CONSTRUCTION PROGRESS – WEEK OF AUGUST 13, 2007
BLOCK 274 – IN BACKGROUND WITH CONVENTION CENTER CONTEXT. HOUSE OF BLUES 3RD LEVEL SLAB HAS BEENBLOCK 274 IN BACKGROUND WITH CONVENTION CENTER CONTEXT. HOUSE OF BLUES 3 LEVEL SLAB HAS BEEN POURED.
PAGE 1
CONSTRUCTION PROGRESS – WEEK OF AUGUST 13, 2007
BLOCK 273 ‐ OFFICE TOWER 2ND LEVEL CONCRETE SLAB IN FOREGROUND. FRAMING FOR 3RD LEVEL OF THE TOWERBLOCK 273 OFFICE TOWER 2 LEVEL CONCRETE SLAB IN FOREGROUND. FRAMING FOR 3 LEVEL OF THE TOWER HAS BEGUN.
PAGE 2
CONSTRUCTION PROGRESS – WEEK OF AUGUST 13, 2007
BLOCK 272 – CONCRETE SLAB ON GRADE FOR 272 SOUTH HAS BEEN POURED.BLOCK 272 CONCRETE SLAB ON GRADE FOR 272 SOUTH HAS BEEN POURED.
PAGE 3
CONSTRUCTION PROGRESS – WEEK OF AUGUST 13, 2007
HOUSTON PAVILIONS PROJECT – ALL BLOCKSHOUSTON PAVILIONS PROJECT ALL BLOCKS
PAGE 4
CONSTRUCTION PROGRESS – WEEK OF AUGUST 13, 2007
HOUSTON PAVILIONS PROJECT – ALL BLOCKSHOUSTON PAVILIONS PROJECT ALL BLOCKS
PAGE 5