DESCRIBED IN EMBANKMENT SPECIFICATION 204. QUANTITY IS BASED ON CUBIC YARD PLAN (C.Y.-P.), THERE WILL BE NO ADJUSTMENT MADE FOR INCREASE OR DECREASE TO QUANTITY. EMERGENCY SPILLWAY EXCAVATION IS CONSIDERED "INCIDENTAL" TO THIS LINE ITEM; TOPSOIL FROM EMERGENCY SPILLWAY SHALL BE PLACED ON EMBANKMENT AND/OR OTHER DISTURBED AREAS NOT RECEIVING RIPRAP. 5. BID ITEM FOR WATER SHALL INCLUDE THE SUPPLY OF ALL LABOR, MATERIAL, AND EQUIPMENT BID ITEM FOR WATER SHALL INCLUDE THE SUPPLY OF ALL LABOR, MATERIAL, AND EQUIPMENT REQUIRED TO ADD WATER TO EMBANKMENTS. THIS BID ITEM INCLUDES LOCATING A WATER SOURCE AND DELIVERING WATER TO SITE. WATER SHALL BE APPLIED TO THE EMBANKMENT AREAS AS SPECIFIED IN DU CONSTRUCTION SPEC 205. PAYMENT WILL BE MADE ON THE CONTRACTOR'S MGAL(M.G.) PRICE FOR WATER. IT IS NOT ANTICIPATED THAT WATER WILL BE REQUIRED FOR THIS PROJECT. 6. BID ITEM FOR RIPRAP DU CLASS I (OR EQUIVALENT) SPILLWAY, 12" DEPTH IS AS SHOWN ON THE BID ITEM FOR RIPRAP DU CLASS I (OR EQUIVALENT) SPILLWAY, 12" DEPTH IS AS SHOWN ON THE PLANS. NON-WOVEN FILTER FABRIC IS REQUIRED BENEATH ROCK RIPRAP IN PRIMARY SPILLWAY LOCATION AND SHALL BE SECURED TO SLOPES AND BOTTOM USING PINS AS NOTED IN SPECIFICATION 305. EXCAVATION REQUIRED FOR ROCK RIPRAP AND PLACEMENT SHALL ALSO BE PAID FOR UNDER THIS LINE ITEM. CONTRACTOR WILL BE PAID FOR THE ACTUAL QUANTITY INSTALLED. QUANTITIES ARE BASED ON TONS, AS MEASURED BY THE AREA OF RIPRAP REQUIRED FOR A DEPTH OF 12" AND A CONVERSION OF 2 TONS PER C.Y. RIPRAP. FINAL QUANTITY WILL BE DETERMINED BY AREA RECEIVING RIPRAP MULTIPLIED BY THE CONVERSION FACTOR OF 2 TONS PER C.Y. RIPRAP SUPPLY SOURCE 7. BID ITEM FOR RIPRAP DU CLASS I (OR EQUIVALENT) ROCK CHECK DAMS IS AS SHOWN ON THE BID ITEM FOR RIPRAP DU CLASS I (OR EQUIVALENT) ROCK CHECK DAMS IS AS SHOWN ON THE PLANS. NON-WOVEN FILTER FABRIC IS REQUIRED BENEATH ROCK CHECK DAMS IN EXCAVATED CHANNEL LOCATIONS AND SHALL BE SECURED TO SLOPES AND BOTTOM USING PINS AS NOTED IN SPECIFICATION 305. EXCAVATION REQUIRED FOR ROCK CHECK DAMS AND PLACEMENT SHALL ALSO BE PAID FOR UNDER THIS LINE ITEM. CONTRACTOR WILL BE FOR THE NUMBER OF ROCK CHECK DAMS INSTALLED. SEE SHEETS 4-5 FOR ROCK CHECK DAM LOCATIONS AND DETAILS. PAYMENT FOR ROCK CHECK DAMS WILL BE MADE ON THE CONTRACTOR'S EACH (E.A.) UNIT PRICE. ROCK CHECK DAM 8. BID ITEM FOR MULCHING SHALL INCLUDE THE MATERIALS, EQUIPMENT AND LABOR REQUIRED TO BID ITEM FOR MULCHING SHALL INCLUDE THE MATERIALS, EQUIPMENT AND LABOR REQUIRED TO MULCH ALL DISTURBED AREAS. NOTE: CONTRACTOR MUST PREPARE TOPSOIL PRIOR TO SEEDING (TO STRAW MULCH SHALL BE APPLIED TO ALL DISTURBED AREAS RECEIVING SEED (SEEDING TO BE DONE BY DUCKS UNLIMITED PRIOR TO MULCHING) AND/OR AS DIRECTED BY THE DU FIELD REPRESENTATIVE AT A RATE OF 2 TONS/ACRE. CONTRACTOR TO UNIFORMLY COVER SEEDED AREAS WITH MULCH WITHIN 24 HOURS AFTER SEEDING HAS BEEN