Construction Programme Team Six Building teachers Two Swedish and English teachers One Mathematic...
-
Upload
rodrigo-dominy -
Category
Documents
-
view
219 -
download
0
Transcript of Construction Programme Team Six Building teachers Two Swedish and English teachers One Mathematic...
![Page 1: Construction Programme Team Six Building teachers Two Swedish and English teachers One Mathematic teatcher Satellite teachers One teacher is responsible.](https://reader034.fdocuments.net/reader034/viewer/2022051819/551656da550346b2068b5b25/html5/thumbnails/1.jpg)
Construction Programme
Team• Six Building teachers• Two Swedish and
English teachers• One Mathematic
teatcher• Satellite teachers • One teacher is
responsible for APU
Per Lennart Karin Runo
Agne Margareta Simon Joakim
![Page 2: Construction Programme Team Six Building teachers Two Swedish and English teachers One Mathematic teatcher Satellite teachers One teacher is responsible.](https://reader034.fdocuments.net/reader034/viewer/2022051819/551656da550346b2068b5b25/html5/thumbnails/2.jpg)
Construction Programme
• For you who• You learn• The aim at
housebuilding• Theoretical studies • The first year• The second year• The third year• After the education• Education time
![Page 3: Construction Programme Team Six Building teachers Two Swedish and English teachers One Mathematic teatcher Satellite teachers One teacher is responsible.](https://reader034.fdocuments.net/reader034/viewer/2022051819/551656da550346b2068b5b25/html5/thumbnails/3.jpg)
Programme structure• Core subjekt courses 750p• Common specific courses 500p• Branch courses (four national) 300p
- Building (Aranäsgymnasiet)- Construction- Painting- Plate working
• Profile courses 550p• Individual choice 300p• Project work 100p
Complete points:2500p
![Page 4: Construction Programme Team Six Building teachers Two Swedish and English teachers One Mathematic teatcher Satellite teachers One teacher is responsible.](https://reader034.fdocuments.net/reader034/viewer/2022051819/551656da550346b2068b5b25/html5/thumbnails/4.jpg)
Profile courses (Aranäsgymnasiet)
Carpenter Bricklayer Concrete worker
Shuttering Brickwork B Reinforcement A+B
Main structure Plastering Concrete
Cladding Chimneys and open fires
Plastering
Building insulation Building insulation Building insulation
Joinery and interior
fittings
Ceramic tiles Shuttering
![Page 5: Construction Programme Team Six Building teachers Two Swedish and English teachers One Mathematic teatcher Satellite teachers One teacher is responsible.](https://reader034.fdocuments.net/reader034/viewer/2022051819/551656da550346b2068b5b25/html5/thumbnails/5.jpg)
Courses that must be offered as optional courses
• English B
• Mathematics B
![Page 6: Construction Programme Team Six Building teachers Two Swedish and English teachers One Mathematic teatcher Satellite teachers One teacher is responsible.](https://reader034.fdocuments.net/reader034/viewer/2022051819/551656da550346b2068b5b25/html5/thumbnails/6.jpg)
Points Hours Holidaytime Time. Tot.
0
0
0200 0
sum: 0 0 0
0
0
0100 0
sum: 0 0 0
0
0
0
0150 0
sum: 0 0 0
0
050 0
sum: 0 0 0
0
0
0100 0
sum: 0 0 0
0
0
0100 0
sum: 0 0 0
0
0
0150 0
sum: 0 0 0
0
050 0
sum: 0 0 0
0
0
0
0150 0
sum: 0 0 0
0
0100 0
sum: 0 0 0
100
100
1150 points 0 0 0Total points and hours:
Mathematic B MA 1202
English B EN 1202
Ceramic tilesHUS 1216100 poäng
Workingcard - CarpenterName: Group:
Structural timber andconcreteHUS 1206200 p
Practical elements
Profile courses:
Branch courses:
CladdingHUS 1203150 p
Reinforcement AHUS 1201100 p
Building insulationHUS 120550 p
ShutteringHUS 1207100 p
Joinery and interior f ittingsHUS 1213100 p
Main structureHUS 1214150 p
Repairs and conversionHUS 1211150 p
Individual choice:
ScaffoldingHUS 121550 p
Workingcard
Carpenter
![Page 7: Construction Programme Team Six Building teachers Two Swedish and English teachers One Mathematic teatcher Satellite teachers One teacher is responsible.](https://reader034.fdocuments.net/reader034/viewer/2022051819/551656da550346b2068b5b25/html5/thumbnails/7.jpg)
BYNThe Swedish Construction
Industri Training Board
EmployerEmployees
RYKRYK
The Regional Construction Industri Vocational Training
Committees
RYK
School SchoolAranäsgymnasiet
![Page 8: Construction Programme Team Six Building teachers Two Swedish and English teachers One Mathematic teatcher Satellite teachers One teacher is responsible.](https://reader034.fdocuments.net/reader034/viewer/2022051819/551656da550346b2068b5b25/html5/thumbnails/8.jpg)
The steps towards the professional titel
• Upper secondary school Buildings and Construction program 3 years. 2500 hours.
• 300 hours from RYK• Including work on
holidays.• Maximum 3400 hours
• Employment• Apply Apprenticebook
from RYK• Apprenticeship• 6800 hours• Theoretical test• Certificate
![Page 9: Construction Programme Team Six Building teachers Two Swedish and English teachers One Mathematic teatcher Satellite teachers One teacher is responsible.](https://reader034.fdocuments.net/reader034/viewer/2022051819/551656da550346b2068b5b25/html5/thumbnails/9.jpg)
The workingplace training on constructions sites (APU)
• Contract/agreement
• Responsbility of the student
• Proper taskes
• Monitored by a tutor
• 4 weeks period of practice, 4 weeks in school
![Page 10: Construction Programme Team Six Building teachers Two Swedish and English teachers One Mathematic teatcher Satellite teachers One teacher is responsible.](https://reader034.fdocuments.net/reader034/viewer/2022051819/551656da550346b2068b5b25/html5/thumbnails/10.jpg)
The workingplace training on constructions sites
• 20 kronor/hour (2 euro) 10 kronor foodcompensation, 10 kronor clothes and tools.
• Insurrance
• Hours of work
• Work environment
• Knowledge about machinery
![Page 11: Construction Programme Team Six Building teachers Two Swedish and English teachers One Mathematic teatcher Satellite teachers One teacher is responsible.](https://reader034.fdocuments.net/reader034/viewer/2022051819/551656da550346b2068b5b25/html5/thumbnails/11.jpg)
The workingplace training on constructions sites
(APU)
• The third year is on construction site.
• The third year is in school
• The second year is in school.
• The second year is on construction site.
![Page 12: Construction Programme Team Six Building teachers Two Swedish and English teachers One Mathematic teatcher Satellite teachers One teacher is responsible.](https://reader034.fdocuments.net/reader034/viewer/2022051819/551656da550346b2068b5b25/html5/thumbnails/12.jpg)
How can we find good companies to collaborate with?
BYNn´RYK-system
Aranäs-gymnasiet
Employees
Full-timeemployee
StudentConstructioncompanies
Confidence Flexibility Understanding
We know what it´s like to run a construction companyAnd we speak the same language.
![Page 13: Construction Programme Team Six Building teachers Two Swedish and English teachers One Mathematic teatcher Satellite teachers One teacher is responsible.](https://reader034.fdocuments.net/reader034/viewer/2022051819/551656da550346b2068b5b25/html5/thumbnails/13.jpg)
Thank You for Your timeand Good Luck