INITIATED. CONTRACTOR SHALL NOT PERFORM MULCHING OPERATIONS WHEN SUSTAINED WIND VELOCITY IS GREATER THAN 25 MPH. CONTRACTOR SHALL AVOID PLACING EXCESSIVE COVER/MULCH THAT SMOTHERS SEEDLINGS. BID ITEM FOR MULCHING SHALL ALSO INCLUDE ANCHORING MULCH INTO TOPSOIL AFTER SEEDING IS INITIATED. MULCH SHALL BE ANCHORED USING PUNCHING METHOD IMMEDIATELY FOLLOWING APPLICATION. TILLER SHALL BE OPERATED PARALLEL TO THE CONTOURS OF THE GROUND. CONTRACTOR TO PUSH MULCH INTO THE SOIL A MINIMUM OF 3 INCHES, WITH THE ENDS OF THE MULCH EXPOSED ABOVE THE SOIL SURFACE. SEE CONSTRUCTION SPECIFICATION 402 FOR ADDITIONAL DETAILS. PAYMENT WILL BE BASED ON ACTUAL ACRES MULCHED AFTER FINAL COMPLETION OF PROJECT. THIS WILL BE DETERMINED BY DU FIELD REPRESENTATIVE. SEEDING NOTE: SEEDING TO BE DONE BY DUCKS UNLIMITED. AS DESCRIBED IN SITE PREPARATION CONSTRUCTION NOTE, CONTRACTOR TO LEVEL AND DRAG/DISK DISTURBED AREAS NOT RECEIVING RIPRAP AFTER TOPSOIL IS REPLACED; CONTRACTOR TO LEAVE ALL DISTURBED AREAS NOT RECEIVING RIPRAP IN A CONDITION SUITABLE ENOUGH FOR SEEDING.
AutoCAD SHX Text
A NOTE CONCERNING INVASIVE SPECIES REQUIREMENTS THE CONTRACTOR SHALL PREVENT INVASIVE SPECIES FROM ENTERING INTO OR SPREADING WITHIN A PROJECT SITE BY CLEANING EQUIPMENT AND CLOTHING PRIOR TO ARRIVING AT THE PROJECT SITE. THE DU FIELD REPRESENTATIVE MAY INSPECT ALL EQUIPMENT AT THE STAGING AREA DETERMINED AT THE PRE-CONSTRUCTION MEETING. IF EQUIPMENT ARRIVES AT THE PROJECT SITE WITH SOIL, AGGREGATE MATERIAL, MULCH, VEGETATION (INCLUDING SEEDS) OR ANIMALS, IT SHALL BE CLEANED BY CONTRACTOR-FURNISHED TOOL OR EQUIPMENT (BRUSH/BROOM, COMPRESSED AIR, OR PRESSURE WASHER) AT THE STAGING AREA. THE CONTRACTOR SHALL DISPOSE OF MATERIAL CLEANED FROM EQUIPMENT AT A LOCATION DETERMINED BY THE DU FIELD REPRESENTATIVE. IF MATERIAL CANNOT BE DISPOSED OF ONSITE, SECURE MATERIAL PRIOR TO TRANSPORT (SEALED CONTAINER, COVERED TRUCK, OR WRAP WITH TARP) AND LEGALLY DISPOSE OF OFFSITE.
AutoCAD SHX Text
1
AutoCAD SHX Text
201
AutoCAD SHX Text
L.S.
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
202
AutoCAD SHX Text
L.S.
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
203
AutoCAD SHX Text
C.Y.-P.
AutoCAD SHX Text
221
AutoCAD SHX Text
4
AutoCAD SHX Text
204
AutoCAD SHX Text
C.Y.-P.
AutoCAD SHX Text
4487
AutoCAD SHX Text
5
AutoCAD SHX Text
205
AutoCAD SHX Text
M.G.
AutoCAD SHX Text
45
AutoCAD SHX Text
305
AutoCAD SHX Text
6
AutoCAD SHX Text
PRIMARY SPILLWAY
AutoCAD SHX Text
TON
AutoCAD SHX Text
120
AutoCAD SHX Text
7
AutoCAD SHX Text
ROCK CHECK DAM
AutoCAD SHX Text
E.A.
AutoCAD SHX Text
4
AutoCAD SHX Text
402
AutoCAD SHX Text
8
AutoCAD SHX Text
MULCHING
AutoCAD SHX Text
ACRE
AutoCAD SHX Text
4
AutoCAD SHX Text
CONSTRUCTION SITE SAFETY NOTE CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF CONTRACTOR. DUCKS UNLIMITED, INC. SHALL NOT ASSUME ANY RESPONSIBILITY FOR THE SAFETY OF THE WORK PERFORMED. PERSONS ENGAGED IN THE WORK, NEARBY STRUCTURES, OR OF OTHER PERSONS ON-SITE.
AutoCAD SHX Text
CONSTRUCTION NOTES
Page 3: Construction site safety is the sole responsibility of the ... · construction site safety note construction site safety is the sole responsibility of contractor. ducks unlimited,
AutoCAD SHX Text
APPROX. PROPERTY LINE
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
EXISTING FENCELINE
AutoCAD SHX Text
SWALE
AutoCAD SHX Text
CONTROL POINT
AutoCAD SHX Text
EXISTING OF ROAD
AutoCAD SHX Text
ND-591-4 ABRAHAM
AutoCAD SHX Text
CAD FILE:
AutoCAD SHX Text
-
AutoCAD SHX Text
TRE
AutoCAD SHX Text
MMS
AutoCAD SHX Text
ABRAHAM RESTORATION
AutoCAD SHX Text
SITE TOPOGRAPHY
AutoCAD SHX Text
MMS
AutoCAD SHX Text
9/21/2020
AutoCAD SHX Text
SHEET 3
AutoCAD SHX Text
US-ND-591-4
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
SURVEYED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
BOOK NO.
AutoCAD SHX Text
GREAT PLAINS REGIONAL OFFICE
AutoCAD SHX Text
Global Leader in Wetlands & Wildlife Conservation
AutoCAD SHX Text
R
AutoCAD SHX Text
D
AutoCAD SHX Text
UCKS
AutoCAD SHX Text
NLIMITED
AutoCAD SHX Text
U
AutoCAD SHX Text
No.
AutoCAD SHX Text
No.
AutoCAD SHX Text
Revisions
AutoCAD SHX Text
Sheet
AutoCAD SHX Text
Revision
AutoCAD SHX Text
BISMARCK, NORTH DAKOTA
AutoCAD SHX Text
(701) 355-3500
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
By
AutoCAD SHX Text
Date
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
0
AutoCAD SHX Text
25
AutoCAD SHX Text
50
AutoCAD SHX Text
100
AutoCAD SHX Text
N
AutoCAD SHX Text
HORIZONTAL CONTROL- COORDINATES ARE BASED ON UTM ZONE COORDINATES ARE BASED ON UTM ZONE 14 NORTH, IN US SURVEY FEET ON THE NORTH AMERICAN DATUM OF 1983. VERTICAL CONTROL- WAS ESTABLISHED USING GEOID 12A CONUS WAS ESTABLISHED USING GEOID 12A CONUS WITH THE ELEVATIONS ON THE NORTH AMERICAN VERTICAL DATUM OF 1988. TRIMBLE R10 GPS RECEIVER USED, RTK BASED ON THE MID STATES VRS SYSTEM.
AutoCAD SHX Text
APPROXIMATE PROPERTY LINE
Page 4: Construction site safety is the sole responsibility of the ... · construction site safety note construction site safety is the sole responsibility of contractor. ducks unlimited,
AutoCAD SHX Text
APPROX. PROPERTY LINE
AutoCAD SHX Text
ND-591-4 ABRAHAM
AutoCAD SHX Text
CAD FILE:
AutoCAD SHX Text
-
AutoCAD SHX Text
TRE
AutoCAD SHX Text
MMS
AutoCAD SHX Text
ABRAHAM RESTORATION
AutoCAD SHX Text
PLAN VIEW RESTORATION SITE
AutoCAD SHX Text
MMS
AutoCAD SHX Text
9/21/2020
AutoCAD SHX Text
SHEET 4
AutoCAD SHX Text
US-ND-591-4
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
SURVEYED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
BOOK NO.
AutoCAD SHX Text
GREAT PLAINS REGIONAL OFFICE
AutoCAD SHX Text
Global Leader in Wetlands & Wildlife Conservation
AutoCAD SHX Text
R
AutoCAD SHX Text
D
AutoCAD SHX Text
UCKS
AutoCAD SHX Text
NLIMITED
AutoCAD SHX Text
U
AutoCAD SHX Text
No.
AutoCAD SHX Text
No.
AutoCAD SHX Text
Revisions
AutoCAD SHX Text
Sheet
AutoCAD SHX Text
Revision
AutoCAD SHX Text
BISMARCK, NORTH DAKOTA
AutoCAD SHX Text
(701) 355-3500
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
By
AutoCAD SHX Text
Date
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
0
AutoCAD SHX Text
25
AutoCAD SHX Text
50
AutoCAD SHX Text
100
AutoCAD SHX Text
N
AutoCAD SHX Text
WETLAND FSL ELEV. 1815.0' WETLAND AREA = ±7.6 ACRE
AutoCAD SHX Text
CONSTRUCTED EMBANKMENT TOP ELEV. = 1817.0' TOP WIDTH = 12' WITH 4:1 SLOPES TOTAL FILL = 4,487 CY-P FOOTPRINT AREA = 0.82 ACRE SURFACE SHOWN IS COMPACTED FILL.
AutoCAD SHX Text
CONSTRUCT 40' PRIMARY SPILLWAY. CREST (TOP OF ROCK) ELEV.=1815.0'. CREST DIM. = 12'W x 40'L. FOOTPRINT AREA = 0.1 ACRE SEE NOTES THIS SHEET AND SHEET 5 FOR DETAILS.
AutoCAD SHX Text
PRIMARY SPILLWAY RIPRAP DU CLASS 1 ROCK RIPRAP OR EQUIVALENT ROCK ON-SITE, 12" DEPTH WITH NON-WOVEN FILTER FABRIC BENEATH. COVER ALL SIDE-SLOPES AND CONTROL SECTION. SEE NOTE SHEET 2. ESTIMATED QTY = 120 TON. SPILLWAY EXCAVATION SHALL BE CONSIDERED "INCIDENTAL" TO EMBANKMENT CONSTRUCTION,
AutoCAD SHX Text
SITE PREPARATION NOTE: THE CONTRACTOR WILL STRIP 6" DEPTH TOPSOIL BENEATH THE EMBANKMENT, STOCKPILE, AND UPON COMPLETION OF COMPACTED FILL PLACE MINIMUM 4" DEPTH TOPSOIL OVER SIDE SLOPES AND TOP. CONTRACTOR WILL STRIP 6" DEPTH TOPSOIL OVER PRIMARY SPILLWAY FOOTPRINT NOT RECEIVING RIPRAP, STOCKPILE, AND UPON COMPLETION PLACE MINIMUM 4" DEPTH TOPSOIL OVER DISTURBED AREAS. BOTTOM OF SPILLWAY INCLUDES FINISHED GROUND. CONTRACTOR WILL STRIP 6" DEPTH TOPSOIL OVER BORROW AREA AS SHOWN THIS SHEET. TOPSOIL WILL BE STOCKPILED AND REPLACED OVER BORROW AREA BLENDING INTO EXISTING LANDSCAPE AS DETERMINED IN THE FIELD BY THE DU FIELD REPRESENTATIVE. CONTRACTOR SHALL STRIP 6" DEPTH TOPSOIL BENEATH THE CHANNEL EXCAVATION FOOTPRINT, STOCKPILE, AND UPON COMPLETION OF EXCAVATION PLACE MINIMUM 4" DEPTH TOPSOIL OVER SIDE SLOPES AND BOTTOM AREAS NOT RECEIVING RIPRAP (ROCK CHECK DAMS). IF ADDITIONAL TOPSOIL IS AVAILABLE, CONTRACTOR SHALL PLACE ON EMBANKMENT. ALL TOPSOIL SHALL BE LEVELED AND DRAGGED SUITABLE ENOUGH FOR SEEDING. EMBANKMENT AND SPILLWAY NOTE: THE CONTRACTOR WILL CONSTRUCT THE EMBANKMENT WITH 12' WIDE TOP, 4:1 UPSTREAM/DOWNSTREAM SLOPES. MATERIAL SHALL COME FROM BORROW AREA AS SHOWN THIS SHEET & CONTRACTOR WILL PLACE AND COMPACT AS DESCRIBED IN EMBANKMENT SPECIFICATION 204. QUANTITY IS BASED ON CUBIC YARD PLAN, THEREFORE THERE WILL BE NO ADJUSTMENT MADE FOR INCREASE OR DECREASE TO QUANTITY. IF WATER IS NEEDED TO OBTAIN THE SPECIFIED COMPACTION OF 95% THEN IT SHALL BE PAID FOR BASED ON THE CONTRACTOR'S UNIT BID PRICE FOR "WATER". ALL EXCAVATED MATERIAL FROM CHANNEL EXCAVATION (NOT INCLUDING TOPSOIL) SHALL BE SPOILED ON THE DOWNSTREAM SLOPE OF THE EMBANKMENT OR MAY BE USED TO CONSTRUCT THE EMBANKMENT IF SOILS ARE SUITABLE AS DETERMINED BY THE DU FIELD REPRESENTATIVE. THE CHANNEL EXCAVATION MATERIAL MAY BE USED TO FLATTEN AND THICKEN THE DOWNSTREAM SIDE SLOPE OF THE EMBANKMENT; EXACT SLOPES WILL BE DETERMINED IN THE FIELD BUT SHALL BE UNIFORM IN SHAPE ON THE DOWNSTREAM SIDE AND BE LEVELED SUITABLE ENOUGH FOR SEEDING. EXCAVATION OF THE PRIMARY SPILLWAY SHALL BE CONSIDERED "INCIDENTAL" TO EMBANKMENT CONSTRUCTION.
AutoCAD SHX Text
SITE ACCESS/PARKING
AutoCAD SHX Text
CHANNEL EXCAVATION 15' BOTTOM WIDTH 10:1 SIDE SLOPES CHANNEL SLOPE = 0.53% TOTAL EXCAVATION = 221 CY-P FOOTPRINT AREA = 0.66 ACRE SEE SHEET 5 FOR DETAILS.
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
EXISTING FENCELINE
AutoCAD SHX Text
SWALE
AutoCAD SHX Text
CONTROL POINT
AutoCAD SHX Text
EXISTING OF ROAD
AutoCAD SHX Text
APPROXIMATE PROPERTY LINE
AutoCAD SHX Text
CHANNEL EXCAVATION NOTE: THE CONTRACTOR WILL EXCAVATE THE CHANNEL WITH 15' WIDE BOTTOM AND 10:1 SIDE SLOPES AT A 0.53% SLOPE AS SHOWN ON SHEET 5. PRIOR TO EXCAVATION, CONTRACTOR WILL STRIP 6" TOPSOIL AS DESCRIBED IN CONSTRUCTION NOTE #2 ON SHEET 2. ALL EXCAVATED MATERIAL OTHER THAN TOPSOIL WILL BE REMOVED FROM CHANNEL LOCATION AND PLACED ON DOWNSTREAM SLOPE OF EMBANKMENT TO FLATTEN AND THICKEN SLOPE, SEE DETAILS AND NOTES SHEETS 4-5. RIPRAP NOTE: RIPRAP DU CLASS I (OR EQUIVALENT) REQUIRED, 12" DEPTH AS SHOWN ON SHEET 5 FOR PRIMARY SPILLWAY AND DEPTH AS SHOWN ON SHEET 5 FOR ROCK CHECK DAMS. NON-WOVEN FILTER FABRIC IS REQUIRED BENEATH ROCK RIPRAP IN PRIMARY SPILLWAY LOCATION AND ROCK CHECK DAM LOCATIONS AND SHALL BE SECURED TO SLOPES AND BOTTOM USING PINS AS NOTED IN SPECIFICATION 305. RIPRAP SUPPLY SOURCE SHALL BE IDENTIFIED ON-SITE DURING THE PRE-CONSTRUCTION MEETING. THERE ARE MULTIPLE EXISTING ROCK PILES ON-SITE; CONTRACTOR TO UTILIZE EXISTING ROCK PILES FOR SPILLWAY. SEE SHEET 2 FOR ADDITIONAL NOTES. MULCHING NOTE: CONTRACTOR TO APPLY STRAW MULCH TO ALL DISTURBED AREAS RECEIVING SEED (SEEDING TO BE DONE BY DUCKS UNLIMITED PRIOR TO MULCHING) AND/OR AS DIRECTED BY THE DU FIELD REPRESENTATIVE AT A RATE OF 2 TONS/ACRE. CONTRACTOR TO UNIFORMLY COVER SEEDED AREAS WITH MULCH WITHIN 24 HOURS AFTER SEEDING HAS BEEN INITIATED. CONTRACTOR SHALL ALSO ANCHOR MULCH INTO TOPSOIL AFTER SEEDING IS INITIATED. SEE CONSTRUCTION SPECIFICATION 402 AND CONSTRUCTION NOTES ON SHEET 2 FOR ADDITIONAL DETAILS.
AutoCAD SHX Text
INSTALL ROCK CHECK DAMS ALONG EXCAVATED CHANNEL. SEE NOTES AND DETAILS THIS SHEET AND SHEET 5.
AutoCAD SHX Text
MULCHING AREAS*: BORROW AREA 2.0 ACRE 2.0 ACRE PRIMARY SPILLWAY 0.5 ACRE 0.5 ACRE CHANNEL 0.7 ACRE 0.7 ACRE EMBANKMENT 0.8 ACRE 0.8 ACRE *APPLICATION RATE = 2 TON/ACRE
Page 5: Construction site safety is the sole responsibility of the ... · construction site safety note construction site safety is the sole responsibility of contractor. ducks unlimited,

1817.84

1814.81

1812.69

1811.93

1811.39

1811.05

1811.96

1812.56

1812.93

1813.29

1813.55

1813.50

1813.81

1813.77

1814.26

1814.49

1814.97

1814.98

1815.68

1817.68

1814.67

1815.34

1815.16

1814.96

1814.54

1814.05

1813.89

1813.76

1813.33

1813.42

1813.06

1812.89

1812.73

1812.56

1812.24

1811.57

1810.91

1810.26

1814.93

1815.14

1815.38

1814.64

1814.14

AutoCAD SHX Text
STRIP 6" DEPTH TOPSOIL BENEATH SPILLWAY FOOTPRINT, STOCKPILE, AND UPON COMPLETION OF EXCAVATION, PLACE MINIMUM 4" DEPTH TOPSOIL OVER SIDE SLOPES AND BOTTOM NOT RECEIVING RIPRAP. SEE NOTE SHEET 4.
AutoCAD SHX Text
ND-591-4 ABRAHAM
AutoCAD SHX Text
CAD FILE:
AutoCAD SHX Text
-
AutoCAD SHX Text
TRE
AutoCAD SHX Text
MMS
AutoCAD SHX Text
ABRAHAM RESTORATION
AutoCAD SHX Text
PROFILE VIEWS AND DETAILS
AutoCAD SHX Text
MMS
AutoCAD SHX Text
9/21/2020
AutoCAD SHX Text
SHEET 5
AutoCAD SHX Text
US-ND-591-4
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
SURVEYED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
BOOK NO.
AutoCAD SHX Text
GREAT PLAINS REGIONAL OFFICE
AutoCAD SHX Text
Global Leader in Wetlands & Wildlife Conservation
AutoCAD SHX Text
R
AutoCAD SHX Text
D
AutoCAD SHX Text
UCKS
AutoCAD SHX Text
NLIMITED
AutoCAD SHX Text
U
AutoCAD SHX Text
No.
AutoCAD SHX Text
No.
AutoCAD SHX Text
Revisions
AutoCAD SHX Text
Sheet
AutoCAD SHX Text
Revision
AutoCAD SHX Text
BISMARCK, NORTH DAKOTA
AutoCAD SHX Text
(701) 355-3500
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
By
AutoCAD SHX Text
Date
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
INSTALL DU CLASS I OR EQUIVALENT ROCK RIPRAP @ 12" DEPTH WITH NON-WOVEN FILTER FABRIC BENEATH ALONG 20:1 SLOPES AND 12'x40' WIDE PRIMARY SPILLWAY CONTROL SECTION. TOP OF ROCK ELEV. 1815.0'. SEE DETAILS AND NOTES THIS SHEET AND SHEET 4. 120 TON TOTAL.
AutoCAD SHX Text
EXISTING GROUND
AutoCAD SHX Text
EXISTING GROUND
AutoCAD SHX Text
STRIP 6" DEPTH TOPSOIL BENEATH EMBANKMENT AND SPILLWAY FOOTPRINT, STOCKPILE, AND UPON COMPLETION OF FILL, PLACE MINIMUM 4" DEPTH TOPSOIL OVER DISTURBED AREAS NOT RECEIVING RIPRAP. SEE NOTE SHEET 4.
AutoCAD SHX Text
TOP COMPACTED FILL ELEV. 1817.0' TOTAL FILL = 4,487 CY-P
AutoCAD SHX Text
INSTALL DU CLASS I OR EQUIVALENT ROCK RIPRAP @ 12" DEPTH WITH NON-WOVEN FILTER FABRIC BENEATH ALONG 20:1 SLOPES AND 12'x40' WIDE PRIMARY SPILLWAY CONTROL SECTION. TOP OF ROCK ELEV. 1815.0'. SEE DETAILS AND NOTES THIS SHEET AND SHEET 4. 120 TON TOTAL.
AutoCAD SHX Text
FINISHED GROUND SPILLWAY ELEV. 1815.0'
AutoCAD SHX Text
STRIP 6" DEPTH TOPSOIL BENEATH CHANNEL FOOTPRINT, STOCKPILE, AND UPON COMPLETION OF EXCAVATION, PLACE MINIMUM 4" DEPTH TOPSOIL OVER DISTURBED AREAS NOT RECEIVING RIPRAP. SEE NOTE SHEET 4.
AutoCAD SHX Text
INSTALL ROCK CHECK DAMS ALONG EXCAVATED CHANNEL. SEE NOTES AND DETAILS THIS SHEET.
AutoCAD SHX Text
EXISTING GROUND
AutoCAD SHX Text
TOP COMPACTED CHANNEL; VARIABLE ELEVATION. CHANNEL GRADE 0.53% TOTAL CUT = 221 CY-P
AutoCAD SHX Text
EMBANKMENT
AutoCAD SHX Text
TOP FINISHED SURFACE (TOPSOIL) ELEV. ±1817.4'
AutoCAD SHX Text
FSL 1815.0'
AutoCAD SHX Text
TOP COMPACTED FILL ELEV. 1817.0'
AutoCAD SHX Text
TYPICAL EMBANKMENT SECTION NTS
AutoCAD SHX Text
TYPICAL ROCK CHECK NTS
AutoCAD SHX Text
TYPICAL ROCK CHECK NTS
AutoCAD SHX Text
TOE OF RIPRAP SHALL BE A MINIMUM 0.5' HIGHER ON ENDS THAN CENTER TO CONCENTRATE FLOW IN THE CENTER OF CHANNEL.
AutoCAD SHX Text
GEOTEXTILE FABRIC LINER ALONG BOTTOM OF RIPRAP.
AutoCAD SHX Text
DU CLASS I (OR EQUIVALENT) RIPRAP
AutoCAD SHX Text
DITCH PROFILE
AutoCAD SHX Text
GEOTEXTILE FABRIC LINER ALONG BOTTOM OF RIPRAP.
AutoCAD SHX Text
"EQUIVALENT ROCK RIPRAP" REFERS TO AVAILABLE ROCK RIPRAP ON-SITE MATCHING SIZE REQUIREMENT FOR DU CLASS I ROCK RIPRAP (6"-12" MIX). THERE ARE EXISTING ROCK RIPRAP PILES ON THE PROPERTY; CONTRACTOR SHALL UTILIZE EXISTING ROCK RIPRAP ON-SITE FOR SPILLWAY AND ROCK CHECK DAM CONSTRUCTION